Académique Documents
Professionnel Documents
Culture Documents
in business and industry to her work in the quality profession. In November of 2005,
she was recognized in Quality Digest as one of the Drivers of Quality. Denise is
a member of U.S. TAG to ISO/TC 176, the committee responsible for updating the
ISO 9000 family of standards. She is also a RABQSA certified lead assessor, an ASQ
Certified Quality Auditor, and a fellow of ASQ.
As the principal of Robitaille Associates she has helped numerous companies in diverse fields to achieve
ISO 9001 registration and to improve their quality management systems. She has conducted training
courses for thousands of individuals on such topics as corrective action, management review, auditing,
document control and implementing ISO 9001.
Denises books include: The Corrective Action Handbook, The Management Review Handbook, The
Preventive Action Handbook, Root Cause Analysis: Basic Tools and Techniques, Document Control and
Managing Supplier-Related Processes. She is a regular columnist for The Auditor newsletter and is the
author of numerous articles.
Look for a special 25% off discount code on all Paton Professional books at the end of this story.
2007, 2009 Denise Robitaille. All rights reserved.
Introduction
S
anta decided it was about time for him to bring more control to the toy manufacturing and delivery
processes at the North Pole. The elf population has increased dramatically, and there are more and
more children to be served. There has been a proportionate increase in the amount of outsourcing due
to several factors.
Recognizing the need for a balance between preserving tradition and addressing consumer safety
laws and environmental protection protocols, Santa initiated processes to ensure continued customer
delight as well as unquestioned safety. This has evolved into a massive project encompassing updated
designs of all the perennial favorites like dolls and sleds and teddy bears. Even with the outsourcing of
21st century gadgetry, theres still a lot of work to keep the elves busy.
Santas Workshop had been outsourcing more of the electronic gadgets and games that kids love.
Rather than sending thousands of elves to universities and trade schools to increase their knowledge of
emerging technologies, it was decided that it made more sense to have the experts make the toys and to
procure them for holiday gift-giving.
Qualifying thousands of suppliers ensures that toys and games continue to reflect Santas commitment
to quality and joy. Hundreds of elves are involved in pre-qualification, supplier audits, developing
improved process documents for the outsource suppliers, and establishing adequate inspection and
acceptance criteria documentation.
Santa became aware of the ISO 9001 standard several years ago and immediately recognized the
value it could bring to the North Pole operation. He has slowly been developing his quality management
system (QMS) with the help of a crackerjack team. Before the production season gets into full swing,
Santa would like to have Santas Workshop registered to ISO 9001.
In preparation for the pre-assessment audit, Santa has sent his organizations quality manual, core
procedures, master document list, and a sampling of other documentation for a document review. It
does not include all the documents.
Enjoy a bit of holiday whimsy as we present the quality manual and core procedures for Santas
Workshop. See if Santas documentation is adequate and if it will pass a registrars assessment. Pick
up a few tips and a fresh perspective on documenting your own QMS from the jolly fellow at the
North Pole.
Santas Workshop
Quality Manual
A pproved:
10/24/09
Date:
Contents
Introduction................................................................................................................................... i
Cover Page with Approval...................................................................................................... ii
Quality Policy............................................................................................................................... 1
Organizational Chart.............................................................................................................. 2
Interrelation of Quality Processes................................................................................. 3
Monitoring and Measurement Activities Flowchart............................................. 4
Management Responsibilities and Review..................................................................... 5
Overview of Quality Management Review.................................................................... 7
Quality System.............................................................................................................................. 8
Quality Objectives...................................................................................................................... 8
Allowable Exclusions.............................................................................................................. 9
Revision History............................................................................................................................ 9
Master Document List............................................................................................................. 10
Documents of External Origin.......................................................................................... 12
QP 4.2.3 Document and Data Control............................................................................... 13
QP 4.2.4 Control of Records................................................................................................... 16
QP 7.4.1 Supplier Qualification and Monitoring........................................................ 17
QP 8.2.2 Internal Auditing....................................................................................................... 21
QP 8.3 Control of Nonconforming Material............................................................... 23
QP 8.5.2 Corrective Action...................................................................................................... 26
QP 8.5.3 Preventive Action....................................................................................................... 27
Reindeer Care Schedule ........................................................................................................ 30
WI 7.3.7 Design Change Control........................................................................................... 31
Quality Policy
Santa and his elves are committed to providing gifts that fulfill customer-specified
requirements and to operating within a quality management system that conforms
to the requirements of ISO 9001. We are committed to improving our products and
processes to ensure continued ability to be the premier provider of gifts during the
holiday season. We are all responsible for quality.
Normative References
Holiday season refers to the period from mid-December until early January that is traditionally
associated with the Christmas holiday. However, Santas Workshop provides gifts to children of any
and all denominations, cultures, and ethnicities.
Customer-specified requirements are defined as those described in childrens letters, made while sitting
on Santas knee or expressed through comparable communiques. Included in the specification are
parents inputs as to appropriateness, which may override child (herein occasionally referred to as
customer) requests. Further, children have been previously advised that the delivery of gifts is subject
to their status on Santas NICE list. It is understood that inclusion on the NAUGHTY list prohibits
delivery of gifts or proportionately decreases quantity delivered.
Santa Claus
Elfin Director
of Toy Design
Senior
Purchasing Elf
Master Elf
of Toy
Production
Outsourcing
contract
supervisory elf
Receiving/
inventory
Toy
production
Chief
Financial
Officer
(Mrs. Claus)
Steward of
letter-sorting
elves
Sleigh and
reindeer
maintenance
Elf training
Yes
Refer to
engineering
No
Manufacture
in-house?
Review design:
revise if needed
Purchase from
approved
outsource
Supplier
on approved
list?
No
Initiate
approval
process
Yes
Refer to
engineering
Placer order
with approved
supplier
Check parts
inventory
Purchase
materials
Receive and inspect
materials
No
OK?
No
Put in stock
Finished
goods?
To finished goods
stockroom
Contact supplier
refer for possible
corrective action
Component/
materials
stockroom
Issue
materials to
manufacturing
Manufacture
toys
Inspect
Deliver toys
Audits
Improvement
initiatives
Process
monitoring
Customer
feedback
Internal audits
Corrective action
Production
performance
Complaints
Preventive action
Scrap rate
Supplier
performance
Nonconforming
material
Analysis
Management
review
Letters to Santa
Market research
Our commitment to quality, and to the fulfillment of specified requirements and adherence to the
This policy is displayed prominently throughout the North Pole and communicated to all elves. The
quality policy is presented at meetings, printed in newsletters, and explained as part of the training for
new hires.
Executive management is responsible for defining and communicating the quality policy. Further,
executive management is responsible for ensuring that the quality management system (QMS) is
established, understood, implemented, and maintained throughout the organization. Organizational
chart and process flowcharts have been developed, indicating authority, responsibility, and interrelation
of processes.
Santa Claus has ultimate authority for all aspects of the organization and the QMS. He ensures
there are adequate resources for the management of the organization and the maintenance of the QMS,
including provision of resources relating to training, equipment, communication, and infrastructure.
Santa Claus is the sole authority in the decision of gift selection and gift giving.
Mrs. Claus serves at the ISO management representative. She ensures the establishment, definition,
and implementation of the QMS. Further, she is responsible for ensuring the awareness of customer
requirements throughout the organization. She ensures that information relative to the QMS and key
performance indicators are analyzed and available to executive management. She participates in
management review. The ISO management representative is responsible for:
Overseeing/maintaining the QMS
Initiating actions that prevent the occurrence of nonconformities
Assisting operations by recommending solutions to problems
Coordinating data and records for management reviews
Participating in supplier assessment and monitoring
Baking cookies for the elves
Mrs. Claus also serves as the chief financial officer, responsible for financial matters and oversight
of administrative staff. She supervises the team of elves responsible for opening and sorting childrens
letters to Santa.
The master elf of toy production is responsible for managing toy manufacturing processes.
Responsibilities include:
Overseeing all aspects of toy production, inspection, packaging, inventory, and maintenance
Participating in the dispositioning of nonconforming material
Assisting in development of plans and objectives
Management of quality control lab
Responsibility for various functions within the QMS and the authority to perform or approve certain
activities are delegated by the executive management to managers and elves in supervisory roles.
Responsibilities are identified in the appropriate documents.
The senior purchasing elf is responsible for processes relating to supplier qualification and monitoring
The elfin director of toy design is responsible for the design and development of toys manufactured
by Santas Workshop. Because most of the toy designs are established, most of the design work involves
revision to existing toy designs. Responsibilities include:
New toy design
Supervision of engineering staff
Revision of existing design to address:
Technological innovation
Management review of the quality system consists of an assessment of the quality management
system (QMS) based upon information, data, and reports on various functions and activities. These
records and data, furnished by the process owners and supervisors, are retained with the records of the
management review. The information may be in summary form.
Records of management review are retained. Aspects of the QMS, which are reviewed, include:
Letters to Santa
Complaints
Market research
Other
3. Presentation of statistical analysis, such as process and production data, nonconforming material
reports, scrap rates, equipment failure/downtime, and supplier performance
4. Review summary of internal audits performed since last management meeting
5. Review of quality policy and objectives
6. Equipment issues
7. Training issues
8. Suggestions
9. Action to be taken
The scope of the quality management system is the design, manufacture, and distribution of gifts
Santas Workshop operates its quality system by a set of defined procedures and processes identified
in the Master Document List. Adherence to these documents ensures fulfillment of customer-specified
requirements and conformance to the requirements of ISO 9001.
Quality planning is incorporated into the appropriate procedures, work instructions, and other
documents. These plans may relate to product design, processes, equipment, inspection, training, and
continual improvement, and reflect consideration for interrelation and sequence of processes.
Quality Objectives
Santas Workshop establishes quality objectives relating to product, performance, and the attainment
of organizational goals. These are defined and communicated in various forms, as appropriate to the
function and objective.
Management ensures that appropriate metrics are established for measuring and assessing the
Documents
and Procedures
The following ISO 9001 requirements are excluded from the scope of Santas Workshops quality
system.
ISO 9001 reference
Requirement
7.5.1 Control of
service provision
after-market services.
Revision History
Revision
Date
Nature of change
5/23/09
Initial release
2/14/09
Added description of
responsibilities for senior
purchasing elf
10/24/09
Included normative
references on page one
10
Title
Rev. Level
Rev. Date
--
Quality Manual
10-24-09
QP 4.2.3
11-6-09
QP 4.2.4
Control of Records
6-12-08
QP 6.2.2
Training
11-22-08
QA 6.3
Equipment Maintenance
10-17-09
QA 7.3
Toy Design
11-6-09
QA 7.4.1
10-17-09
QA 7.4.2
10-17-09
QA 7.5.1
Toy Manufacturing
6-29-08
QA 7.5.5
Toy Packaging
9-13-09
QA 7.6
5-30-10
QA 8.2.2
Internal Auditing
11-6-07
QP 8.3
Nonconforming Material
6-12-09
QA 8.5.2
Corrective Action
9-29-08
QA 8.5.3
Preventive Action
9-29-08
Number
Title
Rev. Level
Rev. Date
WI 6.3.1
9-13-09
WI 6.4.1
10-05-10
WI 7.4.3
8-05-10
WI 7.3.7
11-6-09
WI 7.5.1.1
Dolly Construction
6-25-07
WI 7.5.1.2
Wagon Assembly
7-18-08
WI 7.5.1.3
7-18-08
WI 7.5.1.4
8-29-09
WI 7.5.1.5
8-05-10
WI 7.5.1.6
8-05-10
Work Instructions
11
Title
Rev. Level
Rev. Date
TG 6.3
Stable Cleaning
6-25-06
TG 6.4
Christmas Caroling
1-29-10
TG 7.5.1.1
11-03-09
TG 7.5.1.2
6-25-06
TG 7.5.1.3
6-25-06
TG 7.5.1.4
6-25-06
TG 7.5.1.5
7-06-09
TG 7.5.1.6
7-12-09
TG 7.5.1.7
7-12-09
TG 7.5.1.8
6-25-06
Other Documentation
Category
Location or Owner
Comments
Toy specification
Blitzen drive
On Kringle drive
Access restricted
Calibration schedule
On Dancer drive
Audit schedule
Rudolph drive
Production schedule
Naughty/nice lists
Santa
and schedules
on Comet drive
of individual reindeers
Production routers
Prancer drive
Purchasing/outsourcing
documents
outsource supplier
ISO rep
On Dancer drive
protocols
12
Form Number
Form Name
Rev.
F5.6
F6.3.1
F7.4.1
Vendor Self-Assessment
F8.3.1
Nonconformance ID tag
F8.3.2
F8.5.2
Category
Location/Owner
Comments
QMS standard
ISO Rep
Revision by issuing
body
(various)
Equipment manuals
Consumer
Product Safety
Commission
(CPSC) regs
Safety/statutory
requirements
Elfin director of
toy design
Olafs Care
and Grooming
of Ruminants,
Second Edition
Reindeer care
Master reindeer
custodian
OSHA documents
Safety protocols
Safety elf
MSDS sheets
Material safety
Production area
The Corrective
Action Handbook
Guidance for
problem solving
The Preventive
Action Handbook
Guidance for
managing risk and
potential problems
The Management
Review Handbook
Guidance on strategic
planning and
management issues
Document
Control: A
Simple Guide
to Managing
Documentation
Guidance on how
to keep track of
Santas Workshop
documentation
On shared drive
13
Category
Location/Owner
Comments
Root Cause
Analysis: Basic
Tools and
Techniques
Guidance on
problem-solving
investigation
Managing
Supplier-Related
Processes
Guidance on
purchasing,
outsourcing, and
monitoring suppliers
Santa
Quality Approval:
Mrs. Claus
Date:
11/6/09
Date:
11/6/09
1.0 Purpose
This procedure defines the establishment of a system to approve, control, review, and maintain the
documentation that relates to Santas Workshop.
2.0 Scope
This encompasses QMS documentation, including the quality manual, procedures, work instructions,
production documents, specifications, manuals, and documents of external origin. Some documentation
is generated and maintained electronically.
3.0 Procedure
3.1 The ISO management representative is responsible for developing and implementing a plan for
the control, storage, and maintenance of documents and data relative to the quality system. Quality
procedures are reviewed by the ISO management representative prior to implementation to verify that
they comply with established procedures, statutory requirements, and the ISO 9001 standard.
14
Bill of materials
Blueprints/drawings
Production routers
Additional documentation
3.8 The ISO management representative or the supervisor of a department or function is responsible
for ensuring that all authorized personnel are trained in the control, maintenance, and storage of
15
It is the responsibility of authorized personnel to verify that they are in possession of the most
current revision of a document.
3.9 The following departments/personnel are responsible for document control and maintenance:
Documents
Responsible personnel/department
procedures
Production routers
Naughty/nice lists
Santa Claus
Toys specifications
Purchasing/outsourcing
documents
Reindeer care
3.10 Functions having responsibility for the control, maintenance and/or access of documents of
external origin such as standards, specifications and statutory requirements are identified on the
master document list.
3.11 Electronic documentation maintained and protected in accordance with information management
system (IMS) protocols described in IMS work instructions. The system is backed up on a regular
basis. A copy of the back up is stored off-site
3.12 Santas Workshop has identified forms that need to be controlled and listed them on the master document
list. Other forms, templates and charts may be utilized, but need not be numbered or controlled.
3.13 Quality procedures and work instructions are regularly reviewed for continued applicability and
accuracy as part of scheduled internal audits. Revisions are made if required.Revision History
Revision History
Revision
Date
Nature of Change
6/12/08
Initial release
11/6/09
16
Santa
Quality Approval:
Mrs. Claus
Date:
6/12/08
Date:
6/12/08
1.0 Purpose
The purpose of this procedure is to define the system by which quality records are controlled and
maintained.
2.0 Scope
The scope of this procedure is Santas Workshop records that provide evidence of fulfillment of
specified requirements. Control covers identification, collection, indexing, access, filing, storage,
maintenance, and disposition of the quality records.
3.0 Procedure
3.1 Records verify and substantiate the implementation and effectiveness of the QMS and the
fulfillment of customer-specified requirements.
3.2 Quality records facilitate management review and provide historical reference that may assist in
trending analysis, performing root cause analysis, and developing corrective action plans.
3.3 Records are maintained in a manner that promotes identification, accessibility, and preservation
from damage or deterioration. Records are readily accessible and stored in conditions that guard
against damage and deterioration. Records that are stored electronically are similarly protected.
3.4 Supervisors ensure that elves provide clear and legible records. Further, personnel are trained in
the correct storage, maintenance, and retrieval of records.
3.5 Santas Workshop has identified records that need to be controlled and defined the method of
retention in the record retention matrix.
3.8 Santas Workshop complies with statutory requirements for retention and storage of records
relating to product safety.
17
Date
Nature of Change
6/12/08
Initial release
Quality Approval:
Mrs. Claus
Date:
6/12/08
Date:
6/12/08
1.0 Purpose
This procedure establishes activities relating to the selection, qualifying and monitoring of suppliers
and outsourced processes that affect Santas Workshops ability to supply product that conforms to
specified requirements.
2.0 Scope
This procedure encompasses the purchase of materials used in the manufacturing process and finished
products such as electronic toys and games
18
Class
Product/service
Criteria for
selection
Method of
qualification
(may be one or more
methods)
Method of monitoring
(as appropriate to
category)
1.
Outsourced
processes,
including
fabrication of
toys, games,
and gifts
Training of
department
store Santas
Ability
to fulfill
requirements
Delivery
On-site visit
(After initial visit
may accept copy
of certification to
recognized QMS
standard)
Delivery
Receiving records
Certificates or final
inspection reports
Nonconforming
material reports
Response to corrective
action requests
2.
Raw
materials and
components
Reindeer food
Ability
to fulfill
requirements
Delivery
Copy of certification
to recognized QMS
standard
Customer/associate
recommendation
Historical
performance
Delivery
Receiving records
Certificates or final
inspection reports
Nonconforming
Material Reports
Response to corrective
action requests
3.
Services such
as calibration,
testing, and
veterinary care
Ability
to fulfill
requirements
Availability
Copy of certification
to recognized
standard (Ex: ISO
17025)
Customer/associate
recommendation
Historical
performance
Assessed at time
service is delivered
(observations noted
in supplier file, by
default only, record
of failure to provide
specified service)
Response to corrective
action requests
19
Class
Product/service
4.
Machine parts/
supplies
Criteria for
selection
Price and
delivery
Method of
qualification
(may be one or more
methods)
None
Method of monitoring
(As appropriate to
category)
By default only;
record of late delivery
or incorrect/defective
material
3.5 Criteria for removal from the approved vendor list (AVL) includes, but is not limited to:
3.6 Disqualification of a supplier is recorded and communicated in the purchasing database.
3.7 Quarterly analysis of on-time delivery is conducted for top suppliers by volume as determined by
purchasing personnel. Additionally, occurrences of late deliveries that have affected production
and/or the ability to meet customer requirements are recorded on a case-by-case basis, when
deemed appropriate by purchasing personnel.
3.8 Self-assessment forms are to be sent out to new suppliers as soon as possible, but no later than
forty-five days after generation of initial order. Failure to respond to a request for self-assessment
results in banning from Santas Nice List and removal from the AVL.
4.0 Forms
7.1 F7.4.1 Vendor Self-Assessment
Revision
Date
Nature of Change
6/12/08
Initial release
3/06/09
20
6/12/09
10/17/08
Santa
Quality Approval:
Mrs. Claus
Date:
11/6/07
Date:
11/6/07
1.0 Scope
This procedure covers internal quality audits.
2.0 Purpose
This procedure defines the establishment, implementation, and documentation of the internal auditing
process as an appropriate method for evaluating the effectiveness of the quality system as it relates to
the organizations ability to meet customer requirements.
4.0 Responsibilities
4.1 ISO management representative
Prepares and maintains audit schedule
Ensures that auditors are trained
Ensures that audits are conducted in accordance with the audit schedule
4.2 Auditors
Assist in the preparation of audit material
Conduct audits
Write audit report
Follow up on CARs
5.0 Procedure
5.1 All elements of the quality system are audited at least once within a one-year audit cycle. The
audit schedule is prepared and issued covering a one-year time span. Frequency of audits for
21
22
Revision: B
Mrs. Claus
Date:
6/12/09
Date:
6/12/09
1.0 Purpose
This procedure defines the process for identification, documentation, and disposition of nonconforming
material and products.
2.0 Scope
This procedure applies to materials, components, subassemblies, and finished goods.
3.0 Definitions
Nonconforming product: Material, component, subassembly, or finished product that does not
conform to specified requirements. It includes materials and products whose conformance status
has not been determined.
Material Review Board (MRB): The MRB is comprised of the following individuals:
Santa Claus
Senior purchasing elf
Master elf of toy production
Quality control level III elves
ISO management representative
Production group leader elves
Review of an MRB report and disposition of materials may be performed by one or more members.
Each member is authorized to disposition materials and determine the need for further action.
4.0 Procedures
Identification and segregation
4.1 It is every elfs responsibility to identify nonconforming material when it is noticed during normal
work assignments. The nonconformance is identified with the part number, date of detection,
quantity, and description of defect using a nonconformance tag (F8.3.1).
23
Source/point of
detection
Segregated location
Process
Incoming/receiving
(purchased material
and outsourced
finished goods)
Designated area in
stockroom
Purchased material
detected at first point
of use (usually in
production)
Designated area in
stockroom
24
Segregated location
Process
In-process or at final
inspection
Designated area in
QC
4.5 MRB members determine appropriate disposition and record action taken on MRB form (F8.3.2).
Revision History
Revision
Date
Nature of Change
6/12/08
Initial release
6/12/09
25
Santa
Quality Approval:
Mrs. Claus
Date:
9/29/08
Date:
9/29/08
Evaluate situation
Take appropriate
action
No
Monitor for
recurrence
CA
required?
Repair defect
Quarantine inventory
Contact vendor
Scrap material
Yes
Take corrective
action
Assemble team
Conduct root cause
analysis
Develop plan of
action
Close out
Implement plan
No
Yes
26
Did it
work?
Assess results
Revision
Date
Nature of Change
6/12/08
Initial Release
9/29/08
Santa
Quality Approval:
Mrs. Claus
Date:
9/29/08
Date:
9/29/08
1.0 Scope
This procedure encompasses documentation and activities related to identifying and eliminating the
causes of potential of product and process nonconformances.
2.0 Purpose
The purpose of this procedure is to describe the manner in which Santas Workshop addresses potential
problems and nonconformances through various preventive actions.
3.0 Procedure
3.1 Preventive actions are generated based on the identification of a potential problem and the
determination of probability, magnitude, and criticality. As the opportunity to address potential
problems varies depending on the nature of the product or process, the criteria for determination
and the decision to initiate preventive action is the responsibility of top management or the process
owner.
3.2 The justification to initiate preventive action is derived from a multitude of sources including, but
not limited to:
3.2.1 Market input
3.2.2 Procedural requirements
3.2.3 Trends analysis/performance data
3.2.4 Reports from air traffic controllers
3.2.5 Internal audit
3.2.6 External (third-party) audit
3.2.1 Management review and recommendation
3.3 Preventive actions may be:
3.3.1 Specific procedures or processes
3.3.2 Requirements or steps within a procedure or process
3.3.3 Unique initiatives or projects
27
Preventive
action
To prevent
Defined
in what
procedure,
process, or
requirement
Verification
of
effectiveness
Records
Method of
reporting to
management
Equipment
preventive
maintenance
Equipment
failure
Various
maintenance
manuals
Internal
audits,
periodic
monitoring
by supervisor
Various
maintenance
forms
Results
analyzed
(including
cost) and
summarized
for management review
Reindeer
wellness
program
Sick
reindeers on
Christmas
Eve
Various
Performance
during dryruns and on
Big Night
Reindeer
Care
Schedule
form F6.3.1A
Detailed
reports once
a week,
summarized
for
management
review
Min/max
inventory
levels
Material
shortages,
late deliveries
to customers
MRP
database
Daily
production
meetings
Inventory
database
Data
summarized
and
reported, if
appropriate,
during
management
review
28
Preventive
action
To prevent
Defined
in what
procedure,
process, or
requirement
Verification
of
effectiveness
Records
Method of
reporting to
management
Electronic
data backup
Loss of data
IT backup
and security
protocols
Management
review
On electronic
back up
media
Not required
unless there
is a problem
Safety
program
Injury, scrap,
liability
issues
OSHA
manuals
Number of
accidents &
injuries
Supervisor
accident
reports
Not required
unless there
is a problem
Other
preventive
action
initiatives
Addressing
potential
problems not
identified
through
established
processes
QP 8.5.3
Unique
to each
preventive
action
initiative
Unique
to each
preventive
action
initiative
Regular
part of
management
review
3.7 Determination of the appropriate elf to be assigned responsibility for a preventive action initiative
is determined by top management or various process owners with input from supervisory elves or
managers, when appropriate.
3.7.1 Records of the decision to initiate a preventive action are reliant on the nature of the
perceived problem and are typically found in:
3.8 It is the responsibility of the elf team to which the preventive action has been issued to:
3.8.1 Identify the root cause of the potential nonconformance
3.8.2 Describe and implement a plan for preventive action
3.8.3 Ensure that the plan is implemented
3.8.4 Provide records for review
3.9 Preventive action requests are a regular item at management minutes.
29
Date
Nature of Change
6/12/08
Initial release
9/29/08
Supporting
documents
Frequency
Nature of care
Daily
Plans in individuals
folders on Comet
drive
Coat brushing
N/A
Weekly
Antler grooming
Hoof pedicure
Nose polishing
(Rudolph only)
N/A
Monthly
Annual
N/A
Review of nutritional
plan
Plans in individuals
folders on Comet
drive
30
Review results
Compliance
issues?
Yes
Refer to engineering
No
Colors, features,
fads issues?
Yes
No
Availability of
materials OK?
No
Yes
Need to change
routers?
Yes
No
Release to toy test lab for
mini validation
Results OK?
No
Yes
Release to production
31
A Special Offer
From Santa
Surveying his customers, Santa knows you like a bargain. So Santas giving you 25% off all Paton
Professional books if you order online by Dec. 31, 2009.
Hurrythis is a limited-time offer. Your SANTA discount code is good on all orders placed now
through December 31, 2009.
To Save
1. Place your orders online at: www.patonprofessional.com
2. Simply enter the special promotional code SANTA when you check out. Your 25%
discount will automatically be applied to every one of the books you order from
this list.
3 Call Santas helpers at (530) 342-5480 if you need any help with your order.
32