PER Presentation Meeting

Catlett & Calverton Sewage Collection System and Pump Stations Study

Prepared For:
Fauquier County Water and Sanitation Authority
and Fauquier County

Prepared By:

INTRODUCTION
Background
Probable Construction Costs
Evaluation Criteria
Alternatives
Results

PROBABLE COST OF CONSTRUCTION


Hard Construction Costs only
Grinder Pumps/Lateral Spur located at Property Line

Design Costs
Individual Property Connection to Lateral Spur/Grinder Pumps Provided
Any required Electrical upgrades
Easement Acquisition
Pump Station property Acquisition
O&M Costs

Not Included in Probable Costs

PROBABLE COST OF CONSTRUCTION

Alternative A : LPS, 1 Pump Station, 4-inch FM


$12.1M
Alternative B: LPS, 2 Pump Stations, 2x4-inch FM
$12.7M
Alternative C : Gravity Sewer, 2 Pump Stations, 2x4-inch FM
$21.3M ($3.2M Rock Allowance)

EVALUATION CRITERIA
Capital Cost
Technical Feasibility
Life-Cycle Analysis
Owners Familiarity with System

Alternative A:

ALTERNATIVES
o Low Pressure Sewer (LPS) systems in Catlett and Calverton Sewer Areas
o 1 Pump station from Calverton to Midland
o Force main extending along Rt. 28 Catlett Road to Midland

Alternative B:
o LPS systems in Catlett and Calverton Sewer Areas
o 2 Pump stations and associated forcemains
o Catlett to Calverton
o Calverton to Midland
Alternative C:
o Gravity collection throughout Catlett and Calverton Sewer Areas
o 2 Pump stations and associated forcemains
o Catlett to Calverton
o Calverton to Midland

ALTERNATIVE A - CATLETT

ALTERNATIVE A - CALVERTON

ALTERNATIVE B - CATLETT

ALTERNATIVE B - CALVERTON

ALTERNATIVE C- CATLETT

ALTERNATIVE C - CALVERTON

MIDLAND

SUMMARY OF ALTERNATIVE A
Number of Grinder Pump Units:
113 Simplex
14 duplex
1 Quadplex
1 -4,820 Ft.
1 25,600 Ft.
2- 10,050 Ft.
2.5 -25,820 Ft.
3 9,100 Ft.
4 13,800 Ft.

Low Pressure Force Main:

Pump Stations: 1 (in Calverton)


Calverton Force Main to Midland: 4 or 6- 14,716 Feet

SUMMARY OF ALTERNATIVE B
Number of Grinder Pump Units:
113 Simplex
14 duplex
1 Quadplex
1 -5,820 Ft.
1 20,850 Ft.
2- 12,100 Ft.
2.5 16,200 Ft.
3 10,000 Ft.
4 8,700 Ft.

Low Pressure Force Main:

Pump Stations: 2
Catlett Force Main to Calverton: 4- 17,228 Feet
Calverton Force Main to Midland: 4 or 6- 7,236 Feet

SUMMARY OF ALTERNATIVE C
8 Sewer ~ 56,000 Feet
4 ID Manholes ~ 175
Pump Stations: 2
Number of Grinder Pump Units: 40 Simplex
Individual Grinder Force Main:
1 -11,943 Ft.
2- 2,448 Ft.

Catlett Force Main to Calverton: 4- 15,598 Feet


Calverton Force Main to Midland: 4 or 6- 17,650 Feet

PUMP STATION AND FORCE MAIN SIZES

53.8 gpm

4 inch

4 inch

Force Main
Size
Inches

2.4 ft/sec

1.2 ft/sec

Force Main
Velocity
Feet/Second

Pump Station
Design Capacity
Gallons Per
Minute

30,975 gpd

103 gpm

Average
Daily Design
Flow
Gallons per Day
Catlett

59,238 gpd

Current Signed Agreement Flow


Calverton (cumulative flow)
Catlett (projected)

107,800 gpd

65,800 gpd

187 gpm

114 gpm

4 inch

4 inch

4.3 ft/sec

2.1 ft/sec

Maximum Allowable Design Flow


Calverton (cumulative flow)

TYPICAL CONVENTIONAL PUMP STATION

ALTERNATVE INDIVIDUAL GRINDER PUMPS


Simplex E/One
110V Electric Service

GRINDER PUMP CONNECTION

GRINDER PUMP HYDRAULIC ANALYSIS

GRINDER PUMP WARRANTY


Standard warranty is 2 years.
Purchase extended warranty
5 year warranty

Protect Plus Panel


E/One SS Curb Stop Assembly
E/One online certified installation and Start-up E/Cert System
$481 extra/simplex unit
$765 extra/duplex unit
$1,530 extra/quadplex unit

CHALLENGES
Coordinate with VDOT Plans for Rt. 28
Utilize VDOT Right of Way
Utility Crossings
Railroad Crossings
Stream Crossings at Bridges
Diabase Rock
Easement Acquisition

COORDINATE VDOT RT. 28 PROJECT CALVERTON

GAS LINE CROSSINGS

LIFE CYCLE ANALYSIS CONSIDERATIONS


Design Life
Gravity Sewer & Forcemain: 40 years
Grinder Pump: 10 years
Pump Controls: 20 years

Operation & Maintenance


Replacement Schedules
Power Usage

Technical
Feasibility
3
2

Life-Cycle
Costs
2
1

Owners
Familiarity
1
2

9
7

RESULTS

3
2
1

Total

Alternative A
Alternative B
1

Capital Costs

Alternative C
3 - Most Favorable
1 - Least Favorable

QUESTIONS AND DISCUSSION

PROBABLE COST OF CONSTRUCTION

Alternative A : LPS, 1 Pump Station, 4-inch FM


$12.1M
Alternative B: LPS, 2 Pump Stations, 2x4-inch FM
$12.7M
Alternative C : Gravity Sewer, 2 Pump Stations, 2x4-inch FM
$21.3M ($3.2M Rock Allowance)