Vous êtes sur la page 1sur 6

hr questions list?

About Deloitte: A member if DTTL (Deloitte Touche Tomatsu Limited), DLL in US. 225000
people, 150 countries, 36.8 billion dollar revenue.
All firms work in accordance with national laws, regulations, customary practices and other
factors. In India, at Hyderabad, Delhi, Mumbai and Banglore.
They assist in tax, financial advisory, risk management, audit and consultancy services.
Examples are solving, complex problems, achieve a target or making meaningful progress.

Outsourcing: It involves the contracting out of a business process (e.g. payroll processing,
claims processing) and operational, and/or non-core functions (e.g. manufacturing, facility
management, call center support) to another party(see also business process outsourcing).
Management consulting is the practice of helping organizations to improve
their performance, operating primarily through the analysis of existing organizational
problems and the development of plans for improvement. Organizations may draw upon the
services of management consultants for a number of reasons, including gaining external
(and presumably objective) advice and access to the consultants' specialized expertise
What an IT consultant does:
My strengths: Deadline orientated, punctuality, rule abided, prioritize things, make a
balance of all things ability to work on multiple assignments.
Deloitte team in Reliance JIO used to design business process, implementation of specific
well defined features,
Go-to-market strategy (GTM strategy): is an action plan that specifies how a company
will reach customers and achieve competitive advantage. The purpose of a GTM strategy is
to provide a blueprint for delivering a product or service to the end customer, taking into
account such factors as pricing and distribution. . A GTM strategy is somewhat similar to
a business plan, although the latter is broader in scope and considers such factors as
funding.
Dielectric Material: A dielectric material is a substance that is a poor

conductor of electricity, but an efficient supporter of electrostatic


field s. If the flow of current between opposite electric charge poles
is kept to a minimum while the electrostatic lines of flux are not

impeded or interrupted, an electrostatic field can store energy. This


property is useful in capacitor s, especially at radio frequencies.
Dielectric materials are also used in the construction of radiofrequency transmission lines.
Electrostatic Field: When two objects in each other's vicinity have
different electrical charges, an electrostatic field exists between
them. An electrostatic field also forms around any single object that
is electrically charged with respect to its environment. An object is
negatively charged (-) if it has an excess of electrons relative to its
surroundings. An object is positively charged (+) if it is deficient in
electrons with respect to its surroundings.
RF Frequency: antenna resonant point or centre operating
frequency and the antenna bandwidth or the frequency range over
which the antenna design can operate. These two factors are
naturally very important features of any antenna design .
Business Process: A business process has also been defined as a
set of activities and tasks that, once completed, will deliver a
product or service to a client.
RFP: A request for proposal (RFP) is a document that an
organization posts to elicit bids from potential vendors for a desired
IT solution. The RFP specifies what the customer is looking for and
establishes evaluation criteria for assessing proposals.
BRS and SRS:

BRS
They outline what the software must do

SRS
They outline how the software will be created

They outline the software from the end-user , business and


stakeholder perspective.

They outline the software from the technical team


perspective.

Examples of operational effieicncies:


1. Instead of secured SSH protocol, some devices allows log-in via
Telnet which is less secured because the data transferred is
plain text and hence can be easily tempered with while in SSH
data is secured due to encryption (a key generally of 256
characters is sent from one which is transmitting to the one
where log-in is being done).
2. Instead of keeping backup files which are recent, Samsung
system was accepting old files which might not work after any
patch upgradation or patch installation and hence may result in
system and hence system failure.

3. Make the assignment group mandatory.


4. Need to add the requested start and should be raised 24 before
the current sysdate and it should have the validation
5. Risk and impact analysis should be done by shifthead and not by
requestor
6. Autopopulate of Schedule implemenation start/end from
Expected start/end date

7. Notification needs to be send to user on completion of task.


8. When CR is raised on NE it should autopopulate that CR is already
raised for given NE
9. Give attachment option besides the implemetation date
10.
When we reject the CR in validation phase it need to have
rejection reason dropdown list
11.
In validation phase based on rejection code take the change
to specific phase
12.
Add title,executor name,date and time,requestor
name,NE,SA/NSA in Approval list screen
13.

In approval list it should display the name of all the approver

14.
Make sure that actual implentation start/end date should be
be between shedule start and end date.
15.
Notication to be send to Executor,Executor manager,IM on
breaching 75%SLA
16.

NOC to deciede when to send the mail to user

17.
Allow CM to change the datefield in validation phase if
executor requests for extension of time
18.
Feasibilty to check if its after 10 pm only shifthead can do
cab approval

19.

On 100% breach of CR SLA it should raise IM

Requirement

Based on priority (Root Cause Target Date,


Resolution Target Date) should be populated in date
field
Rearrage "resolution target date" and "Root cause
target date field"

The drop options should be organised as index


option while selecting from the main list

When user login for approval his name should auto


populate in "Approval by" field

Only L2 group person can be an approver

Remark
Ops team to
provide the time for
the SLA(ie.
75%,100%)

Minor change
Enhancement
request.(Available
in next drop after
R2)

Minor change
OPS to define the
role and profile for
the approval
Solution expected
date will be visible
only in required
form
Only PM can go to
any phase for all
other profile
previous phase will
be disbaled
Minor change
Major
customization.
(Available in next
drop after R2)

Hide Solution expected date

For all user except the manager the backup button is


disabled
Autopopulate approver name in know error form

Drop down list should display only those value which


are relevant to that phase
"Post knowledge" should be available after problem
closure
In case if workaround solution or Solution while
deploying fails the system should allow the PR to roll
back to the RCA investigation stage to allow
flexibility to PR manager to initiate thru changes in
same PR rather then start with New PR.

Minor change
By default PM can
go to any
phase.The
implemetation for
notification as part
of WFM is in
progress

When peer login there should be dashboard to


display the ticket status

Error and Categorisation step should be merged with


the previous step rather than 2 steps.

20.
Site Container Shelf Slot Card Port Cable.

Todo list will have


the task status and
SMS and Email
notification will be
available and
daskboard will be
implemented and
will shown to user
Work Flow
customization((Avail
able in next drop
after R2)

Vous aimerez peut-être aussi