Vous êtes sur la page 1sur 32

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 1 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

INDEX
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Description
MECHANICAL CHECK AND VISUAL INSPECTION
POWER TRANSFORMER DATA
GENERAL CHECKS
TRANSFORMER TURNS RATIO TEST
CAPACITANCE AND TAN DELTA OF WINDING
CAPACITANCE AND TAN DELTA OF BUSHING
MAGNETIZING CURRENT TEST
MAGNETIC BALANCE TEST
VECTOR GROUP TEST
SHORT CIRCUIT TEST (IMPEDANCE MEASUREMENT)
ZERO SEQUENCE IMPEDANCE TEST
WINDING RESISTANCE TEST
INSULATION RESISTANCE TEST OF TRANSFORMER WINDING
AND POLARIZATION INDEX TEST
OIL AND WINDING TEMPRATURE GAUGES CALIBRATION
WINDING TEMPRATURE CALIBRATION BY SECONDARY
CURRENT INJECTION
SUPERVISION EQUIPMENT FUNCTIONAL CHECK
COOLING FANS TESTING
OLTC TEST
OIL BREAKDOWN TEST

Mechanical CHECK AND VISUAL INSPECTION:


TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

Remarks

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 2 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Item
1
2
3
4
5
6
7
8
9

Dwg. Ref.:

Record No.:

Description
Inspect for physical damage/defects
Check nameplates information as per contract specification
Check quality for paint work, condition of lifting lugs, quality of weld areas
rust spots and wheel stoppers
Check tightness of all bolted connections
Check impact recorder for any abnormal impact during transportation
Check integrity of diagram/airbag in the conservator
Check piping to buchholz relay has proper slope
Check that all grounding are securely connected

10
11
12
13
14
15
16
17
18

Check vertical/horizontal clearance of live parts to adjacent grounded point


to confirm standard
Check the valves between the tank and radiator
Check the H.V L.V and Tertiary bushing for any damage and completeness
Check phase marking in cable box and it should match with GIS and cables
Perform all the manufacturer specific checks
Check all pipes - hoses and fan protection(not rubber or plastic)
Check the color and quantity of silica gel in breather and oil pot level
Check labeling of all auxiliary devices as per approved drawings
Check proper operation of all auxiliary devices
Check oil leakage by applying 0.35 bar (35KPa) over pressure for 24 Hrs

19
20
21
22
23
24
27
30

Check the oil sampling devices are reachable from ground level
Check oil level in main tank, conservator, tap changer tank and bushing etc
Check all external wiring for correctness and tightness
Bleed trapped air at the bushing turrets and tank top
Check flow of oil in flow meter in correct direction and proper rate
Check that the temperature sensor oil well is two third filled with oil
Check that the Tank Pressure is Positive
Neutral grounding.

NAME PLATE DETAILS:

1ZTR 130609

SERIAL NUMBER
TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

Checked
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Not all
connected
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Will be
done
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Will be
done

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 3 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

TYPE

TR67-EOA-OH-1

MANUFACTURER / YEAR

ABB / 2014
IEC-60076

STANDARD

53-TMSS-01 Rev.01

POWER (MVA)

50/67

COOLING TYPE

ONAN/ONAF

FREQUENCY(Hz)

60

PHASE

VECTOR GROUP

Dyn1

TAP CHANGER TYPE

OLTC ABB

NUMBER OF TAPS

27

NORMAL TAP
VOLTAGE AT NORMAL TAP
(HV/LV)
RATED CURRENT HV
(50/67MVA)
RATED CURRENT LV
(50/67MVA)
PERCENTAGE IMPEDANCE
(%Z) AT TAP (1/11/27)
ZERO SEQUENCE
IMPEDANCE Z0% AT
NORMAL TAP
TEMP. RISE
(WINDING/OIL/MAX
AMBIENT)

11
115/13.8 KV
251/336.4 A
2091.8 / 2803.1 A
22.58 / 21.19 / 20.92 %
22.36 %
50 / 45 / 55 C

TRANSFORMER TURNS RATIO TEST

TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 4 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

ATTACHED

Equipment :

Dwg. Ref.:

Record No.:

TEST RESULTS

TTR - 3 TRANSFORMER TURNS RATIO TESTER

CAPACITANCE AND TAN DELTA OF WINDING


OIL TEMPERATURE =

TEST DATE:

30 C

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 5 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Test Mode

SI
No.

Measured

Dwg. Ref.:

Test
Connecti
on

KV

Record No.:

mA

Watt
s

%Pf

Capacita
nce
(pF)

UST
1

MEASURE
RED,GROUND
BLUE

CHL

GST
2

GROUND
RED,BLUE

CHL+CH

HVBLACK

12.52

0.182
7

0.15

3320.7

26.02

0.432

0.17

6903.2

13.5

0.244
4

0.18

3582.4

12.5

0.186
5

0.15

3320.2

43.1

1.3

0.2

11409

30.6

1.138

0.37

8116.9

LV-RED

GST
3

GUARD
RED,BLUE

CH
10

UST
4

MEASURE
RED,GROUND
BLUE

CLH
HV-RED

GST
5

GROUND
RED,BLUE

CLH+CL

LVBLACK

GST
6

GUARD
RED,BLUE

CL

Criteria: Tan Delta < 0.5%


CAPACITANCE AND TAN DELTA OF HV BUSHING
OIL TEMPERATURE = 30 C
TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 6 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

Equivalent 10 KV
Reading
No.

Bushing
Serial No:

MO
DE

H1

1ZSCT250097
24/03

UST

H2

1ZSCT250097
24/02

UST

H3

1ZSCT250097
24/01

UST

Tes
t
KV

P.F
%

Milli
Amps

POWER
WATTS

Meter
Reading

Watt
Reading

0.857

0.0358

0.4
2

227.68

0.857

0.0359

0.4
2

227.63

0.857

0.0316

0.3
7

227.53

10

Criteria: tan delta< 0.7%

Instrument
Serial No.
Calibration Date
Calibration Due

DELTA 2000
56810607
6/4/2016
6/4/2017

MAGNETIZING CURRENT TEST (NO LOAD TEST)


TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

Capacita
nce (pF)

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 7 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

Applying voltage at high voltage side H1,H2,H3= 400 V while low side is open and
measuring high side current.

TAP NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
TEST DATE:

MAGNETIZING CURRENT AT PRIMARY


WINDING (mA)
IR
(mA)

IS
(mA)

IT
(mA)

2.91
3.05
2.60
2.77
2.78
2.85
2.86
2.88
2.96
3.02
3.09
3.17
3.27
3.35
3.47
3.55
3.62
3.70
3.79
3.88
3.95
4.03
4.14
4.26
4.35
4.47
4.57

2.64
2.58
2.35
2.26
2.32
2.40
2.51
2.85
2.66
2.71
2.75
2.82
2.88
2.90
3.14
3.21
3.26
3.30
3.40
3.48
3.57
3.66
3.75
3.78
3.98
4.05
4.16

4.29
4.14
3.88
3.92
4.00
4.08
4.14
4.26
4.35
4.43
4.57
4.67
4.75
4.87
5.07
5.19
5.32
5.43
5.58
5.70
5.81
5.96
6.11
6.25
6.41
6.57
6.73

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 8 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

CRITERIA: Io<0.5%

Instrument
Serial No.
Calibration Date
Calibration Due

FLUKE 289
56810607
6/4/2016
6/4/2017

CLAMP METER
87945001
6/4/2016
6/4/2017

MAGNETIC BALANCE TEST


SUPPLY 2 PHASES AT HV AND MEASURE ALL HV AND LV VOLTAGES

TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 9 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

Tap 1
X3-X0

X2-XO

X1-X0

H1-H3

H2-H3

H1-H2

APPLIED VOLTGAGE

(V)

(V)

(V)

(V)

(V)

(V)

AT TERMINALS

12.6

24.1

12.1

197.1

205.1

392.5

H1-H2

24.3

23.2

1.3

21.8

395.2

375.8

H2-H3

1.1

23.4

24.1

391.4

17.1

379.3

H1-H3

X3-X0

X2-XO

X1-X0

H1-H3

H2-H3

H1-H2

APPLIED VOLTGAGE

(V)

(V)

(V)

(V)

(V)

(V)

AT TERMINALS

12.4

27.2

15.2

219.6

178.3

391.1

H1-H2

27.4

25.9

1.6

23.6

395.5

373.7

H2-H3

1.1

26.1

27.1

389.7

17.2

376.3

H1-H3

Tap 11

Tap 27
X3X0
TEST DATE:

X2XO

X1X0

H1H3

H2H3

APPLIED
VOLTGAGE

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

H1H2

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 10 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

(V)

(V)

(V)

(V)

(V)

(V)

AT TERMINALS

16.9

33.9

17.1

197.
1

196.
9

392.
4

H1-H2

34.2

31.9

2.3

27.8

397.
1

368.
5

H2-H3

1.5

32.4

33.7

390.
1

18.7

373.
2

H1-H3

Instrument
Serial No.
Calibration Date
Calibration Due

FLUKE 289
56810607
6/4/2016
6/4/2017

CLAMP METER
87945001
6/4/2016
6/4/2017

VECTOR GROUP TEST

HIGH TO LOW (Dyn1):


TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 11 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Vector
Group

Dyn1

Dwg. Ref.:

CONNECTION
CONNECT TERMINAL
H1 TO X1
APPLY SOURCE VOLTS
TO H1,H2 and H3

Record No.:

VOLTAGE
RELATIONS

Checked

H3-X2=H3-X3

OK

H3-X2<H1-H3

OK

H2-X2<H2-X3

OK

H2-X2<H1-H3

OK

MEASURED TERMINAL VOLTAGE (V)


H3-X2

345

H1H3

395

H2X3

403

H3-X3

345

H2X2

348

H1H2

395

H2-H3

395

Test connections:

Connect H1-X1 and apply 3 phase voltage across H1,


H2 & H3
Angular Displacement =

30 Degrees according To

Dyn1

SHORT CIRCUIT IMPEDANCE (PERCENTAGE IMPEDANCE


TEST):
TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 12 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

3 PHASE SUPPLY GIVEN TO HV WINDING WITH LV WINDING SHORTED

TAP
POSITI
ON

Rated
voltag
e (V)

Rated
curre
nt (A)

Measured short
circuit current in
primary (A)

Applied voltage(V)

R-Y

Y-B

B-R

Mea
n

Mea
n

Calcul
ated
%
Impe
dance

Fact.
Result
%Z

12937
5

223

400

399

401

400

2.
9

2.9

23.77

23.2 +/10%

11

11500
0

251

400

399

401

400

3.
8

3.9

21.83

21 +/- 7.5%

27

92000

313.8

400

399

401

400

6.
2

6.
3

6.4

6.3

21.66

21.4 +/10%

* Rated current Meas. Voltage


(*At Corresponding Tap)
% Impedance =

100

----- -- ------- ----------------------------------------------*Rated voltage Meas. Current

Criteria: +/-10 %

Instrument
Serial No.
Calibration Date
Calibration Due

TEST DATE:

FLUKE 289
96820054
2/8/2016
2/8/2017

CLAMP METER
W0153033
17/8/2016
17/8/2017

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 13 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

Zero Sequence Impedance Measurement


Condition: shorting X1, X2, X3 & single phase supply X1-N while
HV side open
Tap
No

Zero Sequence Impedance


Measurement
Applied
voltage(V)

Applied
current(A)

6.3

20.0

11

Z0%

FACTORY
Z0%

% ERROR

24.4

22.49

8%

Z= 3*U measured/ I measured


/Phase
Z0%=Z * I rated per phase * 100 / U rated phase
to neutral
%

CRITERIA: +/- 10%

Instrument
Serial No.
Calibration Date
Calibration Due

TEST DATE:

FLUKE 289
56810607
6/4/2016
6/4/2017

CLAMP METER
87945001
6/4/2016
6/4/2017

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 14 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

WINDING RESISTANCE TEST


Oil temperature: 28-30 C
HV Winding
WINDING RESISTANCE (HV)
H1-H2
Tap
Positi
on

CAL
at

H2-H3

Meas.

75 C

FACT:
at 75
C

905.2

CAL.
at

H1-H3

75 C

FACT:
at 75
C

Meas.

CAL.
at 75
C

FACT:
at 75 C

1.066

910.5

1.062

902.5

1.055

895.5

1.055

899.7

1.052

891.5

1.042

884.4

1.041

890.1

1.041

881.3

1.038

874.4

1.028

877.8

1.027

870.1

1.018

862.5

1.016

868.1

1.015

860.2

1.006

852.4

1.004

857.3

1.002

849.3

0.993

841.4

0.992

848.1

0.995

839.4

0.981

831.3

0.980

836.9

0.979

828.2

0.969

820.9

0.967

825.1

0.968

818.1

0.957

10

810.3

0.955

815.7

0.954

807.9

0.945

11

800.1

0.942

805.2

0.942

797.3

0.932

12

790.2

0.930

795.3

0.931

787.4

0.921

TEST DATE:

FROM 30/10/2016 TO /10/2016

Meas.

TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

SEC EOA Contract No. :


4400003555/00

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

Page 15 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

13

780.2

0.919

785.2

0.918

777.3

0.910

14

769.4

0.907

775.3

0.907

767.4

0.898

15

780.1

0.919

786.2

0.919

778.4

0.910

16

792.4

0.934

797.2

0.933

789.2

0.923

17

802.2

0.945

808.1

0.945

800.2

0.935

18

812.5

0.958

818.1

0.957

810.4

0.947

19

823.9

0.970

829.1

0.972

821.2

0.961

20

833.1

0.982

839.1

0.982

831.8

0.972

21

844.0

0.995

850.1

0.994

841.9

0.985

22

854.4

1.0072

860.2

1.0062

852.4

0.997

23

864.4

1.0193

870.2

1.019

862.3

1.008

24

874.2

1.0312

880.3

1.030

872.2

1.025

25

885.2

1.0428

890.2

1.041

882.5

1.037

26

895.6

1.0554

900.3

1.053

892.4

1.044

27

905.4

1.0672

910.3

1.065

903.2

1.056

LV Winding
TAP

WINDING RESISTANCE (LV)


X1-X2
Measur

TEST DATE:

Measured

X2-X3
Measur

Measur

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

Measured :

X3-X1

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

Measured:

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 16 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

: at
ed

11

75C

Record No.:

at
ed

75 C

ed

at 75 C

14.1

17.03

15.06

17.75

16.01

18.77

(235 + 75)
Res @ 75 C. = Meas. Res @ Amb. Temp. X -----------------------------------------------(235 + Avg Oil Temp.)

Criteria: +/- 3%

Instrument
S.N
Make
Calibration Date
Calibration Due

CPC100
S.N:KF-134R
OMICRON
26/10/2016
26/10/2017

INSULATION RESISTANCE TEST OF TRANSFORMER WINDING AND


POLARIZATION INDEX TEST
Average oil temperature: 30 C
Core insulation Resistance tested with 1000 VDC (1 min)
TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 17 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Insulation resistance between


Core to ground
Frame Lamination to ground
Core to frame

Record No.:

Insulation resistance (G)


10.7
16.1
9.55

Winding Insulation Resistance Test & Polarizing Index Tested with: 5000 VDC
Insulation resistance between

1 Min
( G )

10 Mins
( G )

Polarizing
index

HV (LV+ ground)
LV (HV + ground)
HV-LV

16.9
5.15
28.85

23.9
10.3
45

1.36
2
1.56

Criteria: Polarization Index (I.R at 10 min / I.R at 1 Min) Value > 1.3

Instrument
Make
Serial number
Calibration Date
Calibration Due

MIT520
MEGGER
10003740909091956
17/8/2016
17/8/2017

CALIBRATION OF OIL AND WINDING TEMPRATURE SENSORS


OTI
Type

AKM

Serial

1121882-1

WTI (HV)
TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 18 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Type

AKM

Serial

1121884-15

WTI (LV)
Type

AKM

Serial

REFERENCE
TEMP ( C)
40
60
80
100
120

Record No.:

1121884-10

OTI ( C)

HV WTI ( C)

LV WTI ( C)

40

40

40

60

60

60

80
100
120

80
100
120

80
100
120

CRITERIA: +/- 3 DEGREES

INSTRUMENT: TEMP. CALICRATION GAUGE

WINDING TEMPERATURE GAUGES (HV):


FUNCTIONAL TEST

TEST DATE:

DEVIC
E

FUNCTION

SETTING

OPERATI
ON

F909

Fan Start

80 C

OK

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

REMARKS

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 19 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

Alarm

115 C

OK

Tripping

130 C

OK

WINDING TEMPERATURE GAUGES (LV):


FUNCTIONAL TEST
DEVIC
E

FUNCTION

SETTING

OPERATION

80 C

OK

Alarm

115 C

OK

Tripping

130
C

OK

Fan Start
F910

REMARKS

1) Setting shall be as per manufacturer recommendation.


2) Reading shall be taken at an interval of approximately 40 C to 130 C.
3) Alarm and trip should operate at set temperature
3 C.

OIL TEMPERATURE GAUGE


FUNCTIONAL TEST
DEVICE

FUNCTION

F908

TEST DATE:

SETTING

Alarm

95

Trip

105

C
C

REMARKS

OK
OK

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

OPERATION

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 20 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Criteria

Dwg. Ref.:

Record No.:

Pickup & Dropout values shall be within 1%

NOTE:1) Setting shall be as per manufacturer recommendation.


2) Reading shall be taken at an interval of approximately 40 C to 120 C.
3) Alarm and trip should operate at set temperature
3 C.

Instrument
Serial number
Calibration Date
Calibration Due

TEMP. CALIBRATOR
GAUGE
861A1784
17/8/2016
17/8/2017

WINDING TEMPRATURE CALIBRATION BY SECONDARY CURRENT


INJECTION:
HIGH VOLTAGE WINDING TEMPRATURE INDICATOR (F 909):
CT NO: T 002
RATIO: 421/2A
CURRENT INJECTED: 2.02A

CLASS: 3Fs10

TIME (MIN.)
0
5
10
15
TEST DATE:

TEMP. READING ( C)
36
46
51
53

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 21 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

20
25
30
35
40
45

55
56
56
56
56
56

OIL TEMP. AT START (A)


OIL TEMP. AT END (B)
WINDING TEMP. BEFORE
CURRENT INJECTION (C)
WINDING TEMP. AFTER 45 MINS
(D)
SIMULATED TEMP. RISE
MEASURED
[(D-C)-(B-A)]

36
38
36
56
18

LOW VOLTAGE WINDING TEMPRATURE INDICATOR (F910):


CT NO: T 008
RATIO: 2803/2A
CURRENT INJECTED: 2.12A

CLASS: 3Fs10

TIME (MIN.)
0
5
10
15
20
25
TEST DATE:

TEMP. READING ( C)
36
41
44
48
48
50

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 22 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

30
35
40
45

TEST DATE:

50
50
50
50

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 23 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

OIL TEMP. AT START (A)


OIL TEMP. AT END (B)
WINDING TEMP. BEFORE
CURRENT INJECTION (C)
WINDING TEMP. AFTER 45 MINS
(D)
SIMULATED TEMP. RISE
MEASURED
[(D-C)-(B-A)]

TEST DATE:

50
13

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

38
39
36

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 24 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

INSTRUMENT: SVERKER 760

TESTING OF COOLING FANS


Measurement of Current for Fans:
Make:

ZIEHL-ABEGG

Fan Motor Rating:

3 Phase 400V, 60Hz, D/Y, 2.1/1.3 KW, 5.1/2.9 A,

640/470 rpm, cos Y=0.59

TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 25 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

Current ( A )
Fa
n
No
.

Drawing
Ref.

Starting

Direction of
Rotation

M101

14.
7

14.
2

14.
5

4.8

4.5

4.8

5.66

TO RADIATOR

M102

17.
5

16.
3

15.
3

4.6

4.7

4.9

3.1

TO RADIATOR

M103

20.
4

15.
9

15.
2

4.8

4.6

4.9

4.29

TO RADIATOR

M104

15.
5

14.
6

20.
5

4.9

5.0

4.9

4.09

TO RADIATOR

M105

15.
0

14.
4

19.
1

4.7

4.9

5.0

6.72

TO RADIATOR

M106

20.
3

14.
2

19.
6

4.7

4.9

5.0

3.76

TO RADIAROR

M107

13.
6

14.
7

12.
5

5.4

4.9

4.9

4.58

TO RADIATOR

M108

16.
8

14.
9

17.
3

4.7

4.8

4.8

4.64

TO RADIAROR

M109

14.
1

15.
5

15.
4

4.7

4.8

4.8

3.89

TO RADIATOR

17. 12.
10
FROM M110
30/10/2016 TO 2 /10/2016
7

17.
7

4.6

4.7

4.9

3.77

TO RADIATOR

TEST DATE:

TESTING ENGINEER

11

M111

Signature: ________________
Name
017

IR with
1000V
@60
seconds
(GOhm)

Running

M112
:12
ISLAM EL
KADY

16.
2

12.
7

15.
2

16. 11. 16.


NG ID # OSA7
2
3

CSD- Engineer

4.5

4.8

4.8

3.21

TO RADIATOR

Signature: ________________

4.7 5.0
4.9 AL TAMIM
6.06
Name
: AYIDH

TO RADIATOR

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 26 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

WIRE CHECK: OK

PHASE SEQUENCE CHECK: OK

INSTRUMENT: FLUKE METER & CLAMP METER

Function Check of Fan Panel Accessories:


Item
1.

Backup power supply 3 ph AC 380/220V,60hz

NA

3.

Main power supply


3ph AC 380/220V 60hz to motor drive unit for OLTC
220V AC socket & MCB

OK
OK

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

CHECKED
OK

2.

4.
TEST DATE:

Functions
Main power supply 3ph AC 380/220V,60hz

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 27 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

5.

Lighting and door switches

OK

6.

Heaters, MCB and Manual, off, auto switch

OK

7.

Thermostat

OK

8.

Fan group man/auto switch

OK

9.

Fan local/remote switch

OK

10. Fan on/off manual

OK

11. Fan on/off auto

OK

12. Man/auto interlock check

OK

13. In auto position (group fans-starts at HV winding temp reaches


-starts at LV winding temp reaches

80 C
80 C

OK

14. Fan MCB trip signal for all MCB

OK

15. Fan GROUP signal

Auto

OK

Manual
Local
Remote
On
Off
Group

OK
OK
OK
OK
OK
OK

17. Fan signal from


19. Fan group
21. Fan faulty signal

On Load Tap Changer (OLTC)

TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 28 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

Record No.:

MAKE: ABB (MADE IN SWEDEN)


MOTOR SPECS: 3 PHASE, 60Hz, 380-420V
TYPE: BUE 2
RATING: SUPPLY: 400V (L-L)

1
2
3
4
5
6
7
8
9
10
11
12

Explanation of event
MCB of tap changer motor
AC socket & MCB
Heater & thermostat
Lighting & door switch
Mechanical operation check
Mechanical upper limit lock
Mechanical lower limit lock
Electrical operation
Upper
Electrical limit lock
Lower
Counter operation check
Local operation check
Stop and rotation pointer

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Motor starting / running current (A)

14

Motor handle interlock


Local / remote check(local operation
switching)
Motor drive & OLTC tap # comparison
Sound during operation
Alarm signals for control room
Emergency stop switch
Tap position indicator
Tap changer in progress
Tap changer faulty
Tap changer from
Raise

16
17
18
19
20
21
22
23

IR
0.5
0.4

IS
0.5
0.4
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

CHECKED

13

15

TEST DATE:

CONTROL: 110V AC, 60Hz

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

IT
0.5
0.4

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 29 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

24
25

remote
OLTC local
OLTC remote

26

Tap position

27

Tap changer incomplete

Dwg. Ref.:

Record No.:

Lower

OK
OK
OK
OK
OK
OK

Raise
Lower

Supervision Equipment Functional Checks:


Item

Terminal at
Marshalling Kiosk

Equipment

TEST DATE:

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

Normal
NO

Alarm/trip
NC

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 30 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Dwg. Ref.:

Buchholz Relay Main Tank (-F901)


Stage1 ALARM
Buchholz Relay Main Tank (-F901)
Stage2 TRIP
Buchholz Relay Conservator (-F902)
Stage1 ALARM
Buchholz Relay Main Conservator (-F902)
Stage2 TRIP
Oil Level LOW for OLTC (-F903)
ALARM
Oil Level HIGH for OLTC (-F903)
ALARM
Main Tank Oil level LOW ALARM (-F904)
Main Tank Oil level HIGH ALARM(-F904)
OLTC Pressure Relief Device (-F905.1)
TRIP
OLTC Pressure Relief Device (-F905.2)
TRIP
Transformer Pressure Relief (-F906)
TRIP
OLTC Pressure Relay (-F907.1)
TRIP
OLTC Pressure Relay (-F907.2)
TRIP
Oil Temp. Indicator (-F908)
@ 95 C ALARM
Oil Temp. Indicator (-F908)
@ 105 C TRIP

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Equip. No.: TR. (3)

Winding Temp. Indicator HV side(-F909)


TRIP @ 130 C
Winding Temp. Indicator LV side (-F910)
ALARM @ 115 C
Winding Temp. Indicator LV side (-F910)
TRIP @ 130 C

18
19
TEST DATE:

X3: (1-28)
X4: (2-22)
X3: (2-29)
X4:(3-23)
X4:(3-24)
X4: (5- 25)
X4:(6-26)
X3: (4-31)
X3: (8-35)
X3: (11-38)
X3: (16-43)
X3: (18-45)
X4: (7-27)
X3: (13-40)

Signature: ________________
: ISLAM EL KADY

X3: (14-41)
X4: (9-29)
X3: (15-42)

CSD- Engineer

Name

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK
OK

OK
OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK
OK

OK

Signature: ________________
NG ID # OSA-

OK

X4: (8-28)

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Name
017

X4: (1-21)

Winding Temp. Indicator HV side(-F909) ALARM


@ 115 C

17

Record No.:

: AYIDH AL TAMIM

OK

OK

OK

OK

OK

OK

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 31 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

Dwg. Ref.:

OLTC Oil Flow Relay (-F911.1)


TRIP
OLTC Oil Flow Relay (-F911.2)
TRIP
Rapid Pressure Rise for Tank (-F912)
TRIP

20
21
22

Record No.:

X3: (20-47)
X3: (22-49)
X4: (14-15)

OK

OK

OK

OK

OK

OK

OIL BREAKDOWN (DILECTRIC STRENGTH) TEST


Five samples shall be taken as following; top of main tank, bottom of main tank, OLTC tank, main tank conservator
and OLTC conservator, the average result shall not be less than 50 KV at 2.5 mm gap. (CRITERIA: > 50KV)

SAMPLE NO.

SAMPLE
POSITION

TEST NO.

SAMPLE 1

TOP OF MAIN TANK

TEST 1

TEST DATE:

AVERAGE(KV)

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

BREAKDOWN
VOLATGE(KV)

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

RESULT(KV)

SITE TEST REPORT

Date :
Customer:
SEC-EOA

Contractors name:
AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV Az-Zuhoor Substation

SEC EOA Contract No. :


4400003555/00

Page 32 of 32

POWER TRANSFORMER 3 (115/13.8KV)


Panel No:

Equip. No.: TR. (3)

SAMPLE 2

BOTTOM OF MAIN
TANK

SAMPLE 3

OLTC TANK

SAMPLE 4

MAIN TANK
CONSERVATOR

SAMPL 5

TEST DATE:

OLTC
CONSERVATOR

TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST
TEST

Dwg. Ref.:

2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6

FROM 30/10/2016 TO /10/2016


TESTING ENGINEER

Signature: ________________
Name
017

Record No.:

: ISLAM EL KADY

CSD- Engineer

Signature: ________________
NG ID # OSA-

Name

: AYIDH AL TAMIM

Vous aimerez peut-être aussi