5.1
SLOPE
1%
A.T.
CSTB
MAIN AREA AND UPSTAND FLASHING
12
Silicone mastic
Metal flashing
Mechanical fixing
@@
@@
@@
@@
@@
@@
@@
11 Waterproofing:
cap sheet PARADIENE 30.1 AS/GS torched
10 Reinforcement angle: PAREQUERRE torched
4 Mechanical fixings
(see technical agrement of the insulation board)
40 mm
PENETRATION
12
11
11
FM mechanical fixing
Steel deck
EXPANSION JOINT
1
10
150 mm
6 Penetration
7 Reinforcement with PARADIENE S VV
GUTTERS AND VARIOUS CONNECTIONS : ask the Export Technical Department
NOTICES
1. In valley against a wall, an underlay of mechanically fixed PARADIENE FM is required.
2. Other allowed board: bare perlite.
5.2
SLOPE
1%
A.T.
CSTB
MAIN AREA AND UPSTAND FLASHING
Silicone mastic
Metal flashing
Mechanical fixing
1
FM mechanical fixing
@@
@@
@@
@@
@@
@@
@@
PENETRATION
EXPANSION JOINT
2
1
40 mm
11
10
8
6
7 Reinforcement with PARADIENE S VV
5
NOTICES
1. In valley against a wall, an underlay of mechanically fixed PARADIENE FM is required.
2. Other allowed board: bare perlite.
150 mm
5.3
3/3
SLOPE
1%
A.T.
CSTB
MAIN AREA AND UPSTAND FLASHING
Silicone mastic
Metal flashing
Mechanical fixing
Bent galvanized steel plate 1
Primer: SIPLAST PRIMER 2
Reinforcement angle: 10
PAREQUERRE torched
FM Mechanical fixing 9
Old waterproofing
Steel deck
PENETRATION
EXPANSION JOINT
2
1
40 mm
11
10
6
7 Reinforcement with PARADIENE S VV torched
5 Reinforcement with PARADIENE FM
NOTICES
1. In valley against a wall, an underlay of mechanically fixed PARADIENE FM is required.
2. Remove a 400 mm wide strip of the old waterproofing around all perimeters rain water outlets and usptands.
3. On old mineral self protected waterproofing: apply SIPLAST PRIMER
On old metal self protected waterproofing: remove the metal foil.
4. Removing the old upstand is mandatory.
150 mm