Académique Documents
Professionnel Documents
Culture Documents
DISTRIBUTION WITH
RECTANGULAR WEIR
GATES.(TYP)
BEGIN
CONTRACT
5S
CONTRACT
6S
5SA-1
PDF=967.2
ADF=624.0
D-11
DESIGN FLOW
D-13
D-12
PDF=967.2
ADF=624.0
PDF=2901.6
ADF=1872.0
D-18
D-E 8
PDF=1450.8
ADF=936.0
D-E10
FLOW
MEASURMENT
PARSHALL
FLUME
INFLUENT
BYPASS
STRUCTURE
PDF=5803.2
ADF = 3744.0
ANAEROBIC
POND NO.1
FACULTATIVE
POND NO.1
ANAEROBIC
POND NO.3
ANAEROBIC
POND NO.2
D-E12
PDF=1450.8
ADF=936.0
PDF=1450.8
ADF=936.0
PDF=1450.8
ADF=936.0
P.S
NO.3
FACULTATIVE
POND NO.2
FACULTATIVE
POND NO.3
D-17
PDF = 6339.6m3/ hr
ADF = 4010.4 m3/ hr
PDF=2901.6
ADF=1872.0
D-E.2
D-E.1
(TO FUTURE TREATMENT
PLANT OR BYPASS TO
PAHARANG DRAIN BY
THE YEAR 2000 OF
DESIGN PERIOD)
SPLITTER
BOX NO. 2
D-E.3
PDF=1934.4
ADF=1248.0
PDF=2901.6
ADF=1872.0
D-E 7
PDF=1450.8
ADF=936.0
D-E 9
PDF=1450.8
ADF=936.0
PDF=2901.6
ADF=1872.0
D-E11
PDF=5803.2
ADF=3744.0
PDF=3803.8
ADF=2496.0
LINE
HEADWORKS
SCREENING
STRUCTURE
5SA-2
PDF=5803.2
ADF=3744.0
D-E.4
D-E.6
D-E.5
PDF=2901.6
ADF=1872.0
SPLITTER
BOX. I
ANAEROBIC
POND NO.5
ANAEROBIC
POND NO.4
ANAEROBIC
POND NO.6
PDF=2901.6
ADF=1872.0
D-E19
PAHARANG DRAIN
D-E15
MATCH
SEWAGE PUMP
STATION
D-E17
D-E13
PDF=2901.6
ADF=1872.0
D-14
PDF=967.2
ADF=624.0
D-15
PDF=967.2
ADF=624.0
FACULTATIVE
POND NO.4
D-16
FACULTATIVE
POND NO.5
FACULTATIVE
POND NO.6
PDF=1450.8
ADF=936.0
PDF=1450.8
ADF=936.0
D-E16
D-I 10
D-E18
D-E14
EFFLUENT DRAIN
SLUDGE
POND NO. 1
SLUDGE
POND NO. 2
SLUDGE
POND NO. 3
SLUDGE
POND NO. 4
DRAIN
CONTRACT
6S
WESTERN
DOMESTIC
TRUNK SEWER
PDF=5803.2
ADF=3744.0
PAHARANG
CONTRACT
3S
EFFLUENT
PUMP
STATION
END OF
CONTRACT
5S-A
CONTRACT
5S
NOTE
CONTRACT
NOTE
6S
PDF=PEAK DRY WETHER FLOW,m3 / hr
ADF=AVERAGE DRY WEATHER FLOW m3/ hr
A
AS
PROJECT:- CONTRACT 5S
WESTERN DOMESTIC SEWAGE
TREATMENT PONDS
DRAWN BY:
CHECKED BY:
QAMAR D.M
M.RAFI D.M
ASSTT: DIR:
CHECKED BY:
DY: DIR:
TITLE:-
26-03-2012
SCALE
SC 5A-1