Vous êtes sur la page 1sur 14

Section - 03

(DK 19+844 ~ DK 26+750)

Date - 29 / 03 /2016

Matara-Kataragama Railway Extension Project Matara-Beliatta Sector (Phase 1)


Ministry of Transport
Central Engineering Consultancy Bureau (CECB)
China National Machinery Import & Export Corporation

DAILY DIARY

Item
Activity Description
No.
Earthworks
1
Back Filling
2
Back Filling
3
Embankment Filling
4
Stock pile Preparation
5
Embankment Filling
6
Sock fille Preparation
7
Formwork for retaining wall
8
Retainingwall Construction
Underpass / Culvert Construction
8
Formwork Removing
9
Formwork Construction
10 Reinforcement work

Activity No

Location / Chainage
26+175
25+960
25+960 - 26+000
23+100
22+800 - 830
20+100
25+990 - 26+052
21+300 - 21+600

Plant / Equipment
Roller 01, Loader 01
JCB 01
Grader 01
Excavator 01
Grader 01
Excavator 01

25+680
25+400
23+928

Bridge Construction
11

Sinimodara No 02 Bridge

Reinforcement for pier

Weather
Time period

Heavy Rainy

Moderate Rainy

Site Delays - Feature


Page 1 of 14

CECB

Section - 03
(DK 19+844 ~ DK 26+750)

Date - 29 / 03 /2016

Matara-Kataragama Railway Extension Project Matara-Beliatta Sector (Phase 1)


Ministry of Transport
Central Engineering Consultancy Bureau (CECB)
China National Machinery Import & Export Corporation

DAILY DIARY

Item
No.

Activity Description

Activity No

Location / Chainage

Plant / Equipment

Duration

Cause

Prepared by

Name

M.Munasinghe

Signature

Certified by (Resident Engineer)

Name

A.A.P.Desapriya

Signature

Page 2 of 14

CECB

iatta Sector (Phase 1)

LY DIARY
Labour

Remarks

3
2

9
7
3
3
3

Page 3 of 14

CECB

iatta Sector (Phase 1)

LY DIARY
Labour

Remarks

Cause

Page 4 of 14

CECB

Section - xx
(DK 10+425 ~ DK 19+840)

Date 30/03/2016
DAILY DIARY
Item
Activity Description
No.
Earthworks
1
Embankment Filling
2
Stock Pile Preparation
3
Stock Pile Preparation
4
ABC Back Filling

Activity No

Location / Chainage
26+060 -20+160
26+ 150
23+140
22+040

Plant / Equipment
Grader 01, Roller 01
Tipper 02,Loader 01
Excavator 01
Roller 01

Underpass / Culvert Construction

Bridge Construction
5

Formwork Matara Abutment

Formwork Beliatta Abutment

Rebarwork pier 03

Formwork Pier 03 Top Cap

Rebar work Matara Abutmnt

10

Rebarwork Pier hat pier 03

26+432
26+432
Sinimodara No 03
Sinimodara No 01
Ihalagoda Bridge
Ihalagoda Bridge

crane 01

Weather
Time period

Heavy Rainy

Moderate Rainy

Site Delays - Feature


Duration

Cause
Page 5 of 14

CECB

Section - xx
(DK 10+425 ~ DK 19+840)

Date 30/03/2016
DAILY DIARY
Item
No.

Activity Description

Activity No

Location / Chainage

Plant / Equipment

Prepared by

Name

Signature

Certified by (Resident Engineer)

Name

Signature

Page 6 of 14

CECB

LY DIARY
Labour

Remarks

3
3
3
4
3
2

Cause
Page 7 of 14

CECB

LY DIARY
Labour

Remarks

Page 8 of 14

CECB

Section - xx
(DK 19+840 ~ DK 26+750)

Date - 31/03/2016

Matara-Kataragama Railway Extension Project Matara-Beliatta Sector (Phase 1)


Ministry of Transport
Central Engineering Consultancy Bureau (CECB)
China National Machinery Import & Export Corporation

DAILY DIARY

Item
Activity Description
No.
Earthworks
1
Soil Back Filling

Activity No

Location / Chainage
26+173

2
Stock pile Preparation
3
Stock pile Preparation
4
Soil Back Filling
Underpass / Culvert Construction
5
Concreting
6
Rebarwork

24+650
23+140
20+264
25+400
23+937

Plant / Equipment
JCB 01,Excavater 01
Tipper 02
Excavator 01
Excavator 01
Grader 01
Truck Mixer 03

Bridge Construction
7

Formwork Matara Abutment

Formwork Matara Abutment

Rebarwork Pier 03

10

Rebarwork Matara Abutment

11

Formwork for Batching Plant pier 5 & 6

12

Formwork Pier 01

26+432
Ihalagoda Bridge
Ihalagoda Bridge
Ihalagoda Bridge
Ihalagoda Bridge
Sinimodara 03

Weather
Time period

Heavy Rainy

Moderate Rainy

Site Delays - Feature


Duration

Cause

Page 9 of 14

CECB

Section - xx
(DK 19+840 ~ DK 26+750)

Date - 31/03/2016

Matara-Kataragama Railway Extension Project Matara-Beliatta Sector (Phase 1)


Ministry of Transport
Central Engineering Consultancy Bureau (CECB)
China National Machinery Import & Export Corporation

DAILY DIARY

Item
No.

Activity Description

Activity No

Location / Chainage

Plant / Equipment

Prepared by

Name

Mahesh Munasinghe

Signature

Certified by (Resident Engineer)

Name

P Deshapriya

Signature

Page 10 of 14

CECB

Section - xx
(DK 19+840 ~ DK 26+750)

Date - 31/03/2016

Matara-Kataragama Railway Extension Project Matara-Beliatta Sector (Phase 1)


Ministry of Transport
Central Engineering Consultancy Bureau (CECB)
China National Machinery Import & Export Corporation

DAILY DIARY

Item
No.

Activity Description

Activity No

Page 11 of 14

Location / Chainage

Plant / Equipment

CECB

1)

Labour

Remarks

1
6
5

3
5
3
3
2
3

Cause

Page 12 of 14

CECB

1)

Labour

Remarks

Page 13 of 14

CECB

1)

Labour

Remarks

Page 14 of 14

CECB

Vous aimerez peut-être aussi