Vous êtes sur la page 1sur 9

APPROVED WITH COMMENTS

APPROVED WITH COMMENT

EPCI FOR MDA & MBH FIELDS DEVELOPMENT


DATA SHEET FOR GAS SCRUBBER (MDA-D-1511) FOR MDA PLATFORM

TABULATION OF REVISION PAGE


SHEET
1

A
X

6
7

REVISIONS
C
D
0
1

SHEET

REVISIONS
C
D
0
1

41
42
X

43

44

45

46

47

48

49

10

50

11

51

12

52

13

53

14

54

15

55

16

56

17

57

18

58

19

59

20

60

21

61

22

62

23

63

24

64

25

65

26

66

27

67

28

68

29

69

30

70

31

71

32

72

33

73

34

74

35

75

36

76

37

77

38

78

39

79

40

80

D-100-MDA-WHP-DSM-502 Rev. D

Page 2 of 7

EPCI FOR MDA & MBH FIELDS DEVELOPMENT


DATA SHEET FOR GAS SCRUBBER (MDA-D-1511) FOR MDA PLATFORM

COMMENT RESPONSE SHEET


DOCUMENT REF.:
Comment
No.

Page
No

Date

COMPANY Comment

Implemented
(Y/N)

Explanation/Remarks

All

12/2/2016

IDC Comment

IDC Comments incorporated

Incorporated

30/3/2016

30/3/2016

30/3/2016

30/3/2016

30/3/2016

30/3/2016

30/3/2016

30/3/2016

Cover - General comment.


1. The first 3 pages of data sheet format
shall be standard and as agreed with
COMPANY.
2. All referred document number shall
match with latest MDR.
3. Please follow NOTES and NOTES
marking as commented in other pressure
vessel d/s.
4. Please follow 30% 3D model review
comments.
Design Data - Construction Code.
What addenda or latest for ASME VIII
Design Data - Process Data.
Please check as per latest process data
Design Data - Wind, Seismic & Shipmotion
Data.
Please check as per latest structural
design basis

Incorporated. 2015 edition for ASME


VIII Div.1

Incorporated

Incorporated

Design Data - Migas Certification.


Add: Note 11
Design Data - Insulation.
Any personnel protection?
Accessories - Top davit.
Why no tick? See sketch

Incorporated

No personnel protection

Incorporated

Accessories - Anchor Bolt.


Who will supply anchor bolt

Accessories.
Pls add Internal part:
1. Demister
2. Vortex breaker (if required)
Material Spec. - Support.
Revise Support to skirt
Note 2.
Revise manhole with top cover
Note 16.
1. How to installed demister?
2. What is the maximum weight if it will

Base ring of skirt will be welded to deck

Incorporated

Incorporated

Incorporated

1. Demister installed from the top of


scrubber.
2. VENDOR to finalize the major weight

10

30/3/2016

11

30/3/2016

12

30/3/2016

13

30/3/2016

14

30/3/2016

Note 15.
Please check process data for liquid
droplet and gas side

Incorporated. Already comply with doc.


No. D-100-MDA-WHP-CLP-004

30/3/2016

Note.
Add note:
17. Material cert. shall be in accordance
with BS EN 10204 type 3.1 for all pressure
parts and type 2.2 for all non-pressure
parts.
18. Lifting lugs shall be designed with
factor 2.0
19. SS316L shall be used for name plate
20. Demister material spec.

Incorporated

15

D-100-MDA-WHP-DSM-502 Rev. D

Page 3 of 7

EPCI FOR MDA & MBH FIELDS DEVELOPMENT


DATA SHEET FOR GAS SCRUBBER (MDA-D-1511) FOR MDA PLATFORM

COMMENT RESPONSE SHEET


DOCUMENT REF.:
Comment
No.

Page
No

16

17

18

19

20

21

22

23

Date

COMPANY Comment

Sketch.
30/3/2016 Please check vertical space/head room for
demister replacement
Sketch - Top cover.
30/3/2016
any screw jacking bolt
Sketch.
30/3/2016
Add in nozzle list for top manway
Sketch - Skirt opening
30/3/2016 Pls consider maintenance access
(circular/oval)?
Sketch - N5.
30/3/2016
Any break flange/Support?
Sketch - Shell MW
Please consider opening size and compare
30/3/2016
with ID. Why don't provide handhole for
maintenance purpose.
Sketch - Level Setting.
30/3/2016
Pls check as per latest PID for level
Nozzle - N1.
30/3/2016
Add "(demister)
Sketch
Is this vessel sizing and demister details
30/3/2016
preliminary and VENDOR to check and
finalize?Please mention very clearly
Nozzle List - MW.
The inside vessel diameter is too tight
(1200mm) and the height is also too
30/3/2016 short (less than 2400mm include
demister) for any confined space work.
There is only one way access from the
top of scrubber to replace the internal

Implemented
(Y/N)

Explanation/Remarks

Checking is considered in Layout and


Material Handling Study

Incorporated

Incorporated

Incorporated (Circular)

Incorporated

Revise MW to HH (size 12")

Incorporated

No "demister" at inlet device

Vessel sizing (ID & T/F) as per process


sizing calculation. Demister sizing is by
VENDOR (see note 16)

Revise MW to HH (size 12")

24

25

26

30/3/2016

Accessories - Fireproofing
Release HOLD - No Fireproofing as per
FERA by SAFETY.

27

30/3/2016

Note 12 - deleted
Duplication with note 16.

28

30/3/2016

Note 14 - deleted
Seismic & shipmotion data already
specified.

29

All

6/6/2016

30

6-7

6/6/2016

31

6/6/2016

D-100-MDA-WHP-DSM-502 Rev. D

Approved

Incorporated
Sketch - Elevation & Top View
Revise nozzle orientation & elevation
Accessories.
Tick for anchor bolt

Page 4 of 7

REVISION

EPCI FOR MDA & MBH FIELDS DEVELOPMENT


DATA SHEET FOR GAS SCRUBBER (MDA-D-1511) FOR MDA PLATFORM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79

Client
Project
Location
Contract No.

: Husky-CNOOC Madura Ltd (HCML)


: EPCI FOR MDA & MBH FIELDS DEVELOPMENT
: MDA WHP
: 332004201

Construction Code
Pressure Vessel Specification
Design Pressure
Min. / Max.
Design Temperature
Min. Design Metal Temperature (MDMT)
Operating Pressure
Operating Temperature
Radiography
Corrosion Allowance
Gas
Density
Liquid
Max. Liquid Level
Wind Design Code
Design Wind Speed
Exposure
Importance Factor
Seismic Design Code
SLE 500 Years, Seismic Zone
DLE 2500 Years, Soil Profile
Blast Pressure
Horiz. Accelerations
Ship Motion
Vert. Accelerations
ID
Size
T/F
Length
Shell Thickness
Top
Head Thickness
Bottom
Demister Type
Demister Thickness

Title
Tag Number
No. Required
Doc. No.

DESIGN DATA
ASME VIII Div 1, 2015 Edition
Corrosive Service
Yes
D-100-MDA-WHP-SPM-516
Cyclic Service
Yes
200
psig Other Special Service
-150
F
Code Stamp
Yes
-20
F
MIGAS Certificate
(Note 11)
Yes
140
psig MAWP Basis
Calculated
42.5
F
Impact Test
Yes
Spot PWHT
Full
Yes, Per Serv.
0.125
in
1.3 x MAP
Hydrotest
0.547
lb / ft
63.8
lb / ft
Yes,
thk:
in.
Insulation (By Others)
22
in.
No
API RP2A
Yes,
thk:
in.
Fireproofing (By Others)
63.62
mph
No
ACCESSORIES
Platform / Ladder Clips
Internal Ladder
0.25
g
Insulation Clips
Top davit
0.32
g
Fireproofing Clips
Cathodic Potection
psi
Pipe Support Clips
Name Plate
20 degree
g
Earthing Lugs / Boss
Anchor Bolt
0.2
g
Lifting Lugs
Demister (Note 18)
4' - 0"
ft - in
Tailing Lugs
Vortex Breaker
8' 9"
ft - in
(*)
in
(*)
in
(*)
in
(Note 14)
(Note 14)
in
MATERIAL SPECIFICATIONS
A516 Gr. 70
Gaskets
N/A
thk: N/A in.

Head And Shell


Cladding
Reinf. Pads
Nozzle / Manhole Necks
Forgings
Fittings
Skirt
External Welded Parts

Pipe
Plate

A516 Gr. 70
A106 Gr.B
A516 Gr. 70
A105
A234 WPB-Seamless
A283 Gr.C
A516 Gr. 70

1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)

*
*
*

Internal
External
Internal

Boltings

External

Internals
Painting Internal Surface
Painting External Surface
Painting Specification

ESTIMATED WEIGHT (Note 7)


Empty
Operating
Full of Water

: Gas Scrubber
: MDA-D-1511
: One (1) Set
: D-100-MDA-WHP-DSM-502

lbs
lbs
lbs

No
No
No
No
Dsg. Press.
Per Code
Per Code

SG:
SG:

PTFE (*)
Spiral Wound SS316, Flexible Graphite,
SS316 inner & outer ring
SS316L
A193 Gr.B7 / A194 Gr.2H (phenolic epoxy
coated)
SS316L
No
Yes, Sys. No.:
No
Yes, Sys. No.:
3
D-100-MDA-WHP-SPM-012

SHEAR & MOMENT AT BASE (OPERATING CONDITION)


Shear (lbf)
Moment (lbf.ft)
Wind
*
*
Earthquake
*
*

NOTES
For process data refer to P&ID: D-100-MDA-WHP-11110, MDA Wellhead Platform Gas Scrubber and Gas Generator.
All removable internal (demister & inlet device) shall be designed to pass through top cover.
* : Indicate VENDOR to Advise / Confirm.
Minimum nozzles projection is indicated. VENDOR to advise actual projection.
All nozzle flanges shall be as per ASME B16.5.
Vessel VENDOR shall provide internal support & the required clips / brackets / fastener etc, to install the internals.
To be calculated for overall weight of the vessel with internal installed.
VENDOR to calculate / provide over all size of the equipment and specify thickness, nozzle reinforcement, stiffener details, lifting lugs, etc.
Two earthing lugs to be provided diagonally at skirt.
Design life of the equipment shall be 15 years.
VENDOR is responsible to provide all required documents to obtain MIGAS certification.
Painting shall be as per D-100-MDA-WHP-SPM-012, Specification for Piping Painting and Coating.
VENDOR to guarantee demister performance to retain liquid droplet size of 150 and large.
Demister type, thickness and dimension shall be finalized by VENDOR.
Material Certification shall be accordance with BS EN 10204 type 3.1 for all pressure parts and type 2.2 for all non-pressure parts.
Lifting lugs shall be designed with safety factor 2.0, suitable for single point lifting by crane.
SS316 nameplate complete with braket shall be provided.
Demister material specification is SS316L. Segmental design is preferred to reduce lifting weight for simple handling.
Jack bolt to be provided to facilitate top cover opening
Support for N5 extended nozzle to be finalized by VENDOR, based on nozzle load calculation.

D-100-MDA-WHP-DSM-502 Rev. D

Page 5 of 7

80

??
deleted

D-100-MDA-WHP-DSM-502 Rev. D

Page 5 of 7

REVISION

EPCI FOR MDA & MBH FIELDS DEVELOPMENT


DATA SHEET FOR GAS SCRUBBER (MDA-D-1511) FOR MDA PLATFORM

Client
Project
Location
Contract No.

: Gas Scrubber

: Husky-CNOOC Madura Ltd (HCML)


Title
: EPCI FOR MDA & MBH FIELDS DEVELOPMENT Tag Number
: MDA WHP
No. Required
Doc. No.
: 332004201
SKETCH

: MDA-D-1511
: One (1) Set
: D-100-MDA-WHP-DSM-502

PN
1' - 3 3/4"

MW

N2

C/W JACK BOLT


(NOTE 19)
Demister

8'-9" T/F
6' - 7 7/16"(*)

5' - 1"
3' - 11 1/4"

K3A

HH

N4

1'- 5 13/16" 1'-2"

2'- 1 9/16"

TL
REF. 0

K4B

3' - 7/16"

1' - 5 5/16"

1' - 5 5/16"

VORTEX BREAKER

K1

2'-2"

K4A

5' - 9"

K5

4' - 0" ID

2' - 7 1/2"

N1

4' - 7 5/8"

5' - 9

N6

5 7/8"(*)

7' - 11 1/16"

N3

1'- 7 11/16"(*)

DAVIT

1'-5 5/16"

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

N5

ACCESS OPENING C/W


SLEEVE 16"-DIA.

LEVEL SETTING
HHLL
1' - 10 "
HLL
1' - 6"
LLL
0' - 10"
LLLL
0' - 6"

K3B

2-EARTHING LUGS
/ BOSSES

4-VENTS 4" DIA.


PIPE SLEEVE 4" DIA.

ELEVATION VIEW

SUPPORT (NOTE 20)

8"
NOZZLE

N1
N2
N3
N4
N5
N6
K1

1
1
1
1
1
1
1

2
2
2
2
2
2
2

150#
150#
150#
150#
150#
150#
300#

Flange
Type
WN RF
WN RF
WN RF
WN RF
WN RF
WN RF
WN RF

K3 A/B
K4 A/B
K5
HH
MW

2
2
1
1
1

3
2
2
12
48

300#
300#
300#
150#
150#

WN RF
WN RF
WN RF
WN RF
WN RF

Mark

Qty Size (in)

D-100-MDA-WHP-DSM-502 Rev. D

Rating

Proj. (in.)
(Note 4)
6
6
6
6
6
6
6
6
6
6
8

Description
Gas Inlet
Spare
Gas Outlet
Liquid Outlet
Closed Drain
Vent
PSIT153A
LG/LT151
LSIT152
PIT151
Handhole
Manway

Remark
With inlet device

With vortex breaker

with cover, davit,bolting and gasket.


with cover, davit,bolting and gasket.

Page 6 of 7

REVISION

EPCI FOR MDA & MBH FIELDS DEVELOPMENT


DATA SHEET FOR GAS SCRUBBER (MDA-D-1511) FOR MDA PLATFORM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

Client
Project
Location
Contract No.

: Husky-CNOOC Madura Ltd (HCML)


Title
: EPCI FOR MDA & MBH FIELDS DEVELOPMENT
Tag Number
: MDA WHP
No. Required
Doc. No.
: 332004201
SKETCH

: Gas Scrubber
: MDA-D-1511
: One (1) Set
: D-100-MDA-WHP-DSM-502

PN

N1
N6

K3A

TOPCOVER OPENING

N4

K4A

K3B

K4B

30

315
N2
N3

D-100-MDA-WHP-DSM-502 Rev. D

K1

N5

270
135
180

HH

K5
HANDHOLE OPENING

TOP VIEW

Page 7 of 7