Vous êtes sur la page 1sur 21

TEKNIK & KANDUNGAN MATERI

PRESENTASI CIP

SUCCESS STORY CIP PHE 2014


PKM/GKM (13.30) & SS (10.30)
BANGKITKAN ENERGI NEGERI

Quality Management
QHSSE PHE
23 Sep 2015

JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

# 1 PERKENALAN ANGOTA GUGUS CIP


& ASAL PERUSAHAAN (+/- 2 Menit)

JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

ASAL GUGUS & WOW EFFECT!!!

PKM RECORE BERHASIL MELAKUKAN INOVASI REKAYASA


OIL GUGUS
: 25.000 BOPD,
BAHAN BAKAR PADA SAAT SRU TURN AROUND YANG MENGHASILKAN
GAS : 25 MMSCFD
PENGHEMATAN SEBESAR 1.3 MILYAR RUPIAH
JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

PARETO MASALAH & TEMA Langkah 1


(WAJIB BAGI GKM), PKM & SS Perlu Tunjukan Surat
Perintah dari GM atau Manager SETEMPAT

TEMA :
Meningkatkan Efisiensi
Biaya Pada Saat SRU Turn
Around di JOB P-PEJ
JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

FAKTOR PENYEBAB MASALAH &MENETAPKAN


PENYEBAB DOMINAN Langkah 2 & 3

MESIN

MATERIAL

JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

MERENCANAKAN PERBAIKAN Langkah 4


PROSES
TENDER (AGSSEP 2013)
M AGUS P

3
1

MOC & DESIGN


DRAWING
(JUNI 2013)
DWI MUKTI

MENURUNKAN
BIAYA SRU TURN
AROUND

KONSTRUKSI
(JUNI-JULI 2013)
RINGGO &
WISNU

PONDASI & PIPING


Rp 39.490.000

COMMISIONING
(SEP-OKT 2013)
SAAD, GEDE, PT
BAG

4
JOB PPEJ 2014

10

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

MERENCANAKAN PERBAIKAN Langkah 4


Solusi Rencana Perbaikan

CNG WITH TRUCKING

COST
CONSTRUCTION
SOCIAL
OPERABILITY
SAFETY
SCHEDULE

CNG WITH PIPELINE


HIGH

$ 187.200

LOW

$ 1.522.374

Pondasi & Piping

LOW

Pipeline&Fasilitas,
Tanah Warga

HIGH

Pemblokiran Jalan

LOW

Potensi Isu
Masyarakat

MED

Pressure harus
direduksi

MED

Bisa digunakan
setiap saat

LOW

High Pressure
2500 Psi

MED

Low Pressure
180 Psi

LOW

1 bulan

LOW

1.5 tahun

HIGH

SKENARIO YANG
DIPILIH
JOB PPEJ 2014

11

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

PELAKSANAAN PERBAIKAN Langkah 5


CNG TAKE FUEL
SUPPLY SYSTEM

HEATING CONTROL
MODULE

PROSES SWITCHING BERHASIL,


SHUT DOWN DAPAT DIHINDARI,

CNG TRUCK
2500 Psi

PRESSURE REDUCTION
SYSTEM

LOSS CONDENSATE TIDAK


TERJADI

180 Psig & 160oF

POWER
GENERATION

GRADUALLY
FULL OPEN
OPEN

GAS
COMPRESSOR

SHUT
SHUT
DOWN
DOWN
GRADUALLY
FULL
CLOSED

SULPHUR
RECOVERY UNIT
JOB PPEJ 2014

PROCESS SWITCHING SRU TO CNG


12

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

EVALUASI HASIL PERBAIKAN

Langkah 6

SASARAN
20%

BIAYA TA SRU
1479
995
907
802
762
492
467

IDR
4,024,694,310

IDR
3.351.576.542

IDR
2.723.399.767

433
412

CNG FUEL

2010

2013

2010

SUKSES

HASIL PERBAIKAN MELEBIHI


TARGET AWAL 20%
JOB PPEJ 2014

2013

13

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

EVALUASI HASIL PERBAIKAN

QUALITY

Power Generation beroperasi tanpa


shutdown selama SRU TA

COST

Biaya TA SRU 2013 turun sebesar


32.2 %

Langkah 6

DELIVERY

Gas engine dan gas cmpressor tetap beroperasi


sehingga supply power terjaga dan kondensat
tetap terproduksi sebesar 750 Barrels

HSSE

Penurunan emisi karbon sebear 37


Ton CO2 8% dari 461.27 ton menjadi
424.18 ton CO2

mORALE

SRU TA 2013 lebih cepat, sehingga


karyawan bisa fokus ke pekerjaan
yang lain

JOB PPEJ 2014

14

PANCA
MUTU

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

STANDARISASI Langkah 7

DATA
PEMAKAIAN
CNG
1.399 MMSCFD dengan
load 3254.2 kW

DATA BAHAN
BAKAR CNG

0.011 % CO2 & 84.858


CH4

SRU TA SAFE,
SOP TA
DENGAN
EFFECTIVE &
CNG
WIN-PRD-310-03
INSTALASI EFFISIEN
SOP UNIT PRS &PEMBAKUAN
SWITCHING HCM
SOP
GAS KE PRS-IMW-009
CNG
WIN-PRD-322-00

JOB PPEJ 2014

15

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

SHARING SESSION

FORUM PRESENTASI CIP PHE 2014


UPSTREAM IMPROVEMENT & INNOVATION AWARDS 2014

UPLOAD TO KOMET
JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

JOB PPEJ 2014

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

TESTIMONI
(Menit ke 13.30 , lalu STOP)

JOB PPEJ 2014

20

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

The important thing


is not to stop
questioning
~Albert Einstein~

TERIMA KASIH
JOB PPEJ 2014

21

JOINT OPERATING BODY


PERTAMINA PETROCHINA EAST JAVA

Vous aimerez peut-être aussi