OBJECTIVE
The objective of this report is to provide an engineering design calculation for the
establishment of open and closed channel drainage system to accommodate with the authorities
approval.
LOCATION
Drainage system
DESIGN METHOD
The design method for this calculation is based on the guideline of Urban Stormwater
Management Manual for Malaysia or Manual Saliran Mesra Alam Malaysia (MSMA),
published by the Department of Irrigation and Drainage (DID), Malaysia.
DESIGN CRITERIA
RAINFALL INTENSITY DURATION FREQUENCY (IDF)
The design rainfall intensity-duration-frequency (IDF) relationship were developed from data
obtained from:
a) Design Rainfall (Volume 4 - Design Fundamentals).
b) Flow Estimation and Routing (Volume 5 - Runoff Estimation)
The equation used for IDF curves is in polynomial expressions for estimation of the average
rainfall intensity throughout the 35 main cities/towns in Malaysia. The equations are as follows:
= duration (minutes)
Notes:
(a) a,b,c and d are fitted coefficients for IDF equation which depends on ARI and
location
(b) IDF for Keluang is adopted for the drainage system design.
If t < 30 minutes, an estimation of intensity using the above equation would result in
large error. Therefore the following modified equation is used to derived the rainfall for
t < 30 minutes:
FD
Type of development
5 years
50 years
where:
V = velocity, (m/s)
n = Manning's roughness coefficient
1650 mm A X 1000 mm D
Brickwall sump
1m
1.65 m
Hydraulic design
Flow, Q
Manning's roughnes
coefficient, n
Area, A
Hydraulic Radius, R
Wetlet parameter, P
R
Slope, S
1.49/n A R2 S1/2
=
=
=
=
=
=
0.015
2.1
A/P
3.55
0.59
0.0022
6.93
ft3/sec
m2
m
m/m
m3/sec >
4.1158
m3/sec
BQ
Bill Of Quantities
Item
Description
Unit
Qty
Rate
Amount (RM)
Drain
m2
2,800
5.70
15,960.00
225 mm x 225 mm
1,040.0
75.00
78,000.00
300 mm x 300 mm
1,085.0
85.00
92,225.00
Nos
1,150.00
SUMP
CULVERT
4,600.00
50
225.00
11250.00
Total :
202,035.00
Total B/F
202,035.00
D
MISCELLANEOUS
L.S
5,000.00
L.S
5,000.00
212,035.00
Jumlah Item B/Q (4) :
CONCLUSION
From the design calculation, the peak pre-development and post development flow for
the site catchment area can be summarised as below:
Q pre-development
2775.791/s
Q post-development
4115.82 l/s
The drainage system proposed for this project therefore is adequate and suitable to cater
the peak flow rate of surface water and catchment runoff. Area of the site is less than 25
acres, therefore OSD ( on-site detention ) system is not provided. Final discharge of this
drainage system shall be connected to the existing 900mm drain in front of the site area.