Vous êtes sur la page 1sur 25

.

Technical Specification
For
Dry Type (Cast Resin)
Transformer
11kV/433V

Techno-commercial Bid
(Part-I)

Raja Ramanna Centre for Advanced


Technology, Indore
(M.P)

Contents
Section-A:
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0

Scope
Codes and standards
Bidder's eligibility criteria
Constructional features
Enclosure for transformer
Fittings and accessories
Performance requirement
Inspection and tests
Tolerances
Bid evaluation and penalty criteria
Acceptance criteria
Guarantee period
Documentation
Delivery period
Brief technical specification
Guaranteed Technical Particulars
Load features

Section-B:
1.0
2.0
3.0
4.0

Schedule of Prices
Schedule of essential spares
Activity schedule
Schedule of deviations

Section - A

TECHNICAL SPECIFICATION OF 2 MVA, 11 KV/433V TRANSFORMER


Scope

The scope includes design/engineering, manufacture, testing and


supply of resin cast dry type transformer of rating 2000 KVA, 11
kV/433V, 50 Hz with required spares and accessories, as per the
technical specification.
Codes and Standards

2
2.1
2.2

The design, manufacture and performance of equipment shall comply


with all currently applicable statutes, regulations and safety codes.
Except where modified by this specification, wherever applicable all
material and equipments shall conform to the requirements of latest
Indian Electricity Rule (IER) and below given standards, including all
amendments.

S.No.

2.3

3
3.1

Description

Standard

1.

Dry type transformer

IS 11171& IS 2026

2.

Current transformer (PS class)

:IS 2705

3.

Degree of Ingress Protection for control gear

:IS 12063

4.

Bushing for Alternating voltage above 1000V

:IS 2099

5.

Thermal Evaluation & Classification Of Electrical


Insulation

:IS 1271

6.

Fittings and accessories

IS 3639

7.

Measurement of transformer and reactor sound


levels

IEC 60076-10
or NEMA TR- 1

The overriding effect of various applicable documents shall be as


follows:
1. Tender technical specification.
2. Applicable codes & standards.
3. Approved vendor drawings.
Bidder Eligibility Criteria:
The bidder shall comply with the following conditions:
The Bidder should be the Original Equipment Manufacturer (OEM)/ authorized

dealer of the OEM. The OEM shall have experience of design/engineering,


fabrication, testing and supply of cast resin dry type transformer of minimum
2000kVA rating in last 5 (five) years from the date of tender. In support of above
and the documentary evidence in respect of OEM five yearsexperience shall be
submitted i.e. copies of orders, completion /performance certificate with the
contact details of the end users.
3.2
3.2

The bidder shall submit balance sheets, profit & loss statement for last
03 (three) financial

years. During this period the bidder shall not have incurred overall loss and average
annual turn-over shall not be less than Rs. 02 (Two) crore.
Note:
(a). In case bidder is not OEM, he should also submit the agreement with OEM,
showing that he is authorized to quote on their behalf and the OEM shall support
the bidder for all warranty etc.
(b)Price not to be filled in Part-1 (Technical offer).
4 . Constructional Features
4.1General Requirements:

The dry type cast resin transformers shall be AN (Air Natural) cooled. All
material used shall be new, best quality and of the most suitable class for
working conditions as per the tender technical specification. The material shall
withstand the outdoor atmospheric conditions, overloads, over excitation and
short circuits as per above standards without distortion, deterioration and the
setting-up of undue stresses in any part.
4.1.1 For similar specifications, the supplied transformers shall be identical and their
parts shall be interchangeable.
4.1.2 Nuts, bolts and pins shall be provided with lock washers or locknuts.
4.2

Core:

4.2.1 Transformer design shall be core type. The core shall be made out of high
grade, non-ageing, low loss cold-rolled grain oriented (CRGO) silicon steel
laminations. The core shall be painted and insulated with suitable resin to
protect it against corrosion. The lamination shall be free from burrs and sharp
projections.
4.2.2 The yoke laminations shall be interleaved and carefully assembled to avoid airgaps in the magnetic circuit. The core shall be earthed as per the relevant
standards.
4.2.3 The insulation structure in between core to bolts and core to clamp plates
shall withstand a minimum voltage of 2500 V for one minute.
4.2.4 All steel sections used for supporting the core shall be free from burrs.
4.2.5 The design of the magnetic circuit shall be such as to avoid static
discharges, development of short circuit paths within itself or to the earthed clamping
structure.
4.2.6 The assembled core with all the clamping structures shall be free from
deformation and shall withstand the vibrations during operation.
4.2.7 The core clamping structure shall be designed to minimize eddy current losses.

4.3

Windings:

4.3.1 The Cu-ETP grade copper conductor shall be used for transformer HV and LV
windings. The design and arrangement of the windings and their insulation
shall be such as to ensure uniform distribution of the voltage surges among
all the coils of the windings.
4.3.2 The windings shall be provided with Class-F epoxy resin cast insulation. The
insulation shall have high tensile and dielectric strength. Enough measures
shall be taken during casting to avoid the void formation, cracking and crazing
etc. of the cast coils.
4.3.3 Both HV and LV windings of each phase shall be separately cast on rigid
tubular coil co-axially arranged under vacuum in to moulds. The epoxy resin
insulation system shall be fibre glass strengthened.
4.3.4 The resin used for winding insulation shall be non-hygroscopic to prevent the
penetration of moisture into windings. It should be possible to energize the
transformer without pre-drying even after a long period of service interruption.
The resin used shall be noninflammable, self-extinguishing, void free and
suitable for tropical climate with 100% relative humidity. In the case of
windings provided with taps, the inter-turn insulation of tapped windings shall
be reinforced to obtain uniform stress distribution.
4.3.5 The transformer shall be able to withstand short circuits as well as
switching and lightning/atmospheric impulse voltages as specified in the IS
11171 Standard. The leads and connections shall be mechanically strong and
adequately brazed to withstand short circuit forces and transportation shocks.
4.4 Core and Coil Assembly:
The cast coils are inserted on to the core limbs. The resin cast spacer blocks,
end blocks and separators shall be used as required.
4.5

Earthing:
Single point earthing shall be used for magnetic circuit. The frame work and
clamping arrangements of core and coil shall be securely earthed by copper
strip connection to the main frame and enclosure. Two earthing terminals
suitable for 75X10 mm GI strip shall be provided on the frame for enclosure
earthing.

4.6 Tapping:
Off circuit tap changing link shall be provided with total tapping range of +10%
to -10% in steps of 2.5 %. The tapings shall be on high voltage side. The
transformer shall be capable of delivering its rated output at any tap position
without damage.

4.7 Terminal box arrangement:


4.7.1 The HV side termination facility of the transformers shall be designed for

connecting 11

kV XLPE insulated armoured cable terminated in crimping type lugs and heat
shrinkable sleeves or pre-moulded cast resin push on type terminations.
Suitable undrilled gland plate shall be provided for terminating HV cables. HV
terminals shall be extended up to the cable terminals and the bus bars shall
be located at a convenient height. The cable entry shall be from the bottom.
Preferably the bus-bars shall be supported by the supporting insulators from
the top frame of the enclosure. The winding delta formation on HV side shall be
in supplier's scope.
4.7.2 The LV side terminals and the LV termination box of transformers shall be
suitable for sandwich bus duct connection with flexible conductors. The
earthing stud shall be provided on LV termination box for clamping
sandwich bus duct earthing conductor. The winding star formation on LV
side shall be in supplier's scope.
4.7.3 The LV neutral terminal of the star connected winding shall be brought out
at two separate insulated terminals. One neutral terminal shall be provided by
side of the phase terminals for connecting neutral to bus-duct neutral bus-bar
in the LV termination box. Second neutral terminal shall be provided to
facilitate the earth conductor down to the ground level. The terminal shall be
suitable for connecting two numbers of earth conductors (75mmX1Omm GI)
for neutral earth connection with two separate earthing pads.
4.8 Support Insulators:

a) Support Insulators shall be designed and tested to comply with the


applicable standards.
b) HV terminals rated for minimum current 400A shall have non ferrous and
nonmagnetic flanges and hardware.
c) Air clearance and creepage distances shall be maintained as per the relevant
standard.
d) Preferably the material for support insulators shall be Porcelain or epoxy
resin cast.
4.9 Current Transformer LCT):

a) The REF (Restricted Earth Fault) CT shall be epoxy resin casted under
vacuum and having ratio of 3200/ 1A, Class PS, 10 VA. The CT shall have
minimum V1 400V, maximum 30mA Imag at Vkne/2 and Kt less than 7 Ohm.
This CT shall be provided in the common portion of the LV neutral (Before
branching to LV neutral to earth connection). Class of insulation system of
the CT shall be class F.

b) CT Secondary leads shall be brought to the marshalling box.


c) CT details shall be indicated on name plate of the transformer.
4.10 Temperature sensor & winding temperature indicators (WTI):

a) Temperature sensors: Two (2) numbers, reputed make simplex type (Platinum)
PT 100 shall be provided in each phase at suitable place for measuring hot
spot temperature.
b) A multi channel digital winding temperature indicator shall be provided to
display the temperature of the windings.
c) The indicating instrument shall be provided with four adjustable
electrically

independent ungrounded contacts brought out to separate terminals for


winding temperature alarm and trip. The WTI shall be compatible to 110V
DC and 230V, 50Hz. AC auxiliary supplies.
d) WTI scanner shall have remote PC (personal Computer) communication facility.
4.11 Marshalling box:
a)

The weather proof marshalling box shall be mounted on the transformer


housing. All doors, covers and plates shall be provided with neoprene
gaskets. Bottom of the marshalling box shall be at least 600 mm above
floor level and provided with removable bolted & undrilled gland plate etc.
The required number of knock-out punches shall be provided for outgoing
control cables.

b) All contacts for alarm, trip and indication circuits shall be electrically
potential free, wired for auxiliary supply as specified and brought out to
separate terminals at the terminal blocks in the marshalling box. if
required, separate MCBs shall be provided for protection, isolation and
distribution of AC & DC control supplies in the marshalling box. Wiring
shall be with PTFE insulated (Insulation for wire & cable shall be in
consistence with the ambient temperature in the housing). The wiring
conductor shall be stranded copper and of sizes not less than 4 sq. mm for
CT circuit and 2.5 sq. mm for other control circuits. CT terminals shall
be provided with standard shorting facility. The wires shall be drawn through
neatly clamped conduits. Engraved identification ferrules, marked as per the
approved wiring diagrams shall be provided on each wire. Ferrules shall be
of yellow colour with black lettering. Preferably the terminals shall be stud
type and provided with crimping type cable sockets.

5. Enclosure for transformer:


5.1 The core and coil assembly shall have CRCA sheet steel MS enclosure. The
purpose of having the enclosure is to provide safety from live parts, protect and

make the equipment suitable for outdoor conditions, prevent ingress of foreign
matters, vermin and rodents etc. The minimum number of louvers shall be
provided on the sides of enclosure and the louvers should be covered with SS
or galvanized sheet fine (openings not more than 2.5 mm) mesh. The
enclosure should have structural steel framework with lockable hinged
door on HV and LV termination sides of the transformer. The gasketted doors
shall facilitate the inspection of the transformer.
5.2 The enclosure frame shall be fabricated using suitable CRCA pressed and
shaped sheet steel of thickness not less than 3.0 mm for structural
members and 2.0 mm for all doors/covers etc.

5.3 All panel edges and door edges shall be reinforced against
distortion/deformation by rolling, bending and addition of welded reinforcement
members.

5.4 The complete structure shall be rigid, self-supporting and shall be suitable for
connecting ventilation hood on the top. To remove heat from the transformer,
its metallic enclosure shall have sufficient heat dissipation capability in outdoor
conditions, throughout the year without any additional cooling arrangement. GI
or SS wire mesh shall be provided in the gap in between enclosure and
ventilation hood to prevent entry of birds etc. Powder/enamel paint
coated 3mm thick perforated MS mesh shall be provided for enclosing the
bottom side.
5.5 The enclosure shall not have degree of ingress protection less than IP 33.
5.6 Door switch with 2 NO + 2 NC auxiliary contacts of required rating shall be
provided. It will be used for providing interlock in the HV breaker circuit.
5.7 Painting: After thorough metal treatment enclosure surface shall be given two
coats of enamel/powder paint. Double coat of corrosion resistant primer shall
be applied before painting. The inside of the enclosure shall have semi-glossy
paint finish. All metal parts not accessible for painting shall be made of
corrosion resistant material. All paints shall be carefully selected to withstand
heat and tropical weather conditions.
6.

Fittings and accessories:

Following fittings and accessories shall be provided:


6.1 HV/ LV Terminals suitable for the purchaser's external conductors.
6.2 Rating, terminal marking and danger plates.

6.3 Three earth terminals per transformer, each suitable for earth conductor's of
size 2 nos. 75X10 mm GI strip for earthing of the body of the transformers and
its enclosure.
6.4 Lifting lugs for:
6.4.1 Complete transformer (with enclosure).
6.4.2 Core-Coil assembly.
6.5 The under base shall be provided with channels etc.
6.6 Four bi-directional rollers in base frame for movement of complete transformer
assembly. The stopper arrangement to lock the transformer in the required
position shall also be provided.
6.7 Enclosure with provision for dismantling.
6.8 Marshalling box
6.9 Neutral earth terminal with lugs.
6.10 Six number PT 100 RTDs with WTI display.
6.11 Off circuit tap links.
7.

Performance requirement:

7.1 Transformers shall operate without abnormal heating at the rated KVA at any
voltage within 10 percent of the rated voltage of that particular tap.
7.2 Transformer shall be designed for 110% continuous over fluxing withstand
capability.
7.3 The continuous and short time over loading capacities shall be furnished in
detail. Overloads shall be allowed within the condition defined in the applicable
standard. Terminal,taps or any other auxiliary equipment shall not limit such over
loading. The transformer

shall also be suitable for feeding power to the load as per the load
features (refer clause number 17) of the specification.
7.4 The neutral terminal of windings with star connection shall be designed for
the highest over-current that can flow through this winding.
7.5 The bidder shall ensure that the design and manufacturing of the transformer
shall be such as to reduce noise and vibration level. The sound level of the
transformer with its enclosure in position shall not exceed 66dBA measured
in accordance with NEMA TR-1 or IEC 60076-10 Standard.
7.6 The apparent charge limit shall be 20pC during partial discharge test as per
IS 11171. 7.7 The transformer HV winding shall be suitable for vacuum circuit
breakers switching. 7.8 All other performance requirement as per the relevant
standards and codes shall be met
with the conditions specified above.
8. Inspection and Tests:
At all reasonable times, the purchaser's representative shall have access
to the manufacturer or sub-manufacturer works for the purpose of
witnessing, tests and ascertaining that the transformer being supplied

conform to the requirements of this specification. The stage inspection shall


be performed during fabrication stage. The bidder shall provide the detailed
activity schedule for stage inspection. The bidder shall inform the purchaser at
least in 15 days advance of the testing due date and ask for their
representative's availability. The detailed test schedule shall also be
submitted.
The visual checks including dimensions and clearances shall be performed
during Pre-dispatch Inspection (PDI). In addition to the above checks, the
following routine and special tests shall be carried out on each assembled
transformer.
8.1 Routine Tests:
The tests shall be as below:
a. Measurement of Resistance of windings
b. Measurements of voltage ratio at all taps and check of voltage vector
relationship.
c. Check test for polarity.
d. Measurement of impedance voltage (principal tap), short circuit impedance
and load loss at rated current.
e. Measurement of No-Load loss and current.
f. Separate source voltage withstand test.
g. Induced over voltage withstand test.
h. Measurement of insulation resistance.
i. HV tests on auxiliary & control wiring.
j. Calculation of the regulation and efficiency at rated load on unity P.F and
0.8 P.F lag.
All routine tests shall be carried out as per the IS
11171/2026.
8.2 Special Tests:
a. Partial Discharge test.

b. Measurement of acoustic sound level.


c. Measurement of zero sequence impedance.
8.3Type Test: These tests shall be performed on one of the transformers (as selected
by the
purchaser during PDI) from the lot.

a. The Temperature rise test as per IS 11171.


b. Lightning impulse test at 75kV full standard (1.2/50psec.) lightning
impulse. This test shall be carried out as per IS 11171, at
IEC/CPRI/ERDA/NABL/Govt. approved labs only.
If transformer fails in any of the tests specified, the purchaser shall have the
option to reject complete lot. Additional test shall be performed to determine
the reason of failure and after necessary modifications; all the tests shall be
repeated to prove that the modified transformer meets with the requirements of
the specification in all respects. The cost, if any, for the modification, testing
including any additional test required for verification of the transformer
performance shall be to the account of the bidder.
9.

Tolerances:
Allowable tolerance for other parameters except losses shall be as per the 1S2026 Part-I. In respect of total losses maximum +10% shall only be
permissible, subject to penalty as per clause 10 of the specification. The
losses in the guaranteed Technical particulars (GTP) submitted by the
supplier shall be the reference for percentage loss and bid evaluation.

10.

Bid evaluation & Loading/Penalty Criteria (as per CBIP transformer manual):
1. Formula for evaluation of
bids (`base case' will be the
lowest of guaranteed losses
separately for Load losses
in kW (Wc) & No-Load
losses in kW (Wi) of the
bids received).

Evaluated cost = (F.O.R. cost in ` +


Loading (in `)). The formula for loading
is given by

2. Rates of penalty for exceeding


the guaranteed losses.

In case the measured total loss figure


exceeds the GTP figures by +10% the
transformer shall be liable for
rejection. If measured total loss figure
exceed GTP by less than 10%, the
transformer may be
accepted
subject to
penalty at the rate of `437332/kW
for additional No-Load losses and
`31488/kW for additional Load losses.
No rebate shall be given for the actual
losses being less than the guaranteed
losses submitted by the bidder.

"Loading (in `) = 437332 x (guaranteed


No-Load losses in kW Wi 'base
case') + 31488 x (guaranteed Load
losses in kW Wc 'base case')]".

11.

Acceptance Criteria:
Successful testing as per clause 8 of the specification.

12.

Guarantee Period:
The transformers shall be guaranteed for a period of minimum 2 (Two)
years from the date of acceptance at RRCAT after delivery.

13.

Documentation:
The bidder shall submit the documents at different stages as given
below.
13.1 With Bid (Technical/Part-1):
(a) Copies of orders, completion /performance certificate and contact details of
the end users in support of OEM experience. Refer clause 3.1 of bidder
eligibility criteria of the technical specification.
(b) Copies of the balance sheets, profit & loss statement of the bidder for
last 03 (three) financial years. Refer clause 3.2 of bidder eligibility criteria of
the technical specification.
(c) Detailed catalogues/datasheet and literature indicating technical
specifications.
(d) The following Type Test reports of cast resin dry type transformer
minimum 2000kVA rating.
(i) Impulse voltage withstand test.
(ii)Short-circuit withstand test.
(iii)
Temperature rise test report for offered item rating.

(e) Exhaustive Quality Assurance Plan (QAP) of the manufacturer.


(f) Duly Filled GTP as per the format given in clause 16 (GTP).
(g) Detailed activity schedule as per the format given in section-B clause
3.0.
Note: The offer(s) without copies of the above mentioned shall be liable for
summary rejection.
13.2 After placement of purchase Order: The following documents shall
be submitted for RRCAT approval, before taking up fabrication.
(a)Detailed transformer drawings along with LV and HV termination
box dimensions.
(b)Earth terminals, marshalling panel details and bill of material etc.
(c) Supporting calculations for additional losses caused by harmonic
loading (refer clause 17) and corresponding hot spot/average winding
temperature rise.
(d)Graph of core loss in watt/kg versus flux density (wb/m2) for the
transformer core material.
(e) Continuous and short time over loading details.

13.3 On completion: Six (06) sets of bound manuals of final detailed


drawings, control drawings (marshalling panel), test reports, technical
catalogues, installation instructions, O&M instructions, guarantee
certificate & compliance report etc. along with their soft copy.
14. Delivery period:
The bidder shall quote for minimum delivery period. In this regard, a detailed
activity bar chart shall be submitted by the bidder for manufacturing, testing at
works, transportation and delivery at RRCAT. Expected supply schedule for the
total work is around 4-5 months from the date of order placement.
15.
Brief Technical Specifications
The Technical details are as below.

TECHNICAL PARTICULARS
1
2
3
4

Rating
Frequency
No. of Phases

: 2000 kVA
: 50 Hz 3%
: 3 (Three)

Rated Voltage
i)HV : 11000 Volts with +6% & -9% tolerances.
ii) LV : 433 Volts.

Winding connections
i. HV : Delta
ii.LV : Star

Vector Group

: Dyn11

Seismic Zone
Maximum ambient air
temperature

: Zone-III

: 50C

Max. daily average ambient


temp.

: 40C

10

Service

: Outdoor

Other service conditions

: As per IS:11171/2026

12

Class of Insulation

: minimum class - F

13

Allowable Max.temp. rise of


windings

11

14

Tapping

: 90C
: +10% to -10% in steps of 2.5% on HV side through
off circuit tap links

15
16

17

Percentage Impedance voltage


at principal tap.

: 6.25%

Type of cooling

:AN

Terminal arrangement
HV
LV

18
19
(i)

(ii)

Sound level in transformer

3 core, 11 KV XLPE cable up to 240 Sq.mm:


Aluminium conductor Sandwich bus duct as per
the specification
66dBA ( measured as per standards IEC 60076-10 or
NEMA TR-1

System voltage
HV side
a) Nominal system voltage

11 kV

b) Highest system voltage

12 kV

LV side
a)Nominal system voltage
b)Highest system voltage

433V
477V

20

System earthing

Solidly grounded system neutral

21

System fault level

25KA for 1 sec. at I IkV

22

Insulation withstand voltages

a)

Impulse

75KV (peak)

b)

Power frequency HV
Power frequency LV

28KV(rms)
3 KV(rms)

c)

16.
Guaranteed Technical Particulars (GTP) for Transformer:
The bidder shall submit the filled GTP along with Part-1 (technical bid).

S.
No.

1
2
3
4
5
6
7
8

10

11
12
13
14
15
16
17
18

Description

Name of manufacturer
. Model & type
Suitable for outdoor installation
Standards followed by the
manufacturer or compliance to the
standard
Relevant standard (IS/IEC) for
Short time overloading capacity

Detail/parameter

(Yes/No)

Rated KVA
Short circuit withstand capacity in
kA (with time interval)
Rated Voltage:
(i) HV side
(ii) LV side
Rated current:
(i) HV side
(ii) LV side
Tapping: +10% to -10% in steps of
2.5% on HV side, through off
circuit tap links

HV/LV windings type


Class of insulation system
Winding Connections: HV - Delta
& LV- Star
Vector group reference: Dynll
Rated frequency : 50Hz
Type of cooling : AN
Enclosure class of IP (Ingress
Protection)
Maximum temperature rise of
windings at rated load (as per IS
11171).

(Yes/No)

(Yes/No)
(Yes/No)
(Yes/No)
(Yes/No)

19

20

21
22
23

24
25

26
27

Guaranteed No-Load losses on


principal tapping at rated voltage
and rated frequency.
Guaranteed Load-losses on
principal tapping at rated current
corrected to 75C winding
temperature. Specify, whether the
loss figure is maximum or with IS
tolerance.
Percentage impedance at rated
current for the principal tapping
Percentage reactance at rated
current and rated frequency
Efficiencies at 75C and 0.8 P.F lag
on:
1) Full load
2)75% of full load
3) 50% of full load
4)25% of full load
Magnetizing inrush current value
Percentage regulation at 75C:
(a)At full load:
1) unity power factor
2)0.8 power factor lag
(b) At 50% full load
1) unity power factor
2)0.8 power factor lag
No-load current and power factor
at rated voltage and rated
frequency
No-load power factor at rated
voltage and rated frequency

28. Highest system voltage for


which transformer windings are
suitable:
(a) HV winding
(b) LV winding
29

Maximum flux density at rated


voltage

30

Each phase winding turns


(i) HV winding

31
32
33

(ii) LV winding
Current density at rated current)
HV winding in A/mm
Current density (at rated current)
LV winding in A/mm2
Insulation level
a) separate source power
frequency withstand
b)Full wave lightning impulse
withstand
c) Induced over voltage withstand

34

Weight
a) Core and windings
b) Enclosure
c) Total

35

Dimensions
a) Length
b) Breadth
c) Height

36

Compliance to Environment class


as per IEC 60076: E0 or El or E2

37
38
39
40
41

Compliance to Climate class as


per IEC 60076 : Cl or C2
Compliance to Fire proof class as
per IEC 60076: FO or Fl
Transformer acoustic level
(measured as per standards IEC
60076-10 or NEMA TR-1)
Apparent charge limit during
partial discharge test as per IS
11171 H
Guarantee period: minimum 2
(Two) years from the date of
acceptance at RRCA

(Yes/ No)

17. Load Features:

17.1 The load includes 6 pulse and 12 pulse SCR (silicon controlled rectifier)
power convertor, SMPS etc. The harmonic spectrum may contain the following.
S.
Current Harmonic Order
Magnitude (% of the
No.
fundamental)

1 .5%
18%
9%
1%
5%
2.5%
1%

3rd

1.
2.
3.
4.
5.
6.
7.

5th
7th
9th
11th
13th
15th

17.2. Power convertors loading pattern: The converters periodic loading pattern i.e.
r.m.s current variation with time (in sec.) is as shown below in figure-1.

021

0.14

0.10

0.14

?bows In *month

Figure-1
***************************************

Section-B

1.0 Schedule of Prices:


Item.
No.

Description

Qty.

Supply Rate

Taxes

& Duties

Amount

1.0

Design / Engineering,
04Nos.
fabrication,
Assembly, Testing at works and
supply of continuous duty,2000
kVA, 11kV/0.433kV, 50 Hz
three
phase dry type cast resin
transformer
along
with
required spares (refer 2.0
section-B, schedule of essential
spares) & accessories as per
specification.

PRICES
NOT
TO
BE
FILLED
IN
PART-1

Signature & Seal of the Bidder

2.0 Schedule of essential spares:


The bidder shall also supply the spares as per the list mentioned below. Item wise
unpriced list of these spares shall be confirmed along with partI of the offer. The
prices shall be indicated for individual spare component along with part-2 (Price
bid) of the offer.
S.No.

Description

Qty.

1.

Off circuit tap links of transformer

01 set

2.

WTI

02Nos.

3.

LV insulators

01 set.

4.

Olset

5.

HV
insulators
Rating, terminal and danger plates

6.

Earthing terminal with lugs

7.

-Complete set of gaskets

01 set
' 01 No.
01 set

8.

REF CT

01 No.

9.

Support insulators

01 set

Supply Rate

Amount

PRICES

PRICES

NOT

NOT

TO

TO

BE

BE

FILLED

FILLED

IN

IN

PART-1

PART-1

Signature & Seal of the Bidder

3.0 Activity schedule:


The bidder shall submit the activity schedule along with the offer. After
placement of order, duration required for each activity should be mentioned
separately as per the format given below.

S.No.

Activity

Duration

1.

Design and Engineering

2.

Submission of fabrication drawings for


approval
Submission of design calculation for

3.
4.

additional
loss and temperature rise
Fabrication/stage inspection

5.

Assembly and Testing at Works

6.

Supply at site

Signature & Seal of the Bidder


Desirable delivery schedule is 4-5 months.
4.0 Schedule of deviations:
There are no deviations in the specification of the offered item(s) except for the
following.

S.No.

Tender Specification
Para/Point No.

Deviation detail

Remarks/Justification

Signature & Seal of the Bidder