PROGRAMACION DE OBRAS
ING. JULIO RIVASPLATA

PROGRAMACION DE ACTIVIDADES DE UN PROYECTO DE EDIFICACION (VIVIENDA MULTIFAMILIAR-ESTRUCTURAS)


Id

Nombre de tarea

Duracin

Comienzo

Fin

Predecesoras
S

0
1
2
3
4

VIVIENDA-MULTIFAMILIAR-CRONOGRAMA55.76 das lun 10/10/16


1 ESTRUCTURAS
1.1 MOVIMIENTOS DE TIERRA
1.1.1 EXCAVACIONES
1.1.1.1 Excavacin de Zanjas

10 oct '16
L

55.76 das lun 10/10/16

jue 15/12/16

16.25 das lun 10/10/16

vie 28/10/16

3 das

lun 10/10/16

mi 12/10/16

3 das

lun 10/10/16

mi 12/10/16

1.75 das

mi 26/10/16

vie 28/10/16

1.1.2 RELLENOS

17 oct '16
L

24 oct '16
L

31 oct '16
L

07 nov '16
L

14 nov '16
L

21 nov '16
L

28 nov '16
L

05 dic '16
L

12 dic '16
L

3 das
10/10

jue 15/12/16

1.1.2.1 Rellenos con material propio 1 da

mi 26/10/16

jue 27/10/16 18

1.1.2.2 Relleno con material de


prstamo

0.75 das

jue 27/10/16

vie 28/10/16 6

1.1.3 ELIMINACIN DE MATERIAL


EXCEDENTE

3.5 das

jue 13/10/16

lun 17/10/16 13

1.1.4 NIVELACIN INTERIOR Y


APISONADO

0.25 das

jue 13/10/16

jue 13/10/16 4

1.2 OBRAS DE CONCRETO SIMPLE

12/10

1 da
26/10

27/10
0.75 das
27/10

28/10

3.5 das
13/10

17/10

0.25 das
13/10
13/10

10

11.5 das

jue 13/10/16

mi 26/10/16

12

1.2.1 CIMIENTOS CORRIDOS 1:10 +


30% PG < 6"

1 da

mar 18/10/16

mi 19/10/16 25

13

1.2.2 SOLADO PARA ZAPATAS

0.25 das

jue 13/10/16

jue 13/10/16 4

14

1.2.3 SOBRECIMIENTOS

11

1 da
18/10

7.25 das

mar 18/10/16

mi 26/10/16

15

1.2.3.1 Concreto mezcla 1:8 + 25%


de PM <3"

0.5 das

vie 21/10/16

sb 22/10/16 17

16

1.2.3.2 Encofrado y Desencofrado


(Habilitacin)

0.75 das

mar 18/10/16

mar 18/10/16 26

17

1.2.3.3 Encofrado

2.75 das

mi 19/10/16

vie 21/10/16 16

18

1.2.3.4 Desencofrado

2.25 das

lun 24/10/16

mi 26/10/16 15FC+1 da

19/10

0.25 das
13/10
13/10

0.5 das
21/10

22/10

0.75 das
18/10
18/10
2.75 das
19/10

21/10
2.25 das
24/10

19
20

1.3 OBRAS DE CONCRETO ARMADO


1.3.1 ZAPATAS

55.76 das lun 10/10/16

jue 15/12/16

7 das

lun 10/10/16

lun 17/10/16

21

1.3.1.1 Concreto en zapatas f'c=175 0.25 das


kg/cm2

lun 17/10/16

lun 17/10/16 8

22

1.3.1.2 Acero en zapatas


(Habilitacion)

0.5 das

lun 10/10/16

lun 10/10/16

23

1.3.1.3 Acero en zapatas


(Colocacion)

0.5 das

lun 10/10/16

lun 10/10/16 22

24

1.3.2 VIGAS DE CIMENTACIN

18 das

lun 10/10/16

sb 29/10/16

25

1.3.2.1 Concreto en vigas de


cimentacin f'c=210 kg/cm2

0.13 das

mar 18/10/16

mar 18/10/16 21

0.13 das
18/10
18/10

26

1.3.2.2 Encofrado y Desencofrado


(Habilitacin)

0.25 das

mar 18/10/16

mar 18/10/16 30

0.25 das
18/10
18/10

27

1.3.2.3 Encofrado

6.13 das

mar 18/10/16

sb 29/10/16 26

28

1.3.2.4 Desencofrado

0.25 das

lun 10/10/16

lun 10/10/16

29

1.3.2.5 Acero (Habilitacion)

0.5 das

lun 17/10/16

lun 17/10/16 38

30

1.3.2.6 Acero (Colocacion)

0.5 das

lun 17/10/16

lun 17/10/16 29

24 das

mar 11/10/16

mar 08/11/16

26/10

0.25 das
17/10
17/10
0.5 das
10/10

10/10
0.5 das
10/10
10/10

6.13 das
18/10

0.5 das
17/10

31

1.3.3 COLUMNAS

32

1.3.3.1 Concreto f'c=210 kg/cm2

0.75 das

sb 05/11/16

sb 05/11/16 35

33

1.3.3.2 Concreto f'c=210


kg/cm2(curado)

0.25 das

lun 07/11/16

lun 07/11/16 32

34

1.3.3.3 Encofrado y Desencofrado


(Habilitacin)

2 das

vie 28/10/16

lun 31/10/16 7

35

1.3.3.4 Encofrado

4 das

lun 31/10/16

sb 05/11/16 34

36

1.3.3.5 Desencofrado

2 das

lun 07/11/16

mar 08/11/16 32

37

1.3.3.6 Acero (Habilitacion)

2.5 das

mar 11/10/16

jue 13/10/16 23

29/10

0.25 das
10/10
10/10
17/10
0.5 das
17/10
17/10

0.75 das
05/11
05/11
0.25 das
07/11
07/11
2 das
28/10

31/10
4 das
31/10

05/11
2 das
07/11

38

1.3.3.7 Acero (Colocacion)

2.5 das

jue 13/10/16

13/10

sb 15/10/16 37

2.5 das
13/10

39

1.3.4 VIGAS

13.75 das lun 07/11/16

mar 22/11/16

40

1.3.4.1 Concreto f'c=210 kg/cm2

0.5 das

vie 18/11/16

vie 18/11/16 43

41

1.3.4.2 Concreto f'c=210


kg/cm2(curado)

0.25 das

mar 22/11/16

mar 22/11/16 44

42

1.3.4.3 Encofrado y Desencofrado


(Habilitacin)

2 das

vie 11/11/16

lun 14/11/16 46

43

1.3.4.4 Encofrado

4 das

lun 14/11/16

vie 18/11/16 42

44

1.3.4.5 Desencofrado

2.5 das

sb 19/11/16

mar 22/11/16 40

08/11

2.5 das
11/10

15/10

0.5 das
18/11
18/11
0.25 das
22/11
22/11
2 das
11/11

14/11
4 das
14/11

18/11
2.5 das
19/11

45

1.3.4.6 Acero (Habilitacion)

3.5 das

lun 07/11/16

jue 10/11/16 32

46

1.3.4.7 Acero (Colocacion)

3.5 das

mar 08/11/16

vie 11/11/16 45CC+1 da

10 das

mar 22/11/16

sb 03/12/16

10/11
3.5 das
08/11

47

1.3.5 LOSAS

48

1.3.5.1 Concreto f'c=210 kg/cm2

1.25 das

mar 29/11/16

mi 30/11/16 55

49

1.3.5.2 Concreto f'c=210


kg/cm2(curado)

0.5 das

sb 03/12/16

sb 03/12/16 52

50

1.3.5.3 Encofrado y Desencofrado


(Habilitacin)

2.25 das

mar 22/11/16

jue 24/11/16 41

51

1.3.5.4 Encofrado

3 das

vie 25/11/16

lun 28/11/16 50

52

1.3.5.5 Desencofrado

2.25 das

jue 01/12/16

sb 03/12/16 48

53

1.3.5.6 Acero (Habilitacion)

3.25 das

mar 22/11/16

vie 25/11/16 41

22/11

3.5 das
07/11

11/11

1.25 das
29/11

30/11
0.5 das
03/12
03/12

2.25 das
22/11

24/11
3 das
25/11

28/11
2.25 das
01/12

22/11
54

1.3.5.7 Acero (Colocacion)

3.25 das

mar 29/11/16

vie 02/12/16 51

55

1.3.5.8 Ladrillos para Techo

0.75 das

mar 29/11/16

mar 29/11/16 51

25/11
3.25 das
29/11

3.63 das

sb 03/12/16

vie 09/12/16

57

1.3.6.1 Concreto f'c=210 kg/cm2

0.25 das

mi 07/12/16

mi 07/12/16 60

58

1.3.6.2 Concreto f'c=210


kg/cm2(curado)

0.13 das

vie 09/12/16

vie 09/12/16 61

59

1.3.6.3 Encofrado y Desencofrado


(Habilitacin)

0.75 das

sb 03/12/16

lun 05/12/16 49

60

1.3.6.4 Encofrado

1.5 das

lun 05/12/16

mar 06/12/16 59

61

1.3.6.5 Desencofrado

1 da

mi 07/12/16

vie 09/12/16 57

56

1.3.6 ESCALERAS

03/12

3.25 das

02/12

0.75 das
29/11
29/11

0.25 das
07/12
07/12
0.13 das
09/12 09/12
0.75 das
03/12

05/12
1.5 das
05/12

06/12
1 da
07/12

62

1.3.6.6 Acero (Habilitacion)

1.25 das

sb 03/12/16

lun 05/12/16 49

63

1.3.6.7 Acero (Colocacion)

1.25 das

mi 07/12/16

vie 09/12/16 60

1.3.7 ESTRUCTURAS ESPECIALES

5.38 das

vie 09/12/16

jue 15/12/16

09/12

1.25 das
03/12

05/12
1.25 das
07/12

64
65

1.3.7.1 Concreto f'c= 210 kg/cm2

0.25 das

mi 14/12/16

mi 14/12/16 68

66

1.3.7.2 Concreto f'c=210


kg/cm2(curado)

0.13 das

jue 15/12/16

jue 15/12/16 69

67

1.3.7.3 Encofrado y Desencofrado


(Habilitacin)

0.75 das

vie 09/12/16

sb 10/12/16 58

68

1.3.7.4 Encofrado

1.25 das

lun 12/12/16

mi 14/12/16 71

69

1.3.7.5 Desencofrado

1.25 das

mi 14/12/16

jue 15/12/16 65

09/12

0.25 das
14/12
14/12
0.13 das
15/12 15/12
0.75 das
09/12

10/12
1.25 das
12/12

14/12
1.25 das
14/12

70

1.3.7.6 Acero (Habilitacion)

1.25 das

vie 09/12/16

sb 10/12/16 58

1.25 das
09/12

71

1.3.7.7 Acero (Colocacion)

1.25 das

sb 10/12/16

10/12

lun 12/12/16 70

1.25 das
10/12

Proyecto: VIVIENDA-MULTIFAM
Fecha: lun 10/10/16

Tarea

Divisin

Hito

Resumen

Resumen del proyecto

Tarea inactiva

Hito inactivo

Resumen inactivo

Tarea manual

solo duracin

Informe de resumen manual

Resumen manual

solo el comienzo

Pgina 1

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

solo fin

Tareas externas

Hito externo

Fecha lmite

Progreso

12/12