Copyright
2002 by Computational Systems, Incorporated.
All rights reserved.
No part of this publication may be reproduced, transmitted, transcribed, stored in a retrieval system, or
translated into any language in any form by any means
without the written permission of Computational
Systems, Incorporated (CSI).
Disclaimer
This manual is provided for informational purposes.
COMPUTATIONAL SYSTEMS, INCORPORATED MAKES NO
WARRANTY OF ANY KIND WITH REGARD TO THIS
MATERIAL, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY AND
FITNESS FOR A PARTICULAR PURPOSE. Computational
Systems, Incorporated shall not be liable for errors,
omissions, or inconsistencies that may be contained
herein or for incidental or consequential damages in
connection with the furnishing, performance, or use of
this material. Information in this document is subject
to change without notice and does not represent a
commitment on the part of Computational Systems,
Incorporated. The information in this manual is not allinclusive and cannot cover all unique situations.
Product Support
Should you have any comments on this documentation or questions concerning the Agreement on the
following pages, please contact CSIs Product Support
Department.
Address:
Computational Systems, Incorporated
835 Innovation Drive
Knoxville, TN 37932 USA
Phone:
United States and Canada: 865-675-4274
FAX:
865-218-1416
Internet E-mail:
United States and Canada: custserv@compsys.com
Worldwide Web:
http://www.CSImeansReliablilty.com
ii
Reference Manual
This document was written, illustrated, and produced
by CSIs Engineering Publications Group on Power
Macintosh workstations using Adobe FrameMaker,
Adobe PhotoShop, and Macromedia FreeHand.
Printed copies are produced using the Xerox
DocuTech publishing system.
Trademarks and Servicemarks
AccuTrend; Changing the way the world performs
maintenance, and CSI logo; CSIRBM(Mexico); Doctor
Know; Infranalysis; InfraRoute; Levels of Awareness
Training; M&D; MachineGuard; MachineView;
MasterNet; MotorView; Nspectr; O&M Workstation;
OilView (Japan); RBMware; Reliability-Based Maintenance, and logo; RollView; StarterTrend; STATUS
Technologies; TrendSetter; Tribology Minilab;
UltrasSpec; and WAVEPAK are registered trademarks
of Computational Systems, Incorporated.
CSI (China, Japan, Venezuela, Australia); CSIRBM (Venezuela); Status Condition Monitor; PeakVue; RBMview;
RBMware (Australia, China, Japan); RBMwizard; Reliability-Based Maintenance (Venezuela); SonicScan;
SonicView; SST; STATUS RF SmartSensor; STATUS RF
Transceiver; VersaBal; VibPro; VibView; and Weldwatch are pending trademarks of Computational
Systems, Incorporated.
Lubricant Profile and Trivector are registered servicemarks of Computational Systems, Incorporated.
RBM; RBMware (China); Reliability-Based Maintenance (Venezuela); and STATUS Technologies and
design are pending servicemarks of Computational
Systems, Incorporated.
Adobe is a trademark and FrameMaker and PhotoShop
are registered trademarks of Adobe Systems, Inc.
Power Macintosh is a trademark of Apple Computer,
Inc. Macromedia is a registered trademark and FreeHand is a trademark of Macromedia, Inc. Xerox and
DocuTech are trademarks of Xerox Corporation.
All other brand or product names are trademarks or
registered trademarks of their respective companies.
Patents
The product(s) described in this manual are covered
under existing and pending patents.
License Agreement
IMPORTANT: CAREFULLY READ ALL THE TERMS AND CONDITIONS OF THIS
AGREEMENT BEFORE OPENING THE PACKAGE OR PROCEEDING WITH INSTALLATION. OPENING THE PACKAGE OR COMPLETING THE INSTALLATION INDICATES YOUR ACCEPTANCE OF THE TERMS AND CONDITIONS CONTAINED IN
THIS AGREEMENT.
IF YOU DO NOT AGREE TO THE TERMS AND CONDITIONS CONTAINED IN
THIS AGREEMENT, CANCEL ANY INSTALLATION, PROMPTLY RETURN THIS
PRODUCT AND THE ASSOCIATED DOCUMENTATION TO CSI AND YOUR
MONEY WILL BE REFUNDED. NO REFUNDS WILL BE GIVEN FOR PRODUCTS
WITH DAMAGED OR MISSING COMPONENTS.
Definition of Software
As used herein, software refers to any computer program contained on
any medium. Software includes downloadable firmware for use in
devices such as analyzers or MotorSTATUS units and it includes
computer programs executable on computers or computer networks.
Software License
You have the non-exclusive right to use this software on only one device
at a time. You may back-up the software for archival purposes. For
network systems, you have the non-exclusive right to install this software
on only one server. Read/write access is limited to the number of licenses
purchased. The number of read-only accesses is not limited.
Software Updates
CSI agrees to provide Purchaser, at no charge except for media, preparation and shipping charges, for one (1) year from the date of purchase,
updates to the software and made at the sole discretion of CSI. Should
Purchaser desire to purchase software maintenance for the next
succeeding year following the first year from the date of purchase, and
thereafter on an annual basis, and if CSI is still providing maintenance,
Purchaser may purchase the same, annually, at the existing rate.
Updates/Upgrades
Upon receipt of new CSI software replacing older CSI software, you have
30 days to install and test the new CSI software on the same or a different
device. At the end of the 30-day test period, you must both remove and
return the new CSI software or remove the older CSI software.
Ownership
The licensed software and all derivatives are the sole property of CSI
Technology, Inc. You may not disassemble, decompile, reverse engineer
or otherwise translate the licensed program. You may not distribute
copies of the program or documentation, in whole or in part, to another
party. You may not in any way distort, or otherwise modify the program
or any part of the documentation without prior written consent from CSI.
Transfer
You may transfer the software and license to another party only with the
written consent of CSI and only if the other party agrees to accept the
terms and conditions of this Agreement. If you transfer the program, you
must transfer the documentation and any backup copies or transfer only
the documentation and destroy any backup copies.
Copyright
The software and documentation are copyrighted. All rights are reserved.
Termination
If you commit a material breach of this Agreement, CSI may terminate
the Agreement by written notice.
Virus Disclaimer
CSI uses the latest virus checking technologies to test all its software.
However, since no anti-virus system is 100% reliable, we strongly advise
that you use an anti-virus system in which you have confidence to verify
the software is virus-free. CSI makes no representations or warranties to
the effect that the licensed software is virus-free.
NO WARRANTY
THE PROGRAM IS PROVIDED AS-IS WITHOUT ANY WARRANTIES,
EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO ANY
WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE.
LIMITATION OF LIABILITY AND REMEDIES
IN NO EVENT WILL CSI BE LIABLE TO YOU OR ANY THIRD PARTY
FOR ANY DAMAGES, INCLUDING ANY LOST PROFITS, LOST
SAVINGS, OR OTHER INCIDENTAL OR CONSEQUENTIAL DAMAGES
ARISING OUT OF THE USE OR THE INABILITY TO USE THIS
PROGRAM. THE LICENSEES SOLE AND EXCLUSIVE REMEDY IN THE
EVENT OF A DEFECT IN WORKMANSHIP OR MATERIAL IS EXPRESSLY
LIMITED TO THE REPLACEMENT OF THE MEDIA. IN NO EVENT WILL
CSI'S LIABILITY EXCEED THE PURCHASE PRICE OF THE PRODUCT.
Export Restrictions
You agree to comply fully with all laws, regulations, decrees and orders
of the Unites States of America that restrict or prohibit the exportation (or
reexportation) of technical data and/or the direct product of it to other
countries, including, without limitation, the U.S. Export Administration
Regulations.
U.S. Government Rights
The programs and related materials are provided with RESTRICTED
RIGHTS. Use, duplication or disclosure by the U.S. Government is
subject to restrictions set forth in the Federal Acquisition Regulations and
its Supplements.
iii
iv
Contents
Chapter 1 Introduction
Special Emphasis 1-2
How to Use 1-3
Plant Appointed Project Manager 1-3
Contractor 1-5
Supplemental Information 1-6
Where to Start 1-7
vi
Installation 6-7
Pull A680 Bundled Cable from Junction Box/4500R or 4500S 6-9
Description 6-9
Required Tools & Parts 6-9
4500R or 4500S Enclosure 6-9
Guidelines for Dedicated 4500R or 4500S Network Segment 6-10
Description 6-10
4500R or 4500S Power Circuit Guidelines 6-11
Description 6-11
vii
Index
viii
Chapter
Introduction
Preface
Congratulations on your purchase of the CSI 4500R or 4500S online monitoring system. Along with your system hardware and software, you have
been provided several manuals to assist in installing, learning, and maintaining your system. This particular document is the RBMware Online System
Installation. The purpose of this document is to provide system installers
specific requirements and instructions for the correct installation of the CSI
4500R or 4500S online monitoring system and accessories.
This manual does not attempt to explain the operation or application of the
CSI 4500R or 4500S online system nor does it cover hardware or software
specifications.
Note
1-1
Caution!
Warning!
1-2
Introduction
How to Use
There are two intended audiences for this manual: the plant appointed
project manager, and the contractor. As such, it is important that each
understand how to make use of this document.
Warning!
Warning!
Caution!
How to Use
1-3
Pre-Installation Review
System Documentation
Install Instrumentation
Enclosure Mounting
Cabling Requirements
Wire Terminations.
These sections follow the natural progression of a system installation which
should make it easier for the project manager to estimate schedules and
budgets for the installation. Another important function of the project manager is to procure bids from contractors. Each contractor should receive a
copy of this manual and use that as a basis for their scope of work. Apart
from the installation manual, all the contractor should need is a copy of the
system proposal and any supplemental information for special purchases.
When reviewing bids from contractors it is very important that each contractors scope of work is based on this installation manual and all exceptions are noted.
Before the contractor begins work, the project manager will have the
important duty of performing an installation review and creating proper
system documentation. The installation review, which may include a Contractor Kickoff Meeting attended by a CSI online project manager, is
intended to educate everyone involved with the installation on requirements, deadlines, procedures, etc. The installation review also requires the
project manager to perform a final walk-through of the installation site and
determine if the purchased hardware is adequate and if any additional
hardware will be required.
System documentation is often neglected until an installation is completed.
The project manager must be in charge of creating proper system documentation for the contractor before the installation begins. This includes
assigning labels, creating system diagrams, and filling out cable administration charts. Having the proper system documentation will make the contractors job easier and reduce the number of mistakes made.
Finally the project manager should use this installation manual to validate
the work being performed by the contractor. Particular attention should be
paid to any Notes or Cautions within the document, which are the most
common causes of a poor installation.
1-4
Introduction
Contractor
The contractor will use this manual for two purposes: preparing a bid for
the system installation, and as a guide during the system installation.
When preparing a bid for the system installation, it is imperative that the
contractor reviews all parts of the manual that are specific to the installation
and list any exceptions to the manual within the bid. If the contractor takes
no exceptions, then it will be assumed that the bid covers the scope of work
as defined in the installation manual.
As an installation guide, it is not necessary that the installer be familiar with
the entire manual. The manual is written so a contractor when performing
a certain action, such as installing an AO322LC sensor, can turn to that particular section and have a complete instruction set without referencing any
other part of the manual. This should make it easier when many people are
involved with the installation, each performing a specific function.
How to Use
1-5
Supplemental Information
This installation manual covers the standard online system components.
For specific customer installations, there will be non-standard components
purchased with the online system. For each of these components, an installation guide supplement will be prepared by CSI and included with the
installation guide. If a purchased component cannot be found in the installation guide, please contact your CSI project manager and request an installation guide supplement.
1-6
Introduction
Where to Start
The chapters in this manual are intended to follow the natural progression
of a system installation. The plant assigned project manager needs to pay
particular attention to Chapter 2 Pre-Installation Review and Chapter 3
System Documentation. Contractors need to review Chapters 4-7 to fully
understand the scope of work involved in the online system installation.
The following is a brief summary of each chapter.
Chapter 2 Pre-Installation Review
The online system instrumentation includes the 322 family of accelerometers and the 425 tachometer. This chapter covers the handling requirements, required tools, and the installation procedures for each piece of
instrumentation.
Chapter 5 Enclosure Mounting
The online system will have two types of enclosures: junction boxes (701
family and the 745) and the 4500R or 4500S enclosure. This chapter covers
choosing proper enclosure mounting locations and mounting procedures as
well as preparing the 4500R or 4500S enclosure for conduit access.
Chapter 6 Cabling Requirements
This chapter covers conduit installation guidelines, network cabling guidelines, power line specifications, and pulling the online instrumentation
cabling as well as the 680 bundled (multi-pair) cable from junction boxes
to the 4500R or 4500S.
Where to Start
1-7
Often the cause of most system failures, proper wire terminations within the
online system components is critical for a successful system startup. This
chapter covers routing, tagging, preparing, and terminating cables within
the V701, 702, 703, 745 junction boxes and 4500R or 4500S enclosures.
1-8
Introduction
Chapter
Pre-Installation Review
Description
The pre-installation review is a short but important phase in a successful
online system implementation. Consisting of a Contractor Kickoff
Meeting, final walk-through, and a system component review, it is the
responsibility of the plant assigned project manager with the assistance of
the CSI online project manager to ensure this phase of the system installation is completed successfully. The pre-installation review accomplishes the
following:
Identify and Educate all parties involved in the online system installation
Makes sure that the contractor fully understands the scope of work
Sets the system installation schedule
Confirms that system components fit customers application
Confirms that all necessary system components are on site and available.
Confirms location of system components is appropriate
It is not uncommon for plants to schedule the Contractor Kickoff
Meeting, final walk-through, and system component review all in one day.
This is especially beneficial when the CSI online project manager is
attending the Contractor Kickoff Meeting so that they may assist the plant
assigned project manager during the final walk-through and system component review. For this reason it is also recommended that the online system
has been shipped to the customer site before installation work begins.
2-1
2-2
Pre-Installation Review
Final Walk-Through
The final walk-through is attended by the plant assigned project manager,
contractor representative(s), and the CSI online project manager. Using the
system documentation (see chapter 3) as reference, this is the opportunity
to physically walk-through each part of the installation with the contractors
representative(s) and the vendors representative (online project manager)
to review:
Sensor Mounting Locations
Cable Pulls
Conduit/Cable Tray Use
Enclosure Mounting Locations
Environmental Concerns
Hazardous Locations.
Final Walk-Through
2-3
2-4
Pre-Installation Review
Chapter
System Documentation
Description
Often an overlooked part of the system installation, proper documentation
of a system installation will not only avoid problems during installation but
will also make system maintenance much more efficient. Unfortunately,
many system installations do not have documentation created until after an
installation is completed. A successful installation requires that proper
system documentation be created before a contractor begins working.
Proper documentation includes: system overview drawings showing the
on-line system layout within the plant; system layout drawings showing
sensor and enclosure mounting locations; and tags for all sensors, cables,
and enclosures documented in cable administration charts. This documentation must be given to a contractor before the installation begins and preferably as part of the bid package. When an installation is finished, it is
important that the documentation which has been maintained by the plant
assigned project manager is distributed to the proper plant personnel and
readily available for system maintenance and troubleshooting. The 4500R
or 4500S data collection unit and junction/switch box enclosures include
see-through pouches for storing the on-line system documentation.
3-1
3-2
System Documentation
3-3
3-4
System Documentation
3-5
3-6
System Documentation
Junction Box
The online system junction boxes each serve the same purpose: to provide
a junction between the instrumentation cable and the multi-pair bundled
cable which is pulled back to the 4500R. The cable administration chart for
a junction box simply documents the channel number, wire tag, sensor
type, and sensor location if the wire tag does not contain location information. The following is an example of the junction box cable administration
chart for a typical installation. These charts are shipped with the system and
can be found inside the online system junction boxes.
3-7
4500R Enclosure
The 4500R enclosure has several types of cable terminations with specific
termination locations. The 4500R consists of removable boards to allow
several different configurations. These boards include mux 1&2, tach, I/O,
and the DCM. Each board has specific cable terminations which must be
documented in the cable administration charts. The cable administration
charts for the 4500R consist of two 8.5" x 11" pages. Templates are included
in the installation guide for the project manager to copy and fill out.
3-8
System Documentation
3-9
3-10
System Documentation
4500S Enclosure
The 4500S enclosure has one cable termination card for the 8 sensors, 2
tachometers, and 2 discrete I/O. There is also a 10BaseT network termination and an AC power termination. These are to be documented on the
4500S cable administration chart. A template for this chart has been
included.
3-11
3-12
System Documentation
Documentation Storage
After the system installation is complete, it is the project managers job to
review the system documentation and make any revisions such as rerouted
cables, misspelled wire tags, etc. and make the necessary revisions in the
system documentation. The last step is to create copies of the completed
system documentation and distribute to the appropriate plant personnel.
One copy should be sent to the CSI online project manager. This is also the
appropriate time to place the cable administration charts in the online
enclosures. Each enclosure contains a clear plastic pouch to allow easy reference by contractors and service personnel. In each 4500R enclosure, it is
recommended that a copy of the system overview and layout drawings be
placed in the pouch for quick reference.
Documentation Storage
3-13
3-14
System Documentation
Chapter
Install Instrumentation
4-1
4-2
Install Instrumentation
Description
The A0322RI and A0322RA are general purpose accelerometers with 90degree integral cable connections. The A0322DR sensor is a general purpose accelerometer and temperature sensor with a 90-degree cable connection.These sensors are stud mounted or epoxy mounted to machinery
surfaces and transmit vibration data to the on-line monitoring system. The
integral cable connection joins the sensor housing at a 90-degree angle to
provide a low-profile installation. The A0322RI has a distinguishing bright
yellow polyurethane jacket for easy identification while the A0322DR has
a red polyurethane jacket. The A0322RA is contained in a steel housing
with an armored covered jacket.
Handling Instructions
4-3
Caution!
Do not exert more than 5-lbs. pull force directly on sensor/cable connection during wire pulls.
If sensor mounting occurs before cable is pulled in conduit or raceway to
junction box it is important to leave cable bundled and secured to machine.
Sensor cable cannot be stepped on or severely kinked or permanent signal
degradation will occur. Also, cable bundle should not be placed in such a
manner that it will cause undue strain at the sensor/cable connection.
Suggested Vendor:
Industrial Monitoring Instrumentation (a division of PCB, Inc.)
3425 Walden Avenue, Depew, New York 14043, 1-800-959-4464. Web
sites: www.IMI-sensors.com or www.PCB.com.
IMI Part # 080A127
4-4
Install Instrumentation
Description: the spot face tool attaches to a standard electric drill and provides a machined surface at least 1.1 times greater than the diameter of the
sensor. At the same time the tool drills a pilot hole which is then tapped for
the stud mounted sensor.
A901-1
4-5
Suggested Vendor:
Grainger Part # 4JW57
Description:
3/8" drive inch-lbs. torque wrench. Any torque wrench with a range of
40 to 70 inch-lbs. and less than 5 inch-lbs. increments can be substituted.
1/4"-28 taps & tap handle
9/16" open end wrench
Surface Preparation
There are several ways to mount your accelerometers. This section discusses those ways and what you need to do to successfully mount your
accelerometers.
Stud Mounting
Note
4-6
Install Instrumentation
Note
4-7
Note
4-8
Install Instrumentation
4-9
Epoxy Mounting
Note
Mounting Location must provide a flat surface 1/2" in diameter. If this is not possible, then an alternative mounting procedure must be used. Do not proceed; contact project manager.
1 If necessary, use spot facing tool to prepare flat surface.
2 Using wire brush and plant approved cleaner, clean and degrease
mounting area.
3 Keeping spot face and end milling tool perpendicular to machine
surface, drill into mounting location until face has a minimum finish
of 63 micro inches. This will require the spot facing tool to remove
approximately .04" from the face. The surface should be smooth to
touch with no noticeable irregularities. The surface must be uniform
on all sides. If not, then the tool was not engaged perpendicular to
surface and the procedure must be repeated in a different location.
4 Screw AO322 mounting stud into A901-1 mounting pad applying 78 ft.-lbs. of torque.
5 Using A92016 2-part epoxy, spray activator onto mounting surface.
Place a light coat of epoxy on surface of A0901-1 mounting pad and
hold firmly against surface for 1 minute.
6 If adhesive does not setup within 1 minute, this is an indication that
too much epoxy was applied or that the mounting surface was not
prepared properly. Repeat installation steps 1-5.
4-10
Install Instrumentation
4-11
Sensor Mounting
Note
4-12
Install Instrumentation
Mounting Procedure
4-13
4-14
Install Instrumentation
A0322LC, A0322DS
Description & Handling Instructions
A0322LC, A0322DS
4-15
Description
4-16
Install Instrumentation
Caution!
Do not exert more than 5-lbs. pull force directly on sensor/cable connection during wire pulls.
If sensor mounting occurs before cable is pulled in conduit or raceway to
junction box it is important to leave cable bundled and secured to machine.
Sensor cable cannot be stepped on or severely kinked or permanent signal
degradation will occur. Also, cable bundle should not be placed in such a
manner that it will cause undue strain at the sensor/cable connection.
Suggested Vendor:
Industrial Monitoring Instrumentation (a division of PCB, Inc.)
3425 Walden Avenue, Depew, New York 14043, 1-800-959-4464. Web
sites: www.IMI-sensors.com or www.PCB.com.
IMI Part # 080A127
A0322LC, A0322DS
4-17
Description:
the spot face tool attaches to a standard electric drill and provides a
machined surface at least 1.1 times greater than the diameter of the
sensor. At the same time the tool drills a pilot hole which is then tapped
for the stud mounted sensor.
4-18
Install Instrumentation
Suggested Vendor:
Grainger Part # 4JW57
Description:
3/8" drive inch-lbs. torque wrench. Any torque wrench with a range of
40 to 70 inch-lbs. and less than 5 inch-lbs. increments can be substituted.
A0322LC, A0322DS
4-19
Surface Preparation
There are several ways to mount your accelerometers. This section discusses those ways and what you need to do to successfully mount your
accelerometers
Stud Mounting
Note
Note
4-20
Install Instrumentation
Note
A0322LC, A0322DS
4-21
4-22
Install Instrumentation
Epoxy Mounting
Note
A0322LC, A0322DS
4-23
4-24
Install Instrumentation
Caution!
Caution!
A0322LC, A0322DS
4-25
4-26
Install Instrumentation
Mounting Procedure
A0322LC, A0322DS
4-27
A0322RM
Description & Handling Instructions
4-28
Install Instrumentation
Description
Do not exert more than 5-lbs. pull force directly on sensor/cable connection during wire pulls.
A0322RM
4-29
Suggested Vendor:
Industrial Monitoring Instrumentation (a division of PCB, Inc.)
3425 Walden Avenue, Depew, New York 14043, 1-800-959-4464. Web
sites: www.IMI-sensors.com or www.PCB.com.
IMI Part # 080A127
Description:
the spot face tool attaches to a standard electric drill and provides a
machined surface at least 1.1 times greater than the diameter of the
sensor. At the same time the tool drills a pilot hole which is then tapped
for the stud mounted sensor.
4-30
Install Instrumentation
Suggested Vendor:
Grainger Part # 4JW57
Description:
3/8" drive inch-lbs. torque wrench. Any torque wrench with a range of
40 to 70 inch-lbs. and less than 5 inch-lbs. increments can be substituted.
1/4"-28 taps & tap handle
7/8" open end wrench
Surface Preparation
There are several ways to mount your accelerators. This section discusses
those ways and what you need to do to successfully mount your accelerators
A0322RM
4-31
Stud Mounting
Note
Note
4-32
Install Instrumentation
Note
A0322RM
4-33
4-34
Install Instrumentation
Epoxy Mounting
Note
A0322RM
4-35
4-36
Install Instrumentation
Sensor Mounting
1 If necessary, clean A0322RM Quick-Connect threads using plant
approved degreaser/cleaner.
2 Apply a thin coating of Loc-Tite semi-permanent thread locker to
threads on sensor housing.
3 Place sensor onto mounting base and hold in desired position to
create the least amount of cable strain and cable exposure. Holding
sensor, hand-tighten 7/8" captive nut and use a torque wrench with
7/8" open end to finish tightening to 50-60 in-lbs.
4 If not ready to pull cables, cover exposed sensor connector threads
with supplied connector cover.
A0322RM
4-37
V425
Description & Handling
Description
4-38
Install Instrumentation
A universal mounting bracket is included with sensor which will fit a variety
of applications. If the included bracket will not work, then the contractor
will have to fabricate a custom bracket.
V425
4-39
The V425 is designed to be used with a key meeting the following minimum specifications:
4-40
Install Instrumentation
If the chosen actuator has a dimension (A) which is must greater than .5
inches it is necessary to round the edges of the actuator to allow sensor to
be as close as possible to actuator.
Actuator Material
V425
4-41
V425 Mounting
4-42
Install Instrumentation
Mounting Sensor
1 Screw locking nut onto sensor and thread completely onto sensor.
2 Screw sensor into mounting bracket until sensor pole piece contacts
actuator.
3 Back sensor off 1 full turn and holding sensor in place thread locking
nut against mounting bracket. Torque to 15 ft.-lbs.
4 Slowly turn shaft and confirm that actuator is not contacting sensor.
If sensor is contacting shaft then repeat step (3) after loosening up lock
nut.
5 Run machinery at full speed and confirm that sensor is not contacting
actuator. Let machine reach normal operating temperature and run
through all operational speeds.
6 Observe machinery during coastdown and confirm that sensor is not
contacting actuator.
7 Cover exposed connector threads with included protective cap to
prevent contamination.
V425
4-43
4-44
Install Instrumentation
Chapter
Enclosure Mounting
5-1
5-2
Enclosure Mounting
5-3
Mounting Feet
5-4
Enclosure Mounting
Mounting Instructions
Caution!
5-5
5-6
Enclosure Mounting
5-7
5-8
Enclosure Mounting
5-9
Mounting Instructions
Note
5-10
Enclosure Mounting
5-11
1 A680 Cable pulls should be made on left side of access plate (facing
box) so that cables can be easily routed along left side of enclosure.
2 Conduit fittings must be sized according to the number of A680 pulls
coming from a junction box. An 8 channel junction box will use one
A680 cable pull while 16 channel boxes will require two A680 pulls.
The A680 cable is .5" in diameter and will require a 1.5" conduit run.
Two A680 cable pulls will require a 2" conduit run.
8-channel junction box ... 1 V680 cable ... 1.5" conduit
16-channel junction box ... 2 V680 cable ... 2.0" conduit
4500R or 4500S Power
1 Power line pull should be made to the far right corner of access plate
(facing box) so that power cable is routed along right rear of
enclosure.
2 The conduit should be sized according to plant code and NEC for
running power in the plant.
4500R or 4500S Ethernet Connection
5-12
Enclosure Mounting
5-13
5-14
Enclosure Mounting
Chapter
Cabling Requirements
Introduction
This chapter covers conduit installation guidelines, network cabling guidelines, power line specifications, and pulling the online instrumentation
cabling as well as the 680 bundled (multi-pair) cable from junction boxes
to the 4500R and 4500S.
Warning!
6-1
Application
Description
9732
V701
9734
V702, V745
9736
V703
Application
Description
8168
V701
8175
V702, V745
8178
V703
Note
6-2
Cabling Requirements
6-3
5 Conduit must enter 4500R or 4500S and junction boxes from bottom
of enclosures.
6-4
Cabling Requirements
6-5
Cable Variations
There are four variations of instrumentation cable which are used in the online system:
A. 2 Conductor, Single Twisted-Pair Polyurethane Cable Integrated into
Sensor
B. 2 Conductor, Single Twisted-Pair Armored Cable Integrated into
Sensor
C. 4 Conductor, Single Twisted-Pair Polyurethane Cable Integrated into
V325 Sensor
D. 2 Conductor, Single Twisted-Pair Polyurethane Cable With 2-Pin Mil
Splash Proof Connector.
Instrumentation Cables
6-6
Cabling Requirements
Installation
Caution!
If pulling in conduit cable pull force should not exceed 25 lbs. Excessive
force will deform twisted pair and degrade performance of cable.
Note
Wire labels must be placed on each end of cable and have the
same designation. Wire label designations must be documented on SENSOR LOCATION CARD chart included
on inside of junction/switch boxes.
Caution!
6-7
6-8
Cabling Requirements
A680
6-9
6-10
Cabling Requirements
Note
Nominal voltage:110VAC
Circuit Breaker:10 Amps (with duplex receptacle)
6-11
6-12
Cabling Requirements
Chapter
Wire Terminations
7-1
7-2
Wire Terminations
Note
4 Strip 1/4" from each conductor and twist braided shield at end.
5 Terminate the wire into the proper terminal block as follows:
a) Connect white wire (sensor positive input) to upper level of the
terminal block.
b) Connect black wire (sensor negative input) to middle level of the
terminal block.
c) Connect braided shield to lower level of the terminal block.
7-3
Terminal Connections
7-4
Wire Terminations
Positive
Conductor
Terminal Block
Negative
Conductor
Foil Shield
Yellow
Black
Black
Blue
Black
Blue
Brown
Black
Blue
Orange
Black
Blue
White
Black
Red
Red
Black
Red
Green
Black
Green
Red
White
Blue
7-5
Note
7-6
Wire Terminations
7-7
Terminate Power
DC (with Fan Tray)
1) Route Cable along right rear of box and up right side pulling service
loop as shown in diagram.
2) Pull wire to phoenix connector located next to the On/Off switch and
blunt cut excess wire.
3) Remove 1" of cable jacket and strip conductors 1/4" and terminate to
Phoenix connection as follows:
a) + DC ... + (right-most terminal)
b) DC ... (middle terminal)
c) shield ... (left terminal)\
4) Secure power cable to side of enclosure using only one cable tie down.
7-8
Wire Terminations
1 Route Cable along right rear of box and up right side pulling service
loop as shown in diagram.
2 Pull wire to Phoenix connector labeled input on the 4500R Power
Supply card and blunt cut excess wire.
3 Remove 1" of cable jacket and strip conductors 1/4" and terminate
to Phoenix connection as follows:
d) + DC ... + (left most terminal)
e) DC ... (middle terminal)
f) shield ... (right terminal)
7-9
4 Secure power cable to side of enclosure using only one cable tie
down.
7-10
Wire Terminations
1 Route power cable from right rear of enclosure into the 4500R
external power supply AC input connection.
2 Terminate power cables line, neutral, and ground according to AC
input connector labels.
3 Splice 16 gauge wire from AC input connector to duplex receptacle.
4 Install 5 amp in-line fuse on hot conductor running to duplex
receptacle
5 Terminate wire inside receptacle.
Phoenix Connection
7-11
1 Route power cable from right rear of enclosure into the 4500R
external power supply AC input connection.
2 Terminate power cord line, neutral, and ground according to phoenix
connection labels.
Terminate Discrete Input/Outputs
Caution!
7-12
Wire Terminations
7-13
7-14
Wire Terminations
7-15
6 Remove 1" of foil shield and place wire label around end of foil
shield. Wire label must match sensor wire label in junction box.
7 Strip 1/4" from each conductor and terminate into phoenix connector
as follows:
a) Positive Conductor from Junction Box ... (+)
b) Negative Conductor from Junction Box ... ()
c) Shield Drain ... GND
8 Document sensor name, wire label name, and 4500R channel
number on 4500R cable administration chart.
7-16
Wire Terminations
Appendix
A-1
A-2
Appendix
Introduction
On the following pages are additional connections that may help you in setting up the 4500R.
B-1
B-2
B-3
B-4
Appendix
Introduction
The AC-DC Converter is the power center of the 4500R or 4500S unit. If
it is not installed and maintained properly, the 4500R unit may not function
properly or in the manner desired.
Warning!
Warning!
Caution!
C-1
C-2
C-3
Indicators
There are several indicators on the AC-DC Converter panel. These include
two power outputs and eleven LEDs. Below is a brief description of the
indicators.
C-4
AUX+/24V
25V, 0.6A
C-5
FAN24
25V. 0.3A
LED Indicators
Eleven individual LEDs indicate the condition of internal and external
voltage signals. Ten are green and when on (illuminated) indicate
that the corresponding voltage signal is at is active level. One LED
is red and when on (illuminated) indicates that power has failed. The
LEDs are listed in the following table:
Front Panel Label
C-6
Color
Fail
Red
3.3V
Green
5V
Green
+12V
Green
12V
Green
+24V
Green
AUI
Green
AUX24V
Green
Fan24
Green
Power On
Green
AC Power
Green
Appendix
Connection Parameters
Warning!
Warning!
D-1
It = 5mA
Imax = 50uA
Ca = 1-uf
Ci = 1.5uf
La = 100mH
Li = 100mH
Tach Board:
Vmax = +/- 24VDC
Imax = 100uA
Ci = 1.5uf
Li = 100mH
I/O Board:
D-2
Vt = 24VDC
Vmax = 10VDC
It = 500mA
Imax = 500mA
Ca = 10uf
Ci = 1500uf
La = 1mH
Li = 1mH
Connection Parameters
Index
Numerics
1/4"-28 taps & tap handle 4-6, 4-20, 4-31
10BaseT RJ45 7-14
110AC 6-3
220AC 6-3, 6-7
24 AWG gauge strippers 7-5
24 AWG wire strippers 7-2
440AC 6-3, 6-7
4500 4-20ma Current Loop
Interconnection B-3
4500 Enclosure 3-7, 6-9
4500 Proximity Probe Interconnetion
Diagram B-2
4500S Enclosure 3-11
5 AMP fuse block 7-8
9/16" open end wrench 4-6, 4-20, 4-31
A
A0322 4-11
A0322 Quick-Connect 4-11, 4-12, 4-36
A0322DR 4-1
A0322DS 4-15
A0322LC 4-15
A0322LC with Quick-Connect 4-26
A0322LC-NT 4-16
A0322LC-NT Quick Release SS Nut &
Threaded Base 4-19
A0322LC-NT Quick-Connect 4-23, 4-26
A0322RA 4-1
A0322RI 4-1
A0322RM 4-28, 4-36
A0322RM Quick-Connect 4-37
A212 Mounting Pad 4-18, 4-31
A212 mounting pad 4-23
A612-I-30 cable 6-7
A680 Bundled Cable 7-15
C
cable tie down 7-2
cable tie downs 6-7
Cable Variations 6-6
Chapter 2 Pre-Installation Review 1-7
Chapter 3 System Documentation 1-7
Chapter 4 Instrumentation Installation 1-7
Chapter 5 Enclosure Mounting 1-7
Chapter 6 Cabling Requirements 1-7
Chapter 7 Wire Terminations 1-8
conduit
steel 6-2
tray or aluminum 6-2
Connecting and Maintaining the 4500R or
4500S unit C-2
Connection Parameters D-1
Contractor Kickoff Meeting 2-2
I-1
output connections
auxiliary sensor C-5
fan C-5
Overall System Diagram
3-3
I
I/O Board D-2
Indicators C-4
LED C-6
Power Output Connectors C-5
auxillary sensor C-5
fan output C-6
Installation 6-7
J
Jbox 6-2
Junction Box 7-16
I-2
R
Required Tools & Parts 4-4
RJ45 CAT5 connector 7-8, 7-14
S
SENSOR LOCATION CARD 6-7
Sensor Mounting 4-12, 4-37
Special 1-2
Spot Face & End Mill Tool 4-30
T
Tach Board D-2
terminal block 7-3
7-5
Terminate Discrete Input/Outputs 7-12
Terminate Network Connection 7-14
Torque Wrench 4-6, 4-19, 4-31
V
V425 4-38
V425 Passive Magnetic Pickup 4-38
V4500 and junction boxes 6-4
V4500 dedicated network segment cables
6-3
V4500 Discrete Input/Outputs 5-12
V4500 Ethernet Connection 5-12
V4500 Power 5-12
V4500 Power Circuit Guidelines 6-11
V4500 Power Supply 7-9
V4500 power supply card 7-14
V4500 Wiring 7-7
V680 Bundled Cable 7-5
V701 and V745 series junction 7-1
V701 series junction boxes 5-1
V745 junction/switch box 5-1
Velcro cable tie downs 7-8
W
wire labels 6-7, 6-9, 7-2
I-3
I-4