Vous êtes sur la page 1sur 1

INFLUENT FLOW

DISTRIBUTION WITH
RECTANGULAR WEIR
GATES.(TYP)
BEGIN
CONTRACT
5S
CONTRACT
6S

5SA-1
PDF=967.2
ADF=624.0

D-11
DESIGN FLOW

D-13

D-12

PDF=967.2
ADF=624.0

PDF=2901.6
ADF=1872.0

D-18

D-E 8

PDF=1450.8
ADF=936.0

D-E10

FLOW
MEASURMENT
PARSHALL
FLUME

INFLUENT
BYPASS
STRUCTURE

PDF=5803.2
ADF = 3744.0

ANAEROBIC
POND NO.1

FACULTATIVE
POND NO.1

ANAEROBIC
POND NO.3

ANAEROBIC
POND NO.2

D-E12

PDF=1450.8
ADF=936.0

PDF=1450.8
ADF=936.0

PDF=1450.8
ADF=936.0

P.S
NO.3

FACULTATIVE
POND NO.2

FACULTATIVE
POND NO.3

D-17
PDF = 6339.6m3/ hr
ADF = 4010.4 m3/ hr

PDF=2901.6
ADF=1872.0
D-E.2

D-E.1
(TO FUTURE TREATMENT
PLANT OR BYPASS TO
PAHARANG DRAIN BY
THE YEAR 2000 OF
DESIGN PERIOD)

SPLITTER
BOX NO. 2

D-E.3

PDF=1934.4
ADF=1248.0

PDF=2901.6
ADF=1872.0

D-E 7

PDF=1450.8
ADF=936.0

D-E 9

PDF=1450.8
ADF=936.0

PDF=2901.6
ADF=1872.0

D-E11

PDF=5803.2
ADF=3744.0

PDF=3803.8
ADF=2496.0

LINE

HEADWORKS
SCREENING
STRUCTURE

5SA-2

PDF=5803.2
ADF=3744.0
D-E.4

D-E.6

D-E.5

PDF=2901.6
ADF=1872.0

SPLITTER
BOX. I

ANAEROBIC
POND NO.5

ANAEROBIC
POND NO.4

ANAEROBIC
POND NO.6

PDF=2901.6
ADF=1872.0

D-E19

PAHARANG DRAIN

D-E15

MATCH

SEWAGE PUMP
STATION

D-E17

D-E13
PDF=2901.6
ADF=1872.0

D-14

PDF=967.2
ADF=624.0

D-15

PDF=967.2
ADF=624.0

FACULTATIVE
POND NO.4
D-16

FACULTATIVE
POND NO.5

FACULTATIVE
POND NO.6

PDF=1450.8
ADF=936.0

PDF=1450.8
ADF=936.0

D-E16

D-I 10

D-E18

D-E14

EFFLUENT DRAIN

SLUDGE
POND NO. 1

SLUDGE
POND NO. 2

SLUDGE
POND NO. 3

SLUDGE
POND NO. 4

DRAIN

CONTRACT
6S

WESTERN
DOMESTIC
TRUNK SEWER

PDF=5803.2
ADF=3744.0

PAHARANG

CONTRACT
3S

EFFLUENT
PUMP
STATION

END OF
CONTRACT
5S-A

CONTRACT
5S

NOTE

CONTRACT
NOTE
6S
PDF=PEAK DRY WETHER FLOW,m3 / hr
ADF=AVERAGE DRY WEATHER FLOW m3/ hr

THE INERT AND DIGESTED SLUDGE IS ESTIMATED ABOUT


3

34.200.m / YEAR AT THE DESIGN FLOW RATE OF 90,000.

A
AS

m / DAY AND POPULATION OF 855,000.

PLANNING AND DESIGN DIRECTORATE


WATER AND SANITATION AGENCY
FAISALABAD

PROJECT:- CONTRACT 5S
WESTERN DOMESTIC SEWAGE
TREATMENT PONDS
DRAWN BY:

CHECKED BY:

QAMAR D.M
M.RAFI D.M

ASSTT: DIR:

CHECKED BY:
DY: DIR:

TITLE:-

SCHEMATIC FLOW DIAGRAM


DATED

26-03-2012

SCALE

SC 5A-1

Vous aimerez peut-être aussi