by <Name>
November 2016
Contents
Abstract...3
Task 1 Site Investigation and Groundworks4
Task 2 Foundations..6
Task 3 External Walls..8
Task 4 Floors...10
Task 5 Roofs12
study
6. And other information such as chemical composition of ground water.
This information is important in selecting foundation type e.g. raft, matt or pad.
b. Explain the likely problems the ground, in this case, clay soil with some rubble infill in
parts of the site may have on the foundations. Also identify and explain how excavations
can be carried out safely, with specific reference to the safe use of a mechanical plant.
The likely problems that could be encountered on the ground are:
1. Slope collapse: this would be as a result of the rubble in the strata. This can be
solved by shoring in case excavation is done.
2. Irregular infiltration: this would result in saturation of soil resulting in
interference with structure integrity.
Safe Excavation Measures:
To ensure safe excavation, there is need to:
1. Engage an experienced team of experts in excavations and dredging.
2. Ensure use of good machinery e.g. a valid excavator.
Method/ Process
Falls into trenches or excavations
Unstable adjacent structures
Tripping over equipment, debris and spoil
Incidents involving vehicles and mobile plant
Safety Measure
Have safety tape and signs on site to guide and caution
Offer viable ground and structural support to them.
Organise equipment and debris in a well set manner.
Have a well-structured site mobilisation layout plan
Task 2 - Foundations
a. Assuming trench fill foundations are to be used on this site, detail to scale a typical foundation
and explain why such foundations would be used in this case.
Produce a method statement of activities for the construction of the trench fill strip
foundation from setting out to damp proof course level in the external wall.
According to Fan et al. (2014), the steps involved in construction of a trench fill are:
1. Site Mobilisation: this involves site clearance and delivery of required materials to the
site. Debris and all unwanted materials must be removed from the site, e.g., tree
stumps and foundations of old buildings.
b. Produce a storyboard of the construction of the cavity walls from ground to roof level,
clearly identifying the main stages in construction.
According to Chudley & Greeno (2013), the construction of the cavity walls involves the
following:
Method
1 Cavity Wall from foundation
2 Insulation
Significance/ Description
After foundation formation, a suitable insulation material
is selected from a reputable supplier. These come in
varied lengths and sizes
Cavity walls help in the insulation of rooms from the
damp proof membrane, the masonry blocks are installed
with the insulation material between the two blocks.
Where the insulation material need jointing, an adequate
bonding material is to be used to ensure regularity in
insulating.
On the cill, lintel and window levels, appropriate stopper
should be installed, of the same insulation material to
eliminate weather interference and temperature
irregularities in the room. Same applies to the roof level,
where the insulation is recommended to touch or go
beyond ceiling level.
Task 4 Floors
a. Detail to a scale of 1:10 a cross section showing the construction of the suspended
concrete beam and block ground floor at the junction with an internal party wall,
including a specification of the main components and damp resistance.
b. Produce a method statement for the safe construction of the upper floor using the
engineered timber I-beam joists as shown in the photographs.
Kurian (2016) notes that site preparation is essential to attain a final ground level. The
subsoil should be well levelled and top soil containing vegetation removed. Appropriate
treatment with weed killer is called for. A vapour barrier should be laid on top of the subsoil to
eliminate moisture rise to the floor.
Brickwork foundation should then be erected and walling done. A damp proof course
should be placed on top of the wall section. The dummy walls should go above the vapour
barrier level and some ventilation space allowed around 5cm (Kurian, 2016).
According to Emmitt & Gorse (2006), beams should be arranged across the wall to wall
edges and their ends should be fitted with precast closure blocks. The inner sections should be
filled with infill blocks appropriately.
Conclusion
This report has given an in-depth study and illustrative focus on: site investigation that is
important before construction of any structural element; a detailed study of the foundation,
walling principles, flooring, insulation, and roofing.
It is important that safety precautions are observed at all times to ensure operatives are
available and of good health to clear the projects. Putting workers or house occupants health in
jeopardy can result in disabilities, loss of life and costly legal tussles.
References
Becerik-Gerber, B., Gerber, D.J. and Ku, K., 2011. The pace of technological innovation in
architecture, engineering, and construction education: integrating recent trends into the
curricula. Journal of Information Technology in Construction, 16.