Al Ghandi & Consolidated Contractors International Company

Burj Vista (Plot No.: 14-17 Downtown) Project


RISK ASSESSMENT
Date:
Revision:
Main Activity:
Tools / Equipment
Used:
Location:
Risk Assessment
Reference:
Method Statement
Reference:

Page 1 of 4

26.10.2015

00
Application of Floor Coating

Emaar Burj Vista

Severity

Likelihood

Slight Injury - First


Aid

Minor or Serious
Injury

Major Injury - Lost


Time > 3 days

Single Fatality Permanent Disability

Multiple Fatalities

10

Certain

10

20

40

60

80

100

Very Likely

16

32

48

64

80

Likely

12

24

36

48

60

May happen

16

24

32

40

Unlikely

12

16

20

Trivial Risk - No further improvements necessary provided control measures are maintained
Adequately Controlled Risk - Risk is tolerable when control measures identified are implemented
Moderately controlled Risk - Further risk reduction measures should be considered
Intolerable Risk - Seek specialist advice/ support

Reviewed By: _____________________________

Designation: ____________________

Date: ____________________

Approved By: _____________________________

Designation: ____________________

Date: _____________________

Al Ghandi & Consolidated Contractors International Company


Burj Vista (Plot No.: 14-17 Downtown) Project
RISK ASSESSMENT

Respirable dust and


other abrasive
material pose a risk
to the lungs, hearing
loss

Outcome
(T/A/M/I)

Severity

16
(A)

Provide safety signs to advice of


hazard (By Main Contractor.)
Demarcation of working area &
close it with warning tape to
prevent any unauthorized
personnel into the working area.
Provide good lighting as needed (By
Main Contractor)
Ensure machine call and electric
connections are correct and laid in
a safe way.
Regular inspection and color code
to be done
Only trained and experienced
personnel to work.
Shot blasting operator to wear
PPE as required (PPE: Safety
shoes, helmet, goggles, mask
(N95), ear plugs & gloves.)
Regular inspection of the
equipment by competent person.
Equipment maintenance records
to be maintain.
Adequate forced ventilation to be
provided.

Outcome
(T/A/M/I)

Health Hazards, Physical


Injury

(The harm which could


possibly occur)

Recommended Control Measures &


Mitigations

Severity

Shot Blasting
with vacuum
equipped
equipment to
avoid dust

(The potential to cause harm)

Effects/
Consequences

Likelihood

1-

(Sequence of
working activities)

Hazards

Residual
Risk

Risk Rating With


No Controls
Likelihood

Sr.

Job Step

Page 2 of 4

4
(T)

ALARP
Demons
trated
(Y/N)

Action By

Supervisor

Al Ghandi & Consolidated Contractors International Company


Burj Vista (Plot No.: 14-17 Downtown) Project
RISK ASSESSMENT

Physical Injury

Death, Serious
Injury, Skin Burns

Hand Injury, Wrist


Injury

Outcome
(T/A/M/I)

Severity

24
(A)

6
(T)

The material should be stored in an


air conditioning store. (By Main
Contractor.)
Provide safety signs at the storage to
advice of hazards. (By Main
Contractor).
Provide adequate fire extinguisher at
the storage area.
Any electrical equipment should be
intrinsically safe and flame proof.
Prohibit smoking.
Workers to be explained about
MSDS and make aware about
potential hazard of handling paints.
Rubber hand gloves.
No workers should carry more
than 25Kgs. of load manually; they
should be briefed about safe
manual handling and safe
postures. Damaged container
should be segregated and handled
carefully.
Provide fire extinguisher at the
storage area
Ensure machine cables are correct
and laid in a safe way.
Labors must wear PPE as required.
Machineries & tools should be
maintained properly.

ALARP
Demons
trated
(Y/N)

Action By

Outcome
(T/A/M/I)

Mixing
material

Fire Hazards, Health


Hazards

(The harm which could


possibly occur)

Recommended Control Measures &


Mitigations

Severity

3-

Chemical
storage

(The potential to cause harm)

Effects/
Consequences

Likelihood

2-

(Sequence of
working activities)

Hazards

Residual
Risk

Risk Rating With


No Controls
Likelihood

Sr.

Job Step

Page 3 of 4

8
(T)

Supervisor

4
(T)

Supervisor

Al Ghandi & Consolidated Contractors International Company


Burj Vista (Plot No.: 14-17 Downtown) Project
RISK ASSESSMENT

Environmental Hazards

Shoulder Injury,
Wrist Injury

Environmental
pollution

Action By

6
(T)

Provide good ventilation if


required. (By Main Contractor.)
Demarcation of working area &
close it with warning tape.
Labor must wear PPE.
Machineries & tools should be
maintained properly.

4
(T)

Supervisor

12
(A)

In case of spillage of paint or


solvent the same should not be
allowed to flow off. Spilled
paint & solvent should be
collected and disposed as
specified by manufacturer.
Empty container,
contaminated rugs, used brush
and other material should be
cleaned or disposed off
properly into the dump
containers. Wash of paint
should not be disposed into
Sewer or into any watercourse.

4
(T)

Supervisor

Outcome
(T/A/M/I)

Severity

ALARP
Demons
trated
(Y/N)

Outcome
(T/A/M/I)

Spill & Waste

Physical Injury

(The harm which could


possibly occur)

Recommended Control Measures &


Mitigations

Severity

5-

Coating
application

(The potential to cause harm)

Effects/
Consequences

Likelihood

4-

(Sequence of
working activities)

Hazards

Residual
Risk

Risk Rating With


No Controls
Likelihood

Sr.

Job Step

Page 4 of 4