115 KV Transmission Lines from GTS1 & GTS2 to EGAT

ID

Task Name

Duration

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

115 KV Transmission Lines from GTS1 & GTS2 to EGAT


Contract PO
1)Preliminary
Mobilization and Constrcution
Site Office Completed
2)Design & Engineer
Shop Drawing 115kV Transmission Line for construction
Riser pole(UG)
Steel Support for Terminator inside EGAT Sub
Estimate Cut Length XLPE 1Cx800sq.mm.
Tensile Cable Calculation XLPE 1Cx800sq.mm. before pulling cable
Owner Approve Tensile Cable Calculation XLPE 1Cx800sq.mm. before pulling cable
Estimate Cut Length AAC 1Cx400sq.mm.
3)PROCUREMENT AND ON SITE
Transmission Line
Foundation Concete Pole
Concete pole 22m
Hardware & Accessories
Suspension Insulators &Line post Insulators
Riser pole & Metering Equipment
Steel Support
Surge Arrester
Terminator Kit 115kV
Straight Through joint splicing 115kV
Cross Bound, Link Box 115kV and Accessories
Miscl. Items inside EGAT Area
Steel Support for Terminator inside EGAT Sub
Grounding
Fiber Obtic Work
Fiber Obtic 24 Core Single Mode
SC Simplex Connector
HDPE Conduit
5)Installation Work
115kV Transmission Line
Foundation Concete Pole
Concete pole 22m
Pole Top Hardware & Accessories
Suspension Insulators &Line post Insulators
Stringing Cable AAC 1Cx400sq.mm.
Stringing OHGW
Pulling Underground Cable
Dummy Checking
Cable Megger Test Before Pulling Cable
Pulling Cable 3x800 Sq.mm.
Riser pole & Metering Equipment
Steel Support
Surge Arrester
Terminator Kit 115kV
Straight Through joint splicing 115kV
Cross Bound, Link Box 115kV and Accessories
Miscl. Items inside EGAT Area
Steel Support
Accessorries
Fiber Obtic Work
1x1 HDPE 160mm. Install on existing trench (at inside EGAT)
Fiber Obtic 24 Core Single Mode
SC Simplex Connector
OTDR Test with Reports
6)Commissioning, Testing and Start-Up
DC HV.Test for 115kV XLPE Cable
Insulation Resistance Test for 115kV Line
Ground Test for 115kV Pole
Testing for 115kV LA
Testing for 115kV Air Break Switch
Contact Resistance Test for 115kV DS
Contact Resistance Test at 115kV Terminator
Contact Resistance for 115kV Jumper Loop at Substation Takeoff
7)Training
Training Terminator Kit 115kV(By ABB)
Cross Bound, Link Box 115kV and Accessories (By Tyco)
8)AC.Withstand Volatage Test for Transmission Line and Underground cable
9)ENERGIZER

168 days
1 day
10 days
5 days
5 days
77 days
35 days
35 days
35 days
3 days
5 days
7 days
3 days
90 days
34 days
34 days
34 days
34 days
34 days
90 days
89 days
89 days
89 days
89 days
89 days
78 days
78 days
78 days
89 days
89 days
89 days
89 days
116 days
103 days
44 days
33 days
35 days
35 days
36 days
36 days
88 days
21 days
5 days
57 days
32 days
15 days
14 days
25 days
30 days
30 days
30 days
30 days
30 days
68 days
15 days
30 days
10 days
5 days
12 days
3 days
5 days
5 days
7 days
7 days
7 days
7 days
7 days
2 days
1 day
1 day
1 day
1 day

Project: 115 KV Transmission Lines fro


Date: 03-May-16

Start

Finish

27/4/59
27/4/59
13/6/59
13/6/59
18/6/59
2/5/59
2/5/59
2/5/59
2/5/59
9/5/59
1/8/59
8/8/59
9/5/59
2/5/59
16/5/59
16/5/59
16/5/59
16/5/59
16/5/59
2/5/59
2/5/59
3/5/59
3/5/59
3/5/59
3/5/59
18/5/59
18/5/59
18/5/59
3/5/59
3/5/59
3/5/59
3/5/59
1/7/59
5/7/59
5/7/59
17/8/59
13/9/59
13/9/59
4/10/59
4/10/59
1/7/59
1/7/59
8/8/59
13/8/59
3/10/59
3/10/59
5/10/59
5/10/59
5/10/59
5/10/59
5/9/59
5/9/59
5/9/59
5/9/59
5/9/59
6/10/59
16/11/59
30/11/59
15/11/59
15/11/59
22/11/59
22/11/59
22/11/59
22/11/59
22/11/59
22/11/59
22/11/59
6/12/59
6/12/59
7/12/59
12/12/59
13/12/59

..

..

2559

..

..

..

..

..

13/12/59
27/4/59
24/6/59
17/6/59
24/6/59
15/8/59
17/6/59
17/6/59
17/6/59
11/5/59
5/8/59
15/8/59
11/5/59
31/8/59
30/6/59
30/6/59
30/6/59
30/6/59
30/6/59
31/8/59
30/8/59
31/8/59
31/8/59
31/8/59
31/8/59
31/8/59
31/8/59
31/8/59
31/8/59
31/8/59
31/8/59
31/8/59
6/12/59
21/11/59
31/8/59
29/9/59
28/10/59
28/10/59
21/11/59
21/11/59
27/10/59
29/7/59
12/8/59
27/10/59
14/11/59
21/10/59
23/10/59
7/11/59
14/11/59
14/11/59
14/10/59
14/10/59
14/10/59
6/12/59
23/9/59
15/11/59
29/11/59
6/12/59
30/11/59
17/11/59
28/11/59
28/11/59
30/11/59
30/11/59
30/11/59
30/11/59
30/11/59
7/12/59
6/12/59
7/12/59
12/12/59
13/12/59

Task

Summary

External MileTask

Manual Task

Manual Summary

External Tasks

Split

Project Summary

Inactive Milestone

Duration-only

Start-only

External Milestone

Milestone

External Tasks

Inactive Summary

Manual Summary Rollup

Finish-only

Progress

Page 1

Split

..

..

Vous aimerez peut-être aussi