Vous êtes sur la page 1sur 12

V2504 HVAC LEVEL 4 SCHE

A.

CONSTRUCTION
1

PIPING INSTALLATION
1.1 PRU-V2504-101

North

1.2 PRU-V2504-301

South

HYDRO TESTING & RE-INSTATEMENT


2.1 AHU-V2504-01A

North

2.2 AHU-V2504-01B

North

2.3 AHU-V2504-02A

South

2.4 AHU-V2504-02B

South

INSTRUMENT INSTALLATION
3.1 Pressure Gauge
3.2 Temperature Gauge
3.3 Flowswitch

INSULATION & CLADDING INSTALLATION


4.1 CHP-ACCU-AHU-V2504-01A
4.2 CHP-ACCU-AHU-V2504-01B
4.3 CHP-ACCU-AHU-V2504-02A
4.4 CHP-ACCU-AHU-V2504-02B

B.

COMMISSIONING
1

POWER RECEIPTION
1.1 MCC to ACCU-V2504-01A
1.2 MCC to ACCU-V2504-01B
1.3 MCC to ACCU-V2504-02A
1.4 MCC to ACCU-V2504-02B
1.5 MCC to MCP-V2504-01A
AHU-V2504-01A
CHP-V2504-01A
EF-V2504-01
EF-V2504-03
EF-V2504-04
PRU-V2504-101
EDH-V2504-01
Contingency for Battery Room

Page 1 of 12

V2504 HVAC LEVEL 4 SCHE


1.6 MCC to MCP-V2504-01B
AHU-V2504-01B
CHP-V2504-01B
EF-V2504-01
EF-V2504-03
EF-V2504-04
PRU-V2504-101
EDH-V2504-01
Contingency for Battery Room
1.7 MCC to MCP-V2504-02A
AHU-V2504-02A [Fan]
AHU-V2504-02A [Heater Coil]
CHP-V2504-02A
EF-V2504-02
PRU-V2504-301
1.8 MCC to MCP-V2504-02B
AHU-V2504-02B [Fan]
AHU-V2504-02B [Heater Coil]
CHP-V2504-02B
EF-V2504-02
PRU-V2504-301
2

START-UP & COMMISSIONING


2.1 MCC to ACCU-V2504-01A
2.2 MCC to ACCU-V2504-01B
2.3 MCC to ACCU-V2504-02A
2.4 MCC to ACCU-V2504-02B
2.5 MCC to MCP-V2504-01A
AHU-V2504-01A
CHP-V2504-01A
EF-V2504-01
EF-V2504-03
EF-V2504-04
PRU-V2504-101

Page 2 of 12

V2504 HVAC LEVEL 4 SCHE


EDH-V2504-01
Contingency for Battery Room

Page 3 of 12

V2504 HVAC LEVEL 4 SCHE


2.6 MCC to MCP-V2504-01B
AHU-V2504-01B
CHP-V2504-01B
EF-V2504-01
EF-V2504-03
EF-V2504-04
PRU-V2504-101
EDH-V2504-01
Contingency for Battery Room
2.7 MCC to MCP-V2504-02A
AHU-V2504-02A [Fan]
AHU-V2504-02A [Heater Coil]
CHP-V2504-02A
EF-V2504-02
PRU-V2504-301
2.8 MCC to MCP-V2504-02B
AHU-V2504-02B [Fan]
AHU-V2504-02B [Heater Coil]
CHP-V2504-02B
EF-V2504-02
PRU-V2504-301
3

MCP TESTING & COMMISSIONING


3.1 MCP-V2504-01A
3.2 MCP-V2504-01B
3.3 MCP-V2504-02A
3.4 MCP-V2504-02B

TESTING, ADJUSTING & BALANCING


4.1 Air
AHU-V2504-01A
AHU-V2504-01B
AHU-V2504-02A
AHU-V2504-02B
4.2 Water

Page 4 of 12

V2504 HVAC LEVEL 4 SCHE


AHU-V2504-01A
AHU-V2504-01B
AHU-V2504-02A
AHU-V2504-02B

Page 5 of 12

V2504 HVAC LEVEL 4 SCHE


5

PUNCH LISTING
5.1 PIB Room
5.2 Communication Room
5.3 Mechanical Room [North]
5.4 MCC Room
5.5 Mechanical Room [South]
5.6 34.5 KV
5.7 Harmonic Room

HAND-OVERING
6.1 PIB Room
6.2 Communication Room
6.3 Mechanical Room [North]
6.4 MCC Room
6.5 Mechanical Room [South]
6.6 34.5 KV
6.7 Harmonic Room

Page 6 of 12

V2504 HVAC LEVEL 4 SCHE


A.

CONSTRUCTION
1

PIPING INSTALLATION
1.1 PRU-V2504-101

North

COM

1.2 PRU-V2504-301

South

COM

HYDRO TESTING & RE-INSTATEMENT

COM

2.1 AHU-V2504-01A

North

COM

2.2 AHU-V2504-01B

North

COM

2.3 AHU-V2504-02A

South

COM

2.4 AHU-V2504-02B

South

JOB

INSTRUMENT INSTALLATION
3.1 Pressure Gauge
3.2 Temperature Gauge
3.3 Flowswitch

B.

INSULATION & CLADDING INSTALLATION


4.1 CHP-ACCU-AHU-V2504-01A

JOB

4.2 CHP-ACCU-AHU-V2504-01B

JOB

4.3 CHP-ACCU-AHU-V2504-02A

JOB

4.4 CHP-ACCU-AHU-V2504-02B

JOB

COMMISSIONING
1

POWER RECEIPTION
1.1 MCC to ACCU-V2504-01A
1.2 MCC to ACCU-V2504-01B
1.3 MCC to ACCU-V2504-02A
1.4 MCC to ACCU-V2504-02B
1.5 MCC to MCP-V2504-01A
AHU-V2504-01A
CHP-V2504-01A
EF-V2504-01
EF-V2504-03
EF-V2504-04
PRU-V2504-101
EDH-V2504-01
Contingency for Battery Room

Page 7 of 12

V2504 HVAC LEVEL 4 SCHE


1.6 MCC to MCP-V2504-01B
AHU-V2504-01B
CHP-V2504-01B
EF-V2504-01
EF-V2504-03
EF-V2504-04
PRU-V2504-101
EDH-V2504-01
Contingency for Battery Room
1.7 MCC to MCP-V2504-02A
AHU-V2504-02A [Fan]
AHU-V2504-02A [Heater Coil]
CHP-V2504-02A
EF-V2504-02
PRU-V2504-301
1.8 MCC to MCP-V2504-02B
AHU-V2504-02B [Fan]
AHU-V2504-02B [Heater Coil]
CHP-V2504-02B
EF-V2504-02
PRU-V2504-301
2

START-UP & COMMISSIONING


2.1 MCC to ACCU-V2504-01A
2.2 MCC to ACCU-V2504-01B
2.3 MCC to ACCU-V2504-02A
2.4 MCC to ACCU-V2504-02B
2.5 MCC to MCP-V2504-01A
AHU-V2504-01A
CHP-V2504-01A
EF-V2504-01
EF-V2504-03
EF-V2504-04
PRU-V2504-101

Page 8 of 12

V2504 HVAC LEVEL 4 SCHE


EDH-V2504-01
Contingency for Battery Room

Page 9 of 12

V2504 HVAC LEVEL 4 SCHE


2.6 MCC to MCP-V2504-01B
AHU-V2504-01B
CHP-V2504-01B
EF-V2504-01
EF-V2504-03
EF-V2504-04
PRU-V2504-101
EDH-V2504-01
Contingency for Battery Room
2.7 MCC to MCP-V2504-02A
AHU-V2504-02A [Fan]
AHU-V2504-02A [Heater Coil]
CHP-V2504-02A
EF-V2504-02
PRU-V2504-301
2.8 MCC to MCP-V2504-02B
AHU-V2504-02B [Fan]
AHU-V2504-02B [Heater Coil]
CHP-V2504-02B
EF-V2504-02
PRU-V2504-301
3

MCP TESTING & COMMISSIONING


3.1 MCP-V2504-01A
3.2 MCP-V2504-01B
3.3 MCP-V2504-02A
3.4 MCP-V2504-02B

TESTING, ADJUSTING & BALANCING


4.1 Air
AHU-V2504-01A

North

AHU-V2504-01B

North

AHU-V2504-02A

South

AHU-V2504-02B

South

4.2 Water

Page 10 of 12

V2504 HVAC LEVEL 4 SCHE


AHU-V2504-01A

North

AHU-V2504-01B

North

AHU-V2504-02A

South

AHU-V2504-02B

South

Page 11 of 12

V2504 HVAC LEVEL 4 SCHE


5

PUNCH LISTING
5.1 PIB Room
5.2 Communication Room
5.3 Mechanical Room [North]
5.4 MCC Room
5.5 Mechanical Room [South]
5.6 34.5 KV
5.7 Harmonic Room

HAND-OVERING
6.1 PIB Room
6.2 Communication Room
6.3 Mechanical Room [North]
6.4 MCC Room
6.5 Mechanical Room [South]
6.6 34.5 KV
6.7 Harmonic Room

Page 12 of 12