Vous êtes sur la page 1sur 56

INGENIERIA DE CIMENTACIONES

DIMENSIONAMIENTO DE COLUMNA

ANALISIS POR M2 DE MURO (aparejo soja)


Volumen de muro: 0.125
Volumen de ladrillo: 39 x 0.09 x 0.125 x 0.232 =
0.102m3/m2
Volumen de mortero: 0.125-0.102 = 0.023 m 3/m2
Peso de ladrillo: 39 x2.9 = 113.1 kg/m 2
Peso de mortero: 1400 x 0.023 = 33 kg/m2
Tarrajeo: 0.015x1400x2=42kg/m2
Peso de tabique: 188.1 kg/m2

NIVEL

AREA

LOSA

VP

VS

COLUMN
A

MURO

CM

CM
ACUMULADA

CV

CV
ACUMULADA

TOTAL

INGENIERIA DE CIMENTACIONES

20

8.47

20

10.47

20

10.47

20

10.47

20

10.47

20

10.47

2.1
6
2.1
6
2.1
6
2.1
6
2.1
6
2.1
6

0.96

0.96

0.648

5.08

0.96

0.648

5.08

0.96

0.648

5.08

0.96

0.648

5.08

0.96

0.648

5.08

11.59
19.1
3
19.1
3
19.1
3
19.1
3
19.1
3

11.59

14.59

30.72

38.72

49.85

13

62.85

68.98

18

86.98

88.11

23

111.11

107.24

28

135.24

T=0.50 m

Dnde:
C=1.25
M=0.3
Fc=2100 Tn/m2
P=135.24 Tn

.5 .5

3.0

Se utilizaran
columnas de 0.50
x 0.50

Se utilizara columnas de
0.55mx0.55m

INGENIERIA DE CIMENTACIONES

METRADO DE CARGAS

Eje 4A
Nivel
6
5
4
3
2
1

Are
a
4.5
4.5
4.5
4.5
4.5
4.5

Colum
na

losa
1.903
5
2.353
5
2.353
5
2.353
5
2.353
5
2.353
5

vp
1.29
6
1.29
6
1.29
6
1.29
6
1.29
6
1.29
6

vs
0.3
6
0.3
6
0.3
6
0.3
6
0.3
6
0.3
6

losa
5.07
6
6.27
6
6.27
6
6.27
6
6.27
6
6.27
6

vp
1.29
6
1.29
6
1.29
6
1.29
6
1.29
6
1.29
6

vs
0.9
6
0.9
6
0.9
6
0.9
6
0.9
6
0.9
6

1.8
1.8
1.8
1.8
1.8

Mur
o

CM
3.559
5
8.347
5
8.347
5
8.347
5
8.347
5
8.347
5

2.53
8
2.53
8
2.53
8
2.53
8
2.53
8

CM
acumulada
3.5595
11.907
20.2545
28.602
36.9495
45.297

CV
0.67
5
1.12
5
1.12
5
1.12
5
1.12
5
1.12
5

CV
acumulada

Total

0.675

4.2345

1.8

13.707
23.179
5

2.925
4.05
5.175

32.652
42.124
5

6.3

51.597

CV
acumulada

Total

Eje 4B
Nivel
6
5
4
3
2
1

Are
a
12
12
12
12
12
12

Column
a
Muro

1.8
1.8
1.8
1.8
1.8

3.94
8
3.94
8
3.94
8
3.94
8
3.94
8

CM
7.33
2
14.2
8
14.2
8
14.2
8
14.2
8
14.2
8

CM
acumulada
7.332

CV
1.
8

21.612

4.8

35.892

7.8

50.172

10.8

64.452

13.8

78.732

16.8

9.132
26.41
2
43.69
2
60.97
2
78.25
2
95.53
2

CV
acumulada

Total

1.125

6.1935

3
4.875

18.789
31.384

1.8

Eje 4C
Nivel
6
5
4

Are
a

losa
vp vs
3.172 1.29 0.
7.5
5
6
6
3.922 1.29 0.
7.5
5
6
6
7.5 3.922 1.29 0.

Column Mur
a
o

1.8
1.8

3.10
2
3.10

CM
5.068
5
10.72
05
10.72

CM
acumulada
5.0685
15.789
26.5095

CV
1.12
5
1.87
5
1.87

INGENIERIA DE CIMENTACIONES

3
2
1

5
6
6
3.922 1.29 0.
7.5
5
6
6
3.922 1.29 0.
7.5
5
6
6
3.922 1.29 0.
7.5
5
6
6

1.8
1.8
1.8

2
3.10
2
3.10
2
3.10
2

05
10.72
05
10.72
05
10.72
05

37.23
47.9505
58.671

5
1.87
5
1.87
5
1.87
5

5
6.75
8.625

43.98
56.575
5

10.5

69.171

Eje 3A
Nivel
6
5
4
3
2
1

Are
a

7.5

losa
3.172
5
3.922
5
3.922
5
3.922
5
3.922
5
3.922
5

vp
2.1
6
2.1
6
2.1
6
2.1
6
2.1
6
2.1
6

vs
0.3
6
0.3
6
0.3
6
0.3
6
0.3
6
0.3
6

Are
a

losa

vp
2.1
6
2.1
6
2.1
6
2.1
6
2.1
6
2.1
6

vs
0.9
6
0.9
6
0.9
6
0.9
6
0.9
6
0.9
6

7.5
7.5
7.5
7.5
7.5

Column Mur
a
o

1.8
1.8
1.8
1.8
1.8

3.66
6
3.66
6
3.66
6
3.66
6
3.66
6

CM
5.6925
11.908
5
11.908
5
11.908
5
11.908
5
11.908
5

CM
acumulada
5.6925
17.601
29.5095
41.418
53.3265
65.235

CV
1.12
5
1.87
5
1.87
5
1.87
5
1.87
5
1.87
5

CV
acumulada

Total

1.125

6.8175

20.601
34.384
5

4.875
6.75
8.625

48.168
61.951
5

10.5

75.735

Eje 3B
Nivel
6
5
4
3
2
1

20
20
20
20
20
20

8.46
10.4
6
10.4
6
10.4
6
10.4
6
10.4
6

Column
a
Muro

1.8
1.8
1.8
1.8
1.8

5.07
6
5.07
6
5.07
6
5.07
6
5.07
6

CM
11.58
20.45
6
20.45
6
20.45
6
20.45
6
20.45
6

CM
acumulada

C
V

CV
acumulada

Total

11.58

14.58

32.036

40.036

52.492

13

65.492

72.948

18

93.404

23

90.948
116.40
4

113.86

28

141.86

INGENIERIA DE CIMENTACIONES
Eje 3C
Nivel
6
5
4
3
2
1

Are
a
12.
5
12.
5
12.
5
12.
5
12.
5
12.
5

losa
5.287
5
6.537
5
6.537
5
6.537
5
6.537
5
6.537
5

vp vs
2.1 0.
6
6
2.1 0.
6
6
2.1 0.
6
6
2.1 0.
6
6
2.1 0.
6
6
2.1 0.
6
6

Column Mur
a
o

1.8

4.23

1.8

4.23

1.8

4.23

1.8

4.23

1.8

4.23

CM
8.0475
15.327
5
15.327
5
15.327
5
15.327
5
15.327
5

CM
acumulada
8.0475
23.375
38.7025
54.03
69.3575
84.685

CV
1.87
5
3.12
5
3.12
5
3.12
5
3.12
5
3.12
5

CV
acumulada

Total

1.875

9.9225

28.375
46.827
5

8.125
11.25

17.5

65.28
83.732
5
102.18
5

CV
acumulada

Total

14.375

Eje 2A
Nivel
6
5
4
3
2
1

Are
a
6
6
6
6
6
6

losa
2.53
8
3.13
8
3.13
8
3.13
8
3.13
8
3.13
8

vp
1.72
8
1.72
8
1.72
8
1.72
8
1.72
8
1.72
8

vs
0.3
6
0.3
6
0.3
6
0.3
6
0.3
6
0.3
6

losa
6.76
8
8.36
8
8.36
8
8.36
8
8.36

vp
1.72
8
1.72
8
1.72
8
1.72
8
1.72

vs
0.9
6
0.9
6
0.9
6
0.9
6
0.9

Column
a
Muro

1.8
1.8
1.8
1.8
1.8

3.10
2
3.10
2
3.10
2
3.10
2
3.10
2

CM
4.626
10.12
8
10.12
8
10.12
8
10.12
8
10.12
8

CM
acumulada
4.626
14.754
24.882
35.01
45.138
55.266

CV
0.
9
1.
5
1.
5
1.
5
1.
5
1.
5

0.9
2.4
3.9
5.4
6.9
8.4

5.526
17.15
4
28.78
2
40.41
52.03
8
63.66
6

Eje 2B
Nivel
6
5
4
3
2

Are
a
16
16
16
16
16

Column Mur
a
o

1.8
1.8
1.8
1.8

4.51
2
4.51
2
4.51
2
4.51

CM
9.456
17.36
8
17.36
8
17.36
8
17.36

CM
acumulada
9.456

CV
CV acumulada
2.
4
2.4

Total
11.856

26.824

6.4

33.224

44.192

10.4

54.592

61.56
78.928

4
4

14.4
18.4

75.96
97.328

INGENIERIA DE CIMENTACIONES

16

8
8
6
8.36 1.72 0.9
8
8
6

1.8

2
8
4.51 17.36
2
8

96.296

118.69
6

22.4

Eje 2C
Nivel
6
5
4
3
2
1

Are
a losa
4.2
10
3
5.2
10
3
5.2
10
3
5.2
10
3
5.2
10
3
5.2
10
3

vp
1.72
8
1.72
8
1.72
8
1.72
8
1.72
8
1.72
8

Column
a
Muro

vs
0.
6
0.
6
0.
6
0.
6
0.
6
0.
6

1.8
1.8
1.8
1.8
1.8

3.66
6
3.66
6
3.66
6
3.66
6
3.66
6

CM
6.558
13.02
4
13.02
4
13.02
4
13.02
4
13.02
4

CM
acumulada
6.558
19.582
32.606
45.63
58.654
71.678

CV
1.
5
2.
5
2.
5
2.
5
2.
5
2.
5

CV
acumulada
1.5
4
6.5
9
11.5
14

Total
8.058
23.58
2
39.10
6
54.63
70.15
4
85.67
8

Eje
1-A
Nive Ar
l
ea
5.2
6
5
5.2
5
5
5.2
4
5
5.2
3
5
5.2
2
5
5.2
1
5
Eje 1B
Nivel Are

losa
2.220
75
2.745
75
2.745
75
2.745
75
2.745
75
2.745
75

losa

vp

vp
1.5
12
1.5
12
1.5
12
1.5
12
1.5
12
1.5
12

Colum Mur
vs
na
o
0.
36
0.
2.8
36
1.8
2
0.
2.8
36
1.8
2
0.
2.8
36
1.8
2
0.
2.8
36
1.8
2
0.
2.8
36
1.8
2

vs

Column Muro

CM
acumulad
a

CM
4.092
75
4.09275
9.237
75
13.3305
9.237
75
22.56825
9.237
75
31.806
9.237
75
41.04375
9.237
75
50.2815

CM

CM

CV
0.78
75
1.31
25
1.31
25
1.31
25
1.31
25
1.31
25

CV
acumulad
a

CV

0.7875
2.1
3.4125
4.725
6.0375
7.35

CV

Total
4.880
25
15.43
05
25.98
075
36.53
1
47.08
125
57.63
15

Total

INGENIERIA DE CIMENTACIONES
a
6
5
4
3
2
1

14
14
14
14
14
14

EJES

a
5.92
2
7.32
2
7.32
2
7.32
2
7.32
2
7.32
2

1.51
2
1.51
2
1.51
2
1.51
2
1.51
2
1.51
2

0.9
6
0.9
6
0.9
6
0.9
6
0.9
6
0.9
6

4
1.8

4.23

1.83

4.23

1.8

4.23

2
1.8

4.23

1.8
1

4.23

A
B8.394
C15.82
A 4
B15.82
C 4
A15.82
4
B
15.82
C 4
A15.82
B 4
C

P
acumulada
51.597
8.394
95.532
69.171
24.218
75.735
141.86
40.042
102.185
55.866
63.666
118.696
71.69
85.678
57.6315
87.514
107.114
77.4245

acumulada
2.
1
3.
5
3.
5
3.
5
3.
5
3.
5

2.1

10.494

5.6

29.818

9.1

49.142

12.6

68.466

16.1

87.79
107.11
4

19.6

Eje
1-C
Are
Nivel a
8.7
6
5
8.7
5
5
8.7
4
5
8.7
3
5
8.7
2
5
8.7
1
5

losa
3.701
25
4.576
25
4.576
25
4.576
25
4.576
25
4.576
25

vp
1.51
2
1.51
2
1.51
2
1.51
2
1.51
2
1.51
2

Colum
vs
na
0.
6
0.
6
1.8
0.
6
1.8
0.
6
1.8
0.
6
1.8
0.
6
1.8

Mur
o
3.38
4
3.38
4
3.38
4
3.38
4
3.38
4

CM
5.8132
5
11.872
25
11.872
25
11.872
25
11.872
25
11.872
25

CM
acumulada
5.81325
17.6855
29.55775
41.43
53.30225
65.1745

CV
1.31
25
2.18
75
2.18
75
2.18
75
2.18
75
2.18
75

CV
acumulada
1.3125
3.5
5.6875
7.875
10.0625
12.25

Total
7.1257
5
21.185
5
35.245
25
49.305
63.364
75
77.424
5

INGENIERIA DE CIMENTACIONES

DETERMINACIN DE CAPACIDAD RESISTENTE DEL SUELO

Datos
=32
Df =2 m
=1.8 Tn/m3

MTODO DE TERZAGHI:
qu =C N c + D f N q +0.4 B N
Donde:
qu =Resistencia ultima del suelo
C= Cohesin del suelo

= Peso especifico del suelo

Df = Profundidad de cimentacin
Nq , Nc

N = Factores de capacidad resistente (dependen de ngulo de

friccin del suelo)

INGENIERIA DE CIMENTACIONES

Utilizando las formulas antes mencionadas obtenemos los valores de los


factores de capacidad resistente
Nq= 28.52
Nc=44.04

N =27.90
Resistencia ultima del suelo

qu =C N c + D f N q +0.4 B N = 122.75
Capacidad resistente admisible:
qa =

qu
3

122.75
3

40.92

INGENIERIA DE CIMENTACIONES
SECCIN DE ZAPATA CUADRADA

EJES
4

A
B
C
A
B
C
A

B
C
A

B
C

P
51.597
95.532
69.171
75.735
141.86
102.18
5
63.666
118.69
6
85.678
57.631
5
107.11
4
77.424
5

1.1 (P)
56.7567
105.0852
76.0881
83.3085
156.046

qa
40.92
40.92
40.92
40.92
40.92

AREA
1.39
2.57
1.86
2.04
3.81

LADO
1.18
1.60
1.36
1.43
1.95

112.4035
70.0326

40.92
40.92

2.75
1.71

1.66
1.31

130.5656
94.2458

40.92
40.92

3.19
2.30

1.79
1.52

63.39465

40.92

1.55

1.24

117.8254

40.92

2.88

1.70

85.16695

40.92

2.08

1.44

ASENTAMIENTO INSTANTNEO

W 1 u2

Iw
B E S

W=156.046
B=1.95
U2 = (0.3)2=0.09
E= 210
Jw=0.82

INGENIERIA DE CIMENTACIONES

W 1 u2
156.05 1 0.32

I w

0.82 0.28393
B ES
1.95 210

ASENTAMIENTO DIFERIDO

W=156.046
Limite liquido
Contenido de humedad
Modulo de vaco
Compresibil
Co=0.009(LL10)

LL=
w=
e=w.Ys/Yw
0.144

26
26
0.47

1.9
Pt

SM

=1.8
C=0
=32

COTAS
5.9

CL-ML

=1.6
C=4
=18

LL=26
w=26

1.6
4.8

1.6
1.6

7.5
9.1
10.7

INGENIERIA DE CIMENTACIONES

qo=Y1*h1+Y2*h2+Y3
*h3/2

1.6
1.8

h
2
4

1.6

4.8

h
3.2
7.2
7.68
q =18.08

q=prom(W/(B+N)^2)=(2q1+42+33)/9
W=156.046
B =1.95
D
D/B
q/qo
q'o
q
=W/B^2
5.90
3.02114571
0.07
40.91588 0.001710
62
827
7.50
3.84043947
0.05
40.91588 0.001222
62
019
9.10
4.65973322
0.03
40.91588 0.000733
62
212
10.70
5.47902697
0.01
40.91588 0.000244
62
404
q
0.0090
promq=
0.0010
q/9
(qo+q)/qo
1.0001
log(qo+q)
0.0000
qo
(diferido)=
0.0000
instantane
0.16493
o
total
0.16496

n=
2

0.0034

0.0049

0.0000

0.0007

INGENIERIA DE CIMENTACIONES
0.16496<2.
5

CUMPLE

DISEO DE ZAPATA AISLADA CON SECCIN CUADRADA

Carga sobre zapata


Cap. Resist. De suelo
Concreto
Fierro
Esfuerzo perm. Por corte

DATOS
W (Tn) =
s (Tn/m2)
F'c (Tn/m2)
Fy (Tn/m2)
vp (Tn/m2)=0.53

F ' c
Recubrimiento
Diemensiones de la columna

141.86
40.92
2100
42000
76.80

x10

e (m)
C1 (m)
C2(m)

0.1
0.50
0.50

Calculo del rea de contacto

Se calcula con carga de servicio

A = 1.1xW/
Zapata cuadrada de :

A=
1.1(141.86)
40.92 3.813440

86

BxB (m)=

1.95

INGENIERIA DE CIMENTACIONES
Calculo de peralte
CARGA MAYORADA
CM=
113.86
WU =1.4CM +1.8CV o
WU=1.6(CM +CV)
Wu =
q=Wu/A
q=

CV=28
226.976
59.52

Por punzonamiento
q+4Vp
C1+C2
q+2Vp
q(B2+C1C2)
(q + 4Vp)d2+(C1+C2)(q+2Vp)d=q(B2+C1C2)
Altura de zapata h= d + e

366.74
1
213.13
241.20
0.60
0.70

Verifica por efecto de viga

d
d
C2
C1
B

V
x

V =qL=

q=

W
BL

qL
( BC2 d ) 0.53 F ' c dL
2

226.976
1.952 =59.52

INGENIERIA DE CIMENTACIONES

V =qL=

59.52 x 1.95 ( 1.950.52 x 0.60 )


qL
( BC2 d )=
=14.51
2
2

0.53 F ' c dL =89.86


14.51<89.86.cumple

Verificacin por Dowel

l=

0.12 W

[ ( ) ]
Ag
1
As

up 1.12

0.12W
Ag = C1C2
As =nAsu

0.12(226.98)
Ag=0.50x0.50
10 3/4

u=1.72 F ' c x 10

u=1.72 210 x 10
( 1.91 )
100

p=
l=

27.24
0.25
0.00285023
249.25168
0.059974
0.018738093
0.018738093
<0.6

CUMPLE

Verificacin por aplastamiento


En la Columna
Pn = Pu /0.70
Pa =0.85F'cC1C2

226.98
0.70
2

0.85(2100)(0.5 )
324.25<446.25

324.25
446.25
CUMPLE

En la zapata

A 1=C 1 C 2

(0.5)(0.5)

0.25

INGENIERIA DE CIMENTACIONES

A 2=B2

C2
C1

1.952

0.5
0.5

A2 =

3.8025

c 2 /c1

Pa=0.85 F ' c

446.25

324.25<446.25

CUMPLE

C2
0.5
C C P =0.85 x 2100
0.5 x 0.5
C1 2 1 a
0.5

Diseo por flexin

d
W=ql
L
B
L=
w=
M=

d=
R' =

M
0.9 xBxd
p=

(B-C1)/2
ql
wl^2/2
R=

M
BR

d=
R' =

L=
w=
M=

11.341
1.95 x 668.7

11.341
0.9 x 1,95 x 0.6

0.85 F ' c
2 R'
1 1
Fy
0.85 F '

0.725
43.152
11.341
668.7

0.093

0.60

10.755
0.00026

0.002

INGENIERIA DE CIMENTACIONES
As= pBd

As=0.002(60x195)

Numero de varillas 1/2


n=

23.4
=18 varillas
1.27

Separacin entre varillas


S=

B nr 1951.27(18)20
=
=9 cm
n1
17

N.F.P. (INDICADO)

0.30

0.30

0,7

N.F.C -2.00
SOLADO E=4"

1,95

ELEVACION ES 1/20

1/2 " @ 0.09 m

23.400

cm2

INGENIERIA DE CIMENTACIONES

1/2" @ 0.09 m

10 VARILLAS DE 3/4
3/8 @ 0.10 m

1,95
1/2" @ 0.09 m

1,95
PLANTA ES 1/20

ZAPATA AISLADA CON SECCIN RECTANGULAR

Carga sobre zapata


Cap. Resist. De suelo
Concreto
Fierro
Esfuerzo perm. Por corte

DATOS
W (Tn) =
s (Tn/m2)
F'c (Tn/m2)
Fy (Tn/m2)
vp (Tn/m2)=0.53

F ' c
Recubrimiento
Diemensiones de la columna

141.86
40.92
2100
42000
76.80

x10

e (m)
C1 (m)
C2(m)

0.1
0.5
0.5

Calculo del rea de contacto

Se calcula con carga de servicio


A = 1.1xW/
A=

3.813440

INGENIERIA DE CIMENTACIONES
1.1(141.86)
40.92
Zapata rectangular de :

86

B= 1.8

L= 2.3

Calculo de peralte
CARGA MAYORADA
CM=
113.86
WU =1.4CM +1.8CV o
WU=1.6(CM +CV)
Wu =
q=Wu/A
q=

CV=28
226.976
54.83

Por punzonamiento
q+4Vp
C1+C2
q+2Vp
q(BL+C1C2)
(q + 4Vp)d2+(C1+C2)(q+2Vp)d=q(BL+C1C2)
Altura de zapata h= d + e

362.05
1
208.44
240.7
0.60
0.70

Verifica por efecto de viga

d
d
C2
C1
B

V
x

V =qL=

qL
( BC2 d ) 0.53 F ' c dL
2

INGENIERIA DE CIMENTACIONES

q=

W
BL

226.976
= 1.8 x 2.3 =54.83

V =qL=

54.83 x 1.8 ( 2.30.52 x 0.60 )


qL
( BC2 d )=
=29.61
2
2

0.53 F ' c dL =0.53

210 x 10 x 0.6 x 1.8 =82.95


29.61<82.95.cumple

Verificacin por Dowel

l=

0.12 W

[ ( ) ]

up 1.12

Ag
1
As

0.12W
Ag = C1C2
As =nAsu

0.12(226.98)
Ag=0.5x0.5
10 3/4

u=1.72 F ' c x 10

u=1.72 210 x 10
( 1.91 )
100

p=
l=

27.24
0.25
0.00285023
249.25168

0.059974
0.018738093
0.018738093
<0.6

CUMPLE

Verificacin por aplastamiento

En la Columna
Pn = Pu /0.70
Pa =0.85F'cC1C2

226.98
0.70
2

0.85(2100)(0.5 )
324.25<446.25

324.25
446.25
CUMPLE

INGENIERIA DE CIMENTACIONES
En la zapata

A 1=C 1 C 2

(0.5)(0.5)

0.25

C
A 2=B2 2
C1

A2 =

C2
C1

Pa=0.85 F ' c

3.24
1

446.25

324.25<446.25

CUMPLE

C2
0.5
C 2 C 1 Pa=0.85 x 2100
0.5 x 0.5
C1
0.5

Diseo por flexin

d=0.6
W=ql
L
2.3

L=
w=

M=

(B-C1)/2
ql

wl^2/2
R=

( 2.30.5 )
2

0.90

54.83(0.87
5)

49.343 x 0.90
2

49.343
2

19.984
668.7

INGENIERIA DE CIMENTACIONES

d=
R' =

M
BR

d=

M
0.9 xBxd
p=

R' =

19.984
0.9 x 1.8 x 0.6

0.85 F ' c
2R'
1 1
Fy
0.85 F ' c

As= pBd

19.984
1.8 x 668.7

0.129

0.60

20.559

As=0.002(180X60)

0.00049

0.002

21.600

cm2

Numero de varillas 1/2


n=

21.60
=17 varillas
1.27

Separacin entre varillas


S=

B n2 r 1801.27 (17)20
=
=9 cm
n1
16

rea de acero transversal


As1

0.10

L-B/2

As3

As1=21.600

As2
L

L-B/2

As3

0.10

INGENIERIA DE CIMENTACIONES

A s 2=
-

n=

( BL +1)

2
x 21.6
2.3
=18.97
+1
1.8

18.97
=15
1.27

S=

As1

B n 1801.27( 15)
=
=11 cm
n1
14

As3 = As1 As2=21.600-18.97=2.63

2.63
n= 1.27

=2

S=

( LB20)/2 n (23018020)/21.27 (2)


=
=14 cm
n1
1

INGENIERIA DE CIMENTACIONES

N.F.P. (INDICADO)

0.30

0.30

0,7

N.F.C -2.00

1.80

ELEVACION ES 1/20

SOLADO E=4"

1/2" @ 0.09 m

INGENIERIA DE CIMENTACIONES

1/2" @ 0.14 m

1/2" @ 0.14 m

1,80

0,25

0,25

10 VARILLAS DE 3/4
3/8 @ 0.10 m

1,80
1/2" @ 0.09 m

2,30
1/2" @ 0.11 m

PLANTA ES 1/20

DISESO DE ZAPATA COMBINADA

INGENIERIA DE CIMENTACIONES

L=2.75

P1

P2

Lz

R = P1 + P2 = 83.31+156.05=239.36
Tomando momentos con respecto a P1
P2L RX = 0

X=

P2 L
R

156.05( 2.75)
239.36

=1.79

LZ = 2X=2(1.79)=3.6

s =

B=

R
BLz

Despejando B

R
239.36
S L = 40.92(3.58) =1.7

Diseo por Punzonamiento

INGENIERIA DE CIMENTACIONES
El peralte se hallar por puzonamiento y con las carga de cada columna segn
se ve en la siguiente figura:

CC++D/2
d/2

C+d

d/2

En la

d/2

B
C+d

C+d

Lz
columna P1 el permetro de corte ser p = 2(C + d/2) + (C + d) = 3C +2d
El rea de corte ser

Ac = (3C+ 2d)d

El esfuerzo de corte aplicado es:

(3C+2d) d=

P1
v

2d2 + 3Cd -

P1
v

3 C + 9 C2 +
d 1=

P1

v=0.53 F ' C
q
AC

=0

8 P1
v

3(0.5)+ 9 x 0.52+
4

8(83.31)
76.8
= 0.45

En la columna P2 el permetro de corte es p = 4(C + d)


El rea de corte es

Ac = 4(C + d) d

El esfuerzo de corte aplicado es:

4(C + d) d=

4d2+4Cd-

P2
v

P2
v =0

Y nos da d2:

da:

P2

q A C v=0.53 F ' C

INGENIERIA DE CIMENTACIONES

d 2=0.5 C+0.5 C 2+

P
v

156.05

= 0.5(0.5)+ 0.5 0.5 + 76.8

= 0.5

El peralte de la zapata ser el mayor de los peraltes hallados y la altura h= d


+ 0.1

H=0.5+0.1=0.6

La presin de contacto es: q =

q=

R
LB =

R
LB

239.36
2
3.6 x 1.7 =39.11 Tn/m
39.11<40.92......CUMPLE

La carga repartida es:


w=qxB=39.11x1.70=66.49 Tn/m

Clculo de las Fuerzas Cortantes y Momento Flector:

X2

INGENIERIA DE CIMENTACIONES

X1

Para: 0

0.50

Ecuacin:
V = 66.49X -166.62X

V 0=0
V 0.50=

- 50.07
M = 33.25X2 - 83.31X2

M 0=0
M 0.50=

- 12.52 Tn.m

Para: 0.50

X2

2.75

Ecuacin:
V = 66.49X 83.31

V 0.50=

- 50.07

V 2.75=

99.54

Para momento mximo:


V = 66.49X 83.31=0
X=1.25
M = 33.25X2 - 83.31(X)

M 0.50=

-12.52 Tn.m

M 2.75=

22.35 Tn.m

INGENIERIA DE CIMENTACIONES
M 1.25=

-52.18 Tn.m

Para: 0.35

V = -66.49X

V 0.35=

- 23.28

V 0=

M = -33.25X2

M 0.35=
M 0=

X3

-4.07 Tn.m
0

DIAGRAMA DE CORTANTE

99.54
59.6
4

50.07

23.28

INGENIERIA DE CIMENTACIONES

DIAGRAMA DE MOMENTO FLECTOR

52.18

12.52

4.07

0
0

22.35

Verificacin por Efecto de Viga:


Cortante a la distancia d de la cara de apoyo 2
V=59.64
Corte permisible

V p = vBd = 0.53

V<

210

Vp

Verificacin por Dowel

l=

0.12 W

[ ( ) ]

up 1.12

Ag
1
As

(10) (1.7) (0.6) = 78.34

59.64 < 78.34

CUMPLE

INGENIERIA DE CIMENTACIONES
0.12W
Ag = C1C2
As =nAsu

0.12(239.36 )
Ag=0.5x0.5
10 3/4

u=1.72 F ' c x 10

27.24
0.25
0.00285023

u=1.72 210 x 10
( 1.91 )
100

p=
l=

249.25168
0.059974
0.018738093
0.018738093
<0.6

CUMPLE

Diseo por flexin


Mf =1.6*M=1.6 (52.18)=83.49 Tn.m
B = 1.70 m
R = 668.7 Tn/m2

pmin = 0.002
Verificacin de peralte por flexin

d=

R' =

p=

M
BR

M
0.9 xBxd

83.49
(1.7)(668.7)

= 0.27m0.27<0.60

83.49
0.9 x 1.70 x 0.60

0.85 F ' c
2R'
1 1
Fy
0.85 F ' c

= 90.95

Clculo del rea del Acero


As= pBd = (0.0022) (170) (60) = 22.68 cm2

Numero de varillas 1/2


n=

22.68
=18 varillas
1.27

0.85(210)
2(90.95)
1 1
4200
0.85(2100)

=0.0022

INGENIERIA DE CIMENTACIONES
Separacin entre varillas

S=

B n2 r 1701.27 (18)20
=
=8 cm
n1
17

ACERO TRANSVERSALES
Bajo la columna exterior
d
2

b1 = C +

BC
2

L=

=0.50+0.25 = 0.75 m

1.700.50
2

= 0.60 m

Carga
w = qxb1= 39.11 x 0.75 = 29.33 Tn/m
Momento:

WL
2

M=

R' =

p=

M
0.9 xbxd

31.29 (0.6)2
= 5.27 Tn.m
2

5.63
0.9 x 0.75 x 0.50

0.85 F ' c
2R'
1 1
Fy
0.85 F ' c

= 15.61

se disea con cuanta mnima 0.002


Clculo del rea del Acero
As= pBd = (0.002) (75) (50) = 7.5 cm2

Numero de varillas 1/2

0.85(210)
2(15.61)
1 1
4200
0.85(2100)

= 0.00037,

INGENIERIA DE CIMENTACIONES

n=

7.5
=6 varillas
1.27

Separacin entre varillas


B n 751.27( 6)
S=
=
=13 cm
n1
5

Bajo la columna interior


b2 = C + d = 0.50+0.50= 1.00 m

BC
2

L=

1.700.50
2

= 0.60 m

Carga
w = qxb2 = 39.11 x 1.00 = 39.11Tn/m
Momento:

W L2
=
2

M=

'

R=

p=

M
0.9 xbxd

39.11 (0.6)2
= 7.04 Tn.m
2

7.04
0.9 x 1 x 0.50

0.85 F ' c
2R'
1 1
Fy
0.85 F ' c

= 15.64

se disea con cuanta mnima 0.002


Clculo del rea del Acero
As= pBd = (0.002) (100) (50) = 10 cm2

Numero de varillas 1/2


n=

10
=8 varillas
1.27

0.85(210)
2( 15.64)
1 1
4200
0.85(2100)

= 0.00037,

INGENIERIA DE CIMENTACIONES
Separacin entre varillas
B n 1001.27(8)
S=
=
=12 cm
n1
7

N.F.P. (INDICADO)

0,30

0,30

0,6

N.F.C -2.00
SOLADO E=4"

3,60

ELEVACION ES 1/20

INGENIERIA DE CIMENTACIONES

3,60
0,75

1,00

1,7

1/2" @ 0.13 m

1/2" @ 0.08 m

1/2" @ 0.12 m

PLANTA ES 1/20

ZAPATA CONECTADA

P1 =83.31

P2=156.05
2.75

C1

1.45

C2
VIGA

e
R1

3.00

1.95

R2

INGENIERIA DE CIMENTACIONES

Hallando R1 y R2:
Az1 =2.04

m2

Az2 =3.81

Momento con respecto al eje de la zapata 2:


M = R1xL P1xL
R1x2.28 83.31x2.75
R1= 100.48
Sumatoria de Fuerzas en Y:
P1 + P2 R1 R2 = 0
83.31 + 156.05 100.48 R2=0
R2 = 138.88

Luego hallamos q1 y q2:

q 1=

R 1 100.48
=
=47.79 ton/m 2
Ag 1.452

q 2=

R 2 138.88
2
=
=36.52ton/m
Ag 1.952

Hallando W1 y W2:
W1 = 47.79 x 1.45 = 69.30 tn
W2 = 36.52x 1.95 = 71.22tn

Verificando rea de contacto de la Zapata 1:


A 1=

R1
>A1
s

INGENIERIA DE CIMENTACIONES

A 1=

100.48
>A1
40.92

A 1=2.46> 2.02 entonces se tomara el rea mayor es decir (A1 =


2.46)
ENTONCES la nueva dimensin de la zapata es L=1.57, aproximadamente 1.6 0

Verificando rea de contacto de la Zapata 2:


A 2=

R2
>A1
s

A 2=

138.88
>A2
40.92

A 2=3.39>3.81

83.33

entonces se tomara el rea 2

2.75

69.30

HALLANDO CORTANTES:
En Zapata 1:
V = P1 Wx
x= c

156.0

71.22

INGENIERIA DE CIMENTACIONES
V = 83.33 69.30 x 0.50
V = 48.68
x= b
V = 83.33 69.30 x 1.45
V = -17.16
x= L
V = 83.33 69.30 x 1.775
V = -39.68
Luego:
V1: P1 Wx
83.33 69.30(x) = 0
x = 1.2

En Zapata 2:
V = P2 Wx
x= c
V =156.05 71.22 x 0.50
V = 120.04
x= b
V = 156.05 71.22 x 1.95
V = 17.17

INGENIERIA DE CIMENTACIONES

-39.68

-17.16

-17.16

120.04
48.68
HALLANDO MOMENTOS:
WX
M =PX
2

x=c

M =83.33 x 0.5

69.30 x 0.52
2

M = 33.00

x=b

M =83.33 x 1.45

M = 47.98
Luego:

69.30 x 1.45 2
2

INGENIERIA DE CIMENTACIONES
2

M : PX

WX
=0
2

69.30 X 2
M :83.33 X
=0
2
x = 2.40
Entonces:
x = 1.2

Mmax :83.33(1.2)

69.30 x(1.2)2
=0
2

M mx. = 50.10

50.10

POR FLEXION
ACERO DE ZAPATAS AISLADAS:
ZAPATA1

INGENIERIA DE CIMENTACIONES

W = Bq = 1.60x69.30 = 76.30TN

M=

W L2
2

1.600.5
2

2
76.30
M =

M =11.54 Tn

d=

M
Rb

d=

11.54
( 478.32 ) 1.6

d=0.13 m

Tomamos el mayor, por lo tanto tenemos :

Luego:
R' =

M
59.67
=
=15.49
2
2
/m2
0.9 b . d 0.9 x 2.3 x 0.60

d=0.60 m

INGENIERIA DE CIMENTACIONES

=0.85

f'c
2 R'
1 1
Fy
0.85 xf ' c

=0.85

210
2 x 15.49
1 1
=3 x 104
4200
0.85 x 2100

Cuanta mnima en Cimientos 0.002

Con datos obtenidos calculamos Acero


As = .b.d
As = 0.002 x 1.60 x 0.60
2

As = 19.2 c m
en 1/2"

As = 1.29

Entonces:
N=

19.2
1.29

= 14.88

15 1/2"

Espaciamiento:
e = B / n 1 = 1.60 / 15 1
e = 11.4cm
Por lo tanto: 15 1/2" @ 11cm

=0.002

INGENIERIA DE CIMENTACIONES

ZAPATA 2:

W = Bq = 1.95x36.52
=71.21TN

W L2
M=
2

1.950.5
2

2
71.21
M =

M =18.71Tn

d=

M
Rb

d=

18.71
( 478.32 ) 1.95

d=0.14 m

Luego:

Tomamos el mayor, por lo tanto tenemos :

d=0.60 m

INGENIERIA DE CIMENTACIONES

R' =

M
18.71
=
=29.61
2
tn/m2
0.9 b . d 0.9 x 1.95 x 0.60 2

=0.85

f'c
2 R'
1 1
Fy
0.85 xf ' c

=0.85

210
2 x 29.61
1 1
=7 x 104
4200
0.85 x 2100

Cuanta mnima en Cimientos

0.002

Con datos obtenidos calculamos Acero


As = .b.d
As = 0.002 x 1.95 x 0.60
As = 23.40
en 1/2"

c m2
As = 1.29

Entonces:
N=

23.40
1.29

= 18.14

Espaciamiento:
e = B / n 1 = 195 / 18 1

18 1/2"

=0.002

INGENIERIA DE CIMENTACIONES
e = 11cm
Por lo tanto: 1 1/2" @ 11cm

HALLAMOS ACERO EN VIGA DE CONEXION


Mmax = 50.10
Seccion Viga: 40 x 60
Fc = 210
Fy = 4200kg/cm2

d=

M
Rb

d=

50.10
0.9 x ( 478.32 ) 0.40

d=0.54 m

Tomamos el mayor, por lo tanto tenemos:

Luego:

R' =

=0.85

M
50.10
=
=386.57
2
2
tn/m2
0.9 b . d 0.9 x 0.4 x 0.6

f'c
2 R'
1 1
Fy
0.85 xf ' c

d=0.60 m

INGENIERIA DE CIMENTACIONES

=0.85

210
2 x 386.57
1 1
=7.1 x 103
4200
0.85 x 2100

Cuanta a usar seria

0.007

Con datos obtenidos calculamos Acero


As = .b.d
As = 0.007 x 0.4 x 0.6
2
As = 16.8 c m
en 1"

As = 5.10

Entonces:
N=

24.5
5.10

= 3.30

Espaciamiento:
e = B / n 1 = 40 / 5 1
e = 10 cm
Por lo tanto: 1 1" @ 10cm

M = 18.71Tn
Seccion Viga: 40 x 60
Fc = 210
Fy = 4200kg/cm2

d=

M
Rb

d=

18.71
0.9 x ( 478.32 ) 0.40

4 1"

INGENIERIA DE CIMENTACIONES

d=0.32 m

Tomamos el mayor, por lo tanto tenemos :

Luego:
R' =

M
18.71
=
=144.37
2
0.9 b . d 0.9 x 0.4 x 0.602

=0.85

f'c
2 R'
1 1
Fy
0.85 xf ' c

=0.85

210
2 x 144.37
1 1
=3.5 x 103
4200
0.85 x 2100

Cuanta a usar seria 0.0035

Con datos obtenidos calculamos Acero


As = .b.d
As = 0.0035 x 0.40 x 0.60
2
As = 8.4 c m

en 5/8"

As = 2.00

Entonces:
N=

8.4
2.00

= 4.2

Espaciamiento:
e = B / n 1 = 60 / 5 1

5 5/8"

Tn/m2

d=0.60 m

INGENIERIA DE CIMENTACIONES
e = 12cm
Por lo tanto: 1 5/8" @ 12cm

2.75

P1
C1

1a 10cm

C2

VIGA
5/8a 12cm

1.6

1.95

EN ELEVACION
A

1/2a 11cm

1/2a 11cm
1.95

1.6

1/2a 11cm

2.75

EN PLANTA
0.60

5 1
2 1/2
9 5/8
0.40

SECCION A - A

ESPECIFICACIONES
CONCRETO
Fc = 210
Kg/cm2
FIERRO
Fy = 4200
Kg/cm2
RECUBRIMIENTO
e = 10cm

INGENIERIA DE CIMENTACIONES
ESTRIBAJE:

ZAPATA EN ESQUINA

P2=83.31
P3= 56.76

INGENIERIA DE CIMENTACIONES

L2=5.75
C2=5.28

B3

B2

Z3

Z2

B3

L1=2.75
C1=2.40

B2

P1=105.09
B1

C1=2.27

B1
Z1
C2=5.20
L2=5.75

=0

R1+R2+R3-P1-P2-P3= 0
R1+R2+R3= 105.09+83.31+56.76
R1+R2+R3= 245.16

M2

=0

5.2R1+5.28R3-56.76(5.75)-(105.09)(5.75)=0
5.2R1+5.28R3= 930.64

M1

L1=2.752.752.7

=0

2.4R3+2.7R2= 56.76(2.75)+(83.31)(2.75)

INGENIERIA DE CIMENTACIONES
2.4R3+2.7R2= 385.19
R1= 93.10
R2= 67.49
R3= 84.57

Calculo del peralte de la viga

Altura de V.
ancho de V

l=
h= l/7
d = h - 0.10
b =h/2

5.75
0.85
0.8
0.45

m
m
m
m

Peralte de las zapatas


Zapata 1
Se calcular por efecto de viga
Carga

Zapata 2

q1=
v=
B1 =
c1 =
d=
q2=

36.40
76.80
1.60
2.40
0.80
32.10

Tn/m2

Tn/m2

INGENIERIA DE CIMENTACIONES
v=
B2 =
c2 =
d=
q3=
v=
B3 =
a = B- b
d=
d=

Zapata 3

Se toma

76.80
1.45
5.28
0.80
58.73
76.80
1.20
1.15
0.07
0.55

Tn/m2

Con estos valores se grfica los diagramas de corte y momento:

Capacidad
resistente de S
Cargas

s
P1
P2
P3

Dimensin de
zapatas

Distancias
ZAPATAS 1 3

0
-0.1 0

40.92
105.09
83.31
56.76

B1
B2
B3
L1
L2
C1
C2
C'1
6
C2

1.6
1.45
1.2
2.75
5.75
2.40
5.28
2.27
7
5.20

R3=
R1=
R2=
P3

84.57
93.10
67.49
80

1.6
1.45
1.2

-0.2
-0.3
-0.4

Reacciones

-0.5
-0.6

Fx = P3 + R1
+ R2 R3 =
Verificando
Se toma
Zapatas 1 y 3
Carga repartida

0.00
R3/B3^
2
B3=

13.38 < 14
3.5 VERDADEO

R3/B3
R1/B1 =

46.81 Tn/m2
14.52 Tn/m2

INGENIERIA DE CIMENTACIONES
150
100
50
0
-50 0

10

-100

376.4

-150

120
100
80
60
40

557.9
5

20
0
0

ZAPATAS 2 3

150
100
50
0
-50 0
-100
-150

INGENIERIA DE CIMENTACIONES

120
100
80
60
40
20
0
0

Diseo por flexion


Zapata 3
Concreto
F'c =
Acero
Fy =
d (m)=
b (m)=
Sentido en

Se toma

R
d
d=
R' =

Tn/m2
2100
42000
0.55
3.5
M1(Tn.m) =
557.95
478.4
0.59239794
0.75
503.83

69
78

Est de 3/8''
espaciam

10

Kg/cm2
210
4200

M2(Tn.m) =
697
478.4
0.74
0.75
629.39

p=
As =

para

0.02
401.73
5
1.59
n=
31.46
0.375
=
r=
2( + r)
e = (B-n-2(+r))/(n-1)

5
a

0.02
539.88
12.77
42.28

12.77
31.00
0.9525
10
21.905
9.30
9
cm.

Conclusin: las zapatas tendrn una altura h = 75 + 10 = 85 cm

6.38
6
cm

INGENIERIA DE CIMENTACIONES

y se colocaran 5 (5/8'') a 6 cm en ambos sentidos

Vous aimerez peut-être aussi