RIMBA EXTENSION PROJECT MEP CONSTRUCTION SCHEDULE

( Construction Period : April 1, 2016 ~ November 30, 2016 )

NO

DESCRIPTION

DURATION

13

Mar-16
20

27

Apr-16
10
17

24

May-16
15

22

29

Jun-16
12
19

26

10

Jul-16
17

24

31

Aug-16
14
21

28

Sep-16
11
18

25

Oct-16
16

23

30

Nov-16
13
20

27

Dec-16
4
11

Rimba Extension Project

Site Office & Work Shop

24 days
24
24 days

Site Staff Mobilization

24 days

SYSTEM RUNNING
27 NOV.2016

96 days
WATER SUPPLY
20 SEPT 2016

Received Civil & Achitectural Construction Drawing


Exisiting Sub-Station

6 days

Exisiting Pump Room

6 days
6
6
6 days

Existing Schematic Diagram Sound System


Existing Schematic Diagram Data
Telephone System

6
6 days
6 days
6

BMS Point List Requirements for Bldg. F

6 days

Received Equipment Technical specification

6 days

Heat Pump
Cooling Tower
MEP Shop Drawing
Basement level 2

FLUSHING,
PUMP TEST,
FAN

6 days
6 days
90 days

FA, S/S,
LIGHT,
POWER,
MATV, DATA,
TEL, PANEL

50 days

Mechanical Services
Combine Services Drawing

3 days

Fire Protection Piping Plan

3 days

ACMV Ducting Plan

3 days

ACMV Piping Plan

3 days

Plumbing Piping Plan

7 days

Chiller Plant Room

7 days

Hot Water Pump Room

3 days

Typical Dormitory Room CSD Drawing


( Double Loaded )

3 days

Typical Dormitory Room CSD Drawing


( Hammer Head )

3 days

Typical Dormitory Room ACMV Drawing


( Double Loaded )

3 days

Typical Dormitory Room Plumbing


( Double Loaded )

3 days

Typical Dormitory Room ACMV Drawing


( Hammer Head )

3 days

Typical Dormitory Room Plumbing


( Hammer Head )

3 days

3 days

Ceiling Plot Plan

3 days

Low Voltage Main Feeder Distribution Plan

4 days

BOH & Corridor Lighting

4 days

BOH & Corridor Socket Outlet

4 days

Transformer Room

4 days

Electrical Shaft

4 days

Plant Room Power Piping & Wiring Plan

4 days

Plant Room Power Lighting & Socket Wiring Plan

4 days
3

Typical Dormitory Room Lighting


( Double Loaded )

3 days

Typical Dormitory Room Power Socket


( Double Loaded )

3 days

Telephone & Data Piping & Wiring Plan


Fire Alarm System & Sound System Piping & Wiring Plan
Basement Level 1

Fire Protection Piping Plan

3 days

ACMV Ducting Plan

3 days
3 days
3 days
3 days

Ceiling Plot Plan

3 days

BOH & Corridor Lighting

3 days

BOH & Corridor Socket outlet

3 days

Electrical Shaft

3 days

Fire Alarm System & Sound System Piping & Wiring Plan
Ground Floor

FA, S/S,
LIGHT,
POWER,
MATV, DATA,
TEL, PANEL

21 days

Zoning Plan

Telephone & Data Piping & Wiring Plan

FLUSHING,
PUMP TEST,
FAN.

3 days

15 days

Electronics

WATER SUPPLY
20 SEPT. 2016

3 days

21 days

Plumbing Piping Plan

SYSTEM RUNNING
27 NOV.2016

PLN POWER ON
16 SEPT. 2016

21 days

Mechanical

ACMV Piping Plan

TRAINING FOR
EMPLOYEE

3 days

Combined Services Drawing

Electrical

SIMULATION
TEST ALL
SYSTEM

50 days

Zoning Plan

Electronics

HAND
OVER

Electrical

HAND
OVER

Site Drawing Preparation

PLN POWER ON
18 SEPT 2016

HAND
OVER

Received Letter of Award


Preparation for Site Mobilization

6 days
3 days
3 days
36 days

CSD Guest Room A

3 days

CSD Guest Room B

3 days

CSD Guest Room C

3 days

CSD Corridor

3 days

SYSTEM RUNNING
27 NOV.2016

PLN POWER ON
18 SEPT. 2016

Mechanical
Guest Room A

4 days

Plumbing Piping Plan Section and Details

2 days

ACMV Plan, Section & Detail

2 days

Guest Room B
Plumbing Piping Plan Section and Details

2 days

ACMV Plan, Section & Detail

2 days

Guest Room C

4 days

Plumbing Piping Plan Section and Details

2 days

ACMV Plan, Section & Detail

2 days

Corridor Area

WATER SUPPLY
20 SEPT.2016

4 days

FLUSHING,
PUMP TEST,
FAN.
FA, S/S,
LIGHT,
POWER,
MATV, DATA,
TEL, PANEL

4 days

Fire Protection System

2 days

Typical Pipe Shaft Section & Detail

2 days

Mechanical System Diagram


Fire Protection System

2 days

Chilled Water System

2 days

Ventillation System

2 days

Hot Water Piping System

2 days

Flushing Piping Diagram

2 days

Sewage & Storm Water Diagram

2 days
2 days
40 days

Cooling Water Piping Plan & Details

18 days

Storm Water & Waste Water Piping Plan

18 days

Electrical

26 days

Guest Room A
Lighting & Socket Plan, Section & details

3 days

Electronics Piping & Wiring Plan, Section & details

3 days

Guest Room B

3 days

Electronics Piping & Wiring Plan, Section & details

3 days

Lighting & Socket Plan, Section & details


Electronics Piping & Wiring Plan, Section & details
Corridor Area

3 days
days
3
15 days
5 days
5 days

3 days

Sound System

3 days

Fire Alarm system

3 days

MATV & Security System


External Area

SIMULATION
TEST ALL
SYSTEM

5 days
15 days

Power Distribution System

Data & Telephone System

FA, S/S,
LIGHT,
POWER,
MATV, DATA,
TEL, PANEL

3 days
days
3

Electronics Piping & Wiring Plan, Section & details

Electrical System Diagram

FLUSHING,
PUMP TEST,
FAN.

6 days

Lighting & Socket Plan, Section & details

Typical Electrical Pipe Shaft Section & Detail

WATER SUPPLY
20 SEP2016

6 days

Lighting & Socket Plan, Section & details

Guest Room C

SYSTEM RUNNING
27 NOV.2016

PLN POWER ON
18 SEPT 2016

6 days

HAND
OVER

Clean Water Piping Diagram


External Area

SIMULATION
TEST ALL
SYSTEM

3 days
3 days
28 days

MV Cable Route Plan & details

14 days

Electronic Main Cable Route Plan & details

14 days

Material & equipment Document Submittal For Approval


Mechanical ( Submission )
Electrical ( Submission )

40 days
40 days

Client Approval
Material & Equipment Delivery
Mechanical

150 days
140 days

Supporting Materials

50 days

Black Steel Pipe & Fittings

50 days

PPR Pipe & fittings

50 days

Cast Iron Pipe & fittings

50 days

PVC Pipes & Fittings

50 days

Duct Materials & Insulation

60 days

Vibrator Isolator

12 days

Valves and Fittings

6 days

Grilles & diffuser

6 days

IHB/OHB/ Springklers /Siamese & Hydrant Pillar

6 days

PT. HITACHI PLANT TECH., INDONESIA

PLN POWER ON
18 SEPT. 2016

SYSTEM RUNNING
27 NOV.2016

WATER SUPPLY
20 SEPT.2016

1/3

RIMBA EXTENSION PROJECT MEP CONSTRUCTION SCHEDULE


( Construction Period : April 1, 2016 ~ November 30, 2016 )

NO

DESCRIPTION

DURATION

Pumps

6 days

Hot Water Tank & expansion Tank

6 days

Ventillation Fan

6 days

Chiller & Heat Pump ( Supply By Client )

6 days

AHU ( Supply By Client )

6 days

FCU ( Supply by Client )

13

Mar-16
20

27

Apr-16
10
17

24

May-16
15

22

29

Jun-16
12
19

26

10

Jul-16
17

24

31

Aug-16
14
21

28

Sep-16
11
18

25

150 days

Wires & cables

60 days

Medium Voltage Switchgear

23

30

Nov-16
13
20

FA, S/S,
LIGHT,
POWER,
MATV, DATA,
TEL, PANEL

6 days

Transformer

6 days

LV Panel

27

HAND
OVER

60 days

60 days

Cable Ladders and Trays

Conduit Pipes, Fittings & Accessories

Oct-16
16

FLUSHING,
PUMP TEST,
FAN.

6 days

Electrical

6 days

Lighting Fixtures

12 days

Fire Alarm devices

12 days

Sound system Devices

12 days

Data & Telephone Equipment

12 days

CCTV Equipments

12 days

MATV ( by Client )
Method Statement
MS Preparation & submission ( Mech )

21 days

MS Preparation & submission ( Elect )

21 days

Client Approval

45 days

Construction ( MEP Work )


90 days

Mechanical Work

10

43

60

60

60

46

60

60

46

25

14

12

12

31

39

29

31

31

21

11

39
l
2

39

Support Fabrication
Support Installation
PIPING Work
Chilled Water Piping
Supply Pipe
Return Pipe
Insulation

Basement Level 2 ( MEP Work )

Machine Connection
Riser Pipe

DL-1
x5
2nos/shaft
DL-2
x5
2nos/shaft
HH
x2
2nos/shaft
Fire Hydrant & Springkler

Hot Water

PPR Pipe
Clean / Flushing Water Piping

Rucika
Sewage Pipe

PVC AW
Condensate Pipe

Exhaust Duct
300
200
DORMITORY
x 23
FCU c/w DUCT with piping
Pex Pipe

( 2 group )

PPR
4

12

21

21

21

17

29

29

( 2 group )

SW, WW

Electrical Work

Support Fabrication
Support Installation

25

14

14

10

10

CABLE RACK/PIPING INSTALLATION


Cable Ladder

Raceway

Conduit Pipe

Main Feeder

Sub-Feeder

Wiring for Circuits

2
2
2

2
2
2

2
2
2

Cable Basket
Cable Tray

@RISER

PLN POWER ON
18 SEPT. 2016

WATER SUPPLY
20 SEPT.2016

CABLE INSTALLATION

Electronics Wiring
Electrical Devices Equipment Installation
Lighting Fixtures

Wiring Devices

Electronics Devices

Wiring for Light, Power, Electronics

2
4

FA, S/S,
LIGHT,
POWER,
MATV, DATA,
TEL, PANEL

Fixing of Wiring Devices


Basement Level 1 ( MEP Work )

FLUSHING,
PUMP TEST,
FAN.

DORMITORY
x 23
Installation of Messenger Wire

75 days

12

23

29

25

21

17

17

16

16

18

12

19

15

15

PPR Pipe
Clean / Flushing Water Piping

Rucika
Sewage Pipe

PVC AW
Condensate Pipe

Mechanical Work
PIPING Work
Chilled Water Piping
Supply Pipe
Return Pipe
Insulation
Fire Hydrant & Springkler
Hot Water

Exhaust Duct

SYSTEM RUNNING
27 NOV.2016

SIMULATION
TEST ALL
SYSTEM

300
200
DORMITORY
x 24
FCU c/w DUCT with piping
Pex Pipe

( 2 group )

PPR
SW, WW

( 2 group )

15

11

13

Raceway

Conduit Pipe

Electrical Work

10

10

Support Fabrication
Support Installation
CABLE RACK/PIPING INSTALLATION
Cable Ladder
Cable Basket
Cable Tray

@RISER

CABLE INSTALLATION
Main Feeder
Sub-Feeder
Wiring for Circuits
Electronics Wiring
Electrical Devices Equipment Installation
Lighting Fixtures

Wiring Devices

Electronics Devices

16

18

'

Wiring for Light, Power, Electronics

DORMITORY
x 24
Installation of Messenger Wire

Fixing of Wiring Devices

GROUND LEVEL

60 days

Mechanical Work
PIPING Work
( @ Riser )
Chilled Water Piping
Supply Pipe
Return Pipe
Insulation

21

9
PLN POWER ON
18 SEPT. 2016
WATER SUPPLY
20 SEPT.2016

Hot Water

PPR Pipe
Clean / Flushing Water Piping

Rucika
Sewage Pipe

PVC AW
Condensate Pipe

Exhaust Duct

FLUSHING,
PUMP TEST,
FAN.

GUEST ROOM
x 24
FCU c/w DUCT with piping
Pex Pipe

( 2 group )

PPR
SW, WW

( 2 group )

Electrical Work

Cable Ladder

Cable Basket

12

29

23

25

19

CABLE RACK/PIPING INSTALLATION

Wiring for Light, Power, Electronics

2
4

GUEST ROOM
x 24
Installation of Messenger Wire

Fixing of Wiring Devices


50 days

4
'

LEVEL 1
Mechanical Work

PT. HITACHI PLANT TECH., INDONESIA

2/3

SYSTEM RUNNING
27 NOV.2016

FA, S/S,
LIGHT,
POWER,
MATV, DATA,
TEL, PANEL

300
200

SIMULATION
TEST ALL
SYSTEM

Dec-16
4
11

RIMBA EXTENSION PROJECT MEP CONSTRUCTION SCHEDULE


( Construction Period : April 1, 2016 ~ November 30, 2016 )

NO

DESCRIPTION

DURATION

13

Mar-16
20

27

Apr-16
10
17

24

May-16
15

22

29

Jun-16
12
19

26

10

Jul-16
17

PIPING Work
( @ Riser )
Chilled Water Piping
Supply Pipe

24

Return Pipe

31

Insulation

Aug-16
14
21

28

Sep-16
11
18

25

Oct-16
16

23

30

Nov-16
13
20

27

Hot Water

PPR Pipe
Clean / Flushing Water Piping

Rucika
Sewage Pipe

PVC AW
Condensate Pipe

Exhaust Duct
300
200
GUEST ROOM
x 24
FCU c/w DUCT with piping
Pex Pipe

( 2 group )

PPR
SW, WW

( 2 group )

Electrical Work

Cable Ladder

Cable Basket

CABLE RACK/PIPING INSTALLATION

Wiring for Light, Power, Electronics

4
4

PLN POWER ON
18 SEPT. 2016

GUEST ROOM
x 24
Installation of Messenger Wire

Fixing of Wiring Devices


4

Mechanical Work
PIPING Work
( @ Riser )
Chilled Water Piping
Supply Pipe
Return Pipe

16

16

'

40 days

LEVEL 2

Insulation

WATER SUPPLY
20 SEPT.2016

PPR Pipe
Clean / Flushing Water Piping

Rucika
Sewage Pipe

PVC AW
Condensate Pipe

Exhaust Duct
300
200
GUEST ROOM
x 24
FCU c/w DUCT with piping
( 2 group )

PPR
( 2 group )

12

12

Cable Ladder

Cable Basket

12

35

Electrical Work

SYSTEM RUNNING
27 NOV.2016

FA, S/S,
LIGHT,
POWER,
MATV, DATA,
TEL, PANEL

2
2

SW, WW

FLUSHING,
PUMP TEST,
FAN.

Hot Water

Pex Pipe

SIMULATION
TEST ALL
SYSTEM

CABLE RACK/PIPING INSTALLATION


PLN POWER ON
18 SEPT. 2016
WATER SUPPLY
20 SEPT.2016
4

Wiring for Light, Power, Electronics

GUEST ROOM
x 24
Installation of Messenger Wire
Fixing of Wiring Devices

2
2

23

PIPING Work
( @ Riser )
Chilled Water Piping
Supply Pipe

2
33

'

40 days

Mechanical Work

Return Pipe

'

LEVEL 3

Insulation

FLUSHING,
PUMP TEST,
FAN.

29

SYSTEM RUNNING
27 NOV.2016

FA, S/S,
LIGHT,
POWER,
MATV, DATA,
TEL, PANEL

Hot Water

PPR Pipe
Clean / Flushing Water Piping

Rucika
Sewage Pipe

12

12

PVC AW
Condensate Pipe

Exhaust Duct

SIMULATION
TEST ALL
SYSTEM

300
200
GUEST ROOM
x 24
FCU c/w DUCT with piping
Pex Pipe

( 2 group )

PPR
SW, WW

( 2 group )

Electrical Work

CABLE RACK/PIPING INSTALLATION


Cable Basket
GUEST ROOM
x 24
Installation of Messenger Wire

Wiring for Light, Power, Electronics

Cable Ladder

Fixing of Wiring Devices

2
12

Mechanical Work
PIPING Work
( @ Riser )
Chilled Water Piping
Supply Pipe

16
4

40 days

'

LEVEL 4

Return Pipe

PLN POWER ON
18 SEPT. 2016

Insulation

WATER SUPPLY
20 SEPT.2016

Hot Water

PPR Pipe
Clean / Flushing Water Piping

Rucika
Sewage Pipe

FA, S/S,
LIGHT,
POWER,
MATV, DATA,
TEL, PANEL

4
4

PVC AW
Condensate Pipe

Exhaust Duct
300
200
GUEST ROOM
x 24
FCU c/w DUCT with piping
Pex Pipe

( 2 group )

PPR
SW, WW

( 2 group )

Electrical Work

12

12

Cable Ladder

Cable Basket

FLUSHING,
PUMP TEST,
FAN.

SYSTEM RUNNING
27 NOV.2016

SIMULATION
TEST ALL
SYSTEM

CABLE RACK/PIPING INSTALLATION

Fixing of Wiring Devices


Roof Floor ( MEP Work )

60 days

PAHU

Ducting

Fire Fighting
Hot Water
Electrical Works
External MEP Work

60 days

Mechanical Works
Electrical Works
Existing Sub-Station Installation Works

12 days

Installation of MV Switchgear & Transformer

12 days

Shutdown of Existing LVMDB


LVMDB Modification Works & Cable Connection
PLN Power energized

14

14

14

14

WATER SUPPLY
20 SEPT.2016

0 day

SYSTEM RUNNING
27 NOV.2016

0 day
40 days
0

Mechanical Equipment Site Test

30 days

Electrical & Electronics Equipment T & C

30 days

PLN POWER ON
18 SEPT. 2016

Handing Over

10/09

30 days

Operation & Maintenance Manual

15 days

Training

7 days

Final Handing over

1 day

3/3

11/15
11/15

10/09

As built Drawing

PT. HITACHI PLANT TECH., INDONESIA

14

25 days

Cable Rack & Laying Cables

Testing & commissioning

4
14

HAND
OVER

Wiring for Light, Power, Electronics

GUEST ROOM
x 24
Installation of Messenger Wire

11/15

Dec-16
4