Agenda
Value-Add Basis
Engineering is in a given scope and schedule to go from
assumptions and ideas to an as-built facility that is safe,
reliable, and efficient.
6%
7%
Engineering
37%
Design
Materials
50%
Construction
Enabler
Safety
Reliability
Design consistency/Quality
Fast Track Execution
Change
Deliverables
Link to physical design
Managing the cables
Electrical
The Project
Designing Power Distribution System
Challenges
Cable management
Electrical Engineer
Power distribution design
Electrical Index
Consumers listing
Reference
Data Explorer
Electrical Index
Detailed engineering
Load lists
Interconnections with control systems
Schematics
Detailed one lines
3-Lines
Wiring and cabling (incl. routing)
Panel design/interface with vendors
Construction/Commissioning
Operations
Bidirectional Interface
SmartPlant
Electrical
Plant
SPEL
Cable
Ref.
SPEL Ref
cable
ETAP Cable
library synch
utility
Synch utility
MS access
Database
ETAP Project
ETAP
Cable
LIB
The Basis
Import the Loads from:
Spreadsheets
SmartPlant P&ID
SmartPlant Enterprise (mechanical)
Other sources or solutions
Best Practices
Create look-up table or configuration profiles for the typical
load profiles of the project
Configurable Design Rules to enforce compliance
Assign to load
Automatically size cables
Create one lines
21
Schematics
Engineering/design
Construction
Commissioning
Operation
Cable Routing
Round-tripping between SPEL and Intergraph Smart 3D
SPEL defines to-from and cable type, plus initial size
Actual routing and length determined in automatic cable routing in
Smart 3D
Actual length fed back to SPEL for size validation
SmartPlant Electrical
15,000 / 30,000
40,000 / 80,000
1,500 / 3,000
In Conclusion
Conclusion
Validation and verification of the design in each stage and at each
project milestone
Design rules in SmartPlant Electrical help to make the right design
decisions
Use default settings, engineering standards, and libraries with
associated rules to drive consistency, quality, and conformance with
the engineering practices.
High quality documentations are created directly and automatically
from the design data
Management of change highlights the changes in comparison with the
latest issue to avoid omission of updates
Innovative approach
Measurable and proven benefits
Thank You