10-yr Volume
(Cubic Feet)
99,046
Treatment
Treatment
Volume
Volume (%)
(Cubic Feet)
2,300
24% of WQv
Cost
Construction and engineering oversight is estimated to cost $34,196. Two Fiscal Year 2017 VTrans
Better Back Roads grants were applied for and received by the Town to complete this project. The
20% grant match includes funds from the Town Highway budget and a perpetual 10-foot grass filter
strip on the edge of the agricultural field to be managed by the Mack Farm.
0 50 100
200
Feet
01
1"=200'
CONCEPT DESIGN
Tractor Ruts
Pipe
Scale:
Culvert
Swale
SOURCE(S):
MXD:
EXISTING CONDITIONS
Stream Order
Overland
MMI#: 3452-22
Y:\3452-22\Maps\EXISTING CONDITIONS\MackFarm_ExistingConditionsMap_V2.mxd
Road Centerline
Culvert
Pipe
Tractor Ruts
MXD:
02
1"=60'
Stormwater Flow
Overland
Scale:
CONCEPT DESIGN
LAYOUT
SOURCE(S):
100
Feet
50
MMI#: 3452-22
Section Location
Stream Order
25
Bio-Retention Area
4
Y:\3452-22\Maps\CONCEPT DESIGN\MackFarm_LAYOUT.mxd
10'
PERENNIAL
VEGETATION
(PROPOSED
BUFFER)
FORMER
LOCATION OF
TREE
CL
0
2'
ELEVATION (APPROXIMATE)
EXISTING GROUND
-5
PROPOSED GROUND
REGRADE EDGE OF FIELD
TO DRAIN TO SWALE
-10
-10
10
20
30
40
REVISIONS
-20
EXISTING GROUND
-5
3'
PROPOSED GROUND
REGRADE EDGE OF FIELD
TO DRAIN TO SWALE
-10
-20
-10
10
20
30
40
JCL
DESIGNED
JCL
DRAWN
1"=5'
SCALE
4/8/2016
DATE
SCALE: 1"=5'
3452-22
0'
2.5'
5'
PROJECT NO.
03
SHEET NO.
RS
CHECKED
CHARLOTTE, VERMONT
PERENNIAL
VEGETATION
(PROPOSED
BUFFER)
CL
10'
2'
ELEVATION (APPROXIMATE)
CONCEPT DESIGN
SCALE:1"=5'
115
1 South Main Street, 2nd Floor
Waterbury, Vermont 05676
(802) 882-8335
Fax (802) 882-8346
www.miloneandmacbroom.com
EXISTING EDGE OF
ACTIVE FIELD
110
105
10
20
30
40
50
60
70
REVISIONS
0'
2.5'
5'
INSTALL STONE
CHECK DAM, TYP.
(SEE DETAIL)
16.
5%
INSTALL NEW
CULVERT (SEE DETAIL)
INSTALL STONE
FILTER BERM, TYP.
(SEE DETAIL)
SLO
PE
7.5% S
LOPE
100
189'
4.4% SLOPE
81'
THORP BROOK
TOP OF BANK
BIO-RETENTION AREA
50
100
150
200
250
300
350
DISTANCE (FEET)
JCL
DESIGNED
JCL
DRAWN
VARIES
SCALE
PROFILE - D
4/8/2016
DATE
3452-22
H:0'
15'
30'
V:0'
7.5'
15'
PROJECT NO.
04
SHEET NO.
RS
CHECKED
110
7.6%
SLOPE
CHARLOTTE, VERMONT
REMOVE EXISTING
18" CMP CULVERT
5.2% SLO
PE
RIVER CORRIDOR
AHEAD OF THE STORM
THORP BROOK HEADWATER RESTORATION
120
130
CONCEPT DESIGN
SCALE:1"=5'
120
CL
18" MIN.
STONE
CHECK DAM
SET ELEVATION TO
CREATE UNIFORM
1.5% - 2.0% SLOPE
8" MIN.
REGRADE EDGE OF FIELD
TO DRAIN TO SWALE
PROVIDE 2 FT
DEPTH MINIMUM
PROVIDE DEPRESSION AT
CENTER TO DIRECT FLOW
-SEE SECTION VIEW
NOTES:
EXTEND THE STONE A MINIMUM OF 18 INCHES BEYOND THE BANKS AND CHANNEL
INVERT OF THE SWALE TO PREVENT CUTTING AROUND THE ENDS OF OR UNDERNEATH
THE CHECK DAM
NON-WOVEN GEOTEXTILE
FILTER FABRIC CONTECH
GEOTEX 801 OR EQUIVALENT
THICKNESS=
12" MINIMUM
DETAILS
USE TYPE II STONE FILL (D50=12") OR 6"-12" EROSION STONE AS PER PIKE
INDUSTRIES, NEW HAVEN, VT
JCL
NOT TO SCALE
NOT TO SCALE
DESIGNED
JCL
DRAWN
RS
CHECKED
NOT TO SCALE
SCALE
4/8/2016
DATE
3452-22
PROJECT NO.
05
SHEET NO.
CHARLOTTE, VERMONT
2.5' MIN
1
1
CONCEPT DESIGN
NOT TO SCALE
12" MAX
AT CENTER
CHANNEL
INVERT (TYP.)
3 FT MIN.
REVISIONS
FINISHED
GRADE
MAINTAIN PERENNIAL
VEGETATED BUFFER FROM FIELD
10 FT MIN.
APPROXIMATE
EXISTING SWALE
(SHAPE VARIES)
1.
2.
3.
EXISTING
SUBGRADE
ADJACENT SWALE
PROPOSED GRADE
5.
6.
CROSS SECTION
7.
FLOW
CONCEPT DESIGN
4.
REVISIONS
BIO-RETENTION
AREA BOTTOM
NOT TO SCALE
WIDTH=
8 FT MIN.
CROSS SECTION
NOTES:
EXTEND THE STONE A MINIMUM OF 18 INCHES INTO BANKS AND BOTTOM TO
PREVENT CUTTING AROUND THE ENDS OR UNDER THE FILTER BERM.
JCL
DESIGNED
JCL
DRAWN
NOT TO SCALE
SCALE
4/8/2016
DATE
RS
CHECKED
3452-22
PROJECT NO.
NOT TO SCALE
06
SHEET NO.
CHARLOTTE, VERMONT
PLAN VIEW
ELEVATION
DETAILS
TOP OF BANK
IN. CRUSHED
STONE
HEIGHT=
2 FT MAX.
TOP OF BANK
1
2
18"
APPROACH
LENGTH
VARIES
8"
SEDIMENT BASIN
Item
ITEM/DESCRIPTION
UNIT
COST
LABOR
Labor to Restore Site
HR
18
$35
$630
LS
$0
$0
HR
HR
15
$110
$1,650
10
$80
$800
HR
21
$110
$2,310
HR
16
$80
$1,280
HR
$110
$440
HR
$80
$320
HR
38
$80
$3,040
TN
256
$10
$2,560
TN
56
$10
$560
TN
56
$10
$560
TN
32
$19
$608
LS
$1,749
$1,749
EQUIPTMENT
MATERIALS
LS
$75
$75
ROLL
16
$95
$1,520
BOX
$66
$198
LS
$1,700
$1,700
MISCELLANEOUS
Engineering Oversight
TOTAL
$20,000
Item
ITEM/DESCRIPTION
UNIT
COST
LABOR
Labor to Restore Site
HR
$35
$210
HR
24
$110
$2,640
HR
16
$80
$1,280
HR
35
$80
$2,800
TN
160
$10
$1,600
TN
205
$19
$3,895
LS
$25
$25
ROLL
$95
$380
BOX
$66
$66
LS
$1,300
$1,300
EQUIPTMENT
MATERIALS
MISCELLANEOUS
Engineering Oversight
TOTAL
$14,196