ITEM
STAIRCASE
A. Formwork
METHOD
QTY
43m
15m
PLANT
LABOUR
Lorry
Saw
Hammer
14m
31m
OUTPUT
1.25hr/m2
1.30hr/m2
4
144m
46m
1.00hr/m2
1.00hr/m
0.18hr/m
1.76hr/m
DURATION
(DAYS)
APPENDIX
2 days
1 day
1 day
1 day
5 (a)
1 day
2 days
= 8 days
B. Reinforcemen
t
Bender
Machine
800kg Bar Cutter
172kg
163kg
36kg
32hr/tonne
46hr/tonne
20hr/tonne
3
1 day
1 day
1 day
1 day
32hr/tonne
1 day
42kg
46hr/tonne
182kg
37kg
32hr/tonne
46hr/tonne
1 day
1 day
= 7 days
5 (b)
ITEM
C. Concreting
METHOD
QTY
STEPS
A. Forwmwork
LABOUR
Concrete
Mixer
Vibrator
53m
Concrete
2m Mobile
15m
Crane
PLANT
16m
25m
OUTPUT
1.35hr/m3
DURATION
(DAYS)
3 days
1 day
1 day
APPENDIX
5 (c)
= 5 days
Lorry
Saw
Hammer
2
0.56hr/m
8m
1 day
1 day
5 (d)
1 day
= 3 days
B. Reinforcemen
t
High
Tensile
Reinforcement
Steel
Bar
219kg
49kg
Bar Cutter
Bender
Machine
1 day
3
32hr/tonne
46hr/tonne
1 day
= 2 days
5 (e)
ITEM
METHOD
QTY
C. Concreting
a
2m
PLANT
Mobile
crane
Vibrator
Concrete
Concrete
mixer
LABOUR
OUTPUT
9.00hr/m3
DURATION
(DAYS)
1 day
APPENDIX
5 (f)
METHOD
B. Reinforcemen
t
QTY
Ramp beam
Sloping ramp beam
Edge of slab, exceeding
100mm but not exceeding
200mm high.
5m
3m
53m
PLANT
Lorry
Saw
Hammer
LABOUR
OUTPUT
0.25hr/m2
2
DURATION
(DAYS)
1 day
1 day
2 days
APPENDIX
5 (g)
0.56hr/m
= 4 days
70kg
20kg
Bar Cutter
Bender
Machine
46hr/tonne
1 day
1 day
5 (h)
117kg
49kg
32hr/tonne
1 day
1 day
269kg
20hr/tonne
1 day
METHOD
QTY
30m2
PLANT
LABOUR
OUTPUT
DURATION
(DAYS)
APPENDIX
0.20hr/m2
12m2
1 day
5 (h)
1 day
= 7 days
C. Concreting
Ramp beam
Sloping, ramp beam
125mm thick ramp
Extra over for forming 100mm
x 150mm deep scupper drain
Concrete
Mixer
Vibrator
1m
Concrete
1m Mobile
30m
Crane
38m
1.35hr/m2
1 day
1 day
2 days
2 days
= 6 days
5 (i)
METHOD
a
i
ii
iii
iv
QTY
8m
67m
36m
73m
PLANT
LABOUR
Concrete
mixer
Bucket
Scoop
OUTPUT
1.53hr/m2
0.56hr/m
DURATION
(DAYS)
APPENDIX
1 day
2 days
1 day
2 days
= 6 days
b
i
ii
iii
iv
v
7m
8m
21m
15m
1.54hr/m2
1 day
0.56hr/m
1 day
1 day
1 day
= 4 days
7m
8m
21m
15m
0.93hr/m2
1 day
1.00hr/m
1 day
1 day
1 day
= 4 days
5 (j)
METHOD
B. Step
a
i
ii
iii
iv
C. Ramp
a
i
b
QTY
65m
27m
83m
91m
PLANT
Concrete
mixer
Bucket
Scoop
LABOUR
OUTPUT
0.56hr/m
DURATION
(DAYS)
2 days
1 day
2 days
2 days
APPENDIX
5 (k)
= 7 days
23m
23m
Concrete
mixer
Bucket
2 days
3
1.54hr/m2
5 (l)
2 days
= 4 days