Académique Documents
Professionnel Documents
Culture Documents
PROJECT DESIGNATION:
SITE INSPECTOR
DEPARTMENT:
GLOBE STRUCTURAL
PERIOD COVERED:
JANUARY 2016- JUNE 2016
Goal(s):
Inspect three(3) sites per day regardless of the type of structure being inspected with complete and
accurate datas.
To help not only in site inspection but also in cadworks and structural works.
Embrace full responsibility in the clarification and finalization of site drawings.
PERFORMANCE STANDARDS. This will be rated during the Review Meeting. Summary of actual accomplishments and
ratings will be reflected in the Performance Output Summary Sheet.
Rating
Exceptional (E; 5)
Exceeds Expectations (EE; 4)
Meets Expectations (ME; 3)
Key Result Area: CLIENT FOCUS
Rating
Meets Most Expectations (MS; 2)
Goal(s):
Dealing caretakers, guards and globe field officers with proper manner and respect.
Follow the rules and regulations implemented by the company.
Being polite with my superiors and colleagues.
1|Page
2.8
F-04-213-04 R1
PERFORMANCE STANDARDS. This will be rated during the Review Meeting. Summary of actual accomplishments and
ratings will be reflected in the Performance Output Summary Sheet.
Rating
Exceptional (E; 5)
Rating
Meets Most Expectations (MS; 2)
0.6
Factor Weight :
Goal(s):
Help the cad team in preparing, checking and editing of cad drawings for the final report.
Helps the structural team in preparation of the final reports to meet the deadline of our clients.
Being responsible in all works assigned to me.
PERFORMANCE STANDARDS. This will be rated during the Review Meeting. Summary of actual accomplishments and
ratings will be reflected in the Performance Output Summary Sheet.
Rating
Rating
Exceptional (E; 5)
We have discussed and mutually agreed to the above KRA(s) and S.M.A.R.T. Work Goals.
2|Page