DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Bureau of Maintenance
2nd Street, Port Area, Manila
DAMAGED PUBLIC INFRASTRUCTURES WROUGHT BY HABAGAT (AUG 2016)
Priority I
REGION : III
NAME OF ROAD/BRIDGE/FLOOD
CONTROL STRUCTURE/ (Station Limits)

DISTRICT OFFICE

(1)
Rehabilitation/Restoration of Slope
Protection Along Landslide of San
Fernando-Sto. Tomas-Minalin Tail
Dike

(2)
Pampanga I

2.

Repair/Reconstrcution Along Jose


Abad Santos Avenue (JASA),
Bacolor, Pampanga

Pampanga I

3.

Repair of Slope Protection along


Santol Creek, San Antonio,
Floridablanca, Pampanga

Pampanga II

1.

LENGTH/AREA/ VOLUME
OF DAMAGE
(3)
96.00

CATEGORY

l.m.

(4)
Flood Control

2,600.00

l.m.

Road

15.00

l.m.

Flood Control

Page 1 of 13

EXTENT OF DAMAGE

(5)
Eroded earthdike at
intermittent sections

Series of potholes,
ravelling, and alligator
cracks along asphalt
pavement

Series of cracks along


downstream L=155 l.m;
Collapsed structure along
upstream L=15. l.m.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


Bureau of Maintenance
2nd Street, Port Area, Manila
DAMAGED PUBLIC INFRASTRUCTURES WROUGHT BY HABAGAT (AUG 2016)
Priority I
REGION : III
NAME OF ROAD/BRIDGE/FLOOD
CONTROL STRUCTURE/ (Station Limits)

4.

5.

DISTRICT OFFICE

(1)
Repair/Maintenance of Damaged
Slope Protection along Santol Creek,
Maligaya, Floridablanca, Pampanga

(2)
Pampanga II

Restoration of Damaged Slope


Protection along Sapang Maragul,
Dalan, Bentis, Guagua, Pampanga

Pampanga II

LENGTH/AREA/ VOLUME
OF DAMAGE
(3)
62.00

100.00

Page 2 of 13

CATEGORY

EXTENT OF DAMAGE

l.m.

(4)
Flood Control

(5)
Continuous erosion of
embankment due to
cracks/spalling of
structure

l.m.

Flood Control

Collapsed revetment and


settlement of structure

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


Bureau of Maintenance
2nd Street, Port Area, Manila
DAMAGED PUBLIC INFRASTRUCTURES WROUGHT BY HABAGAT (AUG 2016)
Priority I
REGION : III
NAME OF ROAD/BRIDGE/FLOOD
CONTROL STRUCTURE/ (Station Limits)

6.

7.

DISTRICT OFFICE

(1)
Construction/Rehab./Upgrading of
JASA Road K0077+800 to
K0078+100, K0081+069 to
K0082+000, K0085+000 to
K0085+600, Guagua/Lubao,
Pampanga

(2)
Pampanga II

Restoration of Damaged Slope


Protection along San Jose Creek,
Natividad, Guagua, Pampanga

Pampanga II

LENGTH/AREA/ VOLUME
OF DAMAGE
(3)
1,831.00

70.00

Page 3 of 13

CATEGORY

EXTENT OF DAMAGE

l.m.

(4)
Road

(5)
Series of potholes,
ravelling, and alligator
cracks along asphalt
pavement (4 lanes)

l.m.

Flood Control

Collapsed slope protection

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


Bureau of Maintenance
2nd Street, Port Area, Manila
DAMAGED PUBLIC INFRASTRUCTURES WROUGHT BY HABAGAT (AUG 2016)
Priority I
REGION : III
NAME OF ROAD/BRIDGE/FLOOD
CONTROL STRUCTURE/ (Station Limits)

8.

(1)
Rehab. Of Damaged Concrete
Pavement on the use of Jointed
Reinforced/Continuously Reinforced
Concrete Pavement along AngelesPorac-Floridablanca-Dinalupihan
Road, Porac Pampanga, K0086+(850) - K0088+000

DISTRICT OFFICE

(2)
Pampanga II

LENGTH/AREA/ VOLUME
OF DAMAGE
(3)
2,000.00

Page 4 of 13

l.m.

CATEGORY

(4)
Road

EXTENT OF DAMAGE

(5)
Series of shattered slabs,
depressons, and spalling at
joints along PCCP

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


Bureau of Maintenance
2nd Street, Port Area, Manila
DAMAGED PUBLIC INFRASTRUCTURES WROUGHT BY HABAGAT (AUG 2016)
Priority I
REGION : III
NAME OF ROAD/BRIDGE/FLOOD
CONTROL STRUCTURE/ (Station Limits)

9.

10.

DISTRICT OFFICE

(1)
Improvement of Pamatawan River
(Sitio Baring Section)

(2)
Zambales II

Repair/Rehabilitation of Slope
Protection along Balaybay
resettlement

Zambales II

LENGTH/AREA/ VOLUME
OF DAMAGE
(3)
70.00

100.00

TOTAL
Prepared by:

Page 5 of 13

CATEGORY

l.m.

(4)
Flood Control

l.m.

Slope Protection

EXTENT OF DAMAGE

(5)
Scoured embankment
(downstream)

Collapsed slope protection


(grouted riprap)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


Bureau of Maintenance
2nd Street, Port Area, Manila
DAMAGED PUBLIC INFRASTRUCTURES WROUGHT BY HABAGAT (AUG 2016)
Priority I
REGION : III
NAME OF ROAD/BRIDGE/FLOOD
CONTROL STRUCTURE/ (Station Limits)
(1)
JUAN ARMANDO V. ARCEGA
ENGINEER II

DISTRICT OFFICE

LENGTH/AREA/ VOLUME
OF DAMAGE

CATEGORY

EXTENT OF DAMAGE

(2)

(3)

(4)

(5)

Page 6 of 13

PUBLIC WORKS AND HIGHWAYS


au of Maintenance
eet, Port Area, Manila

CTURES WROUGHT BY HABAGAT (AUG 2016)


Priority I

Proposed Cost by the


DEO (Php)

REMARKS

(6)
(8)
20,000,000.00 No existing flood control
infrastructure along damaged
sections. Documents were already
submitted by the DEO to Planning
Service.
20,000,000.00 Pallative measures was noticed
along damaged sections. Surface
defects are reoccuring. May be
considered as beyond maintenance.
Documents were already submitted
by the DEO to Planning Service.

15,357,383.88 Needs immediate action. Located


along residential area. Documents
were already submitted by the DEO
to Planning Service.

Page 7 of 13

PUBLIC WORKS AND HIGHWAYS


au of Maintenance
eet, Port Area, Manila

CTURES WROUGHT BY HABAGAT (AUG 2016)


Priority I

Proposed Cost by the


DEO (Php)

REMARKS

(6)
(8)
2,000,000.00 Documents were already submitted
by the DEO to Planning Service.

10,000,000.00 Documents were already submitted


by the DEO to Planning Service.

Page 8 of 13

PUBLIC WORKS AND HIGHWAYS


au of Maintenance
eet, Port Area, Manila

CTURES WROUGHT BY HABAGAT (AUG 2016)


Priority I

Proposed Cost by the


DEO (Php)

REMARKS

(6)
(8)
50,000,000.00 Pallative measures was noticed
along damaged sections. Surface
defects are reoccuring. May be
considered as beyond maintenance.
Documents were already submitted
by the DEO to Planning Service.

8,200,000.00 Needs immediate action. Located


along residential area. Documents
were already submitted by the DEO
to Planning Service.

Page 9 of 13

PUBLIC WORKS AND HIGHWAYS


au of Maintenance
eet, Port Area, Manila

CTURES WROUGHT BY HABAGAT (AUG 2016)


Priority I

Proposed Cost by the


DEO (Php)

REMARKS

(6)
(8)
20,545,224.96 Pallative measures was noticed
along damaged sections.
Reoccuring of surface defects due
to trucks. Documents were already
submitted by the DEO to Planning
Service. Typographical error was
noticed at submitted POW. Quantity
is not the same at the submittted
quantity sheet. Correction of net
legnth at submitted POW from 135
l.m. to 2,000 l.m. (attached are
corrected documents).

Page 10 of 13

PUBLIC WORKS AND HIGHWAYS


au of Maintenance
eet, Port Area, Manila

CTURES WROUGHT BY HABAGAT (AUG 2016)


Priority I

Proposed Cost by the


DEO (Php)

REMARKS

(6)
(8)
10,000,000.00 No existing flood control
infrastructure along damaged
sections. Proposed extension of
revetment. Documents are yet to be
submitted by the DEO.
10,000,000.00 Due to continuous
settlement/erosion of damaged
slope protection, school officials are
forced to condemn the affected
classrooms. Documents are yet to
be submitted by the DEO.

166,102,608.84

Page 11 of 13

PUBLIC WORKS AND HIGHWAYS


au of Maintenance
eet, Port Area, Manila

CTURES WROUGHT BY HABAGAT (AUG 2016)


Priority I

Proposed Cost by the


DEO (Php)

REMARKS

(6)

(8)

Page 12 of 13

Pampanga I
Summary
Validation Form
Endorsement from RD
POW
DUPA
Budget Proposal Form 202
Site Location Map
PICTURES WITH CAPTION with date
Certification from DE
Calamity Damage Assessment Report

Pampanga II

Zambales II