INDEX
Page
No:
1 INTRODUCTION
21
4 SUPERSTRUCTURE LOADS
27
27
4.1. ABUTMENT (PILE SUPPORTING SYSTEM) ...........................................
27
4.1.1. DEAD LOADS .........................................................................................
28
4.1.2. LIVE LOADS ............................................................................................
30
30
5.1. ABUTMENT AND PILE SUPPORTING SYSTEM (H=12.25 m) ...................................................
30
5.1.1. LOADS ACTING ON ABUTMENT AND PILE SYSTEM .......................................................
47
5.2. ABUTMENT AND PILE SUPPORTING SYSTEM (H=14.75 m) ...................................................
47
5.2.1. LOADS ACTING ON ABUTMENT AND PILE SYSTEM .......................................................
64
5.3. ABUTMENT AND PILE SUPPORTING SYSTEM (H=17.25 m) ...................................................
64
5.3.1. LOADS ACTING ON ABUTMENT AND PILE SYSTEM .......................................................
81
5.4. ABUTMENT AND PILE SUPPORTING SYSTEM (H=16.75 m) ...................................................
81
5.4.1. LOADS ACTING ON ABUTMENT AND PILE SYSTEM .......................................................
1. INTRODUCTION
This report includes structural analysis and design calculations of BAHARKE
INTERCHANGE pile supporting system. Bridge superstructure is h=120 cm depth
prestressed concrete beams that is connected with in-situ poured reinforced
concrete slab, has a 23.3 m length.
Substructure system of the bridge is composed of piles with 100 cm diameter.
There is 120 cm spacing between piles.In addition, 4 types of pile supporting system
is used and different reinforcement is applied on each system.
Connection element between piles and superstructure of bridge is cap beams that
stay on the piles
Below table includes main properties of bridge:
Span Number
Skew Angle
Span Length
Bridge Width
Beam depth
Beam quantity
Asphalt Thickness
Slab Thickness
Pile Diameter
Pile Spacing
1
0
23.3 m.
57.7 m.
1.2 m.
44
0.06 m.
0.25 m.
100 cm
120 cm
:
:
:
:
:
:
:
:
:
:
MATERIALS
Prestressed Beam Concrete:
C40/50
Reinforced Concrete
C25/30
Lean Concrete
C16/20
Prestressing Strands
0.6 diameter low relaxation
Reinforcement
St III a
fc=40 N/mm
fc=25 N/mm
fc=16 N/mm
fs=1860 N/Mm
fy=420 N/mm
fy=420 N/mm
C25
Modulus of Elasticity of Strands
Ec=23650 N/mm
Ec=29915 N/mm
Es=197000 N/mm
Modulus of Elasticity of Reinforcement
Es=200000 N/mm
44
=
0
m
= 2 x 0.2 / 44 = 0.0091
= 0 x 0.25 x 2.5 / 44 = 0
: 0.4
: 0.25
Allowable Stresses:
During the transfer:
Characteristic strength fci
( 0.75 fc)
( 0.60 fci)
( 0 . 025 f c )
( 0 . 0623 f c )
: 0.01369 t/cm
: 0.03412 t/cm
At Service State
Characteristic strength fc
:0.4 t/cm
:0.40x0.4=0.16 t/cm
:0.0 t/cm
( 0 .050 f c )
: 0.03162 t/cm
:0.25 t/cm
:0.40x0.25=0.10 t/cm
:0.0 t/cm
( 0 . 050 f c )
Allowable stress (tension) (with reinforcement)
Modular Ratio
Transformed Slab Width
:0.0250 t/cm
:0.791
:102.83 cm
Pretension Steel:
0.6 270K Type Low Relaxation Prestress Steel
Nominal Diameter
Section Area (cm)
Tension Strength (t/cm)
: 0.600
: 1.40
:18.6
A: 5335 cm
Height:
Center of Gravity:
(from bottom)
h: 120 cm
: 65.33 cm
W t: 185673.95 cm
W b: 155377.24 cm
Area:
A: 7906 cm
Height:
Center of Gravity:
(from bottom)
h: 145 cm
: 87.17 cm
W t: 313201.25 cm
W b: 207770.95 cm
W bb: 551718.00 cm
V(ton)
M(ton-m)
V(ton)
M(ton-m)
V(ton)
M(ton-m)
V(ton)
M(ton-m)
SHEAR FORCE
MOMENT
SHEAR FORCE
MOMENT
SHEAR FORCE
MOMENT
SHEAR FORCE
MOMENT
1.
2.
3.
4.
0.012
23.341
-0.007
2.556
-0.025
9.466
-0.042
15.538
0m
24.103
22.013
2.822
2.300
10.451
8.519
17.155
13.984
0.05 L
48.206
20.684
5.353
2.045
19.824
7.573
32.542
12.431
0.1 L
66.102
19.356
7.586
1.789
28.095
6.626
46.118
10.877
0.15 L
84.010
18.027
9.522
1.534
35.262
5.679
57.885
9.323
0.20 L
95.722
16.699
11.160
1.278
41.328
4.733
67.841
7.769
0.25L
107.435
15.370
12.500
1.022
46.290
3.786
75.987
6.215
0.30 L
LOADING....................................................................................................
BEAM SELF WEIGHT
LOADING....................................................................................................
SLAB WEIGHT
LOADING....................................................................................................
ASPHALT+BARRIER+PAVEMENT
LOADING....................................................................................................
H30-S24 STANDARD TRUCK LOADING
114.214
14.041
13.542
0.767
50.150
2.840
82.322
4.661
0.35 L
120.989
12.713
14.286
0.511
52.906
1.893
86.848
3.108
0.40 L
122.209
11.384
14.733
0.256
54.561
0.947
89.563
1.554
0.45 L
123.428
10.056
14.882
0.000
55.112
0.000
90.468
0.000
0.50 L
Moment
ton-m
90.46826 0.0582249
2. Slab + Diaphragm
55.11188 0.0354697
3. Other Loads
14.8819 0.0071626
4. Traffic Loads
123.4278 0.0594057
STRESS=
0.160263 t/cm
-0.0316 t/cm
Ps Pse c
+
=
Ab
Wb
0.128663 t/cm
b =
232.920 ton
n = Toron Says =
232.920
16.377
= 14.22
16
ELASTIC SHORTENING
ES =
Es
fcir
Ec '
fcir =
P
P.e 2 Mb.e
+
Ab
Ib
Ib
P = 0.69 fs n Akablo
P = 2874820.0 N
e = 567.1 mm
Ib = 101507950000 mm4
Ab = 533500 mm
Mb = 904682600 N-mm
fcir =
2874820
533500
2874820 x 567.05
1.01508E+11
904682600 x 567.05
101507950000
ES = 197000
29915.1467
9.44
= 62.17 MPa
B) SHRINKAGE
SH=117.21-1.034RH
SH=117.21-1.034 x 60
RH=%60
=
55.17 MPa
C) CREEP OF CONCRETE
551118800 x 567.05
1.01508E+11
148819000 x 785.47
1.81118E+11
3.724
1.481 %
Loss Percantage
ELASTIC SHORTENING
4.46 %
SHRINKAGE
3.96 %
CREEP OF CONCRETE
6.25 %
RELAXATION OF
PRESTRESSING STEEL
TOTAL LOSS
1.48 %
16.15 %
20.66 MPa
(A.A.S.H.T.O. 9.17)
189.254 t-m
* * fs '
fsu* = fs ' 1
( AASHTO
p
fc
p* =
(Service State)
9.17.4.1)
As *
bd
*=0.280
b1= 0.764
fc' = 40 Mpa
(C 40 concrete)
p * fsu *
f' c
16 x 140
= 0.0012883
1275 x 1363.75
0.280
fsu*= 1860
10.764
Mn = [
40
536.18 t-m
p* =
16 x 140
1860
0.0012883
(1 0.60
>
1819.16 MPa
0.0012883 x 1819.16
40
476.56 t-m
......
)]
= 536.18 t.m
(Service state)
= 0.0015774
1275 x 1113.8
fsu*= 1860
Mn = [
0.280
10.764
1860
0.0015774
432.22 t-m
40
(1 0.60
1810.00 MPa
0.0015774 x 1810
10
40
.....
)]
= 432.22 t.m
40
Section satisfies maximum reinforcement ratio requirement.
Wcb
P P.e
+
1
Mcr* = fr +
Wcb MDL
Ac Wb
Wb
Mc r * = 3.921 +
2985530
790575
Mcr* = 337.221
Mn =
536.18 t-m
t-m
2985530 x 567.1
155377240
207770950
2.08E+08 - 1455800x10
155377240
t-m
>
11
- 1
PRESTRESSED BEAM
Bottom:
P .e
Pi
M
+ i b
Ab
Wb
Wb
=
Top:
P .e
Pi
M
i b +
Ab
Wt
Wt
COMPOSTE BEAM
Bottom:
P .e
Pf
M
+ f c
Ac
Wcb
Wcb
Top:
P .e
Pf
M
f c +
Ac
Wct
Wct
Top of beam:
P .e
Pf
M
f c +
Ac
Wbt
Wbt
12
-0.0203
0.0491
-0.0278
0.0491
-0.0130
0.1140
-0.0800
0.0149
0.0049
-0.0112
-0.0065
0.1294
-0.0800
0.0074
0.0024
-0.0210
0.0956
0.0149
0.0074
-0.0178
-0.0912
-0.0912
0.0956
0.1472
0.1560
-0.0089
0.1090
-0.0178
-0.0260
-0.0306
0.1090
-0.0912
0.0092
-0.0912
0.0046
-0.0089
0.1539
0.1594
0.0560
0.0560
0.1090
2410.29
1205.14
-0.0110
282.20
141.10
0.1090
1045.07
-0.0055
1715.52
522.53
0.05 L
1.165
857.76
1
1
0.0070
0.0097
0.0282
-0.0800
0.0853
-0.0258
-0.0337
0.0956
0.0491
-0.0070
0.0282
-0.0912
0.1312
-0.0337
0.1090
-0.0177
-0.0912
0.0175
0.1440
-0.0209
0.1090
0.0560
4820.63
535.31
1982.40
3254.19
0.1 L
2.33
0.0224
0.0134
0.0400
-0.0800
0.0615
-0.0355
-0.0478
0.0956
0.0491
0.0048
0.0400
-0.0912
0.1172
-0.0478
0.1090
-0.0104
-0.0912
0.0248
0.1352
-0.0297
0.1090
0.0560
6610.21
758.64
2809.46
4611.84
0.15 L
3.495
0.0362
0.0170
0.0502
-0.0800
0.0398
-0.0450
-0.0599
0.0956
0.0491
0.0149
0.0502
-0.0912
0.1050
-0.0599
0.1090
-0.0040
-0.0912
0.0312
0.1277
-0.0373
0.1090
0.0560
8401.01
952.20
3526.25
5788.47
0.20 L
4.66
0.0473
0.0194
0.0588
-0.0800
0.0230
-0.0514
-0.0703
0.0956
0.0491
0.0236
0.0588
-0.0912
0.0947
-0.0703
0.1090
0.0013
-0.0912
0.0365
0.1213
-0.0437
0.1090
0.0560
9572.24
1115.97
4132.76
6784.08
0.25L
5.825
13
Since stress values are exceeding the limiting values, debonding is needed.
Location
Support
Distance(m)
0
Loading
M1 (ton-cm)
0.00
M2 (ton-cm)
0.00
M3 (ton-cm)
0.00
M4 (ton-cm)
0.00
TRANSFER STAGE
Pi / Ab
0.0560
Bottom< 0.18 ton/cm
Pi x eb / Wb
0.1090
M1 / Wb
0.0000
0.1649
Top> -0.0341 ton/cm
Pi x eb / Wt
-0.0912
M1 / Wt
0.0000
-0.0352
AFTER CASTING SLAB
Bottom< 0.16 ton/cm
Pi x eb / Wb
0.1090
M1+M2 / Wb
0.0000
0.1649
Top> -0.0316 ton/cm
Pi x eb / Wt
-0.0912
M1+M2 / Wt
0.0000
-0.0352
SERVICE STATE
Pf / Ab
0.0491
Bottom< 0.16 ton/cm
Pf x eb / Wb
0.0956
M1+M2 / Wb
0.0000
M3+M4 / Wcb
0.0000
0.1447
Top> -0.0316 ton/cm
Pf x eb / Wt
-0.0800
M1+M2 / Wb
0.0000
M3+M4 / Wcb
0.0000
-0.0309
0.0567
0.0217
0.0659
-0.0800
0.0083
-0.0577
-0.0787
0.0956
0.0491
0.0306
0.0659
-0.0912
0.0862
-0.0787
0.1090
0.0057
-0.0912
0.0409
0.1160
-0.0489
0.1090
0.0560
10743.47
1249.97
4628.99
7598.67
0.30 L
6.99
0.0636
0.0232
0.0713
-0.0800
-0.0020
-0.0615
-0.0853
0.0956
0.0491
0.0361
0.0713
-0.0912
0.0797
-0.0853
0.1090
0.0091
-0.0912
0.0443
0.1119
-0.0530
0.1090
0.0560
11421.44
1354.19
5014.95
8232.24
0.35 L
8.155
0.0689
0.0245
0.0753
-0.0800
-0.0103
-0.0651
-0.0899
0.0956
0.0491
0.0401
0.0753
-0.0912
0.0750
-0.0899
0.1090
0.0116
-0.0912
0.0468
0.1090
-0.0559
0.1090
0.0560
12098.95
1428.64
5290.64
8684.79
0.40 L
9.32
0.0715
0.0248
0.0776
-0.0800
-0.0139
-0.0659
-0.0928
0.0956
0.0491
0.0424
0.0776
-0.0912
0.0722
-0.0928
0.1090
0.0130
-0.0912
0.0482
0.1073
-0.0576
0.1090
0.0560
12220.90
1473.30
5456.05
8956.32
0.45 L
10.485
0.0726
0.0251
0.0784
-0.0800
-0.0155
-0.0666
-0.0937
0.0956
0.0491
0.0432
0.0784
-0.0912
0.0712
-0.0937
0.1090
0.0135
-0.0912
0.0487
0.1067
-0.0582
0.1090
0.0560
12342.78
1488.19
5511.19
9046.83
0.50 L
11.65
5
16
16
180.146
Pf (ton)
180.146
205.255
180.146
205.255
262.03
298.553
262.03
298.553
262.03
298.553
262.03
298.553
56.705
8.625
16
262.03
298.553
56.705
8.625
14
Transfer distance of prestressing strands, Lt = (fpe/3)*Db; fpe = 162 ksi, Db = 0.6 in --> Lt = 820 mm
205.255
Pi (ton)
56.705
8.625
0.30 L
6.99
16
262.03
298.553
56.705
8.625
0.35 L
8.155
16
262.03
298.553
56.705
8.625
0.40 L
9.32
16
262.03
298.553
56.705
8.625
0.45 L
10.485
16
262.03
298.553
56.705
8.625
0.50 L
11.65
78.99017 78.99017 78.99017 78.54699 78.54699 78.54699 78.54699 78.54699 78.54699 78.54699 78.54699 78.54699
56.705
8.625
16
0.25L
5.825
Cable Numbers
0.20 L
4.66
ec (cm)
56.705
8.625
16
0.15 L
3.495
11
0.1 L
2.33
eb (cm)
11
0.05 L
1.165
11
1
1
x (cm)
n (number)
Support
0
Location
Distance(m)
30
24
18
12
y
cm
Support
0
TRANSFER STAGE
Pi / Ab
0.0385
Bottom< 0.18 ton/cm
Pi x eb / Wb
0.0755
M1 / Wb
0.0000
0.1140
Top > -0.0341 ton/cm
Pi x eb / Wt
-0.0632
M1 / Wt
0.0000
-0.0247
SERVICE STATE
Pf / Ab
0.0338
Bottom< 0.16 ton/cm
Pf x eb / Wb
0.0663
M1+M2 / Wb
0.0000
M3+M4 / Wcb
0.0000
0.1000
Location
Distance(m)
0.0338
0.0338
-0.0130
0.0693
-0.0554
0.0149
0.0049
-0.0019
-0.0065
0.0847
-0.0554
0.0074
0.0024
-0.0118
0.0663
-0.0098
-0.0173
-0.0178
0.0149
0.0074
0.0663
-0.0632
-0.0632
-0.0089
0.0962
0.1051
-0.0155
-0.0201
0.0755
0.0092
0.0046
-0.0178
-0.0632
-0.0632
0.0755
0.1029
0.1084
-0.0089
0.0755
-0.0110
0.0755
-0.0055
0.0385
0.05 L
1.165
0.0385
1
1
0.0070
0.0097
0.0282
-0.0800
0.0853
-0.0258
-0.0337
0.0956
0.0491
-0.0070
0.0282
-0.0912
0.1312
-0.0337
0.1090
-0.0177
0.0175
-0.0912
0.1440
-0.0209
0.1090
0.0560
0.1 L
2.33
0.0224
0.0134
0.0400
-0.0800
0.0615
-0.0355
-0.0478
0.0956
0.0491
0.0048
0.0400
-0.0912
0.1172
-0.0478
0.1090
-0.0104
0.0248
-0.0912
0.1352
-0.0297
0.1090
0.0560
0.15 L
3.495
0.0362
0.0170
0.0502
-0.0800
0.0398
-0.0450
-0.0599
0.0956
0.0491
0.0149
0.0502
-0.0912
0.1050
-0.0599
0.1090
-0.0040
0.0312
-0.0912
0.1277
-0.0373
0.1090
0.0560
0.20 L
4.66
15
0.0473
0.0194
0.0588
-0.0800
0.0230
-0.0514
-0.0703
0.0956
0.0491
0.0236
0.0588
-0.0912
0.0947
-0.0703
0.1090
0.0013
0.0365
-0.0912
0.1213
-0.0437
0.1090
0.0560
0.25L
5.825
0.0567
0.0217
0.0659
-0.0800
0.0083
-0.0577
-0.0787
0.0956
0.0491
0.0306
0.0659
-0.0912
0.0862
-0.0787
0.1090
0.0057
0.0409
-0.0912
0.1160
-0.0489
0.1090
0.0560
0.30 L
6.99
0.0636
0.0232
0.0713
-0.0800
-0.0020
-0.0615
-0.0853
0.0956
0.0491
0.0361
0.0713
-0.0912
0.0797
-0.0853
0.1090
0.0091
0.0443
-0.0912
0.1119
-0.0530
0.1090
0.0560
0.35 L
8.155
0.0689
0.0245
0.0753
-0.0800
-0.0103
-0.0651
-0.0899
0.0956
0.0491
0.0401
0.0753
-0.0912
0.0750
-0.0899
0.1090
0.0116
0.0468
-0.0912
0.1090
-0.0559
0.1090
0.0560
0.40 L
9.32
0.0715
0.0248
0.0776
-0.0800
-0.0139
-0.0659
-0.0928
0.0956
0.0491
0.0424
0.0776
-0.0912
0.0722
-0.0928
0.1090
0.0130
0.0482
-0.0912
0.1073
-0.0576
0.1090
0.0560
0.45 L
10.485
0.0726
0.0251
0.0784
-0.0800
-0.0155
-0.0666
-0.0937
0.0956
0.0491
0.0432
0.0784
-0.0912
0.0712
-0.0937
0.1090
0.0135
0.0487
-0.0912
0.1067
-0.0582
0.1090
0.0560
0.50 L
11.65
21.4 cm
25.5 cm
2103 cm
CG=
8.33
1705 cm
CG=
13.47
20
Stress At The Center
Of Gravity Of Cross
section
The area
provided=
18.9 cm
98.6 cm
72.60 kgf/cm
>
119.5 cm
21.4 cm
14.70 kgf/cm
18.3 cm
25.5 cm
24.70 kgf/cm
OK
F = 1705x8.03=13691.15kgf
Fe = 13691.15/1687 = 8cm
at the bottom flange;
4
20
The area
provided=
12.6 cm
>
OK
8.03 kgf/cm
114.00 kgf/cm
15.50 kgf/cm
16
8.0 cm
2.5. SHEAR
Vk
15.54
ton
Mk =
17.11
ton-m
Vt
9.47
ton
Mt =
10.43
ton-m
Vakb
2.56
ton
Makb =
2.82
ton-m
Vh_i
23.34
ton
Mh_i =
24.11
ton-m
Load resultants are calculated at h/2 distance from the face of the support. AASHTO 9.20.2
d =136.375 cm
I
Yt
( 0.5
fc + fPE fd
....AASHTO 9-27
....AASHTO 9-28
Vcw =
0.29 fc + 0.3fpc b d + VP
....AASHTO 9-29
Vc=min ( Vci,Vcw )
fpc =
0.022786706
t/cm
fd =
0.026215725
t/cm
fpe=
0.124835021
Mcr=
270.61 t-m
Mmax =
Vd =
27.56 t
Vi=
Vci=
295.47 t
Vi(min)=
Vcw=
56.08 t
Vs =
Vu
Vc =
Vs =
t/cm
86.501
0.9
(Service State)
>= 96 cm (0.8 x h)
VM
Vci = 0.05 f c b d + Vd + i cr
MMAX
Mcr =
86.501 ton
56.013
53.996
t-m
t
19.7231
Vp = 0
t
= 40.03 ton
56.08
Av .fsy .d
s
Av =
Av x 4200 x 136.375
s
40030 =
12 iin
Av =
2.26
cm
17
0.07 s
s= 32 cm
0.85
(AASHTO 9.20.4.3)
5.62
kg/cm2
bv =
127.5
cm
dp =
136.38
cm ( At Support )
VDL =
27.56
ton
VLL =
23.34
ton
12
Reinforcement Diameter =
1.2
cm
Reinforcement Spacing =
20
cm
20
2
2.26 cm
Av =
bw = 20.00 cm
2
fy = 4200 kg/cm
minAv
( mm2)
0.34.bw.s
fy
cm2
0.32
<
2.26
274,102
a=
kg
316.12
5.98
ton
> Vu=
ton
371.90
86.50
18
ton
O.K.
86.50
ton
2.7. DISPLACEMENT
2.83 m
12 ton
12 ton
A
5.98 m. B
C
23.3 m.
Moment (t-m)
80.8
119.1
125.4
C
B
max
At mid span;
E = 2991514.66651929 t/m
IC = 0.1811 m4
Ib = 0.10150795 m4
0.017
5 q k L4
384 E I b
P e b L2
P =
8 E Ib
K =
1.334 t/m
m
Prestressing Force
Pi= 298.553 ton
eb = 56.705 cm
dp =
0.038
Slab
qs =
ds =
5 q S L4
S =
384 E Ic
0.812500 t/m
0.01
19
D =
0.41304 t/m
0.003
Moving Loads
Mc = 119.1+(
5 q D L4
384 E Ic
S=
1.3
125.4 - 119.1
) x 2.83 = 123.3 t-m
4.25
dmax=DtAC= 0.5 x 119.1 /EI x 8.82 x 2/3 + (119.1+123.3 ) /2EI x2.83 x (8.82 + 1.423)
dmax= 6601.7 x (S / 1.65) /EI =
0.0096 m
d = -0.0397 m
--> 2.4 x dk **
Prestressing
--> 2.2 x
dp
Slab
--> 2.3 x
ds
dd
--> 3.0 x
* , **
Long term deflection coefficients are taken from PCI Table 4.6.2. ( From PCI
Design Handbook: Precast and Prestressed Concrete, 1992)
20
.....
S =
0.77 cm
2835
cm
Vk
15.5382
ton
Vt
9.4656
ton
Vakb
2.5560
ton
Vh_i
23.3410
25.00 cm
45.00 cm
h_i
0.80 cm
h_d
0.40 cm
n_i
t_pl
h rt
=
=
2 tabaka
0.20 cm
2.40 cm
3.00
cm
Nmax = max x A =
78.75 ton
Maximum Horizontal Load Capacity : Hmax = G x A x s / hrt = 5.63 ton
Maximum Vertical Load Capacity :
AASTHO 14.6.5.3.4
AASTHO 14.5.3.1
S=
L.W
2h ri (L + W )
21
S=
L.W
=
2h ri (L + W )
S,TL =
45.245 kgf/cm
= 0.0452 t/cm =
25 x 45
2 x 0.8 x (25 + 45 )
1.0 x 10 x 10.045
45.245 kgf/cm
10.045
100.45 kgf/cm
OK
70 kgf/cm
LL,TL =
0.0207 t/cm =
0.66 x 10 x 10.045
20.75 kgf/cm
66.297 kgf/cm
OK
Vertical Displacement
Inner Layers h = 8 mm
S=
10.045
ci=
0.0297
ci=
0.0297
c =
hrt /2
12 mm
c =
0.0000108 / C o
sh =
0.0002
T =
25
LE joints,
The distance between the expansion
Each bearing transverse displacement
LE
(elongation)
(LE x c x T) / 2 =
= 28.35 m
22
3.78 mm
6.58 mm
hrt 2.s
Total brake load =
44
ton
w =
s=
H T
=
GxF
0 / (44 x 2) = 0 kg
0 x 2.4
10 x 25 x 45
= 0 cm
2 x (0 + 0.76545 ) =
OK
12 ton
3 ton
4.25 m
5.983 m
qzati =
qtab =
qdiger =
0.25
23.3
0.25
23
1.3338 t/m
0.8125 t/m
0.2021 t/m
fc :
E:
40
2991400
Mpa
t/m2
4
IC : 0.18111806 m
4
Ib : 0.10150795 m
3
1zati =
qzati x Ls
24 x E x Ib
2zati =
Md x Ls
3 x E x Ib
23.3
Md = 0.0417 t.m
(+)
2zati =
1.066E-06 radian
(-)
zati =
-3
2.314 x 10
radian
Pi =
-6.495
x 10-3
P e
2 E Ib
radian
1
diger
0.006
t.m
= 0.0001966 radian
(+)
24
1zati =
( ai + 2 x bi )
1
L
P1 = 12 ton
0.0006498 radian
a1= 14.483 m
b1=
8.817
2
L
0.0007704 radian
a2= 10.233 m
b2= 13.067 m
P2 = 12 ton
0.0001667 radian
a3= 5.983 m
b3= 17.317 m
P3 =
3
L
-3
L =
1.58685 x 10
3 ton
radian
3.4. ROTATION
2. c
LL ( A .A .S.H.T.O . 14 .4.1.4)
L
TL: Relative rotation for elastomeric bearing between upper and bottom faces
TL, x
c: Unit defromation
c =
ci
h ri
LL
( A .A .S.H.T.O . 14 .4.1.2)
tab
diger
L
yol
-3
2.314 x 10
-3
-6.495 x 10
-3
1.410 x 10
-3
0.197 x 10
=
=
| S| =
eci=
eci=
c =
-3
1.587 x 10
-3
0.000 x 10
(Slab Load )
(Asphalt, Barrier and Pavement Loads)
(Moving Load)
(From Road Grade)
-3
0.988 x 10
radian
0.0297
(Ext. Layer)
0.0297
(Int.Layer)
Figure C14.7.5.3.3.1
2. c
= 0.1426 =
L
25.0
25
OK
L
> 0 .5 G S
h ri
S
n
S : Rotation at supports
S =
45.245 kgf/cm
24.231 kgf/cm
OK
3.6. STABILITY
Toplam elastomer kalnl : H
H = 3 cm
H < L/3
H < W/3
H < 8.333 cm
OK
H < 15 cm
OK
3 h ma x S
FY
hS
0.03
cm
2
Fy : Steel Plate yielding stregth (kgf/cm )
hS
FTH :
2 h ma x L
FTH
0.02
cm
DFTH = 1650 kgf/cm2
hs = 0.2 cm
>
0.03 cm
OK
26
4. SUPERSTRUCTURE LOADS
4.1. ABUTMENT (PILE SUPPORTING SYSTEM)
4.1.1. DEAD LOADS (DL)
Unit load of bridge platform
Precast Beam
In-situ casted slab
Asphalt
Handrail
= 1366.8479 ton
= 858.2875 ton
= 191.1024 ton
=
12.3200 ton
+
g = 2428.5578 ton
Cap beam
187.0375 ton
P
g= 2428.5578 t/m
0.25 m.
23.3 m.
0.25 m.
R max
According to results of total dead load of bridge platform, reaction force acting on one support will be
calculated as shown below:
Length of the platform = 57.7 m
R max =
2428.5578
2
1214.2789 ton
Total dead load acting on a piles = R max + W cap beam = 1214.2789 + 187.0375 = 1401.316 ton
Dead load acting on a 1 m =
1401.3160
57.7
24.286239 ton/m
27
24 ton 24 ton
4.25 m.
6 ton
4.25 m.
0.25 m.
23.3 m.
0.25 m.
R max
R max =
= 47.433 ton
P = 19.50 ton
g= 1.5 t/m
0.25 m.
23.3 m.
0.25 m.
R max
R max =
1.50
2 x 23.3
28
Temp. Increase: t = 20 C
o
Shrinkage
t = -25 C
o
L
=
2
= 20 E-05
= 25 E-05
(AASHTO 8.5.4 )
(23.3+2x0.25)x(20E-05+25 E-05)
2
= 0.005355
Choosen Bearing...
a = 250 mm.
H=
w G F
=
T
b = 450 mm.
0.5355 x 10 x 25 x 45
2.4
T=
=
24 mm.
G=10 kgf/cm
2510 kgf/bearing
29
0
1.5
psurdead = 0 t/m
t/m
t/m
Ko = 1-sin(28) = 0.531
Ka=
0.361
30
31
SAP2000 v14.2.2 - File:pile_type1 - Joint Loads (DEAD-ustyapi) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 16:25:58
32
ACTIVE LOADING
SAP2000 v14.2.2 - File:pile_type1 - Frame Span Loads (AKTIF) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 16:26:17
33
SURCHARGE LOADING
SAP2000 v14.2.2 - File:pile_type1 - Frame Span Loads (surcharge) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 16:26:28
34
SAP2000 v14.2.2 - File:pile_type1 - Frame Gravity Multipliers (DEPREM_X) (Global CSys) - Tonf, m, C Units
SAP2000
10.21.13 16:26:40
Ka = 0.361
g = 1.90 t/m3
=28 o
H=5.0 m
Do
Ka = 0.361
g = 1.90 t/m3
35
Kp = 2.77
g = 1.9 t/m3
p1 = q sur K a + H K a 2 c K a
z1 = H
p1
p1 + 2 c K a
P1 = q sur K
R1 = D 0 +
H +
1
K
2
z1 2 c
2
z1
.. moment arm for P1
3
p 2 = q sur K a + H K a 2 c K a
P2 = q sur K a + H K a 2 c K a D 0
R2 =
D0
.. moment arm for P2
2
p 3 = q sur K a + ( H + D 0 ) K a 2 c K a
P3 = q sur K a + ( H + D 0 ) K a 2 c K a
R3 =
D0
.. moment arm for P3
3
pP = H K a + 2 c K P
Pp = q a K P + 2 c K P
Rp =
D0
2
D0
.. moment arm for Pp
3
36
D0
2
z1
2
LOAD
CALCULATED LOAD
VALUES (ton)
P1
P1 x s /1.00 =
R1
P2
P2
R2
P3
P3
R3
P4
P4
R4
M=0
2 ( P1 x R1 + P2 x R2 + P3 x R3 ) P4 x R4 = 0
37
MOMENT ARM ( m )
Sin
Ka
Kp
28
0.4695
0.3610
2.7698
z earth fill
z pile
c
surcharge
pile diameter
pile spacing
1.90
5.00
5.00
0.00
1.50
100.00
120.00
t/m
m
m
t/m
t/m
cm
cm
lower zone
upper zone
Sin
Ka
Kp
35
0.5736
0.2710
3.6902
2
z earth fill
z pile
c
LOADS
Pa0
0.00 t/m
M0
0.00
Pa1
3.9714 t/m
M1
93.33
M2
M3
M4
75.51
13.85
-274.02
Pa2
Pa3
Pp
Do
Moment
GS
3.9714
6.1560
43.2360
6.1666
0.0000
t/m
t/m
t/m
m
z1
z2
ORAN
1.5
5.0000
z NOT CALCULATE
1.2000
Pile length
38
11.17
3
1.90 t/m
0.00 t/m
DEFLECTION CHECK
39
40
SAP2000
10.21.13 16:43:35
41
SAP2000 v14.2.2 - File:pile_type1 - Shear Force 2-2 Diagram (11) - Tonf, m, C Units
SAP2000
10.21.13 16:43:49
43
SHEAR FORCE DIAGRAM - EARTHQUAKE LOADING ( RESULTS OF SAP2000 SUPPORTING PILE MODEL )
SAP2000 v14.2.2 - File:pile_type1 - Shear Force 2-2 Diagram (18_X) - Tonf, m, C Units
SAP2000
10.21.13 16:44:52
42
SAP2000
10.21.13 16:43:59
44
SAP2000
10.21.13 16:45:01
P ( kN)
20000 (Pmax)
y
x
1000 mm diam.
Code: ACI 318-05
Units: Metric
Run axis: Biaxial
Run option: Investigation
Slenderness: Not considered
Column type: Structural
Bars: ASTM A615
2
0
Date: 11/02/13
2500
M (0) ( kNm)
Time: 14:07:40
-4000
(Pmin)
Engineer:
f'c = 25 MPa
fy = 420 MPa
Ag = 785398 mm^2
15 bars
Ec = 23500 MPa
Es = 199955 MPa
As = 7963 mm^2
rho = 1.01%
fc = 21.25 MPa
Xo = 0 mm
Ix = 4.91e+010 mm^4
Yo = 0 mm
Iy = 4.91e+010 mm^4
Beta1 = 0.85
Confinement: Other
Page
2
11/02/13
02:03 PM
General Information:
====================
File Name: d:\kamil d\####proje_2013\proje_irak_baharke_kavsak\uygul...\d100_type1.col
Project:
Column:
Engineer:
Code:
ACI 318-05
Units: Metric
Run Option: Investigation
Run Axis:
Biaxial
Material Properties:
====================
f'c
= 25 MPa
Ec
= 23500 MPa
Ultimate strain = 0.003 mm/mm
Beta1 = 0.85
Section:
========
Circular:
fy
Es
= 420 MPa
= 199955 MPa
Diameter = 1000 mm
785398 mm^2
Reinforcement:
==============
Bar Set: ASTM A615
Size Diam (mm) Area (mm^2)
---- --------- ----------# 3
10
71
# 6
19
284
# 9
29
645
# 14
43
1452
Iy =
Yo =
4.90874e+010 mm^4
0 mm
Pattern: Irregular
Total steel area, As = 7963 mm^2 at 1.01%
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
0
421
531
400
130
531
247
-341
531
-247
-341
531
-400
130
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
171
385
531
419
-44
531
88
-412
531
-365
-211
531
-313
282
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
313
282
531
365
-211
531
-88
-412
531
-419
-44
531
-171
385
Transverse Reinforcement :
Material : Concrete: C 25
Steel :
S 420
Vr=
8.17 ton
Vn=Vr/
=
9.62 ton
Pile Dia. bw =
Pile Core Dia. d =
rb=
zbar=
d=
100 cm
V C = 0 . 17
fc =
fyh=
Cover=
=
250 kg/cm2
4200 kg/cm2
Longitudinal R.C d=
Spiral d=
7.5 cm
0.85
Ag=
85 cm
7854.0 cm2
40 cm
25.46 cm
75.46 cm
fc b w d =
641410 N
64.14
ton
-54.52 ton
s=
5 cm
2
-0.860 cm
2As=Av=Vs*s/(d*fyh)=
Minimum Requirements :
qs=0.45(Ag/Ac-1)(fc/fyh)=
0.010287939
qs=0.12(fc/fyh)= 0.007142857
qs= 0.010287939
s= 5 cm
min.As=qs*d*s/4=
2
1.093 cm
>
-0.860 cm2
12 /5 cm
at plastic region
12 / 15 cm
at other region
1.131
>
1.093
46
cm2
26 mm
12 mm
0
1.5
psurdead = 0 t/m
t/m
t/m
Ko = 1-sin(35) = 0.426
Ka=
0.361
47
48
SAP2000 v14.2.2 - File:pile_type2 - Joint Loads (DEAD-ustyapi) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 16:51:35
49
ACTIVE LOADING
SAP2000 v14.2.2 - File:pile_type2 - Frame Span Loads (AKTIF) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 16:53:56
50
SURCHARGE LOADING
SAP2000 v14.2.2 - File:pile_type2 - Frame Span Loads (surcharge) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 16:54:09
51
SAP2000 v14.2.2 - File:pile_type2 - Frame Gravity Multipliers (DEPREM_X) (Global CSys) - Tonf, m, C Units
SAP2000
10.21.13 16:54:20
Ka = 0.361
g = 1.90 t/m3
=28 o
H=6.0 m
Do
Ka = 0.361
g = 1.90 t/m3
52
Kp = 2.77
g = 1.9 t/m3
p1 = q sur K a + H K a 2 c K a
z1 = H
p1
p1 + 2 c K a
P1 = q sur K
R1 = D 0 +
H +
1
K
2
z1 2 c
2
z1
.. moment arm for P1
3
p 2 = q sur K a + H K a 2 c K a
P2 = q sur K a + H K a 2 c K a D 0
R2 =
D0
.. moment arm for P2
2
p 3 = q sur K a + ( H + D 0 ) K a 2 c K a
P3 = q sur K a + ( H + D 0 ) K a 2 c K a
R3 =
D0
.. moment arm for P3
3
pP = H K a + 2 c K P
Pp = q a K P + 2 c K P
Rp =
D0
2
D0
.. moment arm for Pp
3
53
D0
2
z1
2
LOAD
CALCULATED LOAD
VALUES (ton)
P1
P1 x s /1.00 =
R1
P2
P2
R2
P3
P3
R3
P4
P4
R4
M=0
2 ( P1 x R1 + P2 x R2 + P3 x R3 ) P4 x R4 = 0
54
MOMENT ARM ( m )
Sin
Ka
Kp
28
0.4695
0.3610
2.7698
z earth fill
z pile
c
surcharge
pile diameter
pile spacing
1.90
6.00
6.00
0.00
1.50
100.00
120.00
t/m
m
m
t/m
t/m
cm
cm
lower zone
upper zone
Sin
Ka
Kp
35
0.5736
0.2710
3.6902
2
z earth fill
z pile
c
LOADS
Pa0
0.00 t/m
M0
0.00
Pa1
4.6573 t/m
M1
155.94
M2
M3
M4
124.11
23.07
-454.68
Pa2
Pa3
Pp
Do
Moment
GS
4.6573
7.2546
51.1860
7.3005
-0.0001
t/m
t/m
t/m
m
z1
z2
ORAN
1.5
6.0000
z NOT CALCULATE
1.2000
Pile length
55
13.30
1.90 t/m
0.00 t/m
DEFLECTION CHECK
56
57
SAP2000
10.21.13 16:56:12
58
SAP2000 v14.2.2 - File:pile_type2 - Shear Force 2-2 Diagram (11) - Tonf, m, C Units
SAP2000
10.21.13 16:56:29
59
SAP2000
10.21.13 16:56:44
60
SHEAR FORCE DIAGRAM - EARTHQUAKE LOADING ( RESULTS OF SAP2000 SUPPORTING PILE MODEL )
SAP2000 v14.2.2 - File:pile_type2 - Shear Force 2-2 Diagram (18_X) - Tonf, m, C Units
SAP2000
10.21.13 16:57:07
61
SAP2000
10.21.13 16:57:18
P ( kN)
20000 (Pmax)
y
x
1000 mm diam.
Code: ACI 318-05
Units: Metric
Run axis: Biaxial
Run option: Investigation
Slenderness: Not considered
Column type: Structural
Date: 11/02/13
2500
M (0) ( kNm)
Time: 14:08:04
-4000
(Pmin)
Engineer:
f'c = 25 MPa
fy = 420 MPa
Ag = 785398 mm^2
15 bars
Ec = 23500 MPa
Es = 199955 MPa
As = 7963 mm^2
rho = 1.01%
fc = 21.25 MPa
Xo = 0 mm
Ix = 4.91e+010 mm^4
Yo = 0 mm
Iy = 4.91e+010 mm^4
Beta1 = 0.85
Confinement: Other
Page
2
11/02/13
02:05 PM
General Information:
====================
File Name: d:\kamil d\####proje_2013\proje_irak_baharke_kavsak\uygul...\d100_type2.col
Project:
Column:
Engineer:
Code:
ACI 318-05
Units: Metric
Run Option: Investigation
Run Axis:
Biaxial
Material Properties:
====================
f'c
= 25 MPa
Ec
= 23500 MPa
Ultimate strain = 0.003 mm/mm
Beta1 = 0.85
Section:
========
Circular:
fy
Es
= 420 MPa
= 199955 MPa
Diameter = 1000 mm
785398 mm^2
Reinforcement:
==============
Bar Set: ASTM A615
Size Diam (mm) Area (mm^2)
---- --------- ----------# 3
10
71
# 6
19
284
# 9
29
645
# 14
43
1452
Iy =
Yo =
4.90874e+010 mm^4
0 mm
Pattern: Irregular
Total steel area, As = 7963 mm^2 at 1.01%
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
0
421
531
400
130
531
247
-341
531
-247
-341
531
-400
130
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
171
385
531
419
-44
531
88
-412
531
-365
-211
531
-313
282
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
313
282
531
365
-211
531
-88
-412
531
-419
-44
531
-171
385
Transverse Reinforcement :
Material : Concrete: C 25
Steel :
S 420
Vr=
11.39 ton
Vn=Vr/
=
13.40 ton
Pile Dia. bw =
Pile Core Dia. d =
rb=
zbar=
d=
100 cm
V C = 0 . 17
fc =
fyh=
Cover=
=
250 kg/cm2
4200 kg/cm2
Longitudinal R.C d=
Spiral d=
7.5 cm
0.85
Ag=
85 cm
7854.0 cm2
40 cm
25.46 cm
75.46 cm
fc b w d =
641410 N
64.14
ton
-50.74 ton
s=
5 cm
2
-0.801 cm
2As=Av=Vs*s/(d*fyh)=
Minimum Requirements :
qs=0.45(Ag/Ac-1)(fc/fyh)=
0.010287939
qs=0.12(fc/fyh)= 0.007142857
qs= 0.010287939
s= 5 cm
min.As=qs*d*s/4=
2
1.093 cm
>
-0.801 cm2
12 /5 cm
at plastic region
12 / 15 cm
at other region
1.131
>
1.093
63
cm2
26 mm
12 mm
0
1.5
psurdead = 0 t/m
t/m
t/m
Ko = 1-sin(28) = 0.531
Ka=
0.361
64
65
SAP2000 v14.2.2 - File:pile_type3 - Joint Loads (DEAD-ustyapi) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 17:02:48
66
ACTIVE LOADING
SAP2000 v14.2.2 - File:pile_type3 - Frame Span Loads (AKTIF) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 17:03:18
67
SURCHARGE LOADING
SAP2000 v14.2.2 - File:pile_type3 - Frame Span Loads (surcharge) (Global CSys) - Tonf, m, C Units
SAP2000
10.21.13 17:03:42
68
SAP2000 v14.2.2 - File:pile_type3 - Frame Gravity Multipliers (DEPREM_X) (Global CSys) - Tonf, m, C Units
SAP2000
10.21.13 17:03:49
Ka = 0.361
g = 1.90 t/m3
=28 o
H=7.1 m
Do
Ka = 0.361
g = 1.90 t/m3
69
Kp = 2.77
g = 1.9 t/m3
p1 = q sur K a + H K a 2 c K a
z1 = H
p1
p1 + 2 c K a
P1 = q sur K
R1 = D 0 +
H +
1
K
2
z1 2 c
2
z1
.. moment arm for P1
3
p 2 = q sur K a + H K a 2 c K a
P2 = q sur K a + H K a 2 c K a D 0
R2 =
D0
.. moment arm for P2
2
p 3 = q sur K a + ( H + D 0 ) K a 2 c K a
P3 = q sur K a + ( H + D 0 ) K a 2 c K a
R3 =
D0
.. moment arm for P3
3
pP = H K a + 2 c K P
Pp = q a K P + 2 c K P
Rp =
D0
2
D0
.. moment arm for Pp
3
70
D0
2
z1
2
LOAD
CALCULATED LOAD
VALUES (ton)
P1
P1 x s /1.00 =
R1
P2
P2
R2
P3
P3
R3
P4
P4
R4
M=0
2 ( P1 x R1 + P2 x R2 + P3 x R3 ) P4 x R4 = 0
71
MOMENT ARM ( m )
Sin
Ka
Kp
28
0.4695
0.3610
2.7698
z earth fill
z pile
c
surcharge
pile diameter
pile spacing
1.90
7.10
7.10
0.00
1.50
100.00
120.00
t/m
m
m
t/m
t/m
cm
cm
lower zone
upper zone
Sin
Ka
Kp
35
0.5736
0.2710
3.6902
2
z earth fill
z pile
c
LOADS
Pa0
0.00 t/m
M0
0.00
Pa1
5.4119 t/m
M1
251.62
M2
M3
M4
197.69
37.15
-729.68
Pa2
Pa3
Pp
Do
Moment
GS
5.4119
8.4630
59.9277
8.5473
-0.0002
t/m
t/m
t/m
m
z1
z2
ORAN
1.5
7.1000
z NOT CALCULATE
1.2000
Pile length
72
15.65
1.90 t/m
0.00 t/m
DEFLECTION CHECK
73
74
SAP2000
10.21.13 17:05:13
75
SAP2000 v14.2.2 - File:pile_type3 - Shear Force 2-2 Diagram (11) - Tonf, m, C Units
SAP2000
10.21.13 17:05:21
76
SAP2000
10.21.13 17:05:27
77
SHEAR FORCE DIAGRAM - EARTHQUAKE LOADING ( RESULTS OF SAP2000 SUPPORTING PILE MODEL )
SAP2000 v14.2.2 - File:pile_type3 - Shear Force 2-2 Diagram (18_X) - Tonf, m, C Units
SAP2000
10.21.13 17:05:36
78
SAP2000
10.21.13 17:05:43
P ( kN)
20000 (Pmax)
y
x
1000 mm diam.
Code: ACI 318-05
Units: Metric
Run axis: Biaxial
Run option: Investigation
Slenderness: Not considered
Column type: Structural
Date: 11/02/13
2500
M (0) ( kNm)
Time: 14:06:29
-4000
(Pmin)
Engineer:
f'c = 25 MPa
fy = 420 MPa
Ag = 785398 mm^2
15 bars
Ec = 23500 MPa
Es = 199955 MPa
As = 7963 mm^2
rho = 1.01%
fc = 21.25 MPa
Xo = 0 mm
Ix = 4.91e+010 mm^4
Yo = 0 mm
Iy = 4.91e+010 mm^4
Beta1 = 0.85
Confinement: Other
Page
2
11/02/13
02:05 PM
General Information:
====================
File Name: d:\kamil d\####proje_2013\proje_irak_baharke_kavsak\uygul...\d100_type3.col
Project:
Column:
Engineer:
Code:
ACI 318-05
Units: Metric
Run Option: Investigation
Run Axis:
Biaxial
Material Properties:
====================
f'c
= 25 MPa
Ec
= 23500 MPa
Ultimate strain = 0.003 mm/mm
Beta1 = 0.85
Section:
========
Circular:
fy
Es
= 420 MPa
= 199955 MPa
Diameter = 1000 mm
785398 mm^2
Reinforcement:
==============
Bar Set: ASTM A615
Size Diam (mm) Area (mm^2)
---- --------- ----------# 3
10
71
# 6
19
284
# 9
29
645
# 14
43
1452
Iy =
Yo =
4.90874e+010 mm^4
0 mm
Pattern: Irregular
Total steel area, As = 7963 mm^2 at 1.01%
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
0
421
531
400
130
531
247
-341
531
-247
-341
531
-400
130
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
171
385
531
419
-44
531
88
-412
531
-365
-211
531
-313
282
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
313
282
531
365
-211
531
-88
-412
531
-419
-44
531
-171
385
Transverse Reinforcement :
Material : Concrete: C 25
Steel :
S 420
Vr=
14.21 ton
Vn=Vr/
=
16.71 ton
Pile Dia. bw =
Pile Core Dia. d =
rb=
zbar=
d=
100 cm
V C = 0 . 17
fc =
fyh=
Cover=
=
250 kg/cm2
4200 kg/cm2
Longitudinal R.C d=
Spiral d=
7.5 cm
0.85
Ag=
85 cm
7854.0 cm2
40 cm
25.46 cm
75.46 cm
fc b w d =
641410 N
64.14
ton
-47.43 ton
s=
5 cm
2
-0.748 cm
2As=Av=Vs*s/(d*fyh)=
Minimum Requirements :
qs=0.45(Ag/Ac-1)(fc/fyh)=
0.010287939
qs=0.12(fc/fyh)= 0.007142857
qs= 0.010287939
s= 5 cm
min.As=qs*d*s/4=
2
1.093 cm
>
-0.748 cm2
12 /5 cm
at plastic region
12 / 15 cm
at other region
1.131
>
1.093
80
cm2
26 mm
12 mm
SELF WEIGHT:
Total Dead Load : 1214.2789 ton / 44 beam
Dead load acting on a pile =
27.59725 ton/beam
25.30 ton/pile
LIVE LOAD:
Truck Load : 47.433 x 2 x 0.9 x 1 + 0 ton ---> 85.3794 / 8
VLL = 10.7 ton /pile
Live load acting on a pile =
10.70 ton/pile
EARTHQUAKE LOAD:
Total Lateral Force : 0.1 x 25.3 = 2.53 ton /pile
HEQ = 2.53 ton / pile
81
(for 9 m platform)
0
1.5
psurdead = 0 t/m
t/m
t/m
Ko = 1-sin(28) = 0.531
Ka=
0.361
82
83
SAP2000 v14.2.2 - File:pile_type4 - Joint Loads (DEAD-ustyapi) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 17:08:49
84
SAP2000 v14.2.2 - File:pile_type4 - Joint Loads (live-ustyapi) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 17:09:01
85
EARTHQUAKE FORCE
SAP2000 v14.2.2 - File:pile_type4 - Joint Loads (DEPREM_ustyapi-x) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 17:09:10
86
ACTIVE LOADING
SAP2000 v14.2.2 - File:pile_type4 - Frame Span Loads (AKTIF) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 17:09:19
87
SURCHARGE LOADING
SAP2000 v14.2.2 - File:pile_type4 - Frame Span Loads (surcharge) (As Defined) - Tonf, m, C Units
SAP2000
10.21.13 17:09:39
88
SAP2000 v14.2.2 - File:pile_type4 - Frame Gravity Multipliers (DEPREM_X) (Global CSys) - Tonf, m, C Units
SAP2000
10.21.13 17:09:48
(FOR H= 7.25m)
Ka = 0.361
g = 1.90 t/m3
=28 o
H=7.25 m
Do
Ka = 0.361
g = 1.90 t/m3
89
Kp = 2.77
g = 1.9 t/m3
p1 = q sur K a + H K a 2 c K a
z1 = H
p1
p1 + 2 c K a
P1 = q sur K
R1 = D 0 +
H +
1
K
2
z1 2 c
2
z1
.. moment arm for P1
3
p 2 = q sur K a + H K a 2 c K a
P2 = q sur K a + H K a 2 c K a D 0
R2 =
D0
.. moment arm for P2
2
p 3 = q sur K a + ( H + D 0 ) K a 2 c K a
P3 = q sur K a + ( H + D 0 ) K a 2 c K a
R3 =
D0
.. moment arm for P3
3
pP = H K a + 2 c K P
Pp = q a K P + 2 c K P
Rp =
D0
2
D0
.. moment arm for Pp
3
90
D0
2
z1
2
LOAD
CALCULATED LOAD
VALUES (ton)
P1
P1 x s /1.00 =
R1
P2
P2
R2
P3
P3
R3
P4
P4
R4
M=0
2 ( P1 x R1 + P2 x R2 + P3 x R3 ) P4 x R4 = 0
91
MOMENT ARM ( m )
Sin
Ka
Kp
28
0.4695
0.3610
2.7698
z earth fill
z pile
c
surcharge
pile diameter
pile spacing
1.90
7.25
7.25
0.00
1.50
100.00
120.00
t/m
m
m
t/m
t/m
cm
cm
lower zone
upper zone
Sin
Ka
Kp
35
0.5736
0.2710
3.6902
2
z earth fill
z pile
c
LOADS
Pa0
0.00 t/m
M0
0.00
Pa1
5.5148 t/m
M1
308.61
M2
M3
M4
300.99
72.84
-1332.66
Pa2
Pa3
Pp
Do
Moment
GS
5.5148
9.5187
73.2528
10.4478
-309.0068
t/m
t/m
t/m
m
z1
z2
ORAN
1.5
7.2500
z NOT CALCULATE
1.2000
Pile length
92
17.70
1.90 t/m
0.00 t/m
DEFLECTION CHECK
93
94
SAP2000
10.21.13 17:11:31
95
SAP2000 v14.2.2 - File:pile_type4 - Shear Force 2-2 Diagram (11) - Tonf, m, C Units
SAP2000
10.21.13 17:11:41
96
SAP2000
10.21.13 17:11:49
97
SHEAR FORCE DIAGRAM - EARTHQUAKE LOADING ( RESULTS OF SAP2000 SUPPORTING PILE MODEL )
SAP2000 v14.2.2 - File:pile_type4 - Shear Force 2-2 Diagram (18_X) - Tonf, m, C Units
SAP2000
10.21.13 17:11:58
98
SAP2000
10.21.13 17:12:06
P ( kN)
20000 (Pmax)
y
x
1000 mm diam.
Code: ACI 318-05
Units: Metric
Run axis: Biaxial
Run option: Investigation
Slenderness: Not considered
Column type: Structural
Date: 11/02/13
2500
M (0) ( kNm)
Time: 14:07:08
-4000
(Pmin)
Engineer:
f'c = 25 MPa
fy = 420 MPa
Ag = 785398 mm^2
15 bars
Ec = 23500 MPa
Es = 199955 MPa
As = 7963 mm^2
rho = 1.01%
fc = 21.25 MPa
Xo = 0 mm
Ix = 4.91e+010 mm^4
Yo = 0 mm
Iy = 4.91e+010 mm^4
Beta1 = 0.85
Confinement: Other
Page
2
11/02/13
02:06 PM
General Information:
====================
File Name: d:\kamil d\####proje_2013\proje_irak_baharke_kavsak\uygul...\d100_type4.col
Project:
Column:
Engineer:
Code:
ACI 318-05
Units: Metric
Run Option: Investigation
Run Axis:
Biaxial
Material Properties:
====================
f'c
= 25 MPa
Ec
= 23500 MPa
Ultimate strain = 0.003 mm/mm
Beta1 = 0.85
Section:
========
Circular:
fy
Es
= 420 MPa
= 199955 MPa
Diameter = 1000 mm
785398 mm^2
Reinforcement:
==============
Bar Set: ASTM A615
Size Diam (mm) Area (mm^2)
---- --------- ----------# 3
10
71
# 6
19
284
# 9
29
645
# 14
43
1452
Iy =
Yo =
4.90874e+010 mm^4
0 mm
Pattern: Irregular
Total steel area, As = 7963 mm^2 at 1.01%
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
0
421
531
400
130
531
247
-341
531
-247
-341
531
-400
130
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
171
385
531
419
-44
531
88
-412
531
-365
-211
531
-313
282
Area mm^2
X (mm)
Y (mm)
--------- -------- -------531
313
282
531
365
-211
531
-88
-412
531
-419
-44
531
-171
385
Transverse Reinforcement :
Material : Concrete: C 25
Steel :
S 420
Vr=
14.54 ton
Vn=Vr/
=
17.11 ton
Pile Dia. bw =
Pile Core Dia. d =
rb=
zbar=
d=
100 cm
V C = 0 . 17
fc =
fyh=
Cover=
=
250 kg/cm2
4200 kg/cm2
Longitudinal R.C d=
Spiral d=
7.5 cm
0.85
Ag=
85 cm
7854.0 cm2
40 cm
25.46 cm
75.46 cm
fc b w d =
641410 N
64.14
ton
-47.03 ton
s=
5 cm
2
-0.742 cm
2As=Av=Vs*s/(d*fyh)=
Minimum Requirements :
qs=0.45(Ag/Ac-1)(fc/fyh)=
0.010287939
qs=0.12(fc/fyh)= 0.007142857
qs= 0.010287939
s= 5 cm
min.As=qs*d*s/4=
2
1.093 cm
>
-0.742 cm2
12 /5 cm
at plastic region
12 / 15 cm
at other region
1.131
>
1.093
100
cm2
26 mm
12 mm