This document is the property of SIEMENS and must not be passed on to any third person or firm not authorised

by us, nor be copied/made use of in full or part by such person or firm without our prior permission writing

REVISED INLINE WITH THE COMMENTS VIDE DISCUSSION WITH NTPC DATED 16.05.11

REVISED INLINE WITH THE COMMENTS VIDE DISCUSSION WITH


NTPC DATED 16.05.11
REVISED INLINE WITH THE COMMENTS VIDE DOCUMENT NO 9464001-PVE-B-0110 REV-2 DATED 22.12.10
REVISED INLINE WITH THE COMMENTS VIDE DOCUMENT NO 9464001-PVE-B-0110 REV-1 DATED 26.08.10

13.05.11

14.02.11

30.09.2010

16.08.10

14.12.09

FIRST ISSUE

RAA

ER

MKS

REV

DATE

DESCRIPTION

DSGN

CHKD

APPD

REVISED FOR RESUBMISSION

RAA

ER

MKS

RAA

ER

MKS

RAA

ER

MKS

RAA

ER

MKS

REVISIONS
NTPC DRAWING NO:

9464-001-PVE-B-0110

L&T DRAWING NO:

O9075-E-BM-CS-DD-0110

CLIENT:

CONSULTA

ANPARA THERMAL POWER PROJECT STAGE - D (2x500) - COAL HANDLING PLANT


SPECIFICATION NO.: CW - CM - 9464 - C - 0 - 001
CONTRACTOR:
JOB NO.:
LARSEN & TOUBRO LIMITED
09075
PROJECT:

Digitally signed

Not
Verified
ECC Signature
DIVISION - EDRC
by Charanjeet
Singh
Date: 2011.08.02
16:16:20 IST NAME
Reason:
II
DSGN CAT RAA
Location:
DRWN
RAA
SCALENTPCEOC
CHKD
ER

SUB-CONTRACTOR:
JOB NO.:
IS-MT-MI-PS-SR
TITLE :

APPD

G.A., SLD, Data sheets and Typical Schemes for 3.3kV HT SWITCHGEAR

DATE

30.09.2010
30.09.2010
30.09.2010
30.09.2010

MKS

REV

DOC. No.
RELEASED FOR 

(4)

PRELIMINARY

4


TENDER

X


4 0 8
INFORMATION

Z


APPROVAL

1 -

3


CONSTRUCTION