TULSYAN NEC LTD,GUMMADIPOONDI SAFETY DEPARTMENT HOUSE KEEPING DESCRIPTION CHP Open Coal yard waste scrap materials removing Leveling the soil PLC room backside grass, trench to be leveled CHP front side,Vibro feeders area scrap to be remove DM PLANT Old DG room area grass,waste scrap to be remove Raw water tank area waste scrap to be remove LDO LDO area grass,level the soil jully fill in pump area Diesel drums keep in vertical position BATH ROOM Front side waste ,pipe line leackage arrest MECHANICAL CONTAINER Waste scrap,cotton waste remove SWITCH YARD Front side waste scrap and level soil BOILER Ground area side waste scrap remove DC303 -side scrap to be remove Bellow leackage Economiser shotblower side missing hand rail to be fit Bunker top remove conjusted handrails -to fit gril or plates BC4 tail pully side missing area plot form fit ESP ESP ground area unwanted cables to remove ESP unwanted pipes,cable tray sheets remove ESP top missing rapper to be fit ID FAN 1-ESP joint path way in unsafecondition TG Ground area side waste scrap remove ACC fan ground area materials remove