TRABAJOS PRELIMINARES
Movilizacin de materiales, y equipos a obra
Descarga de tuberia en obra
Arenado o lijado de tuberia en obra
Pintado de tuberia CON BASE estndar
Pintado de tuberia ACABADO estndar
SOPORTERIA PRELIMINAR
Soporte gota 1" UL/FM
Soporte gota 1-1/4", UL/FM
Soporte gota 1-1/2" UL/FM
Soporte gota 2" UL/FM
Soporte gota 2-1/2" UL/FM
TRABAJOS DE INSTALACION DE TUBERIA
Tuberia aerea colgada, SCH 40 1" arenada y pintada
Tuberia aerea colgada, SCH 40 1-1/4"arenada y pintada
Tuberia aerea colgada, SCH 40 1-1/2"arenada y pintada
Tuberia aerea colgada, SCH 40 2" arenada y pintada
Tuberia aerea colgada, SCH 40 2-1/2" arenada y pintada
ACCESORIOS RANURADOS
Acople ranurado 2-1/2"
Codo ranurado 2-1/2" incluye acoples
Tee ranurado 2-1/2" incluye acoples
ACCESORIOS ROSCADOS
Codo roscado 1"x90
Tee roscada 1"
Tee roscada 1-1/4"
Tee roscada 1-1/2"
Tee roscada 2"
Reduccion Busching 2"x1"
Reduccion Busching 1-1/2"x1-1/4"
Reduccion Busching 1-1/2"x1"
SOPORTERIA
Soporte antisimico 1 via 1-1/2"
VLVULAS
Detector de Flujo de paleta y abrazadera 2"UL/FM
Vlvula de bola 1" para drenaje
Vlvula de bola 1/2" para brueba
Manmetro y vlvula de 3 vias
Vlvula de compuerta tipo mariposa 2-1/2" para control general
M.O.
Eq.
Mat.
Parcial
gbl
0.18
535.354
90.91
444.44
Ton
1.00
8.545
3.311
4.671
96.36
m2
4.47
4.000
m2
4.47
4.506
0.818
0.425
3.264
20.13
m2
4.47
4.506
0.818
0.425
3.264
20.13
pza
8.40
6.112
3.903
0.359
1.850
51.34
pza
1.59
6.142
3.903
0.359
1.880
9.77
pza
1.20
6.350
4.066
0.374
1.910
7.62
pza
1.63
6.613
4.242
0.390
1.980
10.80
pza
0.00
6.869
4.435
0.408
2.025
0.00
ml
22.05
6.301
2.981
0.208
3.113
138.95
ml
3.68
7.511
3.379
0.220
3.913
27.60
ml
3.15
8.358
3.620
0.231
4.506
26.33
ml
5.15
11.432
4.223
0.202
7.006
58.82
ml
0.00
16.811
6.157
0.147
10.507
0.00
pza
0.0
13.126
3.379
4.228
5.520
0.00
pza
0.0
27.594
8.229
4.325
15.040
0.00
pza
0.0
39.446
10.592
6.794
22.060
0.00
pza
28.0
3.243
1.279
0.699
1.265
90.79
pza
4.0
4.240
1.838
0.725
1.678
16.96
pza
pza
3.0
3.0
5.680
6.621
2.141
2.817
0.728
0.734
2.811
3.069
17.04
19.86
pza
3.0
7.225
2.676
0.733
3.815
21.67
pza
3.0
3.404
1.223
0.012
2.169
10.21
pza
3.0
3.395
1.223
0.012
2.160
10.19
pza
3.0
3.387
1.223
0.012
2.151
10.16
pza
2.00
59.402
10.705
0.996
47.702
118.80
pza
1.00
132.208
11.212
1.445
119.55
132.21
pza
1.00
15.870
6.727
1.612
7.53
15.87
pza
1.00
9.353
3.494
0.859
5.00
pza
1.00
26.850
pza
0.00
269.630
0.564
8.55
17.86
9.35
26.85
18.510
5.120
246.00
0.00
ROCIADORES
Rociador estndar respuesta estndar 68C
GASTOS ADICIONALES
Movilizacion y desmovilizacion de personal
Alojamiento
Alimentacion
10.000
15.054
M.O.
Eq.
Mat.
Parcial
4.358
1.666
9.03
150.54
0.00
gbl
1.000
137.143
137.14
gbl
1.000
60.000
60.00
gbl
1.000
41.143
41.14
Costo directo
5.0%
69.15
Utilidad
10.0%
138.31
Sub Total
CONDICIONES
Atentamente
Franklin Zagaceta Bautista
1383.06
GG
1590.51