PROJECT
CONSTRUCTION ENGINEERING I
CONSTRUCTION OF MONOLITHIC REINFORCED CONCRETE IN
MULTI-STOREY BUILDING
Content: Design construction method of monolithic reinforced concrete
in multi-storey building
Lecturer:
Student:
Class:
Id Number
DATA
19
Number of storeys
Number of spans
[] Wood (kG/cm2)
Wood (kG/m3)
Season
b (m)
Roof
Dm
m (cm)
8
21
90
600
Winter
12
2.2
2.4
2.2
40
3.3
5.8
4.0
4.5
3.4
3.4
30/45
30/40
30/35
30/30
30/50
30/45
30/40
30/35
15
25/40
25/60
25/35
20/30
20/60
15
Reinf.
ratio
1.0
Foudatio
n
A
B
C
A (m)
t (cm)
B (m)
1
2
L (m)
H1 (m)
Ht (m)
Hm (m)
F.1; F.2
F.3; F.4
F.5; F.6
F.7; F.8
F.1; F.2
F.3; F.4
F.5; F.6
F.7; F.8
C1 (d/h1)
Body
Column
C2 (d/h2)
s (cm)
D1g
D1b
D1
Beam D (cm)
D2
D3
19
CALCULATION
I. DRAWINGS (enclosed):
II. PRELIMINARY DATA:
1. Preliminary concrete volume, steel mass and form work area:
Element
Length (m)
C1
Colum
n
C2
D1
Beam
D
m
Slab
F[1;2
]
F[3;4
]
F[5;6
]
F[7;8
]
F[1;2
]
F[3;4
]
F[5;6
]
F[7;8
]
D1b
D1g
D2
D3
Dmb
Dmg
S1
S2
CONCRETE VOLUME
Volume
Size
per
element
Width
Height
(m3)
(m)
(m)
Quantit
y
Volume
(m3)
4.50
0.30
0.45
0.61
88.00
53.46
3.40
0.30
0.40
0.41
88.00
35.90
3.40
0.30
0.35
0.36
88.00
31.42
3.40
0.30
0.30
0.31
88.00
26.93
4.50
0.30
0.50
0.68
132.00
89.10
3.40
0.30
0.45
0.46
132.00
60.59
3.40
0.30
0.40
0.41
132.00
53.86
3.40
0.30
0.35
0.36
132.00
47.12
5.80
4.00
3.30
3.30
5.80
4.00
5.80
4.00
0.25
0.25
0.25
0.20
0.25
0.25
3.30
3.30
0.60
0.40
0.35
0.30
0.60
0.60
0.15
0.15
0.87
0.40
0.29
0.20
0.87
0.60
2.87
1.98
308.00
308.00
735.00
588.00
44.00
44.00
336.00
336.00
267.96
123.20
212.23
116.42
38.28
26.40
964.66
665.28
19
Total
(m3)
2812.81
STEEL MASS
Element
C1
Column
C2
D1
Beam
D
m
Slab
F[1;2]
F[3;4]
F[5;6]
F[7;8]
F[1;2]
F[3;4]
F[5;6]
F[7;8]
D1b
D1g
D2
D3
Dmb
Dmg
S1
S2
Volumn
(m3)
Reinf.
ratio (%)
Steel
Unit Weight
(Kg/m3)
Steel Mass
(Kg)
Total
(Kg)
53.46
35.90
31.42
26.93
89.10
60.59
53.86
47.12
267.96
123.20
212.23
116.42
38.28
26.40
964.66
665.28
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
4196.61
2818.46
2466.16
2113.85
6994.35
4756.16
4227.70
3699.23
21034.86
9671.20
16660.15
9139.28
3004.98
2072.40
75725.50
52224.48
220805.37
FORMWORK AREA
Size
Element
Colum
n
C1
C2
F[1;2
]
F[3;4
]
F[5;6
]
F[7;8
]
F[1;2
]
F[3;4
]
F[5;6
Area
(m2)
Number
of
Element
s
Area of
Formwor
k (m2)
Total
(m2)
37539.0
8
Length
(m)
Width
(m)
Height
(m)
4.50
0.30
0.45
6.75
88.00
594.00
3.40
0.30
0.40
4.76
88.00
418.88
3.40
0.30
0.35
4.42
88.00
388.96
3.40
0.30
0.30
4.08
88.00
359.04
4.50
0.30
0.50
7.20
132.00
950.40
3.40
0.30
0.45
5.10
132.00
673.20
3.40
0.30
0.40
4.76
132.00
628.32
19
Beam
Slab
]
F[7;8
]
D1b
D1
D1g
D2
D3
Dmb
D
m Dmg
S1
S2
3.40
0.30
0.35
4.42
132.00
583.44
5.80
4.00
3.30
3.30
5.80
4.00
5.80
4.00
0.25
0.25
0.25
0.20
0.25
0.25
3.30
3.30
0.60
0.40
0.35
0.30
0.60
0.60
0.15
0.15
9.86
5.20
3.96
3.30
9.86
6.80
40.02
27.60
308.00
308.00
735.00
588.00
44.00
44.00
336.00
336.00
3036.88
1601.60
2910.60
1940.40
433.84
299.20
13446.72
9273.60
19
MC 1-1
1- Concrete slab;
2- Boards;
3- Stud;
4 Stringer;
Select a typical slab to calculate the formwork: L1=5.8 (m), B=3.3 (m) (axis A-B;1-2).
Calculate on a strip with width 1(m). (perpendicular to the stringers direction).
Calculating diagram is a continuous beam with stringers acting as supports.
19
b b
100 33
225(cm 4 )
12
12
3
I sl .board
b b
100 32
150(cm3 )
6
6
2
Wsl .board
19
M
Wsl .board
[ ]w
q tt .l12 1328.94.l12
132.89l12
10
10
Legend:
q tc l2 4
404.78l2 4
f
1.28 103 l2 4
9
8
128.EI 128 1.1 10 225 10
1
L
400
Lstringer B bmain beam 2 s.board 2 0.15 3.3 0.25 2 0.03 2 0.15 2.69(m)
Number of stringers per a typical slab
19
str in g er
str in g er
bstringer l
The distance between loads applied on each stringer:
19
stringer
1(m)
str in g er
sl a b sho r e
19
1,15.10 5 ( m 4 )
12
12
Wstringer
b h 2 0.08 0.12 2
1,92.104 (m3 )
6
6
Loads:
Load from slab formwork:
q1tt q tt bstringer 1328.94 1 1328.94( kg / m)
Self-weight of stringer:
q2tt n g Fxg 1.1 600 0.08 0.12 6.34( kg / m)
[ ]w
W
10 Ws.board
10 90 10 4 1.92 10 4
1.14( m)
tt
qstringer
1335.28
l1
Deformity condition
f f
19
l2
2.34(m)
tc
400qstringer
400 410.54
lshore 1(m)
Select
Geometric properties:
3
b h
0.1 0.13
I c c
8.33 106 ( m4 )
12
12
0.029(m)
Ac
0.01
rc
Slenderness:
Hc
4.1
3100
3100
141.38 75 2
0.16
rc
0.029
141.382
q ttstringer lshore
1335.28 1
834550(kg / m 2 ) 90 104 ( kg / m 2 )
0.16 0.01
2. Beam formwork:
19
6
7
3
4
11
10
b 4(cm)
Thickness of bottom board:
s 3(cm)
Thickness of side board:
Calculating bottom board:
Loads:
o Self-weight of bottom board (q1), (n1=1.1)
q1tc g Fd
Legend:
g 600(kg / m3 )
g
- Unit weight of wood,
Fd
- Cross-section area of bottom board
g1tc 600 (0.04 0.25)=6(kg / m)
19
b b
25 43
133.3(cm 4 )
12
12
3
I b.board
b b
25 42
66.7(cm3 )
6
6
2
Wb.board
o T-shore distance::
Strength condition:
19
l1
10 Wb.board
q
tt
10 90 66.7
93.8(cm)
6.821
Deformity condition:
128 EI b.board 3 128 110000 133.3
l2 3
106.1(cm)
400q tc
400 3.928
l 70(cm)
Select T-shore distance:
Calculating side board:
Design height of side board:
Loads:
o Horizontal load of concrete motar:
g1tc conc hbeam hs.board 2500 0.6 0.42 630(kg / m)
I s.board
b b
42 33
94.5(cm4 )
12
12
Ws.board
b b
42 32
63(cm3 )
6
6
T-shore distance:
Strength condition:
19
l1
10 Ws.board
q
tt
10 90 63
73.9(cm)
10.374
Deformity condition:
128 EI s.board 3 128 110000 94.5
l2 3
80.8(cm)
400q tc
400 6.3
l 70(cm)
Select T-shore distance:
404.78 1 0.2
40.48( kg )
2
p2 3.928 70 274.96( kg )
N1
10.374 70
726.18(kg )
2 cos(60)
19
N2
6.3 70
441(kg )
2 cos(60)
E 110000(kg / c m2 )
Geometric properties:
3
b h
12 123
I c c
1728(cm 4 )
12
12
Ac bc hc 12 12 144(cm 2 )
rc
Ic
1728.3
3.46(cm)
Ac
144
H c 376
3100
3100
108.67 75 2
0.26
rc 3.46
108.67 2
Vtt
1868.14
49.90(kg / c m 2 ) 90(kg / c m2 )
A 0.26 144
19
0.05(cm)
128 EI b.board 128 110000 133.3
Ldc
0.58(cm)
1000
b 4(cm)
Thickness of bottom board:
s 3(cm)
Thickness of side board:
Calculating bottom board:
Loads:
o Self-weight of bottom board (q1), (n1=1.1)
q1tc g Fd
Legend:
g 600(kg / m3 )
g
- Unit weight of wood,
Fd
- Cross-section area of bottom board
g1tc 600 (0.04 0.25)=6(kg / m)
19
I b.board
b b
25 43
133.3(cm 4 )
12
12
Wb.board
b b
25 42
66.7(cm3 )
6
6
o T-shore distance:
Strength condition:
10 Wb.board
10 90 66.7
l1
106.7(cm)
tt
q
5.274
Deformity condition:
128 EI b.board 3 128 110000 133.3
l2 3
121.2(cm)
400q tc
400 2.639
l 80(cm)
Select T-shore distance:
Calculating side board:
Design height of side board:
19
Loads:
o Horizontal load of concrete motar:
g1tc conc hbeam hs.board 2500 0.4 0.22 220( kg / m)
I s.board
b b
22 33
49.5(cm 4 )
12
12
Ws.board
b b
22 32
33(cm3 )
6
6
T-shore distance:
Strength condition:
10 Ws.board
10 90 33
l1
86.1(cm)
tt
q
4.004
Deformity condition:
128 EI s.board 3 128 110000 49.5
l2 3
92.5(cm)
400q tc
400 2.20
l 80(cm)
19
S1
1328.94 1 0.2
132.89( kg )
2
S2
404.78 1 0.2
40.48( kg )
2
p2 2.639 80 211.1(kg )
N1
4.004 80
320.32( kg )
2 cos(60)
N2
2.20 80
176( kg )
2 cos(60)
E 110000(kg / c m2 )
Geometric properties:
3
bc hc
10 103
I
833.33(cm 4 )
12
12
Ac bc hc 10 10 100(cm 2 )
rc
Ic
833.33
2.89(cm)
Ac
100
19
Slenderness:
H c 396
3100
3100
137.02 75 2
0.17
rc
2.89
137.02 2
Vtt
1109.62
65.27( kg / c m 2 ) 90(kg / c m2 )
A 0.17 100
0.058(cm)
128 EI b.board 128 110000 133.3
b 4(cm)
Thickness of bottom board:
s 3(cm)
Thickness of side board:
Calculating bottom board:
Loads:
o Self-weight of bottom board (q1), (n1=1.1)
q1tc g Fd
Legend:
19
Ldc
0.58(cm)
1000
g 600(kg / m3 )
g
- Unit weight of wood,
Fd
- Cross-section area of bottom board
g1tc 600 (0.04 0.25)=6(kg / m)
b b
25 43
133.3(cm 4 )
12
12
3
I b.board
19
b b
25 42
66.7(cm3 )
6
6
2
Wb.board
o T-shore distance:
Strength condition:
10 Wb.board
10 90 66.7
l1
110.8(cm)
tt
q
4.888
Deformity condition:
128 EI b.board 3 128 110000 133.3
l2 3
126.5(cm)
400q tc
400 2.317
l 90(cm)
Select T-shore distance:
Calculating side board:
Design height of side board:
Loads:
o Horizontal load of concrete motar:
g1tc conc hbeam hs .board 2500 0.35 0.17 148.8( kg / m)
b b
17 33
38.3(cm 4 )
12
12
3
I s.board
19
b b
17 32
25.5(cm3 )
6
6
2
Ws.board
o
T-shore distance:
Strength condition:
10 Ws.board
10 90 25.5
l1
90.2(cm)
tt
q
2.818
Deformity condition:
128 EI s.board 3 128 110000 38.3
l2 3
96.8(cm)
400q tc
400 1.488
l 90(cm)
19
p2 2.317 90 208.53( kg )
N1
2.818 90
253.62( kg )
2 cos(60)
N2
1.488 90
133.92(kg )
2 cos(60)
E 110000(kg / c m2 )
Geometric properties:
3
b h
10 103
I c c
833.33(cm 4 )
12
12
Ac bc hc 10 10 100(cm 2 )
rc
Ic
833.33
2.89(cm)
Ac
100
H c 401
3100
3100
138.75 75 2
0.16
rc
2.89
138.752
19
Vtt
1076.55
67.28(kg / c m 2 ) 90( kg / c m 2 )
A 0.16 100
0.081(cm)
128 EI b.board 128 110000 133.3
b 4(cm)
Thickness of bottom board:
s 3(cm)
Thickness of side board:
Calculating bottom board:
Loads:
o Self-weight of bottom board (q1), (n1=1.1)
q1tc g Fd
Legend:
g 600(kg / m3 )
g
- Unit weight of wood,
Fd
- Cross-section area of bottom board
g1tc 600 (0.04 0.2)=4.8(kg / m)
19
Ldc
0.58(cm)
1000
b b
20 43
106.7(cm 4 )
12
12
3
I b.board
b b
20 42
53.3(cm3 )
6
6
2
Wb.board
o T-shore distance::
Strength condition:
19
l1
10 Wb.board
q
tt
10 90 53.3
115.4(cm)
3.599
Deformity condition:
128 EI b.board 3 128 110000 106.7
l2 3
133.0(cm)
400q tc
400 1.595
l 90(cm)
Select Distance between T-shores s to support bottom board:
Calculating side board:
Design height of side board:
Loads:
o Horizontal load of concrete motar:
g1tc conc hbeam hs .board 2500 0.3 0.12 90( kg / m)
I s.board
b b
12 33
27(cm 4 )
12
12
Ws.board
b b
12 32
18(cm3 )
6
6
T-shore distance:
Strength condition:
19
l1
10 Ws.board
q
tt
10 90 18
95.0(cm)
1.794
Deformity condition:
128 EI s.board 3 128 110000 27
l2 3
101.8(cm)
400q tc
400 0.9
l 90(cm)
Select T-shore distance:
T-shore for beam D3:
Vertical load from slab:
1328.94 0.9 0.33
S1
197.35(kg )
2
S2
p2 1.595 90 143.55( kg )
N1
1.794 90
161.46(kg )
2 cos(60)
N2
0.9 90
81(kg )
2 cos(60)
19
2
600(kg / m3 ) 90(kg / c m )
Select T-shore: bcxhc=10x10(cm),
,
,
E 110000(kg / c m 2 )
Geometric properties:
3
bc hc
10 103
I
833.33(cm 4 )
12
12
Ac bc hc 10 10 100(cm 2 )
rc
Ic
833.33
2.89(cm)
Ac
100
H c 406
3100
3100
140.48 75 2
0.16
rc
2.89
140.482
Vtt
800.92
50.06( kg / c m 2 ) 90( kg / c m 2 )
A 0.16 100
0.07(cm)
128 EI b.board 128 110000 106.7
19
Ldc
0.58(cm)
1000
C -c
10
1
c
2
1
5
4
1 Side boards;
2 Studs, yokes;
3 Clams;
4 Positioning frames ;
5 Washout opening;
6 Props;
7 Turn buckles;
8 Steel hooks;
9 Wooden bars;
10 Bolts;
Select the biggest column to design column formwork and use these parameters for the
others.
Calculating the formwork for column C2 of the first floor: dxh = 22x50 (cm)
Calculating diagram: continuous beam with clamp acting as supports:
19
q1tc conc H
Legend:
conc
conc 2500(kg / m3 )
- self-weight of newly formed concrete,
H=75 (cm)
q 2tc =400(kg/m 2 )
, reliability coefficient n = 1.3
q2tt 1.3 400 520 (kg / m 2 )
Total load for checking Strength condition of column formwork (applied on larger side
h=50(cm)):
b b
50 33
I
112.5(cm 4 ) 1.125 10 6 ( m4 )
12
12
3
b b
50 32
W
75(cm3 ) 7.5 10 5 ( m3 )
6
6
2
10 W
q tt
10 90 104 7.5 10 5
0.68(m)
1478.75
19
Deformity condition:
l2
0.75( m)
400q tc
400 937.5
Componen
t
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
Dimension(m)
l
b
h
[3]
[4]
[5]
4.30 0.30 0.45
0
0
0
4.30 0.30 0.50
0
0
0
4.50 0.30 0.50
0
0
0
6.02 0.25 0.60
5
0
0
4.00 0.25 0.40
0
0
0
3.00 0.25 0.35
0
0
0
3.07 0.20 0.30
5
0
0
3.07 2.72 0.15
5
5
0
3.07 1.77 0.15
5
5
0
2.80 0.30 0.45
0
0
0
2.80 0.30 0.50
0
0
0
3.00 0.30 0.50
0
0
0
6.02 0.25 0.60
5
0
0
4.00 0.25 0.40
0
0
0
3.00 0.25 0.35
0
0
0
3.07 0.20 0.30
5
0
0
V0(m
)
[6]
Quantity
V(m)
[7]
[8]
0.58
46.00
26.70
0.65
46.00
29.67
0.68
23.00
15.53
0.90
46.00
41.57
0.40
46.00
18.40
0.26
105.00
27.56
0.18
84.00
15.50
1.26
84.00
105.5
8
0.82
84.00
68.77
0.38
46.00
17.39
0.42
46.00
19.32
0.45
23.00
10.35
0.90
46.00
41.57
0.40
46.00
18.40
0.26
105.00
27.56
0.18
84.00
15.50
19
Total
(m)
[9]
[10]
71.90
349.2
8
277.3
9
324.4
4
47.06
277.3
9
S1
S2
C1
C2
C3
D1b
3,4
D1g
D2
D3
S1
S2
3.07
5
3.07
5
2.80
0
2.80
0
3.00
0
6.02
5
4.00
0
3.00
0
3.07
5
3.07
5
3.07
5
2.72
5
1.77
5
0.30
0
0.30
0
0.30
0
0.25
0
0.25
0
0.25
0
0.20
0
2.72
5
1.77
5
0.15
0
0.15
0
0.40
0
0.45
0
0.45
0
0.60
0
0.40
0
0.35
0
0.30
0
0.15
0
0.15
0
1.26
84.00
105.5
8
0.82
84.00
68.77
0.34
92.00
30.91
0.38
92.00
34.78
0.41
46.00
18.63
0.90
92.00
83.15
0.40
92.00
36.80
0.26
210.00
55.13
0.18
168.00
31.00
1.26
168.00
0.82
168.00
84.32
639.0
9
554.7
7
211.1
6
137.5
4
Componen
t
C1
C2
C3
D1b
D1g
D2
D3
S1
Dimension(m)
l
b
h
2.80 0.30 0.35
0
0
0
2.80 0.30 0.40
0
0
0
3.00 0.30 0.40
0
0
0
6.02 0.25 0.60
5
0
0
4.00 0.25 0.40
0
0
0
3.00 0.25 0.35
0
0
0
3.07 0.20 0.30
5
0
0
3.07 2.72 0.15
V0(m
)
Quantity
V(m)
0.29
92.00
27.05
0.34
92.00
30.91
0.36
46.00
16.56
0.90
92.00
83.15
0.40
92.00
36.80
0.26
210.00
55.13
0.18
168.00
31.00
1.26
168.00
211.1
19
Total
(m)
629.2
9
74.52
554.7
7
S2
C1
C2
C3
D1b
7
D1g
D2
D3
S1
S2
C1
C2
C3
DMb
DMg
D2
D3
S1
S2
5
3.07
5
2.80
0
2.80
0
3.00
0
6.02
5
4.00
0
3.00
0
3.07
5
3.07
5
3.07
5
2.80
0
2.80
0
2.80
0
6.02
5
4.00
0
3.00
0
3.07
5
3.07
5
3.07
5
5
1.77
5
0.30
0
0.30
0
0.30
0
0.25
0
0.25
0
0.25
0
0.20
0
2.72
5
1.77
5
0.30
0
0.30
0
0.30
0
0.25
0
0.25
0
0.25
0
0.20
0
2.72
5
1.77
5
0
0.15
0
0.30
0
0.35
0
0.35
0
0.60
0
0.40
0
0.35
0
0.30
0
0.15
0
0.15
0
0.30
0
0.35
0
0.35
0
0.60
0
0.60
0
0.35
0
0.30
0
0.15
0
0.15
0
0.82
168.00
0.25
46.00
11.59
0.29
46.00
13.52
0.32
23.00
7.25
0.90
46.00
41.57
0.40
46.00
18.40
0.26
105.00
27.56
0.18
84.00
15.50
1.26
84.00
105.5
8
0.82
84.00
68.77
0.25
46.00
11.59
0.29
46.00
13.52
0.29
23.00
6.76
0.90
46.00
41.57
0.60
46.00
27.60
0.26
105.00
27.56
0.18
84.00
15.50
1.26
84.00
105.5
8
0.82
84.00
68.77
19
32.36
309.7
5
277.3
9
31.88
318.4
6
286.5
9
3,4
5,6
Componen
t
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
V(m)
[3]
26.70
29.67
15.53
41.57
18.40
27.56
15.50
105.58
68.77
17.39
19.32
10.35
41.57
18.40
27.56
15.50
105.58
68.77
30.91
34.78
18.63
83.15
36.80
55.13
31.00
211.16
137.54
27.05
30.91
16.56
83.15
36.80
55.13
31.00
211.16
137.54
Quota
(h/m)
[4]
11.80
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00
11.80
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00
11.80
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00
11.80
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00
Man-hour
(h)
[5]
315.10
350.11
183.20
291.01
128.80
192.94
123.98
527.90
343.86
205.18
227.98
122.13
291.01
128.80
192.94
123.98
527.90
343.86
364.76
410.36
219.83
582.02
257.60
385.88
247.97
1055.80
687.72
319.17
364.76
195.41
582.02
257.60
385.88
247.97
1055.80
687.72
19
Man-day
(day)
[6]
39.39
43.76
22.90
36.38
16.10
24.12
15.50
65.99
42.98
25.65
28.50
15.27
36.38
16.10
24.12
15.50
65.99
42.98
45.60
51.29
27.48
72.75
32.20
48.23
31.00
131.98
85.97
39.90
45.60
24.43
72.75
32.20
48.23
31.00
131.98
85.97
Total
(day)
[7]
[8]
106.0
5
201.0
6
307.1
1
69.41
201.0
6
270.4
7
124.3
7
402.1
2
526.4
9
109.9
2
402.1
2
512.0
4
Component
V(m)
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
DMb
DMg
D2
D3
S1
S2
[3]
11.59
13.52
7.25
41.57
18.40
27.56
15.50
105.58
68.77
11.59
13.52
6.76
41.57
27.60
27.56
15.50
105.58
68.77
Quota
(h/m)
[4]
14.00
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00
14.00
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00
19
Man-hour
(h)
[5]
162.29
159.58
85.49
291.01
128.80
192.94
123.98
527.90
343.86
162.29
159.58
79.79
291.01
193.20
192.94
123.98
527.90
343.86
Man-day
(day)
[6]
20.29
19.95
10.69
36.38
16.10
24.12
15.50
65.99
42.98
20.29
19.95
9.97
36.38
24.15
24.12
15.50
65.99
42.98
Total
(day)
[7]
[8]
50.92
201.0
6
251.9
8
50.21
209.1
1
259.3
2
Compon
ent
Concret
e
Volume
(m)
[1]
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
[3]
0.58
0.65
0.68
0.90
0.40
0.26
0.18
1.26
0.82
0.38
0.42
0.45
0.90
0.40
0.26
0.18
1.26
0.82
0.34
0.38
0.41
0.90
0.40
0.26
0.18
Reinf
.
Ratio
( %
)
[4]
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
S1
1.26
S2
0.82
3,4
Unit
weight
(kg/m
)
Quanti
ty
[5]
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
[6]
46
46
23
46
46
105
84
84
84
46
46
23
46
46
105
84
84
84
92
92
46
92
92
210
168
7850
168
7850
168
19
Reinf.
Mass
(kg)
[7]
2096.19
2329.10
1218.71
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
1364.96
1516.62
812.48
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
2426.59
2729.92
1462.46
6526.88
2888.80
4327.31
2433.19
16576.0
8
10797.2
6
Total
(kg)
[8]
[9]
5643.9
9
21774.
76
27418.
75
3694.0
5
21774.
76
25468.
81
6618.9
6
43549.
52
50168.
49
5,6
Compon
ent
Concret
e
Volume
(m)
C1
C2
C3
D1b
D1g
D2
D3
0.29
0.34
0.36
0.90
0.40
0.26
0.18
Reinf
.
Ratio
( %
)
1
1
1
1
1
1
1
S1
1.26
7850
168
S2
0.82
7850
168
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
0.25
0.29
0.32
0.90
0.40
0.26
0.18
1.26
0.82
0.25
0.29
0.29
0.90
0.60
0.26
0.18
1.26
0.82
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
46
46
23
46
46
105
84
84
84
46
46
23
46
46
105
84
84
84
Unit
weight
(kg/m
)
Quanti
ty
7850
7850
7850
7850
7850
7850
7850
92
92
46
92
92
210
168
19
Reinf.
Mass
(kg)
2123.27
2426.59
1299.96
6526.88
2888.80
4327.31
2433.19
16576.0
8
10797.2
6
909.97
1061.63
568.73
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
909.97
1061.63
530.82
3263.44
2166.60
2163.66
1216.59
8288.04
5398.63
Total
(kg)
5849.8
2
43549.
52
49399.
34
2540.3
4
21774.
76
24315.
10
2502.4
2
22496.
96
24999.
38
Compone
nt
[1]
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
Reinf.
Mass
(kg)
[3]
2096.19
2329.10
1218.71
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
1364.96
1516.62
812.48
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
2426.59
2729.92
1462.46
6526.88
2888.80
4327.31
2433.19
S1
16576.08
6.98
S2
10797.26
6.98
3,4
Quota
(h/m)
Man-hour
(h)
Man-day
(day)
[4]
5.36
5.36
5.36
4.39
4.39
4.39
5.55
6.98
6.98
5.36
5.36
5.36
4.39
4.39
4.39
5.55
6.98
6.98
5.36
5.36
5.36
4.39
4.39
4.39
5.55
[5]
11235.55
12483.95
6532.30
14326.51
6340.92
9498.45
6752.09
57850.52
37682.45
7316.17
8129.08
4354.87
14326.51
6340.92
9498.45
6752.09
57850.52
37682.45
13006.53
14632.35
7838.76
28653.01
12681.83
18996.90
13504.18
115701.0
4
75364.89
[6]
1404.44
1560.49
816.54
1790.81
792.61
1187.31
844.01
7231.31
4710.31
914.52
1016.14
544.36
1790.81
792.61
1187.31
844.01
7231.31
4710.31
1625.82
1829.04
979.84
3581.63
1585.23
2374.61
1688.02
19
14462.63
9420.61
Total
(day)
[7]
[8]
3781.4
8
16556.
37
20337.
84
2475.0
2
16556.
37
19031.
38
4434.7
1
33112.
73
37547.
44
Compone
nt
[1]
[2]
C1
C2
C3
D1b
D1g
D2
D3
Reinf.
Mass
(kg)
[3]
2123.27
2426.59
1299.96
6526.88
2888.80
4327.31
2433.19
S1
16576.08
6.98
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
DMb
DMg
D2
D3
S1
S2
10797.26
909.97
1061.63
568.73
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
909.97
1061.63
530.82
3263.44
2166.60
2163.66
1216.59
8288.04
5398.63
6.98
5.36
5.36
5.36
4.39
4.39
4.39
5.55
6.98
6.98
5.36
5.36
5.36
4.39
4.39
4.39
5.55
6.98
6.98
5,6
Quota
(h/m)
Man-hour
(h)
Man-day
(day)
[4]
5.36
5.36
5.36
4.39
4.39
4.39
5.55
[5]
11380.72
13006.53
6967.79
28653.01
12681.83
18996.90
13504.18
115701.0
4
75364.89
4877.45
5690.36
3048.41
14326.51
6340.92
9498.45
6752.09
57850.52
37682.45
4877.45
5690.36
2845.18
14326.51
9511.37
9498.45
6752.09
57850.52
37682.45
[6]
1422.59
1625.82
870.97
3581.63
1585.23
2374.61
1688.02
19
Total
(day)
[7]
[8]
3919.3
8
33112.
73
37032.
11
14462.63
9420.61
609.68
711.29
381.05
1790.81
792.61
1187.31
844.01
7231.31
4710.31
609.68
711.29
355.65
1790.81
1188.92
1187.31
844.01
7231.31
4710.31
1702.0
3
16556.
37
18258.
39
1676.6
2
16952.
67
18629.
30
Compone
nt
[1]
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
3,4
Dimension (m)
Lengt
h
[3]
4.300
4.300
4.500
6.025
4.000
3.000
3.075
0.120
0.120
2.800
2.800
3.000
6.025
4.000
3.000
3.075
0.120
0.120
2.800
2.800
3.000
6.025
4.000
3.000
3.075
0.120
0.120
Perimet
er
[4]
1.5
1.6
1.6
1.7
1.3
1.2
1.0
11.6
9.7
1.5
1.6
1.6
1.7
1.3
1.2
1.0
11.6
9.7
1.4
1.5
1.5
1.7
1.3
1.2
1.0
11.6
9.7
Area
(m)
Quantit
y
A0
(m)
[5]
6.45
6.88
7.20
10.24
5.20
3.60
3.08
1.39
1.16
4.20
4.48
4.80
10.24
5.20
3.60
3.08
1.39
1.16
3.92
4.20
4.50
10.24
5.20
3.60
3.08
1.39
1.16
[6]
46.00
46.00
23.00
46.00
46.00
105.00
84.00
84.00
84.00
46.00
46.00
23.00
46.00
46.00
105.00
84.00
84.00
84.00
92.00
92.00
46.00
92.00
92.00
210.00
168.00
168.00
168.00
[7]
296.70
316.48
165.60
471.16
239.20
378.00
258.30
116.93
97.78
193.20
206.08
110.40
471.16
239.20
378.00
258.30
116.93
97.78
360.64
386.40
207.00
942.31
478.40
756.00
516.60
233.86
195.55
19
Total
(m)
[8]
[9]
778.78
1561.3
6
2340.
14
509.68
1561.3
6
2071.
04
954.04
3122.7
2
4076.
76
Compone
nt
[1]
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
DMb
DMg
D2
D3
S1
S2
5,6
Dimension (m)
Lengt
h
[3]
2.800
2.800
3.000
6.025
4.000
3.000
3.075
0.120
0.120
2.800
2.800
3.000
6.025
4.000
3.000
3.075
0.120
0.120
2.800
2.800
3.000
6.025
4.000
3.000
3.075
0.120
0.120
Perimet
er
[4]
1.3
1.4
1.4
1.7
1.3
1.2
1.0
11.6
9.7
1.2
1.3
1.3
1.7
1.3
1.2
1.0
11.6
9.7
1.2
1.3
1.3
1.7
1.7
1.2
1.0
11.6
9.7
Area
(m)
Quantit
y
A0
(m)
[5]
3.64
3.92
4.20
10.24
5.20
3.60
3.08
1.39
1.16
3.36
3.64
3.90
10.24
5.20
3.60
3.08
1.39
1.16
3.36
3.64
3.90
10.24
6.80
3.60
3.08
1.39
1.16
[6]
92.00
92.00
46.00
92.00
92.00
210.00
168.00
168.00
168.00
46.00
46.00
23.00
46.00
46.00
105.00
84.00
84.00
84.00
46.00
46.00
23.00
46.00
46.00
105.00
84.00
84.00
84.00
[7]
334.88
360.64
193.20
942.31
478.40
756.00
516.60
233.86
195.55
154.56
167.44
89.70
471.16
239.20
378.00
258.30
116.93
97.78
154.56
167.44
89.70
471.16
312.80
378.00
258.30
116.93
97.78
19
Total
(m)
[8]
[9]
888.72
3122.7
2
4011.
44
411.70
1561.3
6
1973.
06
411.70
1634.9
6
2046.
66
Componen
t
[1]
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
3,4
F.work
area
(m)
[3]
296.70
316.48
165.60
471.16
239.20
378.00
258.30
116.93
97.78
193.20
206.08
110.40
471.16
239.20
378.00
258.30
116.93
97.78
360.64
386.40
207.00
942.31
478.40
756.00
516.60
233.86
195.55
Quota
(h/m)
Man-hour
(h)
Man-day
(day)
[4]
1.20
1.20
1.20
1.50
1.60
1.60
1.60
1.00
1.14
1.00
1.00
1.00
1.50
1.60
1.60
1.60
1.00
1.14
1.00
1.00
1.00
1.50
1.60
1.60
1.60
1.00
1.14
[5]
356.04
379.78
198.72
706.73
382.72
604.80
413.28
116.93
111.46
193.20
206.08
110.40
706.73
382.72
604.80
413.28
116.93
111.46
360.64
386.40
207.00
1413.47
765.44
1209.60
826.56
233.86
222.93
[6]
44.51
47.47
24.84
88.34
47.84
75.60
51.66
14.62
13.93
24.15
25.76
13.80
88.34
47.84
75.60
51.66
14.62
13.93
45.08
48.30
25.88
176.68
95.68
151.20
103.32
29.23
27.87
19
Total
(day)
[7]
[8]
116.8
2
291.9
9
408.8
1
63.71
291.9
9
355.7
0
119.2
6
583.9
8
703.2
4
Componen
t
[1]
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
DMb
DMg
D2
D3
S1
S2
5,6
F.work
area
(m)
[3]
334.88
360.64
193.20
942.31
478.40
756.00
516.60
233.86
195.55
154.56
167.44
89.70
471.16
239.20
378.00
258.30
116.93
97.78
154.56
167.44
89.70
471.16
312.80
378.00
258.30
116.93
97.78
Quota
(h/m)
Man-hour
(h)
Man-day
(day)
[4]
1.00
1.00
1.00
1.50
1.60
1.60
1.60
1.00
1.14
1.30
1.00
1.00
1.50
1.60
1.60
1.60
1.00
1.14
1.30
1.00
1.00
1.50
1.60
1.60
1.60
1.00
1.14
[5]
334.88
360.64
193.20
1413.47
765.44
1209.60
826.56
233.86
222.93
200.93
167.44
89.70
706.73
382.72
604.80
413.28
116.93
111.46
200.93
167.44
89.70
706.73
500.48
604.80
413.28
116.93
111.46
[6]
41.86
45.08
24.15
176.68
95.68
151.20
103.32
29.23
27.87
25.12
20.93
11.21
88.34
47.84
75.60
51.66
14.62
13.93
25.12
20.93
11.21
88.34
62.56
75.60
51.66
14.62
13.93
19
Total
(day)
[7]
[8]
111.0
9
583.9
8
695.0
7
57.26
291.9
9
349.2
5
57.26
306.7
1
363.9
7
3,4
Component
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
F.work area
(m)
[3]
296.70
316.48
165.60
471.16
239.20
378.00
258.30
116.93
97.78
193.20
206.08
110.40
471.16
239.20
378.00
258.30
116.93
97.78
360.64
386.40
207.00
942.31
478.40
756.00
516.60
233.86
195.55
Quota
(h/m)
[4]
0.38
0.38
0.38
0.32
0.32
0.32
0.32
0.27
0.27
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.27
0.27
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.27
0.27
19
Man-hour
(h)
[5]
112.75
120.26
62.93
150.77
76.54
120.96
82.66
31.57
26.40
61.82
65.95
35.33
150.77
76.54
120.96
82.66
31.57
26.40
115.40
123.65
66.24
301.54
153.09
241.92
165.31
63.14
52.80
Man-day
(day)
[6]
14.09
15.03
7.87
18.85
9.57
15.12
10.33
3.95
3.30
7.73
8.24
4.42
18.85
9.57
15.12
10.33
3.95
3.30
14.43
15.46
8.28
37.69
19.14
30.24
20.66
7.89
6.60
Total
(day)
[7]
[8]
36.99
98.10
61.11
20.39
81.50
61.11
38.16
122.2
2
160.3
9
5,6
Component
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
DMb
DMg
D2
D3
S1
S2
F.work area
(m)
[3]
334.88
360.64
193.20
942.31
478.40
756.00
516.60
233.86
195.55
154.56
167.44
89.70
471.16
239.20
378.00
258.30
116.93
97.78
154.56
167.44
89.70
471.16
312.80
378.00
258.30
116.93
97.78
Quota
(h/m)
[4]
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.27
0.27
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.27
0.27
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.27
0.27
19
Man-hour
(h)
[5]
107.16
115.40
61.82
301.54
153.09
241.92
165.31
63.14
52.80
49.46
53.58
28.70
150.77
76.54
120.96
82.66
31.57
26.40
49.46
53.58
28.70
150.77
100.10
120.96
82.66
31.57
26.40
Man-day
(day)
[6]
13.40
14.43
7.73
37.69
19.14
30.24
20.66
7.89
6.60
6.18
6.70
3.59
18.85
9.57
15.12
10.33
3.95
3.30
6.18
6.70
3.59
18.85
12.51
15.12
10.33
3.95
3.30
Total
(day)
[7]
[8]
35.55
122.2
2
157.7
7
16.47
77.58
61.11
16.47
80.52
64.06