SERVICE WATER PUMP
30
31
32
33
34
35
36
MULTI GRADE FILTER
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
ULTRA FILTRATION
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
REVERSE OSMOSIS
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
CT MAKE UP PUMP
106
107
108
DEGASSER BLOWER
109
110
111
112
113
DM UNIT
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
NEUTRALIZE PIT
131
132
133
134
135
136
137
138
UNLOADING SYSTEM
139
140
141
142
143
144
145
146
BOREWELLS
147
148
149
150
151
152
153
154
155
156
157
158
159
COOLING TOWER
160
161
162
DRINKING RO
163
EYE WASH FOUNTAIN
164
165
BOILER AND LABORATORY
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
PVT LTD
midipoondi
DETAILS
STATUS
DEPT
NT
ELE
CLIENT
MECH
MECH
INST
Completed
MECH
MECH
Completed
WTP
MECH
INST
Completed
MECH
INST
MECH
MECH
Completed
MECH
INST
Completed
MECH
INST
ELE
Completed
MECH
WTP
INST
REMARKS
Completed
WTP
MECH
Completed
WTP
MECH
ELE
MECH
MECH
MP
MECH
Completed
WTP
ELE
MECH
MECH
MECH
Completed
MECH
R
WTP
Completed
WTP
MECH
MECH
MECH
Completed
INST
Completed
ELE
Completed
MECH
MECH
INST
ELE
MECH
MECH
INST
INST
Completed
WTP
INST
MECH
MECH
MECH
MECH
MECH
Completed
MECH
INST
INST
INST
MECH
MECH
MECH
MECH
MECH
MECH
MECH
Completed
MECH
MECH
MECH
MECH
MECH
ELE
Completed
INST
Completed
WTP
INST
INST
MECH
MECH
MECH
MECH
MECH
INST
MECH
MECH
MECH
MECH
INST
INST
MECH
MECH
MECH
MECH
MECH
INST
MECH
MECH
MECH
MECH
MECH
MECH
MECH
Completed
WTP
MECH
MECH
R
Completed
WTP
Completed
MECH
ELE
MECH
WTP
Completed
WTP
MECH
MECH
INST
MECH
Completed
MECH
Completed
MECH
INST
Completed
MECH
MECH
Plattform to be
needed
MECH
INST
Completed
MECH
MECH
INST
Completed
MECH
INST
MECH
WTP
INST
INST
MECH
MECH
WTP
WTP
M
ELE
INST
MECH
MECH
MECH
MECH
MECH
INST
Completed
MECH
MECH
MECH
Completed
MECH
MECH
MECH
MECH
Completed
MECH
MECH
ELE
ELE
MECH
Completed
WTP
INST
Completed
WTP
INST
N
Completed
WTP
WTP
ORY
MECH
MECH
CLIENT
CLIENT
CLIENT
WTP
CLIENT
WTP
Completed
ELE
Completed
MECH
MECH
MECH
Completed
MECH
Completed
MECH
MECH
INST
INST
INST
MECH
MECH
MECH
INST
MECH
MECH
MECH
MECH
29
SERVICE WATER PUMP
30
31
32
33
34
35
36
MULTI GRADE FILTER
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
ULTRA FILTRATION
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
REVERSE OSMOSIS
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
CT MAKE UP PUMP
106
107
108
DEGASSER BLOWER
109
110
111
112
113
DM UNIT
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
NEUTRALIZE PIT
131
132
133
134
135
136
137
138
UNLOADING SYSTEM
139
140
141
142
143
144
145
146
BOREWELLS
147
148
149
150
151
152
153
154
155
156
157
158
159
COOLING TOWER
160
161
162
DRINKING RO
163
EYE WASH FOUNTAIN
164
165
BOILER AND LABORATORY
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
N Pit tank sorrounding side gross & bed material filling work to be done
UNLOADING SYSTEM
Caustic unloading pump not available.
Caustic unloading pump pressure gauge not available.
Caustic bulk tank level galss pvc diapharm valve handle to be changed
Caustic unloading pump side serivce water pump fixed because ETP
plant purpose.( Suction & discharge line fixed work going on.
HCL bulk tank side suction pump to be fixed.due to ETP plant purpose.
Caustic bulk tank level glass drain valve not available.
HCL tank level galss pvc diapharm valve handle to be changed
HCL unloading pump pressure gauge not available.
BOREWELLS
Borewell no 5th discharge connection damaged,so to be connected.
Sump pump 2 removed condition, so to be fixed
Borewell 2 to be taken in out side.
Borewell no 8 pump to be taken in out side,Due to electrical problem.
Borewell no 8 pump to be taken in out side,Due to electrical problem.
Borewell no 7 side pvc line leakage to be arrested.
Borewell no 1 Discharge side dummy to be fixed.
Guard pond flow meter Bypass line to be required
Borewell no 13 th to be opened
Borewell no 12 th running time continously tripped, so to be rectified.
Borewell no 14 th running time continously tripped, so to be rectified.
Sump pump to raw water tank make up line side one valve to be
provided,because direct make to clarifier tank.
Coal shed back side commen mechanical flow meter sump inside water
is there.so flow meter to be covered.
COOLING TOWER
CT PH sensor drain hose cleaning to be done.
CT PH sensor to be fixed
CT sump 1 to be cleaned
DRINKING RO
PVT LTD
midipoondi
DETAILS
STATUS
DEPT
NT
ELE
CLIENT
MECH
MECH
INST
MECH
MECH
INST
INST
MECH
MECH
INST
Completed
MECH
INST
ELE
Completed
MECH
WTP
INST
Completed
WTP
MECH
Completed
WTP
MECH
ELE
MECH
REMARKS
MECH
MP
MECH
Completed
WTP
ELE
MECH
MECH
MECH
Completed
MECH
R
WTP
Completed
WTP
MECH
MECH
MECH
Completed
INST
Completed
ELE
Completed
MECH
MECH
INST
ELE
MECH
MECH
INST
INST
Completed
WTP
INST
MECH
MECH
MECH
MECH
MECH
Completed
MECH
INST
INST
INST
MECH
MECH
MECH
MECH
MECH
MECH
MECH
Completed
MECH
MECH
MECH
MECH
MECH
ELE
Completed
INST
Completed
WTP
INST
INST
MECH
MECH
MECH
MECH
MECH
INST
MECH
MECH
MECH
MECH
INST
INST
MECH
MECH
MECH
MECH
MECH
INST
MECH
MECH
MECH
MECH
MECH
MECH
MECH
Completed
WTP
MECH
MECH
R
Completed
WTP
Completed
MECH
ELE
MECH
WTP
Completed
WTP
MECH
MECH
INST
MECH
Completed
MECH
Completed
MECH
INST
Completed
MECH
MECH
MECH
INST
Completed
MECH
MECH
INST
Completed
MECH
INST
MECH
WTP
INST
INST
MECH
MECH
WTP
Plattform to be
needed
WTP
M
ELE
INST
MECH
MECH
MECH
MECH
MECH
INST
Completed
MECH
MECH
MECH
Completed
MECH
MECH
MECH
MECH
Completed
MECH
MECH
ELE
ELE
MECH
Completed
WTP
INST
Completed
WTP
INST
N
Completed
WTP
WTP
ORY
MECH
MECH
CLIENT
CLIENT
CLIENT
WTP
CLIENT
WTP
Completed
ELE
Completed
MECH
MECH
MECH
Completed
MECH
Completed
MECH
MECH
INST
INST
INST
MECH
MECH
MECH
INST
MECH
MECH
MECH
MECH