Vous êtes sur la page 1sur 4

24

9235'23''

1.68

1.24 26326'32''

44
44.5

1.655 1.205 11837'24''

45

8935'47''
44.5 022'58''
9021'45''

58

9459'18''
57.55 52'20''
8454'38''

38

893'34''
67.98 055'39''
9054'52''

50

9246'18''
49.88 245'54.5''
8714'29''

30

29.11 8006'30''

Datar

1.34 11441'53''

II

Rantai

1.58

1
2
1

1.46
1.43

2
3
2

1.43
1.47

1.72

1.14 3443'16''

58

1.76

1.18 18818'37''

58

1.81

1.13 14940'22''

68

1.77

1.09 11116'28''

68

1.68

1.18 30454'43''

50

1.65

1.15 6857'25''

50

1.55

1.25 33254'3''

30

3
4
3

1.47
1.43

4
5
4

1.43
1.4

5
0

1.4

5 1.475

1.625 1.325 33521'22''

30

9954'40''

1.595 1.355 26156'54''

24

23.25 8722'41''

0
1

1.475

Selisih Tinggi(m)

(+)

(-)

Tinggi atas laut (m)

derajat-menit-detik

Sudut
Miring(v)

bawah

1.46

Jarak
(meter)

Sudut / Azimuh

atas

Tengah muka

Berdiri

Ditinjau

Tengah belakang

benang

Optis

No
Patok

keterangan

TITIK

SUDUT

0
1
2
3
4
5

73
211
134
38
166
96
720

'

''
24
15
34
38
21
3
17

KOR
28 (-1'46'')
21 (-5'5")
8 (-3'14")
15 (-55")
45 (-4'00")
22 (-2'19")
19 (-17'19'')

AZIMUTH

'
120
89
134
276
289
13

''
30
19
48
11
53
52

0
44
50
30
45
42

JARAJ
(d)
24
44.5
58
68
50
30

Vous aimerez peut-être aussi