Vous êtes sur la page 1sur 2

WELL CONTROL DATA SHEET for DIRECTIONAL WELLS Wt.

Well Name: Sundance

Well Meas. TD ft
Well TVD ft
Last Csg Set TD ft
SIDPP psi
Pump Efficiency
Pump Liner Sz in

Location: 2-5-40-19W4

KOP ft
Drill Pipe OD in
Csg Shoe TVD ft
SICP psi 600
SlowP.S.strks/min
Pump Rod Sz in

8500
7000
5500
400
96.0%
5 1/2

Hole Size in
Drill Pipe ID in
Casing ID in
Pit Gain bbl 14.0
BOP psi
Slow Speed P.Pressure psi
Stroke Length in

5000
4 1/2
5500
1
0

bbl/ft Capacity gal/ft


0.0095
0.398
0.0406
1.704
0.0445
1.867

8500
3000
5500

Hole Totals
Mud Tanks
TOTAL MUD
Baryte Vol. Gain

Written by Vass Karatzas


WHITE TOWER CONSULTING Ltd.
Comments: vkaratzas@sprint.ca

3 1/8
8 1/8
8000
700
12

bbl Volume gal


80.6
3387
121.7
5112
244.5
10270
446.9
18769
520
21840
446.9
18769
43.6
1832

Time (min)

<

Pump Strokes,

per

Time in Minutes,

Pump Strokes

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.0846
1540
1226
1.10

Pump Output=
MACP with Original Mud in csg =
New MACP with Kill Mud =
Mud Wt. Increase =
11.10
Kill Mud Wt. =
1.60
Baryte Addition =
64994
Total Baryte =
737
Number of 40kg Sacks Required =
0.06
40kg Sacks/min or
Mixing Rate of =
43.6
Volume Gain from Baryte Addition =
strokes
and KOP to Bit
= 10
psi per

3640 psi
4040 psi
4400 psi
3458
3417
1100
538
860
777

Engineer:

Drill Collar Lengt


Drill Collar OD
Mud Wt.
Leak Off Gradient p
Mud Tank Volume
Working Pumps

7 7/8

CALCULATIONS for KILLING THE WELL

Hydrostatic Pressure at TD =
Formation Press =
Csg Shoe Fracture Pressure =
Csg Shoe Pressure at Shut-in =
Csg Shoe Pressure with kick at Csg Shoe =
I. C. Pressure (RSPP + SIDDP) =
Pump Strokes to KOP in D.P. =
Drill Pipe Pressure Drop to KOP =
F. C. Pressure to bit and on =
Rates of D.P. Press Drop: Surface to KOP
= 10
psi

Wt. METHOD

&

Date: 99-10-22

VOLUMES and PUMPING TIMEs

Length ft
Drill Pipe
OH Annulus
Csg Annulus

Rig: CDG 15

psi
psi
psi
strokes
psi
psi

22

D.P. Pressure (in psi) Reduction Schedule

> Bit < Steady D.P. Press t

1100 ICP

1068

1035

1003

971

938

906

874

842

809

777 FCP

777

strokes 0

72

145

217

289

361

434

506

#REF!

#REF!

#REF!

#REF!

min 0

72

145

217

289

361

434

506

#REF!

#REF!

#REF!

#REF!

DRILL PIPE PRESSURE REDUCTION SCHEDULE

809 psi

906 psi

842 psi

777 psi

700

777 psi

800

874 psi

900

938 ps i

971 psi

DRILL PIPE PRESSURE, psi

1000

1003 ps i

1100

1035 psi

1068 psi

1200

#REF!

1605

600
PUMP STROKES

500
0

72

145

217

289

361

434

506

#REF!

#REF!

KICK at Csg SHOE

400
400

600
3458
3458

1100
1100

Csg
Shoe

The Well is

Pump Stks
set @

600

777
777

620
620

Pump is

Kill Mud at

started

the Bit.

00

620
620

777
777

559
559

777
777

Csg
3417 Shoe
3417

Old Mud Wt.

870
870
at Pump Stks

Shut-in &

and I.C.

and Final

Pump's Off

Resumed

Kick's out

Pressure

at Pump Stks

Pump Stks

and the
Well is

at Pump Stks

Pump Stks

Circulating
Pressure

Pump Stks

2295
2295

Pump Stks

915
915

is in Effect

915
915

Shut-in

1193
1193

New MACP

3417
3417

14

established

4154
4154

Circulation

Pressures
Stabilized

Pump Stks

GAS to SURFACE

5069
5069

Kill Mud's up

5069

METHOD
Vass Karatzas

Collar Length ft
Drill Collar OD in
Mud Wt. ppg
ff Gradient psi/ft
Tank Volume bbl
orking Pumps No

620
6 1/4
10.00
0.80
520
1 pump

0.000000855298599939821

0.000000855298599939821

Pump Strokes
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
bbl/min
psi
psi
ppg
ppg
ppg
Lbs
sacks
6 lbs/min
bbl

#REF! strokes
ady D.P. Press to Surface >
777

777

#REF!

#REF!

#REF!

#REF!

777 psi

777 psi

777 psi

CHEDULE

1605

2295

5069

00

00
The Pump
Stopped
and the

Pump Stks

5069
5069

Well is
SHUT-IN

Vous aimerez peut-être aussi