Contract No: 3207067
PQ Number: | PO-TSJK-MHJK-1658
BANYU URIP Project Query =
PROJECT Byeten 8 Sub General
system No:
18-00-2015
Issuing Party: ‘MGL/Tripatra-Samsung Discipline/Group: Instrument/Electrical
Originator: IYOS ROSIANA Required Response Date: | 20-Oct-2015
Reference: IDBU-CW-ISPDS-000037 Close Date/MCL Signatur
Potential Change’: Cost: ¥Yes'/No ‘Schedule: ¥es’/No- ‘Spec Deviation: Yes"/No
PF ramon 17 eg PF macon comm | | I Proimom FF Ena Proicont RF Constn
MCL Contracts [~ SSHAE ‘Quality EnwiR : Contracts [~ SSHBE FF Quality xg
Distn: r r w ir 9 | TSDistn: | r w Tre
FF congine 7 muataen F rk [7 Poca [F cone | tetas mck 7 rect
=
‘Subject: Sunshade Mounting
Rev.0
Specification for Instrument Installation IDBU-CW-ISPDS-000037 section 5.2 paragraph two requires sunshade
protection to be provided for all instrument and control panel installed under direct exposure to sunlight. TS found this
requirement is not applicable for instrument that directly installed in pipe that has no mounting support (e.g.
temperature transmitter). Install the sunshade directly to instrument body is not preferred as it is not a proper
installation and it will obstruct access to transmitter terminal block. Therefore, TS would like to get an exception net to
install sunshade in direct mounting instrument where no adjacent mounting support available.
MCL confirmation and approval to above subject is expected.
Name: Saut Batara/Erwan Signature’ ‘Atachments: YesINo Pages
Rov. 0 EMCL Respons:
EMCL accepts TP proposal.
WeMan toe, 150 CTE
Tia: () Ths form & nota Change Request by COMPANY. Ary changos shall procossed m accordance wih the procadures given Ext G.
(2) Contractor o sum Change Proposal witin 14 calendar days. (3) Contractor to submit Speciicaion Deviation Request within T calendar days.
POLS KI t86 Rey DEM Regan Page tof
Reply Date: 15-Oct-2015 ‘Name: Bruce Edeburn / M:Hamiin as
Signature: