INCINERATOR COST

COMPONENT
FIXED COST
Incinerator land
Incinerator equipment
and technology
Incinerator construction
and installation cost
COLLECTION COST
Transportation
FUEL COST
Diesel
Propane
Natural gas
OPERATIONAL COST
Electric
Chemical materials

QUANTITY

COST
-

RM 1, 230 000.00
RM 71, 700 000.00

RM 30, 100 000.00

10 lorry

RM 140 000 per lorry


RM 1.90 per liter
RM 2.04 per galloon
RM 27.05 per MMBtu

80 MW per day

MAINTANENCE COST
Office maintenance
Equipment maintenance
LABOR COST
Project Manager
Engineer
Technical
Non-Technical
Total Cost :

RM 35.50/kW
RM 1 200 000.00 per
annum
RM 50 000.00 per annum
RM 1, 500 000.00 per
annum

1
4
20
8

RM 10 000 per month


RM 7000 per month
RM 2000 per month
RM 1800 per month