Académique Documents
Professionnel Documents
Culture Documents
ITEM
DESCRIPTION
UNIT
Total Quantity
Rate
Cost
5.02
cum
49,937
cum.
cum.
5,133
cum.
3,225
5.03
a
b
c
d
5.03
a
b
c
d
5.03
a
b
c
d
5.04
a
b
c
5.05
cum.
cum.
cum.
cum.
1,293
-
cum.
cum.
cum.
cum.
3,934
9,307
1,890
-
cum.
cum.
cum.
8
425
cum.
MT
MT
MT
116
833
5
1,087
2,341
371
No.
424
1 of 15
5.07
5.08
5.09
5.10
5.11
5.12
cum.
cum.
No.
6,857
cum.
14,605
cum.
10,671
sqm.
285
2 of 15
5.13
5.14
5.15
5.16
5.17
5.18
5.19
5.20
5.21
5.22
5.24
5.25
5.25
1,031
452
598
sqm.
4,285
cum.
606
cum.
2,564
35,370
sqm.
1,442
cum.
7,883
cum.
4,128
cum.
cum.
639
2.27
5.28
sqm.
Dismentling
5.26 PCC/RCC M-20
5.27 RCC Slab
5.28 Dismentling of Pipe
sqm.
cum.
cum
cum
RM
3 of 15
9,715
9
420
Description
No
Length
Width
Depth
152
6.0
0.8
3.00
25
4.5
0.8
3.00
152
25
8.0
3.0
0.4
0.4
0.6
0.6
Haed Wall/Abutment
Pipe Culvert
Box Culvert
Parapet Wall
Pipe Culvert
Box Culvert
Unit
RCC Slab
Box Culvert
Dismentling of Pipe
A. All types Pipe
Pipe Culvert
Cum
cum
cum
25
6
2.5
3
0.5
12
0.3
1.5
RM
152
86
Total
4
A
Cum
69
Cum
Cum
69
69
7.8
7.8
Area
4.21
0.6
0.64
0.4
Total
Wing Wall
Slab
Cum
Cum
4 of 15
17
17
3
2
Area
1
2.54
0.3
Dismentling
Estimated Qty.
2188.80
270.00
2458.80
291.84
18.00
309.84
9.38
324.00
333.38
13072.00
13072.00
2264.44
-43.90
129.17
2349.71
2349.71
129.71
10.2
5 of 15
Dismentling
DESCRIPTION
count
UNIT
1
13.3
5 x 0.6
2
13.53
5 x 0.6
112.73
112.73
#REF!
Total Qty.
Rate
Amount
Bill No. 05: New culverts, Reconstruction and Repair of existing Culverts
5.01
5.01 (a)
5.01 (b)
5.02
5.03
5.03(a)
5.03 (b)
5.03 (c)
5.03 (d)
5.03 (e)
5.04
5.04(a)
5.04 (b)
5.04 (c)
5.04 (d)
5.04 (e)
5.05
5.05(a)
5.05 (b)
5.05 (c)
5.05 (d)
5.05 (e)
5.06
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
For Foundation
MT
5.06 (b)
MT
5.06 (c)
For Superstructure
MT
5.07 (a)
38.41
38.41
33.04
0.40
33.04
0.40
225.46
-
5.06 (a)
5.07
Cum
105.50
6 of 15
105.50
76.82
66.08
-
0.80
211.00
Summary PIPE
5.07 (b)
5.07 (c)
5.07 (d)
5.07 (e)
5.08
5.09
5.10
5.11
5.12
5.13
5.14
m
m
No.
Cum
Cum
No.
Cum
39.88
39.88
79.76
Cum
Sqm
7 of 15
Summary PIPE
5.15
5.16
5.17
5.18
5.19
5.20
5.21
5.22
5.23
5.24
5.25
5.26
5.27
Sqm
Cum
2.99
2.99
5.98
Cum
5.98
5.98
11.96
Per cm ht.
per letter
150.00
150.00
300.00
Sqm
0.00
0.00
Cum
Cum
Cum
Cum
6.47
5.29
5.30
5.31
6.47
12.94
Sqm
Sqm
No.
Sqm
8 of 15
Summary PIPE
5.32
5.33
Cum
Cum
9 of 15
Summary PIPE
Dismentling
5.34
PCC/RCC M-20
Cum
5.35
RCC Slab
Cum
5.36
Dismentling of Pipe
RM
10 of 15
Summary PIPE
W
N
R
Widening
New Construction
Reconstruction
SR. No.
1
2
10
11
12
Chainage
Existing
Length
Total
length
Proposed
Length
No of
Pipe
Dia of
Pipe
Thk.of
Pipe
No of
Head Wall
U/S
Apron
D/S
Apron
No. of
Toe Wall
No of CD
Structur
e
Remark
2
2
1
1
1
1
0
0
1
1
N
N
13.300
13.530
0
0
21.10
21.10
21.1
21.1
5
5
New Construction
0.6
0.06
0.6
0.06
Item No.
Description
1
for Pipe
For Appron
U/S
D/S
For Toe Wall
No
Length
Width
Depth
Estimated Qty.
Cum
Cum
2
1
8.540
18.45
2.4
5.7
1.1
0.52
45.09
54.69
Cum
Cum
Cum
1
1
0
Area =
Area =
3.61
6.36
15.21
0.6
0.6
0.6
0.75
3.82
9.13
0.00
112.73
112.73
3.38
51.48
-16.45
0.00
0.00
38.41
38.41
Earthwork in excavation
A. All types of Soil
For Head Wall
Unit
Cum
Cum
Cum
Cum
Cum
2
1
5
0
0
8.040
19.040
19.040
3.61
3.61
1.40
5.20
Area=
0.50
0.20
0.15
0.52
0.173
0.15
0.50
cum
cum
10
cum
MT
M
M
M
7.84
(1.03+0.55)/
2
7.84
7.84
(1.25+0.40)/2
Area=
0.4
3.15
2.55
32.99
0.407
-3.71
0.6
3.76
33.04
33.04
0.40
0.40
0.00
0.00
105.50
0
0
105.5
21.10
Filter material
Cum
Area =
4.98
0.15
2.99
2.99
Pitching on slopes
a) Stone
Cum
Area =
4.98
0.30
5.98
5.98
Apron / flooring
a) Boulders
Appron
U/S
D/S
Cum
Cum
1
1
Area =
Area =
6.36
15.21
0.30
0.30
1.91
4.56
6.47
6.47
15
150.00
150
0.6
9.41
9.41
0.72
0.41
79.13
-39.25
39.88
39.88
10
11
Back filling
Deduction for Pipe
Per cm ht.
per letter
10
sqm
7.84
cum
cum
cum
1
5
19.28
19.28
12 of 15
5.7
Area =
PIPE 1
Item No.
Description
1
for Pipe
For Appron
U/S
D/S
For Toe Wall
No
Length
Width
Depth
Estimated Qty.
Cum
Cum
2
1
8.540
18.45
2.4
5.7
1.1
0.52
45.09
54.69
Cum
Cum
Cum
1
1
0
Area =
Area =
3.61
6.36
15.21
0.6
0.6
0.6
0.75
3.82
9.13
0.00
112.73
112.73
3.38
51.48
-16.45
0.00
0.00
38.41
38.41
Earthwork in excavation
A. All types of Soil
For Head Wall
Unit
Cum
Cum
Cum
Cum
Cum
2
1
5
0
0
8.040
19.040
19.040
3.61
3.61
1.40
5.20
Area=
0.50
0.20
0.15
0.52
0.173
0.15
0.50
cum
cum
10
cum
MT
M
M
M
7.84
(1.03+0.55)/
2
7.84
7.84
(1.25+0.40)/2
Area=
0.4
3.15
2.55
32.99
0.407
-3.71
0.6
3.76
33.04
33.04
0.40
0.40
0.00
0.00
105.50
0
0
105.5
21.10
Filter material
Cum
Area =
4.98
0.15
2.99
2.99
Pitching on slopes
a) Stone
Cum
Area =
4.98
0.30
5.98
5.98
Apron / flooring
a) Boulders
Appron
U/S
D/S
Cum
Cum
1
1
Area =
Area =
6.36
15.21
0.30
0.30
1.91
4.56
6.47
6.47
15
150.00
150
0.6
9.41
9.41
0.72
0.41
79.13
-39.25
39.88
39.88
10
11
Back filling
Deduction for Pipe
Per cm ht.
per letter
10
sqm
7.84
cum
cum
cum
1
5
19.28
19.28
13 of 15
5.7
Area =
PIPE 2
Description
Unit
Page Total
1x2.5
General cleaning, removal of debris and vegetable growth from and around the bridge structure as per Technical
Specifications Clause 201
m2
Repair of damaged structural parts with cement concrete (Parapet/Head Wall/Wing Wall etc.)
m3
m2
495
495
31.68
32
0
Item
No.
Description
Slab
slab
slab
slab
1x3.6 (4
no.s)
1x3.5 (2
no.s)
1x3
1x2.4 (2 nos)
52
25
11
17
1.34
0.58
4.55
48
24
Slab
Slab
Slab
box
1x4.15
1x5.3
1x2.5
15
19
157
0.92
0.48
0.80
1.02
1.02
1.95
3.12
1.63
2.70
3.45
1.63
28
11
21
11
13
15
152
Unit
General cleaning, removal of debris and vegetable growth from and around the bridge structure as per Technical
Specifications Clause 201
m2
Repair of damaged structural parts with cement concrete (Parapet/Head Wall/Wing Wall etc.)
m3
Page Total
1x2.5