Vous êtes sur la page 1sur 1
Contract No: 3207067 PQ Number: | PO-TSJK-MHJK-1658 BANYU URIP Project Query = PROJECT Byeten 8 Sub General system No: 18-00-2015 Issuing Party: ‘MGL/Tripatra-Samsung Discipline/Group: Instrument/Electrical Originator: IYOS ROSIANA Required Response Date: | 20-Oct-2015 Reference: IDBU-CW-ISPDS-000037 Close Date/MCL Signatur Potential Change’: Cost: ¥Yes'/No ‘Schedule: ¥es’/No- ‘Spec Deviation: Yes"/No PF ramon 17 eg PF macon comm | | I Proimom FF Ena Proicont RF Constn MCL Contracts [~ SSHAE ‘Quality EnwiR : Contracts [~ SSHBE FF Quality xg Distn: r r w ir 9 | TSDistn: | r w Tre FF congine 7 muataen F rk [7 Poca [F cone | tetas mck 7 rect = ‘Subject: Sunshade Mounting Rev.0 Specification for Instrument Installation IDBU-CW-ISPDS-000037 section 5.2 paragraph two requires sunshade protection to be provided for all instrument and control panel installed under direct exposure to sunlight. TS found this requirement is not applicable for instrument that directly installed in pipe that has no mounting support (e.g. temperature transmitter). Install the sunshade directly to instrument body is not preferred as it is not a proper installation and it will obstruct access to transmitter terminal block. Therefore, TS would like to get an exception net to install sunshade in direct mounting instrument where no adjacent mounting support available. MCL confirmation and approval to above subject is expected. Name: Saut Batara/Erwan Signature’ ‘Atachments: YesINo Pages Rov. 0 EMCL Respons: EMCL accepts TP proposal. WeMan toe, 150 CTE Tia: () Ths form & nota Change Request by COMPANY. Ary changos shall procossed m accordance wih the procadures given Ext G. (2) Contractor o sum Change Proposal witin 14 calendar days. (3) Contractor to submit Speciicaion Deviation Request within T calendar days. POLS KI t86 Rey DEM Regan Page tof Reply Date: 15-Oct-2015 ‘Name: Bruce Edeburn / M:Hamiin as Signature:

Vous aimerez peut-être aussi