" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

Type of Material :
Source / Location of Material :
Stretch
: Km. .To (LHS/RHS)
Lab MDD 2.03
:
8.6
OMC
1.31
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

351 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

6500

4615

1885

1534

1171.0

2476

2.114

6.50

1.985

97.80

6500

4615

1885

1534

1171.0

2473

2.112

8.00

1.955

96.33

6500

4781

1719

1368

1044.3

2225

2.131

7.50

1.982

97.64

6500

4895

1605

1254

957.3

2015

2.105

7.00

1.967

96.91

6500

4915

1585

1234

942.0

1985

2.107

6.50

1.979

97.47

6500

4852

1648

1297

990.1

2084

2.105

7.00

1.967

96.91

6500

4703

1797

1446

1103.8

2344

2.124

6.50

1.994

98.22

6500

4656

1844

1493

1139.7

2403

2.108

6.50

1.980

97.53

6500

4687

1813

1462

1116.0

2378

2.131

8.00

1.973

97.19

10

6500

4695

1805

1454

1109.9

2345

2.113

7.00

1.975

97.27

REMARKS :

97.33

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

99+000 to Km 418+750 in the state of Karnataka under National Highways Development


e III on DBFOT (Toll ) basis.

LACEMENT METHOD (SOIL/GSB/WMM)

9.6
6.6
Specified
Compactio
n (%)

Format No: HCRP

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

Type of Material :
Source / Location of Material :
Stretch
: Km. .To (LHS/RHS)
Lab MDD 2.03
:
8.6
OMC
1.31
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

351 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

6500

4652

1848

1497

1142.7

2398

2.098

7.00

1.961

96.61

6500

4698

1802

1451

1107.6

2345

2.117

6.50

1.988

97.93

6500

4723

1777

1426

1088.5

2289

2.103

6.50

1.974

97.26

6500

4763

1737

1386

1058.0

2205

2.084

7.50

1.939

95.50

6500

4896

1604

1253

956.5

1978

2.068

6.50

1.942

95.65

6500

4805

1695

1344

1026.0

2159

2.104

7.00

1.967

96.88

6500

4684

1816

1465

1118.3

2352

2.103

8.50

1.938

95.49

6500

4678

1822

1471

1122.9

2376

2.116

7.00

1.978

97.41

6500

4712

1788

1437

1096.9

2342

2.135

7.50

1.986

97.84

10

6500

4659

1841

1490

1137.4

2358

2.073

6.50

1.947

95.89

REMARKS :

96.65

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

99+000 to Km 418+750 in the state of Karnataka under National Highways Development


e III on DBFOT (Toll ) basis.

LACEMENT METHOD (SOIL/GSB/WMM)

9.6
6.6
Specified
Compactio
n (%)

Format No: HCRP

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

Type of Material :
Source / Location of Material :
Stretch
: Km. .To (LHS/RHS)
Lab MDD 1.945
:
10.8
OMC
1.31
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

351 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

6500

4856

1644

1293

987.0

2009

2.035

9.00

1.867

96.01

6500

4678

1822

1471

1122.9

2312

2.059

9.50

1.880

96.67

6500

4812

1688

1337

1020.6

2115

2.072

10.50

1.875

96.42

6500

4756

1744

1393

1063.4

2205

2.074

11.50

1.860

95.62

6500

4812

1688

1337

1020.6

2088

2.046

9.50

1.868

96.06

6500

4685

1815

1464

1117.6

2298

2.056

9.50

1.878

96.55

6500

4656

1844

1493

1139.7

2352

2.064

10.00

1.876

96.46

6500

4798

1702

1351

1031.3

2115

2.051

10.50

1.856

95.42

6500

4768

1732

1381

1054.2

2186

2.074

9.50

1.894

97.36

10

6500

4699

1801

1450

1106.9

2276

2.056

9.00

1.886

96.99

REMARKS :

96.36

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

te of Karnataka under National Highways Development

IL/GSB/WMM)

9.6
6.6
Specified
Compactio
n (%)

322.22
11.8
8.8

322.32

18.5

1850

3.89
1.945

21.6
10.8

Format No: HCRP

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

Type of Material :
Source / Location of Material :
Stretch
: Km. .To (LHS/RHS)
Lab MDD 2.065
:
8.95
OMC
1.27
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

2642 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

29000

16251 12749

10107

7958.3

17000

2.136

7.50

1.987

96.23

29000

16489 12511

9869

7770.9

16897

2.174

8.00

2.013

97.50

29000

16758 12242

9600

7559.1

16257

2.151

8.00

1.991

96.43

29000

16357 12643

10001

7874.8

16532

2.099

7.00

1.962

95.01

29000

16896 12104

9462

7450.4

16104

2.161

8.50

1.992

96.47

29000

16571 12429

9787

7706.3

16545

2.147

9.00

1.970

95.38

29000

16375 12625

9983

7860.6

16668

2.120

7.50

1.973

95.52

29000

16189 12811

10169

8007.1

16889

2.109

7.00

1.971

95.46

29000

16596 12404

9762

7686.6

16712

2.174

7.50

2.022

97.94

10

29000

16619 12381

9739

7668.5

16748

2.184

9.00

2.004

97.03

REMARKS :

96.30

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

te of Karnataka under National Highways Development

IL/GSB/WMM)

9.6
6.6
Specified
Compactio
n (%)

322.22
11.8
8.8

322.32

18.5

1850

3.89
1.945

21.6
10.8

Format No: HCRP

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

Type of Material :
Source / Location of Material :
Stretch
: Km. .To (LHS/RHS)
Lab MDD 2.065
:
8.95
OMC
1.27
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

2642 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

29000

16355 12645

10003

7876.4

16785

2.131

8.50

1.964

95.11

29000

16258 12742

10100

7952.8

17015

2.140

9.00

1.963

95.05

29000

16415 12585

9943

7829.1

16744

2.139

8.00

1.980

95.90

29000

16874 12126

9484

7467.7

15985

2.141

8.50

1.973

95.54

29000

16159 12841

10199

8030.7

17011

2.118

7.00

1.980

95.87

29000

16372 12628

9986

7863.0

16728

2.127

7.50

1.979

95.84

29000

16105 12895

10253

8073.2

17245

2.136

8.50

1.969

95.34

29000

16200 12800

10158

7998.4

17025

2.129

8.00

1.971

95.44

29000

16342 12658

10016

7886.6

16798

2.130

7.50

1.981

95.95

10

29000

16589 12411

9769

7692.1

16462

2.140

8.00

1.982

95.96

REMARKS :

95.60

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

te of Karnataka under National Highways Development

IL/GSB/WMM)

9.6

322.22
11.8
8.8

322.32

6.6
Specified
Compactio
n (%)

95.00

95.60

1.65 1.832313

0.34941 96.83231

18.5

1850

3.89
1.945

21.6
10.8

327.9
328
328.27
327.8
327.6
327.39

328
328.15
327.3
327.9
327.8
327.6

1800
1800

2.06

Format No: HCRP

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

Type of Material :
Source / Location of Material :
327.390
Stretch
:
Lab MDD 2.06
:
8.87
OMC
1.31
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

327.600

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

351 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

6500

4755

1745

1394

1064.1

2277

2.140

8.50

1.972

95.74

6500

4668

1832

1481

1130.5

2412

2.134

8.00

1.975

95.90

6500

4714

1786

1435

1095.4

2326

2.123

8.50

1.957

95.00

6500

4793

1707

1356

1035.1

2198

2.123

7.50

1.975

95.89

6500

4901

1599

1248

952.7

2021

2.121

8.00

1.964

95.35

6500

4565

1935

1584

1209.2

2577

2.131

8.50

1.964

95.35

6500

4602

1898

1547

1180.9

2498

2.115

8.00

1.959

95.08

6500

4673

1827

1476

1126.7

2394

2.125

8.00

1.967

95.50

6500

4662

1838

1487

1135.1

2401

2.115

8.00

1.959

95.07

10

6500

4781

1719

1368

1044.3

2223

2.129

8.50

1.962

95.24

REMARKS :

95.41

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

te of Karnataka under National Highways Development

IL/GSB/WMM)

9.6
6.6
Specified
Compactio
n (%)

322.22
11.8
8.8

322.32

18.5

1850

3.89
1.945

21.6
10.8

Format No: HCRP

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

Type of Material :
Source / Location of Material :
327.390
Stretch
:
Lab MDD 2.06
:
8.87
OMC
1.31
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

327.600

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

351 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

6500

4589

1911

1560

1190.8

2532

2.126

8.00

1.969

95.57

6500

4724

1776

1425

1087.8

2328

2.140

9.00

1.963

95.31

6500

4689

1811

1460

1114.5

2385

2.140

9.00

1.963

95.30

6500

4725

1775

1424

1087.0

2314

2.129

8.50

1.962

95.24

6500

4647

1853

1502

1146.6

2443

2.131

8.00

1.973

95.77

6500

4683

1817

1466

1119.1

2366

2.114

8.00

1.958

95.03

6500

4597

1903

1552

1184.7

2517

2.125

8.00

1.967

95.49

6500

4691

1809

1458

1113.0

2383

2.141

8.50

1.973

95.79

6500

4587

1913

1562

1192.4

2537

2.128

8.50

1.961

95.19

10

6500

4696

1804

1453

1109.2

2369

2.136

9.00

1.959

95.12

REMARKS :

95.38

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

te of Karnataka under National Highways Development

IL/GSB/WMM)

9.6
6.6
Specified
Compactio
n (%)

322.22
11.8
8.8

322.32

18.5

1850

3.89
1.945

21.6
10.8

Format No: HCRP

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

Type of Material :
Source / Location of Material :
322+750 TO
Stretch
:
Lab MDD 2.065
:
8.95
OMC
1.27
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

2642 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

29000

16245 12755

10113

7963.0

16892

2.121

8.00

1.964

95.12

29000

16345 12655

10013

7884.3

16876

2.140

8.00

1.982

95.98

29000

16312 12688

10046

7910.2

16843

2.129

8.50

1.962

95.03

29000

16478 12522

9880

7779.5

16639

2.139

9.00

1.962

95.02

29000

16256 12744

10102

7954.3

17041

2.142

8.00

1.984

96.06

29000

16123 12877

10235

8059.1

17198

2.134

8.50

1.967

95.25

29000

16456 12544

9902

7796.9

16701

2.142

8.50

1.974

95.60

29000

16301 12699

10057

7918.9

17021

2.149

9.00

1.972

95.49

29000

16421 12579

9937

7824.4

16661

2.129

8.00

1.972

95.48

10

29000

16478 12522

9880

7779.5

16431

2.112

7.50

1.965

95.14

REMARKS :

95.42

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

te of Karnataka under National Highways Development

IL/GSB/WMM)

9.6

322.22
11.8
8.8

322.32

6.6
Specified
Compactio
n (%)

95.00

95.42

1.65 1.845837

0.375327 96.84584

18.5

1850

3.89
1.945

21.6
10.8

Format No: HCRP

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

Type of Material :
Source / Location of Material :
322+750 TO
Stretch
:
Lab MDD 2.065
:
8.95
OMC
1.27
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

2642 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

29000

16389 12611

9969

7849.6

16793

2.139

8.50

1.972

95.48

29000

16416 12584

9942

7828.3

16711

2.135

8.00

1.977

95.72

29000

16421 12579

9937

7824.4

16741

2.140

8.00

1.981

95.94

29000

16549 12451

9809

7723.6

16522

2.139

8.50

1.972

95.48

29000

16501 12499

9857

7761.4

16615

2.141

8.50

1.973

95.55

29000

16410 12590

9948

7833.1

16714

2.134

8.00

1.976

95.68

29000

16329 12671

10029

7896.9

16743

2.120

8.00

1.963

95.07

29000

16519 12481

9839

7747.2

16508

2.131

8.50

1.964

95.10

29000

16604 12396

9754

7680.3

16361

2.130

8.00

1.972

95.52

10

29000

16532 12468

9826

7737.0

16451

2.126

8.00

1.969

95.34

REMARKS :

95.49

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

te of Karnataka under National Highways Development

IL/GSB/WMM)

9.6

322.22
11.8
8.8

322.32

6.6
Specified
Compactio
n (%)

95.00

95.49

1.65 1.789091

0.266573 96.78909

18.5

1850

3.89
1.945

21.6
10.8

Format No: HCRP

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

Type of Material :
Source / Location of Material :
322+750 TO
Stretch
:
Lab MDD 2.065
:
8.95
OMC
1.27
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

2642 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

29000

16781 12219

9577

7540.9

16111

2.136

8.00

1.978

95.80

29000

16321 12679

10037

7903.1

16794

2.125

8.00

1.968

95.28

29000

16578 12422

9780

7700.8

16502

2.143

8.50

1.975

95.64

29000

16452 12548

9906

7800.0

16583

2.126

8.00

1.969

95.33

29000

16587 12413

9771

7693.7

16438

2.137

8.00

1.978

95.80

29000

16511 12489

9847

7753.5

16732

2.158

9.00

1.980

95.87

29000

16421 12579

9937

7824.4

16703

2.135

8.50

1.967

95.28

29000

16459 12541

9899

7794.5

16589

2.128

8.00

1.971

95.43

29000

16349 12651

10009

7881.1

16903

2.145

9.00

1.968

95.29

10

29000

16441 12559

9917

7808.7

16711

2.140

9.00

1.963

95.08

REMARKS :

95.48

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

te of Karnataka under National Highways Development

IL/GSB/WMM)

9.6

322.22
11.8
8.8

322.32

6.6
Specified
Compactio
n (%)

95.00

95.48

1.65 1.794465

0.276872 96.79447

18.5

1850

3.89
1.945

21.6
10.8

Format No: HCRP

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

Type of Material :
Source / Location of Material :
322+750 TO
Stretch
:
Lab MDD 2.065
:
8.95
OMC
1.27
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

2642 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

29000

16871 12129

9487

7470.1

15971

2.138

8.00

1.980

95.87

29000

16461 12539

9897

7792.9

16565

2.126

7.50

1.977

95.76

29000

16530 12470

9828

7738.6

16591

2.144

8.00

1.985

96.13

29000

16601 12399

9757

7682.7

16418

2.137

8.50

1.970

95.38

29000

16397 12603

9961

7843.3

16700

2.129

8.50

1.962

95.03

29000

16451 12549

9907

7800.8

16701

2.141

8.00

1.982

96.00

29000

16399 12601

9959

7841.7

16689

2.128

8.00

1.971

95.43

29000

16513 12487

9845

7752.0

16588

2.140

7.50

1.991

96.39

29000

16178 12822

10180

8015.7

17201

2.146

9.00

1.969

95.34

10

29000

16519 12481

9839

7747.2

16615

2.145

8.50

1.977

95.72

REMARKS :

95.70

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

te of Karnataka under National Highways Development

IL/GSB/WMM)

9.6

322.22
11.8
8.8

322.32

6.6
Specified
Compactio
n (%)

95.00

95.70

1.65 1.866074

0.414113 96.86607

18.5

1850

3.89
1.945

21.6
10.8

Format No: HCRP

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Develop
Project (NHDP) Phase III on DBFOT (Toll ) basis.

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED
COMPACTION TEST BY SAND REPLACEMENT METHOD (SOIL/GSB/WMM)
(IS:2720, PART - 28)

Type of Material :
Source / Location of Material :
327+800 TO
Stretch
:
Lab MDD 2.1
:
8.95
OMC
1.27
gm/cc
B.D.S.

Sr. No.

Loction/
Chainage

RFI No.
:
Testing Date :
Layer No.
:
Avg. Width (m) :
Area (m2)
:
Sand in cone

328+000

Wt. of
Wt. of
Sand
cylinde
cylinder
in
Offset
r&
& Sand
Cone
From C/L
Sand
before
+Hole
(m)
after
pouring
= (D-E)
pourin
(g)
(g)
g (g)
C
D
E
F

Sand in
Hole =
Vol. of
(F-Sand
Hole
in
(G/B.D.S.)
cone),
(cc)
(g)

Wt. of
Total wet
soil from
Hole (g)

2642 gm

Field
Wet
Compactio
Moisture
Densit
Dry Density
n
Avg.
Content, %
y=
= (J/K*)
(%)=(L/La Compactio
( By rapid
(I/H)
( g/cc)
b
n (%)
moist.Mete
(g/cc)
MDD*100)
r)

29000

16712 12288

9646

7595.3

16193

2.132

8.00

1.974

94.00

29000

16171 12829

10187

8021.3

17004

2.120

8.00

1.963

93.47

29000

16345 12655

10013

7884.3

16991

2.155

8.50

1.986

94.58

29000

16218 12782

10140

7984.3

17120

2.144

8.50

1.976

94.11

29000

16431 12569

9927

7816.5

16833

2.154

8.00

1.994

94.95

29000

16388 12612

9970

7850.4

16711

2.129

8.00

1.971

93.86

29000

16414 12586

9944

7829.9

16870

2.155

9.00

1.977

94.13

29000

16522 12478

9836

7744.9

16566

2.139

8.00

1.981

94.31

29000

16321 12679

10037

7903.1

16968

2.147

8.00

1.988

94.66

10

29000

16116 12884

10242

8064.6

17123

2.123

8.00

1.966

93.62

REMARKS :

94.17

EPC Contractor Representative

Concessionaire Representative

Independent Engineer Representative

Name

Name

Name

Sign

Sign

Sign

Date

Date

Date

Format No: HCRP/T/7

te of Karnataka under National Highways Development

IL/GSB/WMM)

9.6

322.22
11.8
8.8

322.32

6.6
Specified
Compactio
n (%)

95.00

94.17

1.65 1.894426

0.468451 96.89443

18.5

1850

3.89
1.945

21.6
10.8