Vous êtes sur la page 1sur 1

3600

3600

13

12

11

10

1699
1972

3600 2500

14

4TH FLOOR
3RD FLOOR
2ND FLOOR

600

3600

COLLEGE OF ENGINEERING

1ST FLOOR
NGL

RIGHT SIDE ELEVATION


1:120 MM

SCALE

SCHOOL:

SUBJECT:

CE-523

PROJECT TITLE:

PROPOSED FOUR-STOREY
ENGINEERING BUILDING

PREPARED BY:

CHECKED BY:

SHEET NO.

ENGR. S.B.

ENGR. M.D.S.

A-8

BSCE-5TH YEAR

INSTRUCTOR

OF A-8

Vous aimerez peut-être aussi