1.3. Filling in plinth with sand under floors, including watering, running, ramming,
Consolidating and dressing complete.
(continue as above for items 2 to 12)
.
FORM No. 2
Details of Measurements.
Name of Work:
Quantities have been worked out for the approved plan.
Details of work No. Measurement Quantities
L B H
1. Earth work in
excavation in
foundation
trenches in
ordinary soli
2. Filling available
excavated earth in
plinth sides of
foundations, etc,
3 Providing and
laying cement
concrete 1: 5: 10
4 Providing and
laying 38 mm
thick long wall
5 Applying a coat
of residual
petroleum
bitumen 80/100
6 2nd class brick
work in cement
mortar 1:6 in
foundation and
plinth
7 2nd class brick
work in
superstructure in
CM 1:6 up to
floor 2 level
8 RCC1:2:4 in
suspended floors
roof landings
balconies up to
floor 2 level
9 RCC 1:2:4 in
Chajjas up to
floor 2nd level
1 RCC 1:2:4 up to
0 floor 2 level in
lintels’ beams,
etc,
1 Centering,
1 shuttering,
suspended floors
landings,
balconies, etc
1 Mild steel
2 reinforcement for
RCC work
1 Cement concrete
3 Flooring 1:2:4 40
mm thick
1 Providing wood
4 work in frames of
doors, etc.,
1 Providing and
5 fixing 38 mm
thick paneled
glazed shutters of
doors, windows
1 10cm (thick) mud
6 phaska of
clamped brick
arch and converd
with flat tile
bricks
1 12 mm cement
7 plaster 1:6 or any
other mix
1 White washing
8 with lime of new
work
1 Applying priming
9 coat with ready
mixed primer of
approved brand
2 Painting two or
0 more coats
2 Providing and
1 fixing steel
compound gate
Note :- Details like long wall, cross wall, doors, windows etc, ( not printed).