DUW 1012 Case Study 3


(SET A)
Name :
Matrix No.:
Name :
Matrix No.:
Name :
Matrix No.:

Duration: 30 minutes

As a members of Osh Committee in Electrical Engineering Department, you and


your team had identify a few hazard and asses its risk to student and staff that have
to face the hazard in their daily routine of work.
a) At wiring workshop; the 2-level bay, the corridor holders are too low, thats
below hips.
b) A hill step at the main entrance JKE heading upward to wiring & project
workshop was being spotted to be a favorites shortcut route.
c) There were plenty of holes on the cement floor around JKE including at stairs
step, classrooms, along corridor and other location.
d) At the computer laboratory, the floors were using hard-plastic material as
tiles. Problem occurs when times flies by, the corners of each tiles were
smash up (terjongket), and risking student an staff of its sharp end corner.
e) JKEs lecturers were full of lust and passions when it comes to teaching and
learning process. So, theyve been beared their equipment of Teaching &
Learning along their way to classes. Each session of class, and each day a
week. From the factor of ergonomic and the hazard exist along JKE
environment; this is a huge risk of accident and illness in long term.
f) There were few laboratories at JKE that had lack of safety from the position of
workbench. Among with the amount and sizes of these benches, it turns out
to full fill the space of this lab to place this bench. In a safety point of view,
these conditions were not being safe at all.
g) All stairs in department were build not according to its specification. The
steps (anak tangga) were too short. Theres a location where it steps where
to short when you place your foot, it only covers half of your foot. This was
too dangerous.

In group, assess the risk by the table of consequence (Table 1) and severity
(Table 2) given.
Determine on which value is suitable for each of your group case.
Get the Risk Priority Number (RPN) according to Consequence X Severity
formula, using the risk matrix table (Table 3).
Each risk level is determined on Table 4 which your team are needed to
discuss among yourselves, why your case are stated on level that you
choose. Elaborate your findings in a full page report.

RISK ASSESSMENT TABLES

CONSEQUENCE

Table 1

Table 2

SEVERITY

RISK MATRIX

LEVEL DETAILS

Table 3

Table 4

RPN

Case Study Grading Rubric


Each item is rated on the following rubric.
1= Very poor
2 = Poor
3 = Adequate
4 = Good
5 = Excellent

Item

Score

1. Evidence of preparation (organized presentation,


presentation/discussion flows well, no awkward pauses or confusion from
the group, evidence you did your homework)

2. Content (group presented accurate & relevant information, appeared


knowledgeable about the case studies assigned and the topic discussed,
offered strategies for dealing with the problems identified in the case
studies)

3. Eastern connection (group identified campus resources to help with the


problem/issues, discussed relevance to own experience)

4. Delivery (clear and logical organization, effective introduction and


conclusion, creativity, transition between speakers, oral communication
skillseye contact)

5. Discussion (group initiates and maintains class discussion concerning


assigned case studies, use of visual aides, good use of time, involves
classmates)

Total Score: ________ (sum of Items 1-5)

Total Score X 4: ________ (to make the assignment of 100 points)

Comments: