P-62 Platform
Atlntico Sul Recife, PE
TA 001

Start

02/11/2012

End

02/13/2012

ACTIVITIES PERFORMED
Starboard Steering Hydraulic Tank Rando HDZ 68 Texaco Oil
Tank pumping and cleaning completed as requested by client CCI while approved

by CCI inspector.

Port steering Hydraulic Tank Rando HDZ 68 Texaco Oil


Tank pumping and cleaning completed as requested by client CCI while approved

by CCI.

DATE
[handwritten,
03/06/2012]
DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo Zaboth
CMT-P62-Mechanics
Supervisor
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01


[logo] Sulmaz
Epasa, Onip,
Rina
Reference
Client
Vessel/Work

TERM OF ACCEPTANCE

COC-1-P62-CMT-11-12-037
CCI
P-62 Platform

Page

1 of 1

Document:

Port/Local

Atlntico Sul Recife, PE


TA 002

Start

02/08/2012

End

02/14/2012

ACTIVITIES PERFORMED
Aft Bilge of the Engine Room
Bilge pumping and cleaning completed, as requested by client CCI while approved

by CCI inspector.

Fore Bilge of the Engine Room


Bilge pumping and cleaning completed, as requested by client CCI while approved

by CCI inspector.

DATE
[handwritten,
03/06/2012]
DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo Zaboth
CMT-P62-Mechanics
Supervisor
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01


[logo] Sulmaz
Epasa, Onip,
Rina
Reference
Client
Vessel/Work
Port/Local

TERM OF ACCEPTANCE

COC-1-P62-CMT-11-12-037

Page

CCI

1 of 1

Document:

P-62 Platform
Atlntico Sul Recife, PE
TA 003

Start

02/13/2012

End

02/14/2012

ACTIVITIES PERFORMED

Turbine Storage Tank


Pumping and cleaning completed while approved by CCI inspector as requested by

CCI.

DATE
[handwritten,
03/06/2012]
DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo Zaboth
CMT-P62-Mechanics
Supervisor
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page

COC-1-P62-CMT-11-12-037
CCI

1 of 1

Document:

P-62 Platform
Atlntico Sul Recife, PE
02/13/2012

End

02/14/2012

TA 003

ACTIVITIES PERFORMED
Turbine Storage Tank
Pumping and cleaning completed while approved by CCI inspector as requested by

CCI.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION
[signed and stamped by Antonio
Carlos de S. Ado
CMT-P62-Support
CCI S.A.]

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page

COC-1-P62-CMT-11-12-037
CCI

1 of 1

Document:

P-62 Platform
Atlntico Sul Recife, PE
02/15/2012

End

02/15/2012

TA 004

ACTIVITIES PERFORMED
Emergency Generator Sump Tank
Removal of engine oil and cleaning of generators completed while approved by CCI

inspector.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page
1 of 1
Document:

COC-1-P62-CMT-11-12-037
CCI
P-62 Platform
Atlntico Sul Recife, PE
02/13/2012

End

02/13/2012

TA 005

ACTIVITIES PERFORMED
Auxiliary Engine System Oil Storage Tank
Tank pumping and cleaning completed while approved by CCI inspector as

requested by client CCI.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page
1 of 1
Document:

COC-1-P62-CMT-11-12-037
CCI
P-62 Platform
Atlntico Sul Recife, PE
02/13/2012

End

02/13/2012

TA 006

ACTIVITIES PERFORMED
Auxiliary Engine System Oil Settling Tank
Tank pumping and cleaning completed while approved by CCI inspector as

requested by client CCI.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page
1 of 1
Document:

COC-1-P62-CMT-11-12-037
CCI
P-62 Platform
Atlntico Sul Recife, PE
02/15/2012

End

02/15/2012

TA 007

ACTIVITIES PERFORMED
FORE TOP INTK COMPART.
Compartment pumping and cleaning completed while approved by CCI inspector as
requested by client CCI.
AFT TOP INTK COMPART.

Compartment pumping and cleaning completed while approved by CCI inspector as


requested by client CCI.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page
1 of 1
Document:

COC-1-P62-CMT-11-12-037
CCI
P-62 Platform
Atlntico Sul Recife, PE
02/16/2012

End

02/16/2012

TA 008

ACTIVITIES PERFORMED
Compressors Compartment/Air Compressors Sump (0.1 m3 x 4 compressors)
Lube oil drainage and cleaning of engine room compressors No. 1 in the fore, and No. 1
and No. 2 in the aft of the engine room completed, while approved by CCI inspector as
requested by client CCI.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page
1 of 1
Document:

COC-1-P62-CMT-11-12-037
CCI
P-62 Platform
Atlntico Sul Recife, PE
02/16/2012

End

02/16/2012

TA 009

ACTIVITIES PERFORMED
Engine Room 200-Liter Lube Oil Drums
Lube oil pumping of 11 drums of 200 liters each of engine room for tank No. 68 completed
while approved by CCI inspector.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01


[logo] Sulmaz
Epasa, Onip, Rina

TERM OF ACCEPTANCE

Reference
Client
Vessel/Work
Port/Local
Start

Page
1 of 1
Document:

COC-1-P62-CMT-11-12-037
CCI Construces Offshore S.A.
P-62 Platform
Estaleiro Atlntico Sul Recife, PE
02/22/2012
End

02/23/2012

TA 010

ACTIVITIES PERFORMED
Auxiliary Engine System Taro 30 DP 30 Texaco Oil
3 Turbo Compressors (3 x 0.1 m3)
Lube oil drainage of the compressors and cleaning of the equipment and trays completed,
while approved by CCI inspector as requested by client CCI.

Services surveyed by CCI inspector while approved as requested.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01


[logo] Sulmaz
Epasa, Onip, Rina
Reference

TERM OF ACCEPTANCE

COC-1-P62-CMT-11-12-037

Page

1 of 1

Client
Vessel/Work
Port/Local
Start

CCI Construces Offshore S.A.


P-62 Platform
Estaleiro Atlntico Sul Recife, PE
02/17/2012
End

Document:

02/24/2012

TA 011

ACTIVITIES PERFORMED
Auxiliary Engine System Oil Sump Tanks (0.85 m3 X 3 engine)

Pumping and cleaning of lube oil of the generators and cleaning of the trays completed
while approved by CCI inspector.

Services surveyed and approved by CCI inspector.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page
1 of 1
Document:

COC-1-P62-CMT-11-12-037
CCI Construces Offshore S.A.
P-62 Platform
Estaleiro Atlntico Sul Recife, PE
02/22/2012
End

02/23/2012

TA 012

ACTIVITIES PERFORMED
Texaco Meropa 320 Oil Purifiers
Purifiers Sump (0.2 m3 x 4 Purifiers).

Cleaning and drainage of lube oil of the equipment and cleaning of the trays while approved
by CCI inspector as requested by client CCI.

Services surveyed and approved by CCI inspector.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page
1 of 1
Document:

COC-1-P62-CMT-11-12-037
CCI Construces Offshore S.A.
P-62 Platform
Estaleiro Atlntico Sul Recife, PE
02/23/2012
End

02/25/2012

TA 013

ACTIVITIES PERFORMED
Cargo Oil Pumps Turbine Sump Tanks (1 m3 x 3 pumps)
Cleaning and drainage of lube oil of the equipment and cleaning of the trays as requested
and approved by CCI inspector.
Tank Cleaning Pump Sump Tank
Cleaning and drainage of lube oil of the equipment and cleaning of the tray as requested
while approved by CCI inspector as requested by client CCI.

Services surveyed and approved by CCI inspector.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page
1 of 1
Document:

COC-1-P62-CMT-11-12-037
CCI Construces Offshore S.A.
P-62 Platform
Estaleiro Atlntico Sul Recife, PE
02/15/2012
End

02/15/2012

ACTIVITIES PERFORMED
Auxiliary Generator Room
Drainage services of the engine lube oil and cleaning of the equipment.

Services surveyed and approved by CCI inspector.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

TA 014

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page
1 of 1
Document:

COC-1-P62-CMT-11-12-037
CCI Construces Offshore S.A.
P-62 Platform
Estaleiro Atlntico Sul Recife, PE
02/24/2012
End

02/28/2012

TA 015

ACTIVITIES PERFORMED
01 HFO Settling Tank
Existing oil pumping completed; all existing residue packed and removed to a drum, and
cleaning done with a rag in finishing the services requested as in the pictures below.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01


[logo] Sulmaz
Epasa, Onip, Rina

TERM OF ACCEPTANCE

Reference
Client
Vessel/Work
Port/Local
Start
1

Page
1 of 1
Document:

COC-1-P62-CMT-11-12-037
CCI Construces Offshore S.A.
P-62 Platform
Estaleiro Atlntico Sul Recife, PE
02/24/2012
End

02/28/2012

TA 016

ACTIVITIES PERFORMED
HFO Settling Tank
Existing oil pumping completed; all existing residue packed and removed to a drum, and
cleaning done with a rag in finishing the services requested as in the pictures below.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01


[logo] Sulmaz
Epasa, Onip, Rina
Reference

TERM OF ACCEPTANCE

CO-CCI-P62-CMT-11-12-037

Page

1 of 1

Client
Vessel/Work
Port/Local
Start

CCI Construces Offshore S.A.


Platform Project P-62
Estaleiro Atlntico Sul Suape Port, PE
02/29/2012
End
03/01/2012

Document:

TA 017

ACTIVITIES PERFORMED
01 Pump House Basement
Pumping completed; all existing residue packed, and cleaning done with a rag on the
basement floor in removing it to a drum, as in the pictures below.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE
Page
1 of 1
Document:

CO-CCI-P62-CMT-11 -12-037
CCI Construces Offshore S.A.
Project Platform P-62
Estaleiro Atlntico Sul Recife, PE
02/28/2012
End

03/01/2012

TA 018

ACTIVITIES PERFORMED
01 Waste Oil Tank (rest of fuel oil and diesel leaked)
Pumping completed; all existing residue packed, and cleaning done with a rag on the
basement floor in removing it to a drum, as in the pictures below.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE

CO-CCI-P62-CMT-11 -12-037
CCI Construces Offshore S.A.
Project Platform P-62
Estaleiro Atlntico Sul Suape Port, PE
02/23/2012
End
03/01/2012

Page
1 of 1
Document:

TA 019

ACTIVITIES PERFORMED
01 Bilge Tank (oily water)
Pumping completed; all existing residue packed, and cleaning done with a rag on the
basement floor in removing it to a drum, as in the pictures below.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

[logo] Sulmaz
Epasa, Onip, Rina
Reference
Client
Vessel/Work
Port/Local
Start

TERM OF ACCEPTANCE

CO-CCI-P62-CMT-11 -12-037
CCI Construces Offshore S.A.
Project Platform P-62
Estaleiro Atlntico Sul Suape Port, PE
02/25/2012
End
03/01/2012

Page
1 of 1
Document:

TA 020

ACTIVITIES PERFORMED
01 Lube Oil Drain Tank (rest of lube oil leaked)
Pumping completed; all existing residue packed, and cleaning done with a rag on the basement
floor in removing it to a drum, as in the pictures below.

DATE
[handwritten,
03/06/2012]

DATE

CLIENT'S ACCEPTANCE
SIGNATURE/STAMP
POSITION
[signed and stamped by Saulo
Zaboth
Supervisor
CMT-P62-Mechanics
CCI S.A.]
SIGNATURE/STAMP
[signed and stamped by Uldison
Alves
CMT-P62-Mechanics
CCI S.A.]

POSITION

EPS-MR-12 TERM OF ACCEPTANCE Rev.01

Vous aimerez peut-être aussi