SYSTEM REQUIREMENTS
WIRELINE EQUIPMENT
D-SR-008
Rev. 1, October 1996
Please note that whilst every effort has been made to ensure the accuracy of the NORSOK standards
neither OLF nor TBL or any of their members will assume liability for any use thereof.
Wireline equipment
D-SR-008
Rev. 1, October 1996
CONTENTS
1 FOREWORD
2 SCOPE
3 NORMATIVE REFERENCES
2
2
3
5 FUNCTIONAL REQUIREMENTS
5.1 General
5.2 Equipment/Schematic/Borderline
5.3 Process/Ambient conditions
5.4 Performance and Operational requirements
5.5 Maintenance requirements
5.6 Layout requirements
5.7 Interface requirements
3
3
3
3
4
4
4
4
10
11
12
NORSOK standard
Page 1 of 12
Wireline equipment
D-SR-008
Rev. 1, October 1996
FOREWORD
NORSOK (The competitive standing of the Norwegian offshore sector) is the industry initiative to
add value, reduce cost and lead time and remove unnecessary activities in offshore field
developments and operations.
The NORSOK standards are developed by the Norwegian petroleum industry as a part of the
NORSOK initiative and are jointly issued by OLF (The Norwegian Oil Industry Association) and
TBL (Federation of Norwegian Engineering Industries). NORSOK standards are administered by
NTS (Norwegian Technology Standards Institution).
The purpose of this industry standard is to replace the individual oil company specifications for use
in existing and future petroleum industry developments, subject to the individual company's review
and application.
The NORSOK standards make extensive references to international standards. Where relevant, the
contents of this standard will be used to provide input to the international standardization process.
Subject to implementation into international standards, this NORSOK standard will be withdrawn.
Annexes are normative.
SCOPE
This standard describes functional, performance and operational requirements for slickline, braided
line, cased and open hole logging equipment.
NORMATIVE REFERENCES
ISO 10423
API Spec 9A
NACE MR-0175
4.1
Definitions
The well control system is divided in the following three (3) distinct logic groups:
Primary well control system for wireline operations. This is the stuffing box or grease injection
head.
Secondary well control system. This system consists of minimum one (1) wireline ram for
slickline and two (2) wireline rams for braided line.
Tertiary well control system (safety head). An independent operated shear/seal BOP located as
close as possible to the wellhead. Alternatively, a x-mas tree gate valve with documented wire
cutting capabilities will be equal to an independent shear seal.
Work program. This document contains the detailed work steps, requirements and guidelines for
a specific wireline job.
NORSOK standard
Page 2 of 12
Wireline equipment
Shall
Should
May
Can
D-SR-008
Rev. 1, October 1996
4.2
ESD
BOP
LL
PM
SF
Abbreviations
Emergency Shut Down
Blowout Preventer
Load Limit
Preventive Maintenance
Safety Factor
FUNCTIONAL REQUIREMENTS
5.1
General
The wireline unit, well control equipment and associated equipment shall be suitable for the job and
its intended purpose as specified in the work program, and additional requirements defined by
receiver of service with reference to section 5.3. For well control equipment ISO 10423 applies as
far as relevant. For slickline API 9A applies as far as relevant.
5.2
Equipment/Schematic/Borderline
The system shall comprise of the following main items:
Wireline unit including power pack.
Well control system.
Depth & Weight indicator system.
Slickline, braided line & electric line
Grease injection skid
Downhole tools.
Test pump
Wellhead pump
5.3
Process/Ambient conditions
The well control system with associated valves, hoses and piping shall be designed as required for
the following alternative conditions:
Well pressure; bar ( psi)
Wellhead temperature; C (F)
Operating temperature; C (F)
Formation fluids
CO2
Oil & water based drilling muds
Diesel
Glycol
NORSOK standard
345 (5,000)
120 (250)
-10 (14)
Yes
Yes
Yes
Yes
Yes
690 (10,000)
120 (250)
-10 (14)
Yes
Yes
Yes
Yes
Yes
1034 (15,000)
177 (350)
-10 (14)
Yes
Yes
Yes
Yes
Yes
Page 3 of 12
Wireline equipment
Methanol
Acid (inhibited)
Cement slurry
Nitrogen
D-SR-008
Rev. 1, October 1996
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
For conditions where H2S service is required, NACE MR-0175 applies (optional).
5.4
Performance and Operational requirements
Wireline Unit including Power Pack:
Ref. Annex A
Well Control System:
Ref. Annex B, C, D and E
Slickline, braided line & electric line:
Ref. Annex F
Downhole tools:
Ref. Annex G
5.5
Maintenance requirements
The supplier shall have established a :
Maintenance program with defined frequencies and work scopes.
Re-certification program
5.6
Layout requirements
The supplier shall ensure that the following provisions are taken care of on the work location:
Securing the wireline area
Adequate escape ways
Sufficient illumination
Securing of the riser/lubricator sections for lateral support
Securing the high pressure lines
Verification of all wireline equipment to function as intendent
Location of the second control panel for the secondary well control system in a safe area
Location of the third and independent control panel for the tertiary well control system in a safe
area
Location of the wireline ESD panel in safe area
5.7
Interface requirements
Mechanic, electric, hydraulic and pneumatic interface connections shall be compatible with rig or
platform connections
NORSOK standard
Page 4 of 12
Wireline equipment
Annex A
D-SR-008
Rev. 1, October 1996
0.36 m (14)
0.36 m (14)
0.36 m (14)
0.48 m (19)
0.53 m (21)
0.56 m (22)
Page 5 of 12
Wireline equipment
Annex A
D-SR-008
Rev. 1, October 1996
Load limit (LL) requirement for sheave & hay pulley: Maximum line pull x 2 x SF
Minimum safety factor (SF): 2.
All locking devices to have a double safety feature
Wireline and fishing clamps
Two (2) for each line size
Load limit (LL) requirement: Line breaking strength x SF
Minimum safety factor (SF): 2
All locking devices to have a double safety feature
Hydraulic power pack:
Diesel engine certified for Zone 2 or electric motor certified for Zone 1
A gas detector with an audible/visible alarm installed on air inlet of diesel engine
Drip pan
Manual ESD function.
ESD panel loacted in a safe area
Data Acquisition system: See Annex I
Pressure test pump:
Working pressure 345 bar (5,000 psi) / 690 bar (10,000 psi) / 1034 bar (15,000 psi) as required.
Pump rate:
- 50 l/min at 69 bar (1,000 psi)
- 8 l/min at 345 bar (5,000 psi), 5 l/min at 690 bar (10,000 psi) and 1034 bar (15,000 psi)
Fluid tank: 1000 liter
Pressure recorder included
Wellhead pump:
Working pressure 345 bar (5,000 psi)/ 690 bar (10,000 psi) / 1034 bar (15,000 psi) as required
Minimum two (2) separate pumps included in skid
Check valve on return line to fluid reservoir
NORSOK standard
Page 6 of 12
Wireline equipment
Annex B
D-SR-008
Rev. 1, October 1996
NORSOK standard
Page 7 of 12
Wireline equipment
Annex C
D-SR-008
Rev. 1, October 1996
Stuffing box:
Hydraulic actuated packing nut operated from hydraulic control panel
Blow-out plug to be included
Soft metal inserts (brass or equivalent)
Grease injection head:
Line wiper & stuffing box to be included in the assembly.
Grease injection inlet manifold to include check valve
Integral ball check valve system to be included
Two (2) ports for grease injection
Grease injection skid:
Minum two (2) pumps and grease tanks
Capacity: Minimum 0.75 l/min at maximum pump pressure
Include system for injecting grease between BOPs
Hydraulic line wiper and stuffing box:
Hydraulic actuated rubber element operated from hydraulic control unit.
NORSOK standard
Page 8 of 12
Wireline equipment
Annex D, E and F
D-SR-008
Rev. 1, October 1996
NORSOK standard
Page 9 of 12
Wireline equipment
Annex G
D-SR-008
Rev. 1, October 1996
NORSOK standard
Page 10 of 12
Wireline equipment
Annex H and I
D-SR-008
Rev. 1, October 1996
Name of equipment.
Production number.
Name of manufacturer and supplier.
Description of design and manufacture, indicating safety factor used.
Verification of design/strength/assumptions carried out by an independent survey institution.
Depending on organisational independence, this function may be taken care of by the
manufacturer.
Material certificates and confirmation as to where materials have been used.
Welding procedure specifications.
Statement of manufacture and inspection signed by manufacturer and surveyor/surveying
firm/body.
Report from testing including testing conditions, and information on how testing has been carried
out
Supplier's operation and maintenance specifications, with indication of operational
criteria/limitations.
Marking of equipment.
Updating of items in the case of modification of equipment.
Weight and dimensions
Lift certificate
Wire/Cable
Name of equipment
Production number.
Name of manufacturer and supplier.
Description of design and manufacture, indicating safety factor used.
Material certificates including chemical analysis and mechanical strengths.
Report from testing including testing conditions, and information on how testing has been carried
out.
Quality audit of the maker's manufacturing process.
Inspection reports.
Physical dimensions.
Downhole tools
Name of equipment
Production number
Name of manufacturer and supplier
Description of design and manufacture, indicating safety factor used.
Material certificates and confirmation as to where materials have been used.
Statement of manufacture and inspection signed by manufacturer or surveyor/surveying
firm/body.
NORSOK standard
Page 11 of 12
Wireline equipment
Annex H and I
D-SR-008
Rev. 1, October 1996
Report from testing including testing conditions, and information on how testing has been carried
out.
Supplier's operation and maintenance specifications, with indication of operational
criteria/limitations.
Marking of equipment.
Drawings showing internal parts/functions, overall length, max. OD, min. ID and weight.
NORSOK standard
Page 12 of 12