RISK ASSESSMENT

Reference #
Work Activity :

Interior
Work

RA/RFT/001
Location :

ACTIVITY RISK ASSESSEMENT WORKSHEET GUIDELINES


Assessment Team :

H02 BEACH VILLA


ADDRESS - SECTOR 51,
PLOT NO. 143 OFFICERS
CLUB, ABU DHABI U.A.E.

Date : 25 Dec 12
Signature

Project Manager - Mr. Moataz Chaabi


056 728 7403
Project Engineer Mr. Anthony Arago
050 140 2931
HSE officer/Engineer Mr. Musadek Hussein 050
848 8603
First Aider Mr. Mohamed AbdelSabour Hussein
055 825 7883

Approved By :
GUIDANCE NOTES
Risk AssessmentInitial Risk
AssessmentProbabilitySeverity

Potential Risk
One or more risk assessment workshop
shall be held, which consider all potential
project risks.
Note that Liquidated Damages is not a
Project Risk It is consequences of an
event, typically failure to meet project
milestones. Neither should this be
recorded as a risk, as it is too general,
and arises due to one or more reasons.
* Delay in selection of Vendor X;
* Failure of Vendor Y to meet
schedule;
* Failure of Subcontractor Y to
mobilize sufficient resources;
* Etc.
These are the potential risks which should
be considered.

The likelihood that


this potential risk will
be realized on this
project is classified as
:

The consequences
for the project of
the potential risk
being realized are
classified as :

1.
2.
3.
4.
5.

1.
2.
3.
4.
5.

Very Unlikely
Unlikely
Possible
Likely
Very Likely

Negligible
Marginal
Critical
Severe
Catastrophic

RISK ASSESSMENT MATRIX


1.
SEVERITY
1. Negligible
2. Marginal
3. Critical
4. Severe
5. Catastrophic

Very Unlikely

Using the
simplified Risk
Matrix below, the
Probability and
severity are
considered
together to give
the Initial risk as :

Low

Medium

High

PROBABILITY
3. Possible
LOW

2. Unlikely

Mitigation Action
Low Risks are
acceptable. These should be
recorded to confirm that this risk
has been considered, but no
further action is required.
Medium Risks
are Tolerable. Mitigation action
shall be taken where practical to
reduce the probability or the
severity of the risk, and the risk
reassessed.
High Risks are
Unacceptable. Immediate
mitigation action shall be taken to
reduce the Probability or Severity
of the Risk and the risk
reassessed. Risk must be
reduced to Medium or Low

4. Likely

LOW
LOW

MEDIUM

This is the
assessment of
the risk, following
successful
implementation
of mitigating
action.
Low Risks are
considered as
Closed.
Medium & High
Risks are
considered as
Open and must
be actively
managed.

5. Very Likely
MEDIUM
MEDIUM
HIGH

Page 1 of 5HIGH

MEDIUM
MEDIUM

Residual Risk
Assessment

HIGH

RISK ASSESSMENT

Task

Step
#

Description of
Task Step

Arrival of
personnel on
site

Hazard

Hazard Description & Effect

1.1 Unfamiliar with local


situation.
1.2 Unfamiliar with site rules.

Check work
location for
space and
obstacles
Handling /
carrying tools
and
equipments

2.1 Insufficient space.


2.2 Obstacles present

Set up
barriers and
caution signs

Locate under
ground
cables /
services by
scanner

Initial Risk
Who or
What
might be
Harmed?

Control Measures

Consequen
Risk Rating
Probability
ce
Control Measures and / or Recovery
Measures

Residual Risk
Consequen
Risk Rating
Probability
ce
*Residual
Risk Level
(ALARP )

People

2M

4M

8M

1.1 Site Induction course by HSE.

2L

2L

4L

Low

People

2M

4M

8M

1.2 All personnel to be fully briefed on


task and responsibilities together
with the use of PPEs.
1.3 Control unauthorized personnel
entry to plant by Tawazen
.

2L

2L

4L

Low

2L

2L

4L

Low

People
People

2L
2L

3L
3L

6L
6L

2.1 Cordon off area.


2.2 Have obstacles removed.

2L
2L

2L
2L

4L
4L

Low
Low

Property

2L

3L

6L

2L

2L

4L

Low

People

2L

3L

6L

3.1 Use lift / equipments for heavy


load.
3.2 Clear all tripping hazards and
Use safe access.

2L

2L

4L

Low

4.1 Injury from blunt /


defective hand
tools / handling
material.

People

2L

3L

6L

4.1 Use PPEs.

2L

2L

4L

Low

5.1 Tripping hazards


5.2 Damage to the
equipment / scanner

People
Property

3M
3M

3M
3M

9M
9M

5.1 Remove all tripping hazards.


5.2 Competent person to use the
scanner / equipments for locating
the U/G services.

3L
3L

2L
2L

6L
6L

Low
Low

3.1 Injury from carrying


heavy tools / loads.
3.2 Fall / trip while carrying
hand tools.

Page 2 of 5

RISK ASSESSMENT

Task

Step
#

Description of
Task Step

Grinding

Lifting of
Valve by
Crane and Fit
Up

Hazard

Hazard Description & Effect

Initial Risk
Who or
What
might be
Harmed?

Control Measures

Consequen
Risk Rating
Probability
ce
Control Measures and / or Recovery
Measures

6.1 Flying objects Eye


injury
6.2 Puncture of run pipe
6.3 Electric shock

Property

3M

3M

9M

People
People

3M
3M

3M
3M

9M
9M

6.4 Possible ignition of gas


and cause fire at flanges
/ threaded connections.

People /
Property

3M

3M

9M

7.1 Loose Ground

Property
/ People

5H

5H

25H

7.2 Exposed Live line

Property

5H

5H

25H

7.3 Positioning of crane


inside fenced area

Property
/ People

4H

4H

7.4 Trailer arrive with valve

Property

2L

7.5 Off loading the valve

Property
/ People

7.6 Falling from crane

Property
/ People

14.1Eye protection & face shield to


be worn.
14.2Follow WPS Procedures.
14.3Follow the requirements in
Remarks.
14.4Cover the near by flanges /
threaded connections with fire
blankets and monitor gas leakage
24x24 hours.
16.1 Compact Ground before
positioning the crane and
place outrigger pads as per
the safety requirement and
perform load test on finished
ground.

Residual Risk
Consequen
Risk Rating
Probability
ce
*Residual
Risk Level
(ALARP )

3L

2L

6L

Low

3L
3L

2L
2L

6L
6L

Low
Low

3L

2L

6L

Low

5M

2M

10M

Medium

16.2 Protect live line with barrier


constructed with sand
bags in front and on top of
operating pipeline.

5M

2M

10M

Medium

16H

16.3 Use tested & Certified


equipment / rigging gear.

3L

2L

6L

Low

3L

6L

16.4 Keep clear lifting zone during


lifting.

3L

2L

Low

3M

3M

9M

16.5 Use only Competent Rigging


group

2L

2L

4L

Low

4M

3M

12M

16.6Conduct Tool box talk and


discuss risk assessment with team
to identify all hazards and

1L

1L

1L

Low

Page 3 of 5

RISK ASSESSMENT
mitigation measures.
7.7 Damaging to material
or personnel injury

7.8 Lowering the valve to fit


up location

7.9 Fit up of valve

Property
/ People

Property/
People

Property
/ People

4H

5H

5H

4H

4H

4h

16H

20H

20H

16.7Check weather condition and


wind speed to confirm safe for
lifting.
16.8Keep clear all unwanted /
unauthorized personnel.
16.9After lifting the valve from the
trailer, maintain a minimum
distance (100 Millimeter
approximately) of the valve from
the ground level.
16.10 Slew the load to the fit
up location in a slow and
steady motion.
16.11 Lower the valve into the bell
hole onto the fit up location slowly
and carefully, maintaining
minimum clearance from ground.
16.12 Monitor any change in the
ground condition due to
crane movement.

3L

2L

6L

Low

3M

3M

9M

Medium

5H

3H

15H

High

4M

3M

12M

Medium

3M

3M

9M

Medium

3M

3M

9M

Medium

Page 4 of 5

RISK ASSESSMENT

REMARKS:
1.
2.
3.
4.
5.
6.

Cables, Hoses, Fittings, Gauges, etc. shall be visually inspected on a daily basis before starting any work and it should be
ensured that all is in good conditions.
Wind Indicator shall be provided, people and vehicles shall stay upwind of the work location.
Escape route clearly identified, understood & known to all personnel working inside the live plant.
Escape route must be kept clear of any obstacle.
EMERGENCY NUMBERS Tawazen HOT LINE NUMBERS must be posted & know to all personnel.
Any emergency drill conducted by Tawazen live plant operations must be attended according to Tawazen procedures.

Page 5 of 5