METHOD STATEMENT FOR

ROAD MARKINGS
Equipment description: NA
Tag/Item number(s): NA

30.06.10

YUVARAJ.P

KIRAN
KANCHAN

B.GANDHI

Rev

Date

Prepared by
(GCC)

Chkd
by(GCC)

Appr.by
(GCC)

IFI

Appr.by
(THC)

Contractor name:

Statu
s

Issued for Information

Revision reason
description

for

issue

Unit: 0-0000

Contractor Project No.: 5887


Contractor Contract No.: PI-098

Sheet: 1 of 3

PEARL GTL PROJECT


QATAR
T-4.196.185
Rev. O METHOD STATEMENT FOR ROAD MARKINGS

Orig. Org.:
THC

PCWBS: N/A
Contractor Doc No: N/A
Project Doc No : T-4.196. 224T4.196.178

Rev.: O

DOC NO: T-4.196.185

Rev.: O

Date: 30.06.10

METHOD STATEMENT FOR ROAD MARKINGS


Sheet: of 3

1. PURPOSE:
The purpose of this document is the procedure for Road markings.

2. SCOPE:
This document applies for marking on road.

3. REFERENCE:
Project Specification
Qatar Construction Specification
Approved RFC Drawings

4. RESPONSIBILITY:
Site Engineer (Responsible for execute the specified activity)
QA/QC Engineer (Responsible for ensure the quality of materials and works)
Site foreman. (Execute the specified activity)

5. MATERIALS: Thermoplastic paint


6. PROCEDURE:

The road surface shall be dry, and free of loose, detritus mud or other extraneous
matter.

The area of road marking is identified and premarking is done as per approved RFC
drawings prior to application of thermoplastic paint.

Self Contained Multipurpose screed machine applicator shall be used for the
application of Thermoplastic paint.

For special lettering, arrows or symbols the material shall be applied manually.

Manual application shall be done by putting a required size of dye on the part where
the marking will be placed and pouring an amount of material by a bucket the dye will
be pulled according to a pre-marking provided with a guide like steel bar or steel plate

to get the desired line or shape, glass beads will be also applied manually during the
application.

DOC NO: T-4.196.185

Rev.: O

Date: 30.06.10

METHOD STATEMENT FOR ROAD MARKINGS


Sheet: of 3

The finished lines shall be free from raggedness and be true in place with the road surface.
The upper surface shall be level uniform and free from streaks, blisters,lumps and other
defects.
Traffic restrictions shall remain in force prior to, throughout and following application unit
markings area cured, dry and resistant to traffic.

6. HSE

A risk assessment shall be prepared to address the HSE issues of road marking
works. GCC will operate a strict HSE system at site. GCC recognizes the
importance of HSE requirements for working at site.

7. Documentation

Approval of materials.

Approval of inspection requests.

Manufacturers instructions manual.