GRV-H2

Installation & General Inspection


Date
Huawei Representative
TNL Representative
Site ID-GIS Code
Site Type (Shelter (Indoor/ Outdoor,Nano),
Civil, Mobility Shared)
Site Type (AC/Non-AC)
Site on SDH,CEN
(ALU,Cisco,Hauwei,ZTE),MW,SDH L2 POI

Details
5/10/16
Zaid
Ravinder Thapa
GRV
CIVIL
AC
CEN-ALU
H2
Huawei MA5600T
0/9/0 & 0/10/0

Node Name
Vendor & Model
MSAN Uplink Port Details
MSAN Uplink Connectivity Type (Ethernet/
Fiber)
Software
Source A in VDc
Source B in VDc
Earthing Value in Ohm
Amps Rating of MCB's

MA5600V800R016C00
-53.7
-53.6
1.05
63A

Sr No

Item

Slot

Serial Numbers

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

H801CITD
H80DCCPE
H80DCCPE
H80DCCPE
H80DCCPE
H80DCCPE
H80DCCPE
H808ASPB
H806VPGA
H802SCUN
H802SCUN
H806VPGA
H808ASPB
H80DCCPE
H80DCCPE
H80DCCPE
H80DCCPE
H80DCCPE
H80DCCPE

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

020LKLD0G3000610
023ANU10FC005140
023ANU10FC005214
023ANU10FC005114
023ANU10FC004165
023ANU10FC005208
023ANU10FC005159
020STCDMF9602022
022PRY10FA001168
021VDEDMFA602113
021VDE10FA004673
022PRY10FA001164
020STCDMF9602099
023ANU10FC004078
023ANU10FC005163
023ANU10FC004232
023ANU10FC004188
023ANU10FC005095
023ANU10FC005111

Description

Status

Remarks

19

Proper Installation/Mounting of Rack

OK

Applicable for NEW RACk


only

20

Proper Installation/Mounting of
MSAN Shelf

OK

21

Sufficient Space for Air Circulation

OK

Fiber

Criteria
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W
H/W

installed shall be verified from NOC thru EMS


installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS
installed shall be verified from NOC thru EMS

Pass/Fail
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass

Physical Verification

22
23
24
25
26
27

No Physical Damage to MSAN


Shelf/Cards
No Physical Damage to MSAN
Cards
Proper laying of Power Cables
Terminating of power cables to Dual
Power Supply
Earth Cable is properly Grounded
Proper Laying of Fiber/ Ethernet
Cables

Pass/Fail
exiting rack

Pass
Pass

Applicable for New Rack


only and if Space avialbale

Air-flow from bottom to TOP for MA5600T and from


Left to right for MA5603T

Pass

OK

Pass

OK

Pass

OK

Pass

OK

Cabinet to DCDB only

Pass

OK

Pass

OK

Pass

28

Proper Laying of Subscribers Cables

OK

Pass

29

All Cards are screw tight


Check the Labelling of Shelf, Power
Cables, Grounding Cables & Uplink
Connectivity Cables
All Alarms LEDs/ Lamps are in
healthy condition.
Unused Slots are close with Blank
pannel

OK

Pass

OK

Pass

30
31
32

OK

Should be Green

OK

Pass
Pass

Optical Power Level of Uplinking


Fiber Patch Cord

Uplink Port

Tx (db)

Rx(db)

Limit (db)

Pass/Fail

33

0/9/0

1/1/11

-6.110112

-6.187043

should be greater than -19

Pass

34

0/10/0

1/1/12

-5.800442

-5.412111

should be greater than -19

Pass

Mohd Zaid
Huawei Representative Signature

Ravinder Thapa
TNL Field Representative Signature