DETAIL CONSTRUCTION OF
WORKS ITEMS
Assumption:
Description
This work have to include all excavation in the line, grade, slope and elevation shown on the Drawing,
boundary, removal, transportation, dumping and Spreading and grading in disposal area.
At construction process, if Any damage to existing structure or facilities that is caused by Contractors
operational, contractor will be repaired to the pre-project condition at the contractors expense
All Construction will be execute as according to determined Technical specification in tender document
Works Sequences :
2. Measurement
Before excavation started, must be done work of Measurement to know elevation and boundary plan
of excavation.
3. Excavation
Excavation must be done according to height line, grade, slope and elevation which is shown in
Drawing.
Equipments :
1. Excavator
2. Pontoon
3. Floating Barge
4. Dump truck
5. Tools
Mobilization of Equipments
& Personal
Ok
FINISH
FINISH
If determined
Spreading & Grading by Buldozer
No
Cek
Ok
FINISH
Work Direction
Construction;
- All Construction Will be constructed from Up Stream up to Down stream
- At first, Common excavation will construction
- Continue by Sheet Pile Construction
Dredging
Dredging
Work Direction
1. Temporary Disposal
Excavated Material
Traffic Handling to
disposal area
Handling Location
Temporary
Disposal
Excavated Material
Garbage
Separation Garbage
- Use separator /screen to separate large size solid waste
- Use Labor, floating pontoon ship and Tool or
- Use Labor and tools in temporary disposal. For some location, Work by Excavator Usually for this
method for floating Garbage
Access Road;
- Problem
1. Existing Access Road already Owner by Third party.
- Solution
1. Contractor will coordination to using that road from the owner.
2. Mediator by Project owner if needed
3. Any damage to existing structure & existing road or facilities that is caused by Contractors
operational, contractor will be repaired to the pre-project condition at the contractors expense
(even more better)
4. Handling and hauling of material excavated and garbage at mind night from 22.00 wib up to
05.00 wib
Traffic management with traffic lights that have been there (intersection lights) and will be assisted
with traffic management by contractor
Contractor will request and permissions using Ancols land to using access road for disposal of
excavated material determined to the tender document
For Garbage, Disposal as determined to the tender document or otherwise determined by Director
Bantar Gebang
Illustration
1.2 m
2.4 m
1.2 m
Handling
Existing Road
Owner by third
party
Design Container Unit that open in Side system based from Drag Line Method.
1) Labour
3) Production /
Foreman
Skill Labor
Labor
1
3
2) Material
-
Non
Schedule
Item no
hour /day 4)
m3
21.00
m3
/hour
Equipments
-
168
m3
/day
Pontoon
3 Unit
Floating Barge
10 Unit
Steel Container
50 Unit
Tug Boat
3 Unit
3 Unit
7 Unit
= As according to " Construction Schedule" that one of attacments in Tender Bid Document
301
3 Unit
Dredging, Sheet Pile & Capping Beam FOR GUNUNG SAHARI DRAIN
Dredging 5.100m
Construction Plan
Stage 1
- All construction will be start from Up stream (Hulu) up to down stream (Hilir)
- Construction for Dredging Will be constructed Form End Project (STA. 5+100)
- Construction for Sheet Pile Will be constructed Form Jl. Mangga Besar (STA. 2+450) up to STA.
0+000)
- Construction Will be Fontal (at same time)
EXISTING
WEST SIDE
EAST SIDE
Dredging
Type 1
1. Excavation & Hauling
- Work at 22 05.wib
- Movable Floating barges by winch
Separation Garbage
- Use separator /screen to separate large size solid waste
- Use Labor, floating pontoon ship and Tool or
- Use Labor and tools in temporary disposal. For some location, Work by Excavator Usually for
this method for floating Garbage
Type From Floating barge min 20 m directly into Dump Truck by Mobile Excavator
- Work can be happen, if Dredged material in temporary disposal has been finished loaded, and
Construction of Dredging still continue.
1. Excavation
Side of River
Excavation
Lumpur
Temporary Place
Loading
Dumping
Side View
Top View
Side View
Top View
Type 2
Loading to temporary placed
- Excavator on Pontoon for
excavation
- Excavated material
disposed on temporary
disposed on Temporary
Disposal by Floating
Barge (Oil drum and
Woo)
- Other Excavator loading
excavated material into
dump truck
- Dump truck delivery of
excavated material into
determined disposal area
1. Excavation
- 24 work Hour
- Movable Floating barges and Temporary Floating Barges from Oil Drum by winch
Separation Garbage
- Use separator /screen to separate large size of solid waste
- Use Labor, floating pontoon ship and Tool or
- Use Labor and tools in temporary disposal. For other location, Work by use Excavator Usually for
this method for floating Garbage
Temporary Floating Disposal by Oil Drum, Wood, Board wood and Plastic to cover of Wood
Movable Floating barges and Temporary Floating Disposal from Oil Drum by winch
1.5 m
Max 50 m
3m
1) Labour
3) Production /
Foreman
Skill Labor
Labor
1
3
2) Material
-
Non
Schedule
Item no
hour /day 4)
m3
29.00
m3
/hour
Equipments
-
Excavator, 0.8m3
232
m3
/day
Pontoon
2 Unit
Floating Barge
18 Unit
Excavator, 0.8m3
1 Unit
5 Unit
tools
1 Ls
= As according to " Construction Schedule" that one of attacments in Tender Bid Document
201
2 Unit
Down Stream
Up Stream
Work Direction
Water Injection
Mobilization of Equipments
& Personal
No
Cek
Ok
No
Cek
Ok
FINISH
FINISH
If determined
Spreading & Grading by Buldozer
No
Cek
Ok
FINISH
DREDGING ON
- Gresik Drain
- Cideng hulu drain
Assumption
- Construction by labor and Tools
- Temporary Disposal by Container
Equipment;
@ Location
- Container
=
- Dump Truck =
- Mobile Crane =
=
- Labor
Container
5
2
1
20
Unit
Unit for Cideng drain and 1
Unit
Person
1.2 m
2.4 m
1.2 m
Illustration
Dredged Material
-
Garbage separation will be executed on Temporary Disposal and put on temporary garbage box by Labor
and tools
On Location where Loading and estafet by wagon can be executed, Dredeg can be assiten by Temporary
floating (made by bambo and wood)
No
Temporary placed Ex. Material
kerukan di atas Bantara kali
Cek
Ok
Loading oleh Pekerja + alat bantu
ke gerobak (langsir) & Dari
gerobak ke dalam bak dump truck
Transportasi material ex. Kerukan ke
lok. pembuangan / disposal area
FINISH
No
Cek
Ok
FINISH
CONSTRUCTION PLAN FOR DAILY STORAGE OF SOLID WASTE (Bigger than 30 x 30 cm)
- Use separator /screen to separate large size solid waste
- Use Labor, floating pontoon ship and Tool or
- Use Labor and tools in temporary disposal. For other location, Work by Excavator Usually for this
method for floating Garbage
- Time for Construction are 2 kind of work
1. Construction that can be done for 24 hour
Waduk Melati
1.1. Using existing Drain for temporary disposal
2.4.
Directly from Pontoon Barge (assumption top of sediment that contain of garbage already
excavated on day time and separation on temporary disposal)
Hauling and dumping into Disposal
Access to the Site can generally be achieved by the network of public roads and streets in the vicinity
of Site.
The Contractor will use the existing road for the works.
Design Route for Hauling and Handling into CDF
Routes for Dredged Material ;
Jl. Kebon Kacang
Jl. MH. Thamrin
Jl. Merdeka Barat
Jl. Majapahit
Jl. Juanda
Jl. Ciliwung Gunung Sahari
The Contractor will be fully inform himself of the conditions of roads, traffic conditions and
traffic regulations with respect to gaining access to the Site for the purposes of performing the
Works and shall take all necessary actions to ensure availability of access to the Site as required.
The dredged materials shall be properly disposed in the designated Confined Disposal Facility (CDF) at
Ancol without retribution cost.
The garbage to Bantargebang, the bidder must include the retribution cost and follow the cost
regulation of Bantargebang. They can find out the cost per ton or per truck by themselves to
Bantargebang.
For Garbage, Disposal as determined to the tender document or otherwise determined by Director
Bantar Gebang
All truck / vehicles transporting the dredged material will be equipped with Global Positioning
System as instructed, for monitoring purpose. All Truck will be Recording.
Access to the Site can generally be achieved via the network of public roads and streets in the vicinity
of Site.
The Contractor will use the existing road for the works.
The Contractor shall fully inform himself of the conditions of roads, traffic conditions and traffic
regulations with respect to gaining access to the Site for the purposes of performing the Works and
shall take all necessary actions to ensure availability of access to the Site as required.
- Dredged Material will be transported into disposal, Spreader and grading. Handling Material, Trucks
Dump must be equipped by Water Seal during transportation process, so that no debris of Excavated
material on access road.
Traffic management with traffic lights that have been there (intersection lights) and will be assisted
with traffic management by contractor
Contractor will request and permissions using Ancols land to using access road for disposal of
excavated material determined to the tender document Confined Disposal Facility (CDF) at
Ancol Area
For Garbage, Disposal as determined to the tender document or otherwise determined by Director
Bantar Gebang
All truck / vehicles transporting the dredged material will be equipped with Global Positioning
System as instructed, for monitoring purpose. All Truck will be Recording.
Disposal
- The garbage to Bantargebang, the bidder must include the retribution cost and follow the cost
regulation of Bantargebang. They can find out the cost per ton or per truck by themselves to
Bantargebang.
- Garbage Material will be transported into disposal (bantargebang). Handling Material, Trucks Dump
must be equipped by Water Seal during transportation process, so that no debris of Garbage on
access road.
On Gunung Sahari
@ 14 m
@ 15 m
Description;
- Structure Type W 450 B1000 (@ 15m and 14 m)
- Work of CCSP is conecction with Revetment work Finished of CCSP will continue with Revetment
Work
- Construction;
1. Location;
Construction on 2 Site , Waduk Melati and Gunung Sahari
Waduk melati
= @ 15 m
Gunung Sahari = @ 14 m
2. Other
Based of The drawing on Gunung Sahari Site, Work site divide to 2 side of River. West River
(left side) and East River (Right side).
Contractor will construction this work by some Group of Works
Frontal on Waduk Melati and Gunung Sahari
Temporary Stock
Pile
Based the Work Location, Stock Pile Possible Placed on Side of East of Waduk Melati
Start Point for Handling Material and Equipment From Upper location as describe at Image bellowed.
From Starting Point, The material will be to site by Pontoon and service Crane
Any damage to existing structure or facilities that is caused by Contractors operational, contractor will
be repaired to th pre-project contition at the contractors expense (even more better)
Handling the material at mind night from 22.00 wib up to 05.00 wib
Temporary Stock
Pile
2. Stage Construction
Pilling
LEAN CONCRETE
REINFORCING STEEL
Concreting
- Concreting by Ready mix
- Compaction
by
Concrete
Vibratory
- Concreting by Truck mixer on
Ponton
CONCRETING
Concreting of West
Side of
Waduk
melati
Directly from Truck
Mixer via Gutter
Concreting
Side of
melati
of East
Waduk
FINISH
Concreting as
according to the
drawing and
technical
specification
Finish
Made of guide beam on pilling position using steel material WF type with elevation distance from
sub grade 1 to 2 meter, before pilling is executed
Guide beam is made with strength enough that can supporting of moment when pilling is executed
and stabile
Piling founded by vertical and monitored with measuring instrument ( Theodolite) and yarn in 2
direction which each other vertical
Concrete Sheet pile is vibrated by Vibro hammer is and the Sheet pile will be pilled into ground
cause of gravitation moment and weight of Sheet pile it selfand also helped by Water Jet Pump
that spraying water, that mean this construction to easyly andalso helped byWaterJetPump
thatspraying waterwhichis intendedtosoften of soileasierPilling proccess
At pilling time, between one of Steel Sheet pile and each other of side (has been pilled) if there is
gap, can be near by trek beam.
Pilling is executed until a Sheet pile reach deepness elevation plan as according to the drawing.
Pengadaan dan
Transportasi Material
Sheet Pile
1) Labour
3) Production /
Foreman
Skill Labor
Labor
1
3
2) Material
-
hour /day 4)
Item no
7.00
/hour
Equipments
-
2 Unit
56
/day
Vibro Hammer
2 Unit
2 Unit
Pontoon
2 Unit
tools
1 Ls
Schedule
= As according to " Construction Schedule" that one of attacments in Tender Bid Document
342
START
No
Check
Yes
Delivery of Sheet Material on Trailer
Pilling Process
pemancangan
Pilling
No
Check
Yes
Finished Pillingi / Piled Sheet Pile
FINISH
Capping Beam
Construction Plan
Contruction Method for this Point will be used JACKING SLURRY (FULL JACK) method
TANPA SKALA
Adalah pekerjaan galian tempat untuk peralatan dan mesin jacking guna mendorong pipa secara
horizontal, konstruksi starting/driving pit berukuran;
Perkuatan dinding pit menggunakan Material sesuai dengan gambar diatas
Disamping itu di dalam driving pit juga dilengkapi dengan block beton untuk dead man, pondasi
mesin, lantai kerja.
2. Pekerjaan Boring & Jacking
Pekerjaan pengeboran tanah dapat dilakukan dengan mesin, akan tetapi memungkinkan juga
dilakukan secara manual apabila diameter pipa cukup besar untuk akses pekerja galian dan kondisi
tanah cukup stabil.
Struktu Perkuatan
Dinding Tanah
Deadman/
Concrete Trust Wall
Pondasi
ARRIVING PIT
STARTING PIT
RECEIVING
PIT
Pekerjaan
persiapan
ini antara lain adalah : pembuatan perkuatan dinding DRIVING
galian,PITpembuatan
deadman untuk menahan thrusting block, pembuatan lantai pondasi untuk guide-rail
7.00
Concrete Thrust
Wall
Pressure plate
Concrete Pipe
Main Jack
1.40
Cutter Edge
Dudukan/Pengarah
Jacking Pipe
2.40
Thrust Ring
6.00
Steel Sleeper
Arah Jacking
STARTING PIT
Hydraulic
Jack
Laser
Steel Thrust
Ring
Guide Rails
Steel Pressure
Plate
**) untuk ekskavasi tanah dengan cara manual biasanya mata bor diganti dengan
driving collar (steel collar yang didesain khusus untuk menembus tanah).
ARRIVING PIT
Pipa -1
ARRIVING PIT
STARTING PIT
ARRIVING PIT
STARTING PIT
Stage Construction
3
1