Zaw Naing

Managing Director, Mandalay Technology


Director, Royal HaskoningDHV (Myanmar)
Myanma Oil and Gas Services Society (MOGSS)

New Oil & Gas Awards in Myanmar

Possible Timeline
- PSC Contract Signing
may be end of this year,
2014.
- Then, EIA and SIA , etc.
- Exploration is expected to
be after the 2015
Monsoon, i.e., after Oct
2015

15 October 2014

Myanmar Ports
SITTWE

Port
Yangon
Sittwe
Kyaukpyu
Thandwe

Region/State
Yangon

KYAUKPYU

THANDWE

Rakhine

YANGON

PATHEIN

Pathein

Ayeyarwady

Mawlamyine

Mon

MAWLAMYINE

DAWEI

Dawei
Myeik
Kawthoung

Tanintharyi

MYEIK

KAWTHOUNG

Yangon Port & River Estuary

River port and Premier port of


Myanmar

YANGON

Yangon Port to Thilawa Port - 16 Km

Yangon Port to Elephant Point- 32 Km

Elephant Point to Pilot Station- 32 Km


THILAWA PORT AREA

All vessels calling to the Yangon Port,


pilotage is compulsory if they are over

200 GRT.
Tidal Range (The average tidal range )
about 19.3 feet (5.85 m) at spring tide
about 8.4 feet (2.55 m) at neap tide

ELEPHANT pt.

Current Velocity - 4 to 6 knots

Wave

- do not hinder marine operations


- seldom rough with less than (2m)
wave-height.

Location of Terminals and ICD at Yangon Inner Harbour


HOB

HPT
AWPT

International Wharf

- 18

Inland Container Depot (ICD)

ICD I & II

- 3

Monkey Point

International Wharves at Thilawa


YANGON
RIVER
YANGON

INNERBAR

Main
Channel
d Silva Pt.

BAGO RIVER

Liffey
SECONDARY CHANNEL
Chokey pt.
THILAWA PORT AREA

Kyauktan Creek

THANTE
-10

ELEPHANT pt.

-5
-3

EASTEN
GROVE
FLATS

OUTER BAR
MIPL

MITT

International Wharves
International wharves
o Yangon Port - 18 wharves
o Thilawa Port - 6 wharves
Total
- 24 wharves

Future Port Development Plan

Future Port Development at


Yangon Inner Harbour Area

Conceptual Plan for Yangon Port at Dala and King Bank Foreshore Area

1650 m
150 acre

4450 m

1000 m
Total 2470 acre

1390 m
1250 m
1250 m

12

13

Conceptual Plan for Yangon Port at Elephant Point Foreshore Area


(Yangon)

(Dala)

(Thilawa)

(Lat Khote Kone)

Conceptual Plan for Yangon Port at Elephant Point Foreshore Area

15

Yangon River Access


Channel

YANGON
Inner Bar
THILAWA PORT

Outer Bar
ELEPHANT POINT

Two
constraint
areas
(shallow water area)
Inner Bar and
Outer Bar
Restricting of the size and
draft of vessel
Available water depth at
Inner Bar near Monkey
Point below chart datum is
about 4.5m and at Outer
Bar near Elephant Point is
only about 5m.

Improvement of Yangon River Access Channel and


Its Associated Port Facilities

o All vessels generally sailing on flood tides and


crossing to both Inner Bar and Outer Bar at near
high tide. Waiting flood tide means delay time.

o Daily maintenance dredging at Inner bar


reallocation of navigation buoys at Outer bar.

and

o Yangon Port can be accessible to vessel of 167m


LOA, 9m draft, 15,000 DWT and vessel of 200m
LOA, 9m draft, 20,000 DWT at Thilawa Port.

Port Expansion at Thilawa Area

18

Thilawa Port
Thilawa

area

located

downstream of Yangon Port


YANGON

Thilawa Port

16

km

o 37 plots
o Each plot: 15 hectares (
acres) (200m x 750m )
9

Container / G.C
Terminal
Fuel Oil Terminal

37 Plots

101/3 Plots

Bitumen Terminal

Plot

Grain / G.C Terminal

Plots

Ship Breaking Yard

Plots

MPA/ JICA ODA

Plots

Reserved

12/3 Plots

Total
34
35
36
37

10 Plots

37

Plots

DEEP SEA PORT PROJECTS IN MYANMAR


Dawei

SEZ

together

with

Deep Sea Port in the South

Kyauk Phyu

Kyaukpyu Deep Sea Port at


Rakhine State in the West
Kalagauk Deep Sea Port,

between

Mawlamyine and

Ye Region at in the South

Ngayo
ke Bay
Kalagauk

Coast.
Westport Deep Sea Port at

Ngayoke Bay, Ayeyarwaddy


Region

Dawei

DAWEI

Dawei Deep Sea Port Project


Location
Lies at Nabule Area, north-west of
Dawei Town.
Geographical Position
13 48'.5 N, 98 04' E
Approach channel
LAD 15 m, Tide Range 5m
Habour Area
LAD 15 m
Sea Room 3.2 Km
Prosperity

Dawei Area as a hub connecting to


GMS, South and South East Asia
countries.
Industry, Tourism, Fisheries, Mining and
Energy

Nabule

Dawei

Dawei Deep Sea Port Project

Dawei Deep Sea Port Project


Construction of Small Port

94 % of the Construction of Project Supply Jetty COMPLETE.


Main jetty (100 m x 25 m) ; the approach jetty (53 mx7m)

Accommodative: Container 400 TEU and water Depth (Apron) 8 m.


MPA and ITD Co., Ltd will sign Sectorial Agreement to implement
Deep Sea Port in Dawei SEZ.

Kyaukpyu Deep Sea Port Project


Location
Made Island., 11.2 km S/E of Kyaukphu
Geographical Position
19 22'.6 N, 93 40'.8 E
Approach channel
LAD 24 m, Tidal Range 2~2.7m
Habour Area
LAD 20 m, Sea Room 1000 m ~ 1600 m
Prosperity
o Most appropriate approach to cope western corridor.
o Save sailing distance about 5000 Km compare with
existing sea route through Malacca Strait to China East
Coast.
o Main Outlet of ocean route for land locked regions' trade.
o Opportunity for transporting of Container, General
Cargoes, Crude Oil and Gas.
o Shortest trade route from India to China.

Sittwe

Kyaukpyu

Made
Is.

28

Development of Oil and Gas Pipe Lines and Terminal


at Kyaukphyu Region
o In June 2009, the MOU signed for the Development, Operation
and Management of the Myanmar Crude Oil Pipe Line Project

between the Myanmar Government and CNPC.


o Estimated Investment : over US$ 2.0 billions.
o Oil and gas terminal completed.
o Work-boat Wharf completed.
o Pipeline Completed.

29

Kyaukphyu Oil and Gas Terminal

Workboat Wharf was completed on 31 August, 2010.


Crude Oil Terminal was completed in May, 2013, and can accommodate oil

tankers of DWT 300,000 vessel with a draft of 26 meter, LOA 300 meter
and 60 meter width.

Renovation of Kyaukphyu No.1 old Jetty (MPA): 2011

Construction of Kyaukphyu No.3 Jetty (MPA) : 2013.

Location of Potential Site 9 Places to implement Deep Sea Ports in Kyaukphyu

T1

T1 - 6 Nos
T2 - 10 Nos
T3 - 3 Nos
T4 - 1 No
T5 - 1 No
T6 - 2 Nos
T7 - 2 Nos
T8 - 10 Nos
T9 - 6 Nos

T8

T5

T2
T3 T4

T6 T7
T9

34

Kalagauk Deep Sea Port


MoU

Signed for FS to develop

deep sea port

infrastructure

and related

at

Kalagauk

Area, between the MPA and


the

Emerald

Grand

Hotel.

Co.,Ltd in August, 2013.


Kalagauk

Geo-strategic

connected

location being

with

East-West

Economic Corridor within GMS


and ASEAN region and NorthSouth

Economic

Corridor

within China and ASEAN.

Kalagauk Deep Sea Port

Kalagauk Island

Andaman Sea

Westport Deep Sea Port

MoU Signed for a Feasibility Study and Preparation of Master Plan to develop deep

sea port and related infrastructure at Ngayok Bay Area, between the MPA and the
Super Axis Development Co., Ltd in August, 2013.

NGAYOK BAY

Oil & Gas Block Map and Offshore Suply Base in


Myanmar
Currently, 3 Offshore Supply Bases
(OSB) in Myanmar:
- Tharkayta OSB in Yangon
- Kanbauk OSB in Dawei
- Kyauk Phyu OSB

NEW OSB(s)
Needed!
15 October 2014

38

Offshore Supply Base in Yangon

15 October 2014

Existing Supply base Near Yangon


Allowable draft for vessel 5m
Newly built pontoon jetty

39

Investment Opportunities
o Public Investment

o 100% Investment under Build, Operate and Transfer basic


by Foreign and/or Local Investors.
o Joint-Venture between MPA and Foreign and/or local
Investors.
o Grant aids or soft loan financed by international financial
institute.

Conclusion
o

For Myanmar offshore and onshore oil and gas industry, a


remaining question is about the ports for servicing the industry.

The countrys existing ports are too small and shallow for most

modern needs.
o

The deep sea port development projects together with the


special economic zones (SEZ) developments in Dawei, Kyauk

Phyu, West Coast, and Maw La Myaing / Kalagauk are taking


time.
o

INVESTORS for Supply Base are NEEDED URGENTLY!

Myanmar Governments approval for those Supply Base


Development Proposals are Strongly Encouraged!

Thank You.
Zaw Naing
Managing Director, Mandalay Technology
Director, Royal HaskoningDHV (Myanmar)
Unit 7, Building 1, MICT Park
Hlaing Township, YANGON.
Tel/ Fax: 01-652285 ~ 86
zawnaing@mandalay-technology.com
zaw.naing@rhdhv.com
zawnaing72@gmail.com