Vinaphone-Alcatel-Lucent 3G Project

WNMS, NPO, SAM and WCE Mgnt TSSR


Site Name :
Site Code :
Project :

Vinaphone Head Office


0
Vinaphone-Alcatel-Lucent 3G Project

VINAPHONE-ALCATEL-LUCENT
3G Project

Technical Site Survey Report RNC


SITE NAME:
RNC-------SITE CODE:
SITE ACTION: Core site

ZTE

Mobfione

Name

Name

Signature

Signature

Date

Date

Accept

Not Accept

Floor Layout

Clearance 800 mm

REAR

SUN RACK
1242

600 x 1200

FRONT

Clearance 800 mm

Rack Layout
Row / Pos
RU
46
45
44
43
42
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17

WCE OAM Server Package

16
15
14

NPO (HP DL380p G8)

13
12
11
10

Storage Tek (SUN LTO5)


SAM-5620 (SPARC T4-1)

9
8
7
6

Storage Tek (SUN LTO5)


WNMS-9359 (SPARC T4-1)

5
4
3
2
1
WNMS's RACK
19" Rack
WxDxH

600mm x 1200mm x 2060mm


= AC Equipment

WNMS - NPO and SAM Equipment Technical Details

Main Equipment

Rack Dimensions(WxDxH) mm

Clearance required
(Left/ Right/ Front/
Rear/ Top mm

Max Power
Consumption (W)

Typ. Power
Consumption (W)

Typical Heat
Dissipation
(BTU/h)

AC or DC

600 x 1200 x 2060

0 / 0 / 800 / 800 / 200

2570 W

1818 W

6203 W

AC 220-240V

Equipment

Rack Units (RU)

Max Power
Consumption (W)

Typ. Power
Consumption (W)

Typical Heat
Dissipation
(BTU/hr)

AC or DC

NA
2

NA
750

NA
750

NA
2559

NA
AC 230V

NA
NA

180
28

2
2
1
1

770
770
140
140

450
450
84
84

1535
1535
287
287

AC 230V
AC 230V
AC 230V
AC 230V

NA
NA
NA
NA

27
27
9
9

WNMS - NPO and SAM Rack

Rack Configuration

External Main Breaker


4 x 25A AC 3
or 2 x 25A AC 4

Internal Fuse / Breaker

SUN RACK 1242

Weight-kg
(max) - incl.
cabling
280 kg

Weight-kg
(max) - incl.
cabling
280

SUN Rack II 1242 with AC-PDU


NPO (HP DL380p G8)
SAM-5620 (SPARC T4-1)
WNMS-9359 (SPARC T4-1)
Sun StorageTek HP LTO5
Sun StorageTek HP LTO5
3) Using direct AC power connection (4 feeders)
4) Using 2 AC Main power feeders with Branch lines

SUN RACK Mechanical & Electrical Requirements


Requirements

WNMS-NPO-SAM

Mechanical:
Dimensions (WxDxH (mm))

600 x 1200 x 2060

Clearance required (Left/ Right/ Front/ Rear/ Top (mm))

0 / 0 / 800 / 800 / 200

Weight

280 kg

Heat Dissipation:

6203 BTU/h

Electrical:
DC Power:
Voltage
Fuse Rating

External Power Feeder

DC Power Consumption (maximum)


DC Power Consumption (typical)
AC Power:
Voltage

220V - 240V AC

Fuse Rating

Option 1: 4 x 25A AC 3
Option 2: 2 x 25A AC 4

External Power Feeder

Option 1: 4 x 3x4mm Cable


Option 2: 2 x 3x4mm Cable

AC Power Consumption (maximum)

2570 W

AC Power Consumption (typical)

1818 W

TOTAL
Total Weight:
Total Heat Dissipation:
Total AC Power (typical):
Total DC Power (typical):

280 kg
6203 BTU/h
1818 W
0W

General Data:
Operating Temperature: 5C to 45C
Operating Humidity: 5% to 85%
3) Using direct AC power connection (4 feeders)
4) Using 2 AC Main power feeders with Branch lines

3
4

Vinaphone-Alcatel-Lucent 3G Project
WNMS, NPO, SAM and WCE Mgnt TSSR
Site Name :
Site Code :
Project :

Vinaphone Hng Ph Office


0
Vinaphone-Alcatel-Lucent 3G Project

Site Survey Report

Site Type

Power/Routing Interf Necessary

Building and Necessary

ITEMS
1. Equipment Room
Geographical Location

One Floor Building

Longtitude :
Latitude :

Installation Floor

Floor Loading and


Condition (if applicale)
Room Size(m)
2. Air Conditioning System
Brand/Type :
Cooling Capacity :
No of Aircon:
Power Type
3. Grounding System
4.Distand from:
-Rectifier
-Router/SW
-Grounding
5.Cable tray (Runing way)
6.Power availability
Rectifier Breakers available
A source Yes
No
B source Yes
No

> Two Floor building

Length:

10

Specialty
KJ/H
2
DC
Joint-E

REMARKS

105.786121
10.018451

1st Floor
2nd Floor
3rd Floor
4th Floor
Raise Floor
Ceiling Cable Tray:
Others
1000
kg

Floor Type

Two Floor Building

RESULT

Width:

12

Height:

Window type

3
AC
Multi-Earthing

Rectifier:
Route/SW:
Grounding bar:
Accessible

Available space

Capacity

5th Floor
Other: __________

Standing type

12
4
11
Other

6
Others
Others

meters
meters
meters

Grounding available Other

Yes

No

Yes

No

Yes

No

Yes

No

Additional Information
Optical/ Ethernet cable running way available space

Yes

No

VNP Router / Switch Identified and reserved

Yes

No

Is ODF connection required?

Yes

No

ODF distand to RACK:

Note :

ODF connector type:


35

Vinaphone-Alcatel-Lucent 3G Project
WNMS, NPO, SAM and WCE Mgnt TSSR
Site Name :
Site Code :
Project :

Vinaphone Hng Phu Office


0
Vinaphone-Alcatel-Lucent 3G Project

1. WNMS, NPO, SAM & WCE's RACK Room Layout

2. Raise Floor/Ceiling Cable Running Way Layout

3 WNMS, NPO, SAM and WCE Mgnt Server Survey Picture


WNMS, NPO, SAM and WCE Mgnt Server location picture

Rectifier's Picute

4. Router, Switch & ODF picture Picture

5. Rectifier/Breakers Picture

Pi

ct
ur
e

tu
re

Pi
ct
ur
e

Pi

Pi
ct
ur
e

Pi

ct
ur