Vous êtes sur la page 1sur 1

Assignment 2

Topics:
1. Planning techniques for mega construction projects
2. Schedule control techniques in construction projects
3. Statistical, mathematical and simulation based tools for planning complex
projects
4. WBS as a monitoring and control tool
5. Use of precedence diagramming techniques in modern project management
Notes:
1.
2.
3.
4.
5.
6.
7.

A group of 4x members each


Each topic will be taken by 2x groups who will compete/collaborate with each
Each group to study at least 8x research papers
Publication period: not older than 2005
At least 50% papers must be from prescribed journals
Papers be preferably published in journals
Each group will present a maximum 5-pages report (title, names, references,
etc.)
8. Each topic will be presented by both groups duration of presentation = (5 x
no. of group members) min.
9. Groups to be formed and communicated by 7th November 2016
10.Deadline: 14th November 2016
Journals:
1.
2.
3.
4.
5.

International Journal of Project Management


Project Management Journal
Construction Management and Economics
Journal of Construction Engineering and Management
Journal of Management in Engineering

Evaluation Criteria:
1.
2.
3.
4.

30%
40%
20%
10%

on
on
on
on

report
presentation (15% + 25%) content + delivery
participation in same topic presentation
participation in different topic presentation

Vous aimerez peut-être aussi