RECOVERY BOILER DAILY PROGRESS

SYSTEM

MATERIAL

HEADER BOILER BANK


FURNACE REAR WALL SCREEN
PIPING PROCESS RECOVERY BOILER
PIPING PROCESS LAYDOWN
PIPING FEEDWATER EL.33
CIRCULATION RISER

CS
CS
SS
SS
CS
CS

PREVIOUS
JOINT
DIA INCH
230
690
405
1215
141
1848
280
1852
12
268
21
105

Y PROGRESS
TODAY
JOINT
DIA INCH
DONE
DONE
31
93
10
132
36
250
0
0
2
10

TOTAL
JOINT
DIA INCH
230
690
436
1308
151
1980
316
2102
12
268
23
115

RECOVERY BOILER DAILY PROGRESS


SYSTEM

MATERIAL

HEADER BOILER BANK


FURNACE REAR WALL SCREEN
PIPING PROCESS RECOVERY BOILER
PIPING PROCESS LAYDOWN
PIPING FEEDWATER EL.33
CIRCULATION RISER

CS
CS
SS
SS
CS
CS

PREVIOUS
JOINT
DIA INCH
230
690
436
1308
151
1980
316
2102
12
268
23
115

Y PROGRESS
TODAY
JOINT
DIA INCH
DONE
DONE
12
36
7
118
57
321
3
48
2
10

TOTAL
JOINT
DIA INCH
230
690
448
1344
158
2098
373
2423
15
316
25
125

RECOVERY BOILER DAILY PROGRESS


SYSTEM

MATERIAL

HEADER BOILER BANK


FURNACE REAR WALL SCREEN
PIPING PROCESS RECOVERY BOILER
PIPING PROCESS LAYDOWN
PIPING FEEDWATER EL.33
CIRCULATION RISER
HP PIPING

CS
CS
SS
SS
CS
CS
CS

PREVIOUS
JOINT
DIA INCH
230
690
448
1344
158
2098
373
2423
15
316
25
125
0
0

Y PROGRESS
TODAY
JOINT
DIA INCH
DONE
DONE
0
0
12
127
105
396
1
20
6
30
6
57

TOTAL
JOINT
DIA INCH
230
690
448
1344
170
2225
478
2819
16
336
31
155
6
57

RECOVERY BOILER DAILY PROGRESS


PREVIOUS
JOINT
DIA INCH
230
690
PIPING PROCESS
170
3225
478
3829
PRESSURE PART
448
1344
HP PIPING
63
558

SYSTEM

MATERIAL

HEADER BOILER BANK

CS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN

SS
SS

PRESSURE PART
HP PIPING

CS

Y PROGRESS
TODAY
JOINT
DIA INCH
DONE
DONE

TOTAL
JOINT
DIA INCH
230
690

SS
20
96

151
306

190
574

3376
4135

54

156

502

1500

10

65

568

RT

RECOVERY BOILER DAILY PROGRESS


PREVIOUS
JOINT
DIA INCH
230
690
PIPING PROCESS
190
3376
574
4135
PRESSURE PART
502
1500
HP PIPING
65
568

SYSTEM

MATERIAL

HEADER BOILER BANK

CS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN

SS
SS

PRESSURE PART
HP PIPING

CS

Y PROGRESS
TODAY
JOINT
DIA INCH
DONE
DONE

TOTAL
JOINT
DIA INCH
230
690

SS
9
79

140
282

199
653

3516
4417

110

330

612

1830

10

67

578

RT

RECOVERY BOILER DAILY PROGRESS


PREVIOUS
JOINT
DIA INCH
230
690
PIPING PROCESS
199
3516
653
4417
PRESSURE PART
612
1830
HP PIPING
67
578

SYSTEM

MATERIAL

HEADER BOILER BANK

CS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN

SS
SS

PRESSURE PART
HP PIPING

CS

Y PROGRESS
TODAY
JOINT
DIA INCH
DONE
DONE

TOTAL
JOINT
DIA INCH
230
690

SS
13
88

162
352

212
741

3678
4769

39

117

651

1947

41

72

619

RT

RECOVERY BOILER DAILY PROGRESS


PREVIOUS
JOINT
DIA INCH
230
690
PIPING PROCESS
212
3678
741
4769
PRESSURE PART
651
1947
HP PIPING
72
619

SYSTEM

MATERIAL

HEADER BOILER BANK

CS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN

SS
SS

PRESSURE PART
HP PIPING

CS

Y PROGRESS
TODAY
JOINT
DIA INCH
DONE
DONE

TOTAL
JOINT
DIA INCH
230
690

SS
12
58

150
216

224
799

3828
4985

12

36

663

1983

14

46

86

665

RT

RECOVERY BOILER DAILY PROGRESS


PREVIOUS
JOINT
DIA INCH
0
0
PIPING PROCESS
224
3828
799
4985
PRESSURE PART
663
1983
HP PIPING
86
665

SYSTEM

MATERIAL

HEADER BOILER BANK

CS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN

SS
SS

PRESSURE PART
HP PIPING

CS

Y PROGRESS
TODAY
JOINT
DIA INCH
DONE
DONE

TOTAL
JOINT
DIA INCH
230
690

SS
19
45

170
220

243
844

3998
5205

41

123

704

2106

13

85

99

750

RT

RECOVERY BOILER DAILY PROGRESS


PREVIOUS
JOINT
DIA INCH
0
0
PIPING PROCESS
243
3998
844
5205
PRESSURE PART
704
2106
HP PIPING
99
750

SYSTEM

MATERIAL

HEADER BOILER BANK

CS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN

SS
SS

PRESSURE PART
HP PIPING

CS

Y PROGRESS
TODAY
JOINT
DIA INCH
DONE
DONE

TOTAL
JOINT
DIA INCH
230
690

SS
12
32

100
234

255
876

4098
5439

102

306

806

2412

10

104

109

854

RT

RECOVERY BOILER DAILY PROGRESS


PREVIOUS
JOINT
DIA INCH
0
0
PIPING PROCESS
255
4098
876
5439
PRESSURE PART
806
2412
HP PIPING
109
854

SYSTEM

MATERIAL

HEADER BOILER BANK

CS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN

SS
SS

PRESSURE PART
HP PIPING

CS

Y PROGRESS
TODAY
JOINT
DIA INCH
DONE
DONE

TOTAL
JOINT
DIA INCH
230
690

SS
8
26

140
190

263
902

4238
5629

83

249

889

2661

17

80.5

126

934.5

RT

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

23 DESEMBER 2015

SYSTEM

MATERIAL

JOINT

DIA INCH

30
2
52
0
84

225
24
310
0
559

18

3
0
0
0
3

22
0
0
0
22

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

31-Dec-15

SYSTEM

MATERIAL

JOINT

DIA INCH

18
29
7
0
54

62
107
152
0
321

149

298

19
0
0
1
20

57
0
0
1.5
58.5

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

2-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

2
48
20
0
70

20
306
154
0
480

25

50

4
4
0
2
10

15
26.5
0
3
44.5

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

3-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

6
33
20
0
59

50
151.5
140
0
341.5

20

46

10

33

1
11

1.5
34.5

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

4-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

0
41
16
39
96

0
215
164
83
462

60

120

27
6
0
2
35

69
29.5
0
3
101.5

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

5-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

2
29
22
26
79

16
129.5
148
73
366.5

57

171

8
5
0
3
16

31
7.5
0
3
41.5

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

6-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

0
28
24
36
88

0
78
144
110
332

70

140

22
2
0
0
24

22
23
0
0
45

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

7-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

0
26
35
34
95

0
226
111.5
178
515.5

63

126

20
0
0
3
23

20
0
0
4.5
24.5

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

8-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

25
32
57

169
66
134
98
467

111

222

23
0
0
0
23

45
0
0
0
45

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

9-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

15
10
32
35
92

140
61
162
90
453

166

309.5

27
0
0
0
27

33
0
0
0
33

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

Eco
Screen rear
Screen Middle
Lower Nose
Upper Nose
Boiler Bank
Boiler Bank

59
9
9
24
39
7
7
3
4
5

88.5
18
18
48
78
17.5
17.5
6
8
10

166

309.5

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

10-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

29
4
29
17
79

164
32
166
40
402

80

160

11
1
0
0
12

11
22
0
0
33

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

11-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

9
22
39

84
182
162

70

428

185

307.5

25

30

25

30

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

12-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

3
31
53

18
227
189

87

434

88

164.5

39

72

39

72

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

13-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

7
51
55
3
116

56
356
209
72
693

129

235

26

32.5

6
3
35

6
3
41.5

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

14-Jan-16

SYSTEM

MATERIAL

JOINT

DIA INCH

7
45
22
50
124

38
277
82
164
561

127

254

24
1
3
5
33

58.5
22
3
5
88.5

PIPING PROCESS
SS
CS
CS
SS

PIPING PROCESS RECOVERY BOILER


PIPING PROCESS LAYDOWN
TOTAL
PRESSURE PART
PRESSURE PART
HP PIPING
HP PIPING
TOTAL

CS
P91
P11
P22

24
0.25
3
1
3
1
1
1

1
2
3
6
3
2
3
5
25

24
0.5
9
6
9
2
3
5
58.5

12
25
39
35
33

144

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

PRESSURE PART

HP PIPING

PIPING
PROCESS

PIPING PROCESS
RECOVERY BOILER
LAYDOWN

MATERIAL
SS
CS
CS
SS

TOTAL
HP PIPING

CS
P91
P11
P22

TOTAL
Area
Economizer I (Lower)
Economizer II (Lower)
Boiler Bank Upper
Boiler Bank Header
Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
Upper Nose
Nose Lower
Total

Total
460
460
234
9
230
648
836
76
304
304
308
308

15-Jan-16
JOINT
DIA INCH
29
192
6
37
36
124
23
73
94
426
29
29

29
Previous
41
0
124
0
128
153
121
21
52
0
264
264

29
Today
75
0
27
3
0
18
10
8
10
36
0
0
187

Pressure Part
Target Previous
900
609

Today Balance
187
104

HP Piping
Target Previous
190
144

Today Balance
29
17

Accumulate Balance
116
344
0
460
151
83
3
6
no one reported
128
102
171
477
131
705
29
47
3 day not yet reported
62
242
36
268
264
44
264
44

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

16-Jan-16

PRESSURE PART

HP PIPING

PIPING
PROCESS

PIPING PROCESS
RECOVERY BOILER
LAYDOWN

MATERIAL

JOINT

DIA INCH

SS
CS

13
23

75
176

CS

18

127

SS

14

81

TOTAL
CS
HP PIPING

68

459

17

20.5

17

20.5

Pressure Part (10-16 JAN 2016)


Target
900

190

P11
P22

Area

Total

Previous

Today

Balance

Economizer I (Lower)
Economizer II (Lower)

460
460

116
0

96

248
460

Boiler Bank Upper

234

151

83

Boiler Bank Header

10

Boiler Bank Lower


Screen Rear

230
648

128
171

18

102
459

Screen Middle

836

131

12

693

Screen Front Header

76

29

44

Screen Front Single Tube

304

62

235

Furnace Middle lower (Opening)


Upper Nose

304
308

36
264

29

239
44

Nose Lower

308

264

TOTAL

4,178

44
1,355

796

Balance

165

HP Piping (10-16 JAN 2016)


Target
Today
Previous

P91

TOTAL

Today

Previous

165

2,658

173

-61

Balance
17

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

PRESSURE PART

HP PIPING

PIPING
PROCESS

PIPING PROCESS
RECOVERY BOILER
LAYDOWN

MATERIAL
SS
CS
CS

JOINT
7
19
31

DIA INCH
64
134
111

SS

11

36

68

345

CS

10

36.5

P91
P11

0
0

0
0

P22

10

36.5

TOTAL

HP PIPING

TOTAL

Date:
17 Januari 2016
Pressure Part (17-23 JAN 2016)
Target
Today
Previous
Balance
1308
0
104
1204
HP Piping (17-23 JAN 2016)
Target
Today
Previous
240

Balance
10

Area

Total

Previous

Today

Balance

Economizer I (Lower)

460

212

73

175

Economizer II (Lower)
Boiler Bank Upper
Boiler Bank Header
Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube

460
234
10
230
648
836
76
304

0
151
3
128
189
143
32
69

0
0
3
0
18
7
3
0

460
83
4
102
441
686
41
235

aligment in process

Furnace Middle lower (Opening)


Upper Nose

304
308

65
264

0
0

239
44

please install scafolding from inside

Nose Lower

308

264

44

TOTAL

4,178

1,520

104

2,554

Remarks

230

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

PRESSURE PART

RECOVERY BOILER
LAYDOWN

MATERIAL
SS
CS
CS

JOINT
8
29
10

SS

27

114

74

441

CS
P91

10
0

10
0

P11

TOTAL

HP PIPING

DIA INCH
66
193
68

P22
TOTAL

10

10

HP Piping (17-23 JAN 2016)


Target
Today
Previous
240

Area

Total

Previous

Today

Economizer I (Lower)

460

285

109

66

Economizer II (Lower)
Boiler Bank Upper
Boiler Bank Header
Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
Upper Nose

460
234
10
230
648
836
76
304
304
308

0
151
6
128
207
150
35
69
65
264

0
0
0
10
18
14
3
11
0
0

460
83
4
92
423
672
38
224
239
44

Nose Lower

308

264

44

TOTAL

4,178

1,624

Balance

165

10

Balance
10

Remarks
aligment in process

please install scafolding from inside

2,389

220

SUBCONT

LOCATION

Elv.83

PERMATA

HP PIPING

PIPING
PROCESS

PIPING PROCESS

Date:
18 Januari 2016
Pressure Part (17-23 JAN 2016)
Target
Previous
Today
Balance
1308
104
165
1039

RUN

WELDING SECTION

Elv.74

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1

Mat'l

NPS

Qty

January 18, 2016

PLANING TOMORROW
REMARKS

Mat'l

NPS

Qty

REMARKS
No Activity, Possibility in Spray Water Prepare for SH IV, V

Prepare for Main Steam Pipe

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

16

BB Header Elv.50

Elv.42

1
1

P-No.1
P-No.1

2
16

6
1

Riser Screen Elv.52


BB Header Cont'd Elv.50

Elv.33

P-No.1

20

Pip Process Elv.15

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Screen Header Elv.52

Elv.33

P-No.1

22

Feed Water Elv.10

P-No.1

22

Feed Water Cont'd Elv.10

Elv.15

P-No.1

20

Pip Process Elv.10

Elv.55

No Activity

Possible for PWHT Middle Steam Pipe (if any)

Possible 1 More Joint

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

PRESSURE PART

RECOVERY BOILER
LAYDOWN

JOINT

DIA INCH

SS
CS
CS

5
31
44

36
294
158

Target

SS

48

HP Piping (17-23 JAN 2016)


Target
Today
Previous

86

536

CS

23

100

P91

TOTAL

HP PIPING

Date:
19 Januari 2016
Pressure Part (17-23 JAN 2016)

MATERIAL

P11

P22
TOTAL

240

Balance

148

20

Balance
23

Elv.83

891

197

Elv.74
Elv.55

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1

Mat'l
P-No.1

NPS
8,10

Qty
3

P-No.1

Riser Screen Elv.52

P-No.1

16

BB Header Elv.50

1
1

Mat'l
P-No.1

NPS
8,10

Qty
2

REMARKS
Spray Water

P-No.15E

1.5

Valve P91 Elv.74

P-No.1

P-No.1

P-No.1

PWHT Riser Screen Elv.52

P-No.1

PWHT Pipe Process Elv.15

Prepare for SH IV, V

Elv.42

January 19, 2016

PLANING TOMORROW
REMARKS
Spray Water

Riser Screen Elv.52


Riser Screen Elv.52

Elv.33

20

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Screen Header Elv.52

100

Elv.33

P-No.1

22

Feed Water Elv.10

P-No.1

22

con't Feed Water Elv.10

Elv.15

P-No.1

20

Pipe Process Elv. 10

P-No.1

20

PWHT Pipe Process Elv. 10

Total

Previous

Today

Balance

Economizer I (Lower)

460

394

27

39

Economizer II (Lower)

460

60

400

Boiler Bank Upper


Boiler Bank Header

234
10

151
6

0
1

83
3

Boiler Bank Lower


Screen Rear

230
648

138
225

7
22

85
401

Screen Middle
Screen Front Header

836
76

164
38

23
3

649
35

Screen Front Single Tube


Furnace Middle lower (Opening)

304
304

69
65

0
5

235
234

Upper Nose

308

264

Nose Lower

308

264
4,178

Today
269

LOCATION

23

Area

TOTAL

Previous
1308

SUBCONT

44

0
1,778

44

148

2,252

Remarks

RUN

HP PIPING

PIPING
PROCESS

PIPING PROCESS

PERMATA

WELDING SECTION

Prepare for Main Steam Pipe

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

PRESSURE PART

RECOVERY BOILER
LAYDOWN

JOINT

DIA INCH

SS
CS
CS

4
27
33

48
223
100

Target

SS

62

HP Piping (17-23 JAN 2016)


Target
Today
Previous

69

433

CS

28

152

P91

TOTAL

HP PIPING

Date:
20 Januari 2016
Pressure Part (17-23 JAN 2016)

MATERIAL

Previous
1308

240

Today
Balance
150

43

741

Balance
28

169

LOCATION

Elv.83
Elv.74
Elv.55

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1

Mat'l
P-No.1

NPS
8,10

Qty
2

January 20, 2016

PLANING TOMORROW
REMARKS
Spray Water

Mat'l
P-No.1

NPS
8,10

Qty
3

REMARKS
Spray Water

P-No.15E

1.5

IF POSSIBLE

Prepare for SH IV, V

1
1

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

Elv.42

P-No.1

P-No.1

P11

Elv.33

P-No.1

20

PWHT Pipe Process Elv.15

P-No.1

20

P22

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Elv.33

P-No.1

20

con't Feed Water Elv.10

P-No.1

20

Feed Water Elv.10

Elv.15

P-No.1

20

P-No.1

20

PWHT Pipe Process Elv. 10

28

152

Area

Total

Previous

Today

Balance

Economizer I (Lower)

460

421

18

21

Economizer II (Lower)
Boiler Bank Upper
Boiler Bank Header
Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
Upper Nose

460
234
10
230
648
836
76
304
304
308

60
151
6
145
247
187
41
69
70
264

43
27
0
13
15
15
3
11
5
0

357
56
4
72
386
634
32
224
229
44

Nose Lower

308

TOTAL

TOTAL

417

SUBCONT

264
4,178

0
1,925

44

150

2,103

Remarks

RUN

HP PIPING

PIPING
PROCESS

PIPING PROCESS

PERMATA

WELDING SECTION

PWHT Screen Header Elv.52

PWHT pipe Process Elv.10

PWHT Screen Header Elv.52


Con't PWHT Pipe Process Elv.15
Screen Header Elv.52

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

PRESSURE PART

RECOVERY BOILER
LAYDOWN

JOINT

DIA INCH

SS
CS
CS

4
31
0

42
224
0

Target

SS

42

HP Piping (17-23 JAN 2016)


Target
Today
Previous

38

308

CS

22

132

P91

TOTAL

HP PIPING

Date:
21 Januari 2016
Pressure Part (17-23 JAN 2016)

MATERIAL

Previous
1308

240

Today
Balance
166

71

575

Balance
25

144

LOCATION

Elv.83
Elv.74
Elv.55

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1

January 21, 2016

PLANING TOMORROW

Mat'l
P-No.1
P-No.15E

NPS
8,10
1.5

Qty
3
3

REMARKS
Spray Water
Valve P91

Mat'l
P-No.1
P-No.15E

NPS
8,10
1.5

Qty
3
3

REMARKS
Spray Water
Valve P91

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

Elv.42

P-No.1

P-No.1

16

P11

Elv.33

P-No.1

20

PWHT Pipe Process Elv.15

P-No.1

20

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Elv.33

P-No.1

20

con't Feed Water Elv.10

P-No.1

20

Feed Water Elv.10

Elv.15

P-No.1

20

P-No.1

20

PWHT Pipe Process Elv. 10

25

135

Area

Total

Previous

Today

Balance

460

439

15

Economizer II (Lower)
Boiler Bank Upper
Boiler Bank Header
Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
Upper Nose

460
234
10
230
648
836
76
304
304
308

103
151
6
158
262
202
44
80
75
264

28
0
0
7
27
24
3
12
6
44

329
83
4
65
359
610
29
212
223
0

Nose Lower

308

TOTAL

264
4,178

0
2,048

44

166

1,964

Remarks

Prepare for SH IV, V


Move to elevation 83 If Possible

P22

Economizer I (Lower)

TOTAL

567

SUBCONT

RUN

HP PIPING

PIPING
PROCESS

PIPING PROCESS

PERMATA

WELDING SECTION

PWHT Screen Header Elv.52

PWHT pipe Process Elv.10

Boiler bang Header Elv.52


Con't PWHT Pipe Process Elv.15
Screen Header Elv.52

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

PRESSURE PART

RECOVERY BOILER
LAYDOWN (MOVE TO RB)

MATERIAL

JOINT

DIA INCH

SS
CS
CS

6
34
0

44
266
0

SS

40

310

CS

28

51

P91

TOTAL

HP PIPING

Date:
22 Januari 2016
Pressure Part (17-23 JAN 2016)
Target

Previous
1308

240

Today
Balance
183

96

392

Balance
31

113

LOCATION

Elv.83
Elv.74
Elv.55

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1

January 22, 2016

PLANING TOMORROW

Mat'l
P-No.1
P-No.15E

NPS
8,10
1.5

Qty
3
3

REMARKS
Spray Water
Valve P91

Mat'l
P-No.1
P-No.15E
P-No.1

NPS
6
1.5
6.8

Qty
3
4
3

REMARKS
Spray Water
Valve P91
Spray Water

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

Elv.42

P-No.1

Boiler Bank Header Elv.52

P-No.1

16

P11

Elv.33

P-No.1

20

PWHT Pipe Process Elv.15

P-No.1

20

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Elv.33

P-No.1

20

Feed Water Elv.10

P-No.1

20

Con't Feed Water Elv.10

Elv.15

P-No.1

20

P-No.1

20

PWHT Pipe Process Elv. 10

31

54

Area

Total

Previous

Today

Balance

460

454

Economizer II (Lower)
Boiler Bank Upper
Boiler Bank Header
Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
Upper Nose

460
234
10
230
648
836
76
304
304
308

131
151
6
165
289
226
47
92
75
308

102
24
0
4
27
17
3
6
0
0

227
59
4
61
332
593
26
206
229
0

Nose Lower

308

264

44

TOTAL

4,178

2,208

183

Remarks

please install scafolding

1,787

Prepare for SH IV, V


Move to elevation 83 If Possible

P22

Economizer I (Lower)

TOTAL

733

HP Piping (17-23 JAN 2016)


Target
Today
Previous

SUBCONT

RUN

HP PIPING

PIPING
PROCESS

PIPING PROCESS

PERMATA

WELDING SECTION

PWHT pipe Process Elv.10

Con't Boiler Bank Header Elv.52


Con't PWHT Pipe Process Elv.15
Screen Header Elv.52

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

PRESSURE PART

RECOVERY BOILER
LAYDOWN (MOVE TO RB)

MATERIAL

JOINT

DIA INCH

SS
CS
CS

20
49
0

54
211
0

SS

69

265

CS

20

66

P91

TOTAL

HP PIPING

Date:
23 Januari 2016
Pressure Part (17-23 JAN 2016)
Target

Previous
1308

240

Today
Balance
182

127

210

Balance
24

89

LOCATION

Elv.83
Elv.74
Elv.55

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1

January 23, 2016

PLANING TOMORROW

Mat'l
P-No.1
P-No.15E

NPS
8
1.5

Qty
2
4

REMARKS
Spray Water
Valve P91

Mat'l
P-No.1
P-No.15E
P-No.4

NPS
8
1.5
2

Qty
1
3
21

REMARKS
Spray Water
Valve P91
SuperHeater III

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

Elv.42

P-No.1

Boiler Bank Header Elv.52

P-No.1

16

P11

Elv.33

P-No.1

20

PWHT Pipe Process Elv.15

P-No.1

20

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Elv.33

P-No.1

20

Feed Water Elv.10

P-No.1

20

Feed Water Elv.10

Elv.15

P-No.1

20

P-No.1

20

PWHT Pipe Process Elv. 10

24

72

Area

Total

Previous

Today

Balance

460

454

Economizer II (Lower)
Boiler Bank Upper
Boiler Bank Header
Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
Upper Nose

460
234
10
230
648
836
76
304
304
308

233
175
6
169
316
243
50
98
75
308

145
0
3
0
4
11
3
16
0
0

82
59
1
61
328
582
23
190
229
0

Nose Lower

308

264

44

TOTAL

4,178

2,391

182

Remarks

please install scafolding

1,605

Prepare for SH IV, V


Move to elevation 83 If Possible

P22

Economizer I (Lower)

TOTAL

916

HP Piping (17-23 JAN 2016)


Target
Today
Previous

SUBCONT

RUN

HP PIPING

PIPING
PROCESS

PIPING PROCESS

PERMATA

WELDING SECTION

PWHT pipe Process Elv.10

Boiler Bank Header Elv.52


Con't PWHT Pipe Process Elv.15
Screen Header Elv.52

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

PRESSURE PART

RECOVERY BOILER
LAYDOWN (MOVE TO RB)

MATERIAL

JOINT

DIA INCH

SS
CS
CS

7
30
0

66
203
0

SS

37

269

CS

14

36

P91

TOTAL

HP PIPING

Date:
24 Januari 2016
Pressure Part (24-31 JAN 2016)
Target

Previous
1563

Today
Balance
128
1435

HP Piping (17-23 JAN 2016)


Target
Today
Previous
271

Balance
17

254

LOCATION

Elv.83
Elv.74
Elv.55

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1

January 24, 2016

PLANING TOMORROW

Mat'l
P-No.5A
P-No.15E
P-No.5A

NPS
2
1.5
2

Qty
7
3
21

REMARKS
SuperHeater III
Valve P91
SuperHeater III

Mat'l
P-No.1
P-No.5A
P-No.5A

NPS
8
2
2

Qty
2
21
21

REMARKS
Spray Water
SuperHeater III
SuperHeater III

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

Elv.42

P-No.1

Boiler Bank Header Elv.52

P-No.1

16

P11

Elv.33

P-No.1

20

PWHT Pipe Process Elv.15

P-No.1

20

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Elv.33

P-No.1

20

Feed Water Elv.10

Elv.15

P-No.1

20

P-No.1

20

PWHT Pipe Process Elv. 10

17

39

Area

Total

Previous

Today

Balance

460

454

Economizer II (Lower)
Boiler Bank Upper
Boiler Bank Header
Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
SuperHeater III
Upper Nose

460
234
10
230
648
836
76
304
304
1064
308

378
175
9
169
320
254
53
114
75
0
308

47
0
0
4
26
20
3
0
0
28
0

35
59
1
57
302
562
20
190
229
1036
0

Nose Lower

308

264

TOTAL

5,242

0
2,573

44

128

2,541

Remarks

please install scafolding

Prepare for SH IV, V


Move to elevation 83 If Possible

P22

Economizer I (Lower)

TOTAL

SUBCONT

RUN

HP PIPING

PIPING
PROCESS

PIPING PROCESS

PERMATA

WELDING SECTION

PWHT pipe Process Elv.10

Con't Boiler Bank Header Elv.52


Con't PWHT Pipe Process Elv.15
Screen Header Elv.52

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

PRESSURE PART

RECOVERY BOILER
LAYDOWN (MOVE TO RB)

MATERIAL

JOINT

DIA INCH

SS
CS
CS

13
53
0

134
285
0

SS

66

419

CS

21

53.5

P91

TOTAL

HP PIPING

Date:
25 Januari 2016
Pressure Part (24-31 JAN 2016)
Target
Previous
1563
128

17

Balance
21

233

LOCATION

Elv.83
Elv.74
Elv.55

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1

January 25, 2016

PLANING TOMORROW

Mat'l
P-No.1
P-No.5A
P-No.5A

NPS
8
2
2

Qty
2
21
21

REMARKS
SuperHeater III
SuperHeater III
SuperHeater III

Mat'l
P-No.1
P-No.5A
P-No.5A

NPS
8
2
2

Qty
2
21
21

REMARKS
Spray Water
SuperHeater III
SuperHeater III

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

Elv.42

P-No.1

Con't Boiler Bank Header Elv.52

P-No.1

16

P11

Elv.33

P-No.1

20

PWHT Pipe Process Elv.15

P-No.1

20

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Elv.33

P-No.1

20

Feed Water Elv.10

P-No.1

20

Con't Feed Water Elv.10

Elv.15

P-No.1

20

P-No.1

20

PWHT Pipe Process Elv. 10

21

53.5

Area

Total

Previous

Today

Balance

460

454

Economizer II (Lower)
Boiler Bank Upper
Boiler Bank Header
Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
SuperHeater III
Upper Nose

460
234
10
230
648
836
76
304
304
1064
308

425
175
9
173
346
274
56
114
75
28
308

20
0
1
9
27
29
3
5
0
42
0

15
59
0
48
275
533
17
185
229
994
0

Nose Lower

308

264

TOTAL

5,242

44
2,701

please install scafolding

180

Remarks

2,361

Prepare for SH IV, V


Move to elevation 83 If Possible

P22

Economizer I (Lower)

TOTAL

Today
Balance
180
1255

HP Piping (17-23 JAN 2016)


Target
Today
Previous
271

SUBCONT

RUN

HP PIPING

PIPING
PROCESS

PIPING PROCESS

PERMATA

WELDING SECTION

PWHT pipe Process Elv.10

PWHT Header Screen Elv.52


Con't PWHT Pipe Process Elv.15
Screen Header Elv.52

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

PRESSURE PART

RECOVERY BOILER
LAYDOWN (MOVE TO RB)

MATERIAL

JOINT

DIA INCH

SS
CS
CS

13
41
0

136
278
0

SS

54

414

CS

48

P91
P11

0
0

0
0

P22

TOTAL

HP PIPING

Date:
26 Januari 2016
Pressure Part (24-31 JAN 2016)
Target
Previous
1563
308

271

48

Area

Total

Previous

Today

Balance

460

454

Economizer II (Lower)

460

445

10

Boiler Bank Upper

234

175

59

Boiler Bank Header


Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
SuperHeater III
Upper Nose

10
230
648
836
76
304
304
1064
308

10
182
373
303
59
119
75
70
308

0
13
21
12
3
17
0
42
0

0
35
254
521
14
168
229
952
0

Nose Lower

308

308

TOTAL

5,242

0
2,881

38

1137

Balance
5

Remarks

please install scafolding

118

2,243

LOCATION

Balance
118

HP Piping (17-23 JAN 2016)


Target
Today
Previous

Economizer I (Lower)

TOTAL

Today

SUBCONT

228

Elv.83

PERMATA

HP PIPING

PIPING
PROCESS

PIPING PROCESS

RUN

WELDING SECTION

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1

Mat'l
P-No.1
P-No.5A
P-No.5A

NPS
8
2
2

Qty
1
21
21

January 26, 2016

PLANING TOMORROW
REMARKS
Spray Water Elv.83
SuperHeater III
SuperHeater III

NPS
2
2
2

Qty
6
21
21

REMARKS
SuperHeater V
SuperHeater III
SuperHeater III

P-No.5A

14

SuperHeater III

P-No.15E-8

P-No.15E-8

SuperHeater V

Elv.55

1
1

P-No.1
P-No.1

2
2

6
6

Riser Screen Elv.52


Riser Screen Elv.52

P-No.1
P-No.1

2
2

6
6

Riser Screen Elv.52


Riser Screen Elv.52

Elv.42

P-No.1

Con't Boiler Bank Header Elv.52

P-No.1

16

PWHT Header Screen Elv.52

Elv.33

P-No.1

20

PWHT Pipe Process Elv.15

P-No.1

20

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Screen Header Elv.52

Elv.33

P-No.1

20

Feed Water Elv.10

P-No.1

20

Con't Feed Water Elv.10

Elv.15

P-No.1

20

P-No.1

20

PWHT Pipe Process Elv. 10

Elv.78

Mat'l
P-No.15E-8
P-No.5A
P-No.5A

PWHT pipe Process Elv.10

Prepare for SH IV, V

SuperHeater V

Con't PWHT Pipe Process Elv.15

Move to Elv 78
Move to Elv 78

RECOVERY BOILER DAILY PROGRESS


Date:

PRESSURE PART

RECOVERY BOILER
LAYDOWN (MOVE TO RB)

MATERIAL

JOINT

DIA INCH

SS
CS

20
5

208
78

CS

SS

25

286

CS

36

P91

P11

TOTAL

HP PIPING

P22

36

Area

Total

Previous

Today

TOTAL

Target

Today
426

271

Elv.83

43

Balance
6

222

Balance

460

454

460

455

234

175

59

Boiler Bank Header

10

10

Boiler Bank Lower

230

195

31

Screen Rear
Screen Middle

648
836

394
315

18
16

236
505

Remarks

Screen Front Header

76

62

11

Screen Front Single Tube

304

136

19

149

Furnace Middle lower (Opening)


SuperHeater III

304
1064

75
112

0
35

229
917

Upper Nose

308

308

Nose Lower

308

please install scafolding

127

2,116

Date :
TODAY ACTIVITIES

QTY Machine
1
1

Mat'l
P-No.1
P-No.5A

NPS
8
2

Qty
1
21

P-No.5A

14

January 27, 2016

PLANING TOMORROW
REMARKS
Spray Water Elv.83
SuperHeater III

Mat'l
P-No.15E-8
P-No.5A

NPS
2
2

Qty
6
21

REMARKS
SuperHeater V
SuperHeater III

SuperHeater III

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

moving to connect

P-No.15E-8

moving to connect

P-No.15E-8

SuperHeater V

1
Elv.78

SuperHeater V

P-No.1

Riser Screen Elv.52

P-No.1

Riser Screen Elv.52

P-No.1

PWHT Header Screen Elv.52

P-No.1

Con't PWHT Header Screen Elv.52

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Elv.33

P-No.1

20

Feed Water Elv.10

P-No.1

20

Con't Feed Water Elv.10

Elv.15

P-No.1

20

PWHT pipe Process Elv.10

P-No.1

20

PWHT Pipe Process Elv. 10

Elv.55

Boiler Bank Upper

2,999

LOCATION

1010

308

SUBCONT

Balance
127

HP Piping (17-23 JAN 2016)


Target
Today
Previous

Economizer I (Lower)

5,242

Previous
1563

Economizer II (Lower)

TOTAL

27 Januari 2016

Pressure Part (24-31 JAN 2016)

RUN

HP PIPING

PIPING
PROCESS

PIPING PROCESS

PERMATA

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION

Screen Header Elv.52

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

MATERIAL

JOINT

DIA INCH

CS

41

186

SS

28

43

214

Date:
28 Januari 2016
Pressure Part (24-31 JAN 2016)
Target

Previous

Today

SUBCONT

TOTAL

HP PIPING

CS

17

27

P91

P11

P22

17

27

PRESSURE PART

TOTAL

1563

271

Area

Total

Previous

Today

Balance

460

454

Boiler Bank Upper


Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
SuperHeater III

234
230
648
836
76
304
304
1064

175
226
412
331
65
155
75
147

26
4
18
8
3
6
7
49

33
0
218
497
8
143
222
868

Superheater V

1064

5,220

14
2,040

141

HP Piping (24-31 JAN 2016)


Target
Today
Previous

Economizer I (Lower)

TOTAL

426

43

996

Balance
17

Remarks

please install scafolding

1050

141

3,039

LOCATION

Balance

PIPING PROCESS

PERMATA

DESCRIPTIONS

Elv.83

Elv.78
Elv.55

211

RUN

WELDING SECTION

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1

Mat'l
P-No.5A
P-No.5A
P-No.5A
P-No.15E to 8

P-No.15E to 8

P-No.15E to 8

P-No.1

January 28, 2016

PLANING TOMORROW

NPS
2
2
2
2

Qty
21
21
7
2

REMARKS
SuperHeater III
SuperHeater III
SuperHeater III
SuperHeater V

Mat'l
P-No.5A
P-No.5A
P-No.5A
P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

20

PWHT

P-No.1

NPS
2
2
2
2

Qty
21
21
2
2

REMARKS
SuperHeater III
SuperHeater V
SuperHeater III
SuperHeater V

SuperHeater V

10

SuperHeater V
PWHT

P-No.1

20

PWHT

P-No.1

22

PWHT

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Screen Header Elv.52

Elv.33

P-No.1

20

PWHT

P-No.1

20

PWHT

Elv.15

P-No.1

20

Preheat Piping Process Elv.10

P-No.1

20

Preheat Piping Process Elv.10

Remaining 8 joints

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

MATERIAL

JOINT

DIA INCH

CS

41

177

SS

51

50

228

Date:
29 Januari 2016
Pressure Part (24-31 JAN 2016)
Target

Previous

Today

SUBCONT

TOTAL

HP PIPING

CS

14

24

P91

P11

P22

271

14

24

Area

Total

Previous

Today

Balance

460

460

Boiler Bank Upper


Boiler Bank Lower
Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
SuperHeater III

234
230
648
836
76
304
304
1064

201
230
430
339
68
161
82
196

0
0
12
17
3
5
9
56

33
0
206
480
5
138
213
812

Superheater V

1064

14

TOTAL

5,220

0
2,181

567

102

HP Piping (24-31 JAN 2016)


Target
Today
Previous

Economizer I (Lower)

TOTAL

PRESSURE PART

1563

60

894

Balance
14

Remarks

please install scafolding

1050

102

2,937

LOCATION

Balance

PIPING PROCESS

PERMATA

DESCRIPTIONS

Elv.83

Elv.78
Elv.55

197

RUN

WELDING SECTION

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1

January 29, 2016

PLANING TOMORROW

Mat'l
P-No.5A
P-No.5A
P-No.5A

NPS
2
2
2

Qty
21
21
14

REMARKS
SuperHeater III
SuperHeater III
SuperHeater III

P-No.1

20

PWHT

1
1

Mat'l
P-No.5A
P-No.5A
P-No.5A
P-No.15E-8

NPS
2
2
2
2

Qty
21
21
21
5

REMARKS
SuperHeater III
SuperHeater III
SuperHeater III
SuperHeater IV

P-No.15E-15E

P-No.15E-8

SuperHeater V

P-No.1

Riser Screen Elv.52

SuperHeater IV

P-No.1

20

PWHT

P-No.1

Riser Screen Elv.52

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Screen Header Elv.52

Elv.33

P-No.1

20

PWHT

P-No.1

20

PWHT

Elv.15

P-No.1

20

Preheat Piping Process Elv.10

P-No.1

20

Preheat Piping Process Elv.10

If Possible SH V

Remaining 8 joints

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

MATERIAL

JOINT

DIA INCH

CS

25

194

SS

17

57

42

251

Date:
30 Januari 2016
Pressure Part (24-31 JAN 2016)
Target

Previous

Today

SUBCONT

TOTAL

HP PIPING

CS

26

P91

P11

P22

271

26

Area

Total

Previous

Today

Balance

234

201

33

Boiler Bank Lower


Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
SuperHeater III

230
648
836
76
304
304
1064

230
442
356
71
166
91
252

0
18
28
3
12
5
63

0
188
452
2
126
208
749

Superheater V

1064

14

TOTAL

4,760

0
1,823

669

129

HP Piping (24-31 JAN 2016)


Target
Today
Previous

Boiler Bank Upper

TOTAL

PRESSURE PART

1563

1050

129

2,808

74

Remarks

765

Balance
9

LOCATION

194

Balance

PIPING PROCESS

PERMATA

DESCRIPTIONS

Elv.83

Elv.78
Elv.55

188

RUN

WELDING SECTION

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1

January 30, 2016

PLANING TOMORROW

Mat'l
P-No.5A
P-No.5A
P-No.5A

NPS
2
2
2

Qty
21
21
21

REMARKS
SuperHeater III
SuperHeater III
SuperHeater III

P-No.1

Riser Screen Elv.52

1
1

Mat'l
P-No.5A
P-No.5A
P-No.5A
P-No.15E-8

NPS
2
2
2
2

Qty
21
21
21
5

REMARKS
SuperHeater III
SuperHeater III
SuperHeater III
SuperHeater IV

P-No.15E-15E

P-No.15E-8

SuperHeater V

P-No.1

Riser Screen Elv.52

SuperHeater IV

P-No.1

20

PWHT

P-No.1

20

PWHT

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Screen Header Elv.52

Elv.33

P-No.1

20

PWHT

P-No.1

20

PWHT

Elv.15

P-No.1

20

Preheat Piping Process Elv.10

P-No.1

20

Preheat Piping Process Elv.10

If Possible SH V

Remaining 8 joints

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

MATERIAL

JOINT

DIA INCH

CS

65
2

204

SS

17

32

84

236

PIPING PROCESS
TOTAL

HP PIPING

CS

33

P91

P11

P22

33

PRESSURE PART

TOTAL

Date:
31 Januari 2016
Pressure Part (24-31 JAN 2016)
Target

271

Area

Total

Previous

Today

Balance

234

201

33

Boiler Bank Lower


Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
SuperHeater IV
SuperHeater III

230
648
836
76
304
304
760
1064

230
460
384
74
178
96
0
315

0
14
16
2
14
0
10
63

0
174
436
0
112
208
750
686

Superheater V

1064

14

5,520

0
1,952

Today

798

1050

152

3,416

83

Remarks

613

Balance
8

LOCATION

194

Balance

152

HP Piping (24-31 JAN 2016)


Target
Today
Previous

Boiler Bank Upper

TOTAL

Previous

1563

SUBCONT

PERMATA

DESCRIPTIONS

Elv.83

Elv.78
Elv.55

180

RUN

WELDING SECTION

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1

Mat'l
P-No.5A
P-No.5A
P-No.5A
P-No.15E-8

NPS
2
2
2
2

Qty
21
21
21
5

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

P-No.15E-15E

P-No.1

SuperHeater IV

P-No.15E-8

SuperHeater V

P-No.15E-8

Riser Screen Elv.52

P-No.15E-8

1
1

January 31, 2016

PLANING TOMORROW
REMARKS
SuperHeater III
SuperHeater III
SuperHeater III
SuperHeater IV

SuperHeater V

If Possible SH V

SuperHeater V

move to Elv 78

SuperHeater III

move to Elv 78

P-No.5A

21

Elv.55

P-No.1

Screen Header Elv.52

P-No.1

Screen Header Elv.52

Elv.33

P-No.1

20

PWHT

P-No.1

20

PWHT

Elv.15

P-No.1

20

Preheat Piping Process Elv.10

P-No.1

20

Preheat Piping Process Elv.10

Remaining 8 joints

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

MATERIAL

JOINT

DIA INCH

CS

22

152

SS

16

89

Date:
01 Februari 2016
Pressure Part (01-07 FEB 2016)
Target

Previous

Today

SUBCONT

38

241

CS

10

25

P91

TOTAL

HP PIPING

P11

P22

143

10

25

Area

Total

Previous

Today

234

234

Screen Rear
Screen Middle
Screen Front Header
Screen Front Single Tube
Furnace Middle lower (Opening)
SuperHeater IV
SuperHeater III

648
836
76
304
304
760
1064

474
400
76
192
96
10
378

19
16
0
10
8
0
0

155
420
0
102
200
750
686

Superheater V

1064

14

TOTAL

5,290

Balance

42
1,874

95

HP Piping (01-07 FEB 2016)


Target
Today
Previous

Boiler Bank Upper

TOTAL

PRESSURE PART

914

1008

95

3,321

Remarks

819

Balance
10

LOCATION

194

Balance

PIPING PROCESS

PERMATA

DESCRIPTIONS

Elv.83

Elv.78

Date :
TODAY ACTIVITIES

February 1, 2016

PLANING TOMORROW

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-15E
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

P-No.15E-8

SuperHeater V

P-No.15E-8

P-No.15E-8

SuperHeater V

P-No.15E-8

P-No.15E-8

SuperHeater V

P-No.15E-15E

P-No.15E-8

SuperHeater IV

Riser Screen Elv 52

P-No.1

PWHT Screen Header Elv.52

133

RUN

WELDING SECTION

Qty

REMARKS
If Possible SH III
If Possible SH V
If Possible SH V
If Possible SH V
If Possible SH V
If Possible SH V
SuperHeater IV

Elv.55

P-No.1

Elv.33

P-No.1

20

PWHT

P-No.1

20

PWHT

Elv.15

P-No.1

20

Preheat Piping Process Elv.10

P-No.1

20

Preheat Piping Process Elv.10

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

MATERIAL

JOINT

DIA INCH

CS

32

198

02 Februari 2016

SUBCONT

Pressure Part (01-07 FEB 2016)


Target

Previous

Today

SS
TOTAL

HP PIPING

108

306

CS

10

40

P91

P11

P22

914

143

10

40

Area

Total

Previous

Today

Balance

648

493

18

137

Screen Middle

836

416

12

408

Screen Front Single Tube


Furnace Middle lower (Opening)

304
304

202
104

0
29

102
171

SuperHeater IV
SuperHeater III

760
1064

10
378

10
0

740
686

Superheater V

1064

56

1008

TOTAL

4,980

1,659

95

69

HP Piping (01-07 FEB 2016)


Target
Today
Previous

Screen Rear

TOTAL

PRESSURE PART

11
43

69

3,252

10

Remarks

750

Balance
10

LOCATION

194

Balance

PIPING PROCESS

PERMATA

Date:

DESCRIPTIONS

Elv.83

Elv.78

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-15E

NPS
2
2

Qty
5
5

February 2, 2016

PLANING TOMORROW
REMARKS
SuperHeater IV
SuperHeater IV

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

PWHT Screen Header Elv.52

P-No.1

Riser Screen Elv. 52

123

RUN

WELDING SECTION

Elv.55

P-No.1

Elv.33

P-No.1

20

PWHT

P-No.1

20

PWHT

Elv.15

P-No.1

20

Preheat Piping Process Elv.10

P-No.1

20

Preheat Piping Process Elv.10

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

22

168

SS

24

153

46

321

CS

16

63

P91

04 Februari 2016

SUBCONT

Pressure Part (01-07 FEB 2016)


Target

Previous

Today

Balance

PIPING PROCESS

Elv.83

P11

P22
TOTAL

143

Balance
16

107

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.1

8.10

1
Elv.78

Preparation Machine

Preparation Machine

Previous

Today

511

21

116

428

19

389

Screen Front Single Tube


Furnace Middle lower (Opening)

304
304

202
133

12
30

90
141

SuperHeater IV

760

20

740

SuperHeater III

1064

378

686

Superheater V

1064

56

42

966

124

Preparation Machine
Preparation Machine

Elv.55

1
1

P-No.1

12

Riser Screen Elv. 52

P-No.1

12

Elv.33

P-No.1

20

PWHT

P-No.1

20

PWHT

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

EL 74 J 12, EL 60 J12 (GAP>10MM)

3,128

Spray Water Elv 82


Preparation Machine

648

1,728

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

836

Remarks

February 4, 2016

PLANING TOMORROW

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

Screen Rear

4,980

Balance

20

626

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1

Screen Middle

TOTAL

Total

0
63

124

HP Piping (01-07 FEB 2016)


Target
Today
Previous

16

164

RUN

PRESSURE PART

Area

914

PERMATA

TOTAL

HP PIPING

LOCATION

Preparation Machine
Riser Screen Elv. 52

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

39

146

04 Februari 2016

SUBCONT

Pressure Part (01-07 FEB 2016)


Target

Previous

Today

Balance

PIPING PROCESS

Elv.83
4

82

43

228

CS

54

P91

P11

P22

0
54

143

Area

Total

Previous

Today

Balance

Screen Rear

648

532

18

98

Screen Middle

836

447

11

378

Screen Front Single Tube


Furnace Middle lower (Opening)

304
304

214
163

12
38

78
103

SuperHeater IV

760

20

10

730

SuperHeater III

1064

378

679

Superheater V

1064

98

28

938

TOTAL

4,980

1,852

124

HP Piping (01-07 FEB 2016)


Target
Today
Previous

288

124

36

502

Balance
9

98

Elv.78

Remarks

Date :
TODAY ACTIVITIES
Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.1

8.10

Spray Water Elv 82

P-No.5A

P-No.5A

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

SuperHeater III
SuperHeater III

Preparation Machine

Preparation Machine

3,004

February 4, 2016

PLANING TOMORROW

QTY Machine
1
1
1
1

Preparation Machine

Elv.55

1
1

P-No.1

12

Riser Screen Elv. 52

P-No.1

12

Elv.33

P-No.1

20

PWHT

P-No.1

20

PWHT

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

EL 74 J 12, EL 60 J12 (GAP>10MM)

RUN

PRESSURE PART

TOTAL

914

PERMATA

SS
TOTAL

HP PIPING

LOCATION

Preparation Machine
Riser Screen Elv. 52

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION
DESCRIPTIONS

MATERIAL
CS

JOINT
30

DIA INCH
219

SS

13

108

43

327

Date:
05 Februari 2016
Pressure Part (01-07 FEB 2016)
Target
Previous
Today
Balance

SUBCONT

PIPING PROCESS

Elv.83

74

P11

P22

11

74

Area

Total

Previous

Today

Balance

Screen Rear

648

550

18

80

Screen Middle
Screen Front Single Tube
Furnace Middle lower (Opening)
SuperHeater IV

836
304
304
760

458
226
201
30

17
10
29
20

361
68
74
710

SuperHeater III

1064

385

Superheater V

1064

126

4,980

HP Piping (01-07 FEB 2016)


Target
Today
Previous
143

14

366

910

136

45

Balance
11

87

Elv.78

Remarks

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

February 5, 2016

PLANING TOMORROW
REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
2
5

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater IV

P-No.15E-8

SuperHeater V

P-No.15E-15E

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-8

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

P-No.5A

14

SuperHeater III

P-No.5A

14

SuperHeater III

P-No.1

8.10

Spray Water Elv 82

P-No.1

16

Feed Water to header eco 2 el 84

SuperHeater IV
SuperHeater IV

665

28
1,976

136

PERMATA

11

TOTAL

412

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1
1

CS
P91

TOTAL

PRESSURE PART

914

2,868

If Possible SH V
If Possible SH V
If Possible SH V

Elv.55
Elv.33

1
1
1
1

P-No.1
P-No.1

2
20

12
1

Riser Screen Elv. 52


PWHT

P-No.1
P-No.1

2
20

12
1

Riser Screen Elv. 52


PWHT

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

EL 74 J 12, EL 60 J12 (GAP>10MM)

RUN

TOTAL

HP PIPING

LOCATION

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

42

282

SS

10

42.5

52

324.5

06 Februari 2016

SUBCONT

Pressure Part (01-07 FEB 2016)


Target

Previous

Today

Balance

PIPING PROCESS

Elv.83

CS

40

P91

P11

P22

40

548

127

239

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1
1

HP Piping (01-07 FEB 2016)


Target
Today
Previous
143

56

Balance
8

79

Elv.78

Qty
6
6
2
5

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater IV

SuperHeater V

P-No.15E-15E

SuperHeater IV

SuperHeater IV

P-No.15E-8

SuperHeater IV

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.5A

14

SuperHeater III

P-No.15E-15E

SuperHeater IV

P-No.1

8.10

Spray Water Elv 82

P-No.15E-15E

P-No.5A

SuperHeater III

P-No.1

16

Feed Water to header eco 2 el 84

648

568

71

Screen Middle

836

475

11

350

Screen Front Single Tube


Furnace Middle lower (Opening)

304
304

236
230

22
18

46
56

SuperHeater IV

760

50

25

685

SuperHeater III

1064

399

14

651

Superheater V

1064

154

28

882

SuperHeater IV

Elv.55

1
1

P-No.1

12

Riser Screen Elv. 52

P-No.1

12

Elv.33

P-No.1

20

PWHT

P-No.1

20

PWHT

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

EL 74 J 12, EL 60 J12 (GAP>10MM)

2,741

NPS
2
2
2
2

Screen Rear

127

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

P-No.15E-8

Balance

2,112

February 6, 2016

PLANING TOMORROW
REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

P-No.15E-8

Today

4,980

Qty
6
6
6
6

P-No.15E-15E

Previous

TOTAL

NPS
2
2
2
2

Total

Remarks

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

Area

RUN

PRESSURE PART

TOTAL

914

PERMATA

TOTAL

HP PIPING

LOCATION

Riser Screen Elv. 52

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION
DESCRIPTIONS

MATERIAL
CS

JOINT
39

DIA INCH
208

SS

13

69

52

277

Date:
07 Februari 2016
Pressure Part (01-07 FEB 2016)
Target
Previous
Today
Balance

SUBCONT

PIPING PROCESS

Elv.83

CS

40

P91

P11

P22

675

92

HP Piping (01-07 FEB 2016)


Target
Today
Previous
143

64

147

Balance
4

75

Elv.78

Date :
TODAY ACTIVITIES

February 7, 2016

PLANING TOMORROW

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
2
5

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater IV

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

SuperHeater V

P-No.15E-15E

SuperHeater IV

P-No.15E-8

P-No.15E-8

SuperHeater IV

P-No.15E-8

P-No.15E-15E

SuperHeater IV

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

SuperHeater V

40

P-No.15E-15E

Area

Total

Previous

Today

Balance

P-No.5A

SuperHeater III

P-No.5A

21

SuperHeater III

Screen Rear

648

577

15

56

P-No.1

16

Feed Water to header eco 2 el 84

P-No.15E-8

SuperHeater IV

Screen Middle
Screen Front Single Tube
Furnace Middle lower (Opening)
SuperHeater IV

836
304
304
760

486
258
247
85

0
4
17
35

350
42
40
640

Elv.55
Elv.33

1
1
1
1

P-No.1
P-No.1

2
20

4
1

Riser Screen Elv. 52


PWHT

P-No.15E-8
P-No.1
P-No.1
P-No.1

2
16
2
20

6
2
12
1

SuperHeater IV
Feed Water to header eco 2 el 84
Riser Screen Elv. 52
PWHT

SuperHeater III

1064

406

651

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

Superheater V

1064

168

14

882

TOTAL

4,980

2,227

92

2,661

Remarks

EL 74 J 12, EL 60 J12 (GAP>10MM)

RUN

TOTAL

PRESSURE PART

914

PERMATA

TOTAL

HP PIPING

LOCATION

Move to el 55

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

31

234

09 Februari 2016

SUBCONT

Pressure Part (08-14 FEB 2016)


Target

Previous

Today

Balance

PIPING PROCESS

Elv.83
84

318

CS

64

P91

P11

P22

1108

189

HP Piping (01-07 FEB 2016)


Target
Today
Previous
184

919

Balance
8

176

Elv.78

Date :
TODAY ACTIVITIES

February 9, 2016

PLANING TOMORROW

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

SuperHeater IV

SuperHeater V

64

P-No.15E-15E

P-No.15E-15E

Area

Total

Previous

Today

Balance

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

Screen Rear

648

592

11

45

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

Screen Middle

836

486

42

308

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

Screen Front Single Tube


Furnace Middle lower (Opening)

304
304

262
264

18
30

24
10

1
1

P-No.1

16

Feed Water to header eco 2 el 84

P-No.15E-8
P-No.1

2
16

5
2

SuperHeater IV
Boiler Bank Down Comer el 52

SuperHeater IV

760

120

25

615

P-No.1

Riser Screen Elv. 52

P-No.1

12

Riser Screen Elv. 52

SuperHeater III

1064

413

21

630

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

Superheater V

1064

182

42

840

TOTAL

4,980

2,319

189

Remarks

EL 74 J 12, EL 60 J12 (GAP>10MM)

RUN

TOTAL

PRESSURE PART

9
40

PERMATA

SS
TOTAL

HP PIPING

LOCATION

2,472

Elv.55
Elv.15

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

29

164

SS

16

99

45

263

10 Februari 2016

SUBCONT

Pressure Part (08-14 FEB 2016)


Target

Previous

Today

Balance

PIPING PROCESS

Elv.83

CS

52

P91

P11

P22

189

142

HP Piping (01-07 FEB 2016)


Target
Today
Previous
184

777

Balance
6

170

Elv.78

Date :
TODAY ACTIVITIES

February 10, 2016

PLANING TOMORROW

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

SuperHeater IV

SuperHeater V

52

P-No.15E-15E

P-No.15E-15E

Area

Total

Previous

Today

Balance

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

Screen Rear

648

603

18

27

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

Screen Middle

836

528

301

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

Screen Front Single Tube


Furnace Middle lower (Opening)

304
304

280
294

12
7

12
3

1
1

P-No.15E-8
P-No.1

2
16

5
2

SuperHeater IV
Boiler Bank Down Comer el 52

P-No.1
P-No.1

16
16

2
2

Feed Water to header eco 2 el 84


Boiler Bank Down Comer el 52

SuperHeater IV

760

145

35

580

P-No.1

Riser Screen Elv. 52

P-No.1

12

Riser Screen Elv. 52

SuperHeater III

1064

434

21

609

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

Superheater V

1064

224

42

798

TOTAL

4,980

2,508

142

Remarks

EL 74 J 12, EL 60 J12 (GAP>10MM)

RUN

TOTAL

PRESSURE PART

1108

PERMATA

TOTAL

HP PIPING

LOCATION

2,330

Elv.55
Elv.15

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION
DESCRIPTIONS

MATERIAL
CS

JOINT
39

DIA INCH
209

SS

12

72

51

281

Date:
11 Februari 2016
Pressure Part (08-14 FEB 2016)
Target
Previous
Today
Balance

SUBCONT

PIPING PROCESS

Elv.83

CS

71

P91

P11

P22

331

124

HP Piping (08-14 FEB 2016)


Target
Today
Previous
184

14

653

Balance
6

164

Elv.78

Date :
TODAY ACTIVITIES

February 11, 2016

PLANING TOMORROW

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

SuperHeater IV

SuperHeater V

71

P-No.15E-15E

P-No.15E-15E

Area

Total

Previous

Today

Balance

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

Screen Rear

648

621

18

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

Screen Middle
Screen Front Single Tube
Furnace Middle lower (Opening)
SuperHeater IV

836
304
304
760

535
292
301
180

17
12
3
20

284
0
0
560

1
1
1
1

P-No.15E-8
P-No.15E-8

2
2

6
6

SuperHeater IV
Welder test

P-No.1
P-No.1

16
2

2
10

Boiler Bank Down Comer el 52


Riser Screen Elv. 52

P-No.1

PWHT Header Screen Elv. 52

SuperHeater III

1064

455

21

588

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

Superheater V

1064

266

TOTAL

4,980

42
2,650

756

124

2,206

Remarks

RUN

TOTAL

PRESSURE PART

1108

PERMATA

TOTAL

HP PIPING

LOCATION

Elv.55
Elv.15

move to El 84

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

40

234

SS

13

116

53

350

12 Februari 2016

SUBCONT

Pressure Part (08-14 FEB 2016)


Target

Previous

Today

Balance

PIPING PROCESS

Elv.83

CS

53

P91

P11

P22

455

119

HP Piping (08-14 FEB 2016)


Target
Today
Previous
184

20

534

Balance
6

158

Elv.78

Date :
TODAY ACTIVITIES

February 12, 2016

PLANING TOMORROW

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

SuperHeater IV

SuperHeater V

53

P-No.15E-15E

P-No.15E-15E

Area

Total

Previous

Today

Balance

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

Screen Rear

648

630

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

Screen Middle

836

552

22

262

P-No.1

12

Feed Water Eco Elv 84

P-No.15E-8

SuperHeater IV

Screen Front Single Tube


Furnace Middle lower (Opening)

304
304

304
304

0
0

0
0

1
1

P-No.15E-8

Welder test

Elv.83

P-No.15E-15E
P-No.5A

2
2

6
21

SuperHeater IV
SuperHeater III

SuperHeater IV

760

200

25

535

Elv.55

P-No.1

10

Riser Screen Elv. 52

P-No.1

PWHT Header Screen Elv. 52

SuperHeater III

1064

476

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

Superheater V

1064

308

TOTAL

4,980

21

567

42
2,774

714

119

Remarks

RUN

TOTAL

PRESSURE PART

1108

PERMATA

TOTAL

HP PIPING

LOCATION

2,087

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

45

243

13 Februari 2016

SUBCONT

Pressure Part (08-14 FEB 2016)


Target

Previous

Today

Balance

PIPING PROCESS

Elv.83
74

317

CS

40

P91

P11

P22

1108

574

145

HP Piping (08-14 FEB 2016)


Target
Today
Previous
184

26

389

Balance
8

150

Elv.78

Date :
TODAY ACTIVITIES

February 13, 2016

PLANING TOMORROW

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

SuperHeater IV

SuperHeater V

40

P-No.15E-15E

P-No.15E-15E

Area

Total

Previous

Today

Balance

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

Screen Rear

648

639

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

Screen Middle

836

574

11

251

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV
SuperHeater IB

760
760

225

35
10

500
750

Elv.83

1
1

P-No.15E-15E
P-No.5A

2
2

6
21

SuperHeater IV
SuperHeater III

P-No.5A
P-No.5A

2
2

21
21

SuperHeater III
SuperHeater III

SuperHeater III

1064

497

42

525

Elv.55

P-No.1

PWHT Header Screen Elv. 52

P-No.1

PWHT Header Screen Elv. 52

Superheater V

1064

350

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

TOTAL

5,132

42
2,285

672

145

Remarks

RUN

TOTAL

PRESSURE PART

6
51

PERMATA

SS
TOTAL

HP PIPING

LOCATION

2,702

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

SS

14 Februari 2016

SUBCONT

Pressure Part (08-14 FEB 2016)


Target

Previous

Today

Balance

PIPING PROCESS

Elv.83

CS

P91

P11

P22

719

175

HP Piping (08-14 FEB 2016)


Target
Today
Previous
184

34

214

Balance
0

150

Elv.78

Date :
TODAY ACTIVITIES

February 14, 2016

PLANING TOMORROW

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

SuperHeater IV

SuperHeater V

P-No.15E-15E

P-No.15E-15E

Area

Total

Previous

Today

Balance

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

Screen Rear

648

644

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

Screen Middle

836

585

245

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

Elv.83

1
1

P-No.15E-15E
P-No.5A

2
2

6
21

SuperHeater IV
SuperHeater III

P-No.5A
P-No.5A

2
2

21
21

SuperHeater III
SuperHeater III

Elv.55

P-No.1

PWHT Header Screen Elv. 52

P-No.1

PWHT Header Screen Elv. 52

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

SuperHeater IV
SuperHeater IB

760
760

260
10

30
30

470
720

SuperHeater III

1064

539

63

462

Superheater V

1064

392

TOTAL

5,132

42
2,430

630

175

Remarks

RUN

TOTAL

PRESSURE PART

1108

PERMATA

TOTAL

HP PIPING

LOCATION

2,527

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

32

137

15 Februari 2016

SUBCONT

Pressure Part (15-21 FEB 2016)


Target

Previous

Today

Balance

PIPING PROCESS

Elv.83
94

231

CS

22

P91

P11

P22

0-

157

HP Piping (15-21 FEB 2016)


Target
Today
Previous
0-

Balance
5

Elv.78

Date :
TODAY ACTIVITIES

February 15, 2016

PLANING TOMORROW

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

SuperHeater IV

SuperHeater V

22

P-No.15E-15E

P-No.15E-15E

Area

Total

Previous

Today

Balance

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

Screen Rear

648

648

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

Screen Middle

836

591

18

227

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV
SuperHeater IB

760
760

290
40

30
25

440
695

1
1

P-No.15E-15E

SuperHeater IV

Elv.83

P-No.5A
P-No.5A

2
2

21
21

SuperHeater III
SuperHeater III

SuperHeater III

1064

602

42

420

Elv.55

P-No.1

PWHT Header Screen Elv. 52

P-No.1

PWHT Header Screen Elv. 52

Superheater V

1064

434

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

TOTAL

5,132

42
2,605

588

157

Remarks

RUN

TOTAL

PRESSURE PART

8
40

PERMATA

SS
TOTAL

HP PIPING

LOCATION

2,370

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION
DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

35

171

Date:
16 Februari 2016
Pressure Part (15-21 FEB 2016)
Target

Previous

Today

SUBCONT

PIPING PROCESS

Elv.83
33

81

68

252

86

P11

P22

86

CS
P91

157

163

Today

Previous

Balance
9

0
56

Elv.78

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

P-No.15E-8

P-No.15E-8

P-No.15E-8

P-No.15E-8

P-No.15E-15E

P-No.15E-15E

Description

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

SuperHeater IV

P-No.15E-8

SuperHeater IV

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater V
SuperHeater V

Area

Total

Previous

Today

Balance

P-No.5A

21

SuperHeater III

P-No.5A

21

Screen Middle

836

609

14

213

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

760
760

320
65

30
35

410
660

1
1

P-No.15E-8
P-No.15E-15E

2
2

5
6

SuperHeater IV
SuperHeater IV

P-No.15E-15E
P-No.1

2
8

6
2

SuperHeater IV
Spray Water elv 83

SuperHeater III

1064

644

P-No.5A

21

SuperHeater III

P-No.5A

Superheater V

1064

476

TOTAL

4,484

42

Remarks

378

42
2,114

February 16, 2016

PLANING TOMORROW
REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

SuperHeater IV
SuperHeater IB

546

163

2,207

RUN

PRESSURE PART

TOTAL

HP Piping (15-21 FEB 2016)


Target

PERMATA

SS
TOTAL

HP PIPING

LOCATION

Balance

Elv.83

SuperHeater III

21

P-No.5A

21

SuperHeater III

P-No.1

12

Feed water eco elv 83

SuperHeater III

P-No.1

8.10

Spray Water elv 83

Elv.55

P-No.1

PWHT Header Screen Elv. 52

P-No.1

PWHT Header Screen Elv. 52

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

fins,membran wall and peanuts


area
Weld Length

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION
DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

65

353

Date:
17 Februari 2016
Pressure Part (15-21 FEB 2016)
Target

Previous

Today

SUBCONT

PIPING PROCESS

Elv.83
97.5

450.5

14

62

P11

SS

P22

14

62

Previous

Today

Area
Screen Middle

Total

320

182

Today

Previous
0

14

Balance
14

0
56

Balance

Elv.78

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

P-No.15E-8

P-No.15E-8

P-No.15E-8

P-No.15E-8

P-No.15E-15E

P-No.15E-15E

P-No.5A

21

Remarks

NPS
2
2
2
2

Qty
6
6
6
6

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

P-No.15E-15E

SuperHeater IV

21

SuperHeater III

P-No.5A

5,000
21,000

Fin Lower Nose outside

8,000

Total

52,000

SuperHeater III

623

17

196

P-No.15E-8

SuperHeater IV

P-No.15E-8

30

380

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

100

30

630

P-No.1

Spray Water elv 83

P-No.15E

22

Main Steam Elv 74

686

63

315

P-No.5A

21

SuperHeater III

P-No.5A

21

Superheater V

1064

518

P-No.5A

21

SuperHeater III

P-No.5A

21

P-No.1

12

Feed water eco elv 83

P-No.1

12

Feed water eco elv 83

P-No.1

8.10

Spray Water elv 83

P-No.1

8.10

Feed water pipe eco II sweet water condenser elv 83

Elv.55

P-No.1

PWHT Header Screen Elv. 52

P-No.1

PWHT Header Screen Elv. 52

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

2,025

Elv.83

5,000

Fin Upper Nose Outside


Membran Wall Furnace middle upper front inside

SuperHeater V

350

504

Membran wall FMLRR inside

5,000
8,000

SuperHeater V

760

182

Date:

Weld Length

SuperHeater V

836

42

Description
area
Membran wall lower furnace rear outside
Membran wall upper nose inside

SuperHeater IV

760

2,277

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

1064
4,484

FINS, MEMBRAN WALL AND PEANUTS


RECOVERY BOILER

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

SuperHeater III
TOTAL

February 17, 2016


PLANING TOMORROW

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

SuperHeater IB

SuperHeater IV

RUN

PRESSURE PART

TOTAL

HP Piping (15-21 FEB 2016)


Target

PERMATA

11
76

CS
P91

TOTAL

HP PIPING

LOCATION

Balance

SuperHeater IV

SuperHeater III
SuperHeater III

February 16,2016

Total Length

welded

TODAY

BALANCE

29,588,230

19,688,547

52,000

9,847,683

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION
DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

65

353

Date:
17 Februari 2016
Pressure Part (15-21 FEB 2016)
Target

Previous

Today

SUBCONT

PIPING PROCESS

Elv.83
97.5

450.5

14

62

P11

SS

P22

14

62

Previous

Today

Area
Screen Middle

Total

320

182

Today

Previous
0

14

Balance
14

0
56

Balance

Elv.78

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

P-No.15E-8

P-No.15E-8

P-No.15E-8

P-No.15E-8

P-No.15E-15E

P-No.15E-15E

P-No.5A

21

Remarks

NPS
2
2
2
2

Qty
6
6
6
6

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

P-No.15E-15E

SuperHeater IV

21

SuperHeater III

P-No.5A

5,000

Fin Upper Nose Outside

5,000

Membran Wall Furnace middle upper front inside

21,000

SuperHeater V

Fin Lower Nose outside

8,000

Total

52,000

SuperHeater III

623

17

196

P-No.15E-8

SuperHeater IV

P-No.15E-8

350

30

380

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

100

30

630

P-No.1

Spray Water elv 83

P-No.15E

22

Main Steam Elv 74

686

63

315

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

Superheater V

1064

518

42

504

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

Elv.83

5,000
8,000

SuperHeater V

760

2,025

Membran wall FMLRR inside

Weld Length

SuperHeater V

836

182

Date:

Description
area
Membran wall lower furnace rear outside
Membran wall upper nose inside

SuperHeater IV

760

2,277

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

1064
4,484

FINS, MEMBRAN WALL AND PEANUTS


RECOVERY BOILER

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

SuperHeater III
TOTAL

February 17, 2016


PLANING TOMORROW

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

SuperHeater IB

SuperHeater IV

RUN

PRESSURE PART

TOTAL

HP Piping (15-21 FEB 2016)


Target

PERMATA

11
76

CS
P91

TOTAL

HP PIPING

LOCATION

Balance

SuperHeater IV

P-No.1

12

Feed water eco elv 83

P-No.1

12

Feed water eco elv 83

P-No.1

8.10

Spray Water elv 83

P-No.1

8.10

Feed water pipe eco II sweet water condenser elv 83

Elv.55

P-No.1

PWHT Header Screen Elv. 52

P-No.1

PWHT Header Screen Elv. 52

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

20

PWHT Piping Process Elv.10

no power no progress

February 16,2016

Total Length

welded

TODAY

BALANCE

29,588,230

19,688,547

52,000

9,847,683

RECOVERY BOILER DAILY PROGRESS

ARRANGEMENT PRE-HEAT MACHINE

WELDING SECTION
DESCRIPTIONS

MATERIAL

JOINT

DIA INCH

CS

89

414

Date:
19 Februari 2016
Pressure Part (15-21 FEB 2016)
Target

Previous

Today

SUBCONT

Elv.83
122

614.5

CS

10

104

0
0

10

104

Area

Total

Previous

Today

Balance

Screen Middle

836

640

24

172

760

380

30

760
760

130

10
50

750
580

1064

15

1049

1064

749

42

273

Superheater V

1064

560

42

462

2,459

28

Balance
10

213

3,636

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

P-No.15E-8

P-No.15E-8

P-No.15E-8

FINS, MEMBRAN WALL AND PEANUTS

February 19, 2016


PLANING TOMORROW

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

P-No.15E-8

P-No.15E-8

P-No.15E-8

Date:

RECOVERY BOILER
REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Description
area
Membran wall lower furnace rear outside
Membran wall upper nose inside
Membran wall FMLRR inside

15,000

SuperHeater V
SuperHeater V

Weld Length
7,000
8,000

Fin Lower Nose Inside


Membran Wall Furnace middle upper front inside

5,500
32,000

SuperHeater V

Fin Lower Nose outside

11,000

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

Total

78,500

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

1
1

P-No.15E
P-No.5A

22
2

1
21

Main Steam Elv 74


SuperHeater III

P-No.5A
P-No.5A

P-No.5A

21

SuperHeater III

P-No.5A

P-No.1

12

Feed water eco elv 83

P-No.1

P-No.1

8.10

Feed water pipe eco II sweet water condenser elv 83

P-No.1

Elv.55

P-No.1

PWHT Header Screen Elv. 52

Elv.15

P-No.1

20

PWHT Piping Process Elv.10

1
1

Elv.78

Remarks

350

SuperHeater II
SuperHeater III

6,308

Today

Previous
0

SuperHeater 1A
SuperHeater IB

TOTAL

Date :
TODAY ACTIVITIES

QTY Machine
1
1
1
1
1

0
0

SuperHeater IV

213

HP Piping (15-21 FEB 2016)


Target

P11
P22

TOTAL

502

PERMATA

200.5

P91

TOTAL

PRESSURE PART

33

RUN

SS

HP PIPING

LOCATION

Balance

PIPING PROCESS

Elv.83

SuperHeater V
SuperHeater V

2
2

21
21

21

SuperHeater III

12

Feed water eco elv 83

SuperHeater IV

8.10

Feed water pipe eco II sweet water condenser elv 83

P-No.1

PWHT Header Screen Elv. 52

P-No.1

20

PWHT Piping Process Elv.10

SuperHeater II
SuperHeater III

Move to Elv 55

February 16,2016

Total Length

Welded

Today

Balance

29,588,230

19,740,547

78,500

9,769,183

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

RUN

PERMATA

Elv.83

Elv.78

Elv.83

Elv.55

Date :

February 20, 2016

FINS, MEMBRAN WALL AND PEANUTS

Date:

February 20,2016

RECOVERY BOILER

Total Length

Welded

Today

Balance

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Description
area
Membran wall lower furnace rear outside
Membran wall upper nose inside

29,588,230

19,819,047

72,000

9,697,183

Membran wall FMLRR inside

15,000

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

Fin Lower Nose Inside


Membran Wall Furnace middle upper front inside

5,500
29,000

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

Fin Lower Nose outside

9,500

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

Total

72,000

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

SuperHeater IV

SuperHeater IV

TODAY ACTIVITIES

PLANING TOMORROW

P-No.15E-15E

P-No.15E-15E

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

1
1
1

P-No.15E-15E
P-No.15E
P-No.5A

2
22
2

6
1
21

SuperHeater IV
PWHT MainSteam Elv 74
SuperHeater III

P-No.15E-15E
P-No.5A
P-No.5A

2
2
2

6
21
21

SuperHeater IV
SuperHeater II
SuperHeater III

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

1
1

P-No.1
P-No.1

12
8.10

2
3

Feed water eco elv 83


Feed water pipe eco II sweet water condenser elv 83

P-No.1
P-No.1

12
8.10

2
3

Feed water eco elv 83


Feed water pipe eco II sweet water condenser elv 83

P-No.1

PWHT Header Screen Elv. 52

P-No.1

PWHT Header Screen Elv. 52

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

PWHT Header Screen Elv. 52

Weld Length
5,000
8,000

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

RUN

PERMATA

Elv.83

Elv.78

Elv.83

Elv.55

Date :

February 22, 2016

FINS, MEMBRAN WALL AND PEANUTS

Date:

February 22,2016

RECOVERY BOILER

Total Length

Welded

Today

Balance

QTY Machine
1
1
1
1

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Mat'l
P-No.15E-8
P-No.15E-8
P-No.15E-8
P-No.15E-8

NPS
2
2
2
2

Qty
6
6
6
6

REMARKS
SuperHeater V
SuperHeater V
SuperHeater V
SuperHeater V

Description
area
Membran wall lower furnace rear outside
Membran wall upper nose inside

29,588,230

19,891,047

75,000

9,622,183

Welded

Today

Balance

Membran wall FMLRR inside

10,000

6,600

4,000

415,000

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

Fin Lower Nose Inside


Membran Wall Furnace middle upper front inside

5,000
24,000

P-No.15E-8

SuperHeater V

P-No.15E-8

SuperHeater V

membran boiler bank front

3,000

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

peanuts lower rear

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

Seal Box opening screen

4,000

P-No.15E-15E

SuperHeater IV

P-No.15E-15E

SuperHeater IV

Fin Lower Nose outside

15,000

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

Total

79,000

P-No.15E-8

SuperHeater IV

P-No.15E-8

SuperHeater IV

1
1
1

P-No.15E-15E
P-No.15E
P-No.5A

2
22
2

6
1
21

SuperHeater IV
PWHT MainSteam Elv 74
SuperHeater III

P-No.15E-15E
P-No.5A
P-No.5A

2
2
2

6
21
21

SuperHeater IV
SuperHeater II
SuperHeater III

P-No.5A

21

SuperHeater III

P-No.5A

21

SuperHeater III

1
1

P-No.1
P-No.1

12
8.10

2
3

Feed water eco elv 83


Feed water pipe eco II sweet water condenser elv 83

P-No.1
P-No.1

12
8.10

2
3

Feed water eco elv 83


Feed water pipe eco II sweet water condenser elv 83

P-No.1

PWHT Header Screen Elv. 52

P-No.1

PWHT Header Screen Elv. 52

P-No.1

20

PWHT Piping Process Elv.10

P-No.1

PWHT Header Screen Elv. 52

TODAY ACTIVITIES

PLANING TOMORROW

Weld Length
5,000
8,000

5,000

Seal Box opening screen


Total Length
425,600

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
DESCRIPTIONS

MATERIAL
CS

JOINT
43

DIA INCH
198

SS

70

51

268

CS

25

178

P91

P11

P22

25

178

Date:
23 Februari 2016
Pressure Part (22-29 FEB 2016)
Target
Today
Previous
Balance

PIPING PROCESS
TOTAL

HP PIPING

PRESSURE PART

TOTAL

Total

Previous

Today

Balance

Screen Middle

836

701

20

115

SuperHeater IV

760

470

30

260

SuperHeater 1A
SuperHeater IB

1140
380

60
315

30
40

1050
25

SuperHeater II

1064

45

15

1004

SuperHeater III

1064

875

42

147

Superheater V

1064

686

42

336

6,308

3,152

219

HP Piping (22-29 FEB 2016)


Target
Today
Previous

Area

TOTAL

965

219

2,937

53

Balance
25

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
DESCRIPTIONS

MATERIAL
CS

JOINT
43

DIA INCH
198

SS

70

51

268

CS

25

178

P91

P11

P22

25

178

Date:
23 Februari 2016
Pressure Part (22-29 FEB 2016)
Target
Today
Previous
Balance

PIPING PROCESS
TOTAL

HP PIPING

PRESSURE PART

TOTAL

Total

Previous

Today

Balance

Screen Middle

836

701

20

115

SuperHeater IV

760

470

30

260

SuperHeater 1A
SuperHeater IB

1140
380

60
315

30
40

1050
25

SuperHeater II

1064

45

15

1004

SuperHeater III

1064

875

42

147

Superheater V

1064

686

42

336

6,308

3,152

219

HP Piping (22-29 FEB 2016)


Target
Today
Previous

Area

TOTAL

965

219

2,937

53

Balance
25

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
DESCRIPTIONS

11

56

Date:
25 Februari 2016
Pressure Part (22-29 FEB 2016)
Target
Today
Previous
Balance
0
965
122
HP Piping to Hydrotest
Total
Today
Previous
Balance

73

350

2669

CS

40

P91

P11

P22

40

MATERIAL
CS

JOINT
62

DIA INCH
294

PIPING PROCESS
SS
TOTAL

HP PIPING

PRESSURE PART

TOTAL
Area

Total

Previous

Today

Balance

Screen Middle

836

721

115

SuperHeater IV

760

500

25

235

SuperHeater 1A
SuperHeater IB

1140
380

90
355

10
25

1040
0

SuperHeater II

1064

60

20

984

SuperHeater III

1064

917

42

105

Superheater V

1064

728

336

HP PIPING TO
HYDROTEST

TOTAL

6,308

122

3,371

Today

Total

Previous

CS

2308

1057

P91
P11

131
152

68
87

63

P22

78

40

38

2669

1252

total

Balance
1233
65

18

18

Remarks

2,815

MATERIAL

18

1252

1399

Remarks

1399

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
SS

DIA INCH
187
0

CS
P91
P11

JOINT
33
0
33
0
0
0

P22

TOTAL

HP PIPING

PRESSURE PART

TOTAL

187
0
0
0

Area

Total

Previous

Today

Balance

Screen Middle

836

721

106

SuperHeater IV

760

525

235

SuperHeater 1A

1140

100

20

1020

SuperHeater IB
SuperHeater II
SuperHeater III

380
1064
1064

380
80
959

0
0
0

0
984
105

Superheater V

1064

728

42

294

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
7,541
3,493
HP Piping to Hydrotest
Total
Previous
2669
1270

7,541

MATERIAL

Total

Previous

CS
P91
P11

2308
131
152

1075
68
87

P22

78

40

2669

1270

total

71

3,493

Today
18

Today

Balance
71

Today

2,744
Balance

18

Remarks

2,744
Balance
1215
63
65
38

18

26 Februari 2016

1381

Remarks

1381

Circulation Pipe Riser


Area

Total

Previous

Today

Balance

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
SS

DIA INCH
195
71

CS
P91
P11

JOINT
37
16
53
0
0
0

P22

TOTAL

HP PIPING

PRESSURE PART

TOTAL

266
0
0
0

Area

Total

Previous

Today

Balance

Screen Middle

836

721

113

SuperHeater IV

760

525

235

SuperHeater 1A

1140

120

1015

SuperHeater IB
SuperHeater II
SuperHeater III

380
760
1064

380
80
959

0
0
0

0
680
105

Superheater V

1064

770

294

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
7,237
3,555
HP Piping to Hydrotest
Total
Previous
2669
1288

7,237

MATERIAL

Total

Previous

CS
P91
P11

2308
131
152

1093
68
87

P22

78

40

2669

1288

total

3,555

Today
20

Today

Balance
7

Today

2,442
Balance

20

Remarks

2,442
Balance
1195
63
65
38

20

27 Februari 2016

1361

Remarks

1361

Circulation Pipe Riser


Area

Total

Previous

Today

Balance

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
SS

DIA INCH
0
0

CS
P91
P11

JOINT
0
0
0
0
0
0

P22

TOTAL

HP PIPING

PRESSURE PART

TOTAL

0
0
0
0

Area

Total

Previous

Today

Balance

Screen Middle

836

723

113

SuperHeater IV

760

525

235

SuperHeater 1A

1140

125

1015

SuperHeater IB
SuperHeater II
SuperHeater III

380
760
1064

380
80
959

0
0
0

0
680
105

Superheater V

1064

770

294

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
7,237
3,562
HP Piping to Hydrotest
Total
Previous
2669
1308

7,237

MATERIAL

Total

Previous

CS
P91
P11

2308
131
152

1113
68
87

P22

78

40

2669

1308

total

3,562

Today
12

Today

Balance
-

Today

2,442
Balance

12

Remarks

2,442
Balance
1183
63
65
38

12

28 Februari 2016

1349

Remarks

1349

Circulation Pipe Riser


Area

Total

Previous

Today

Balance

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
SS

DIA INCH
52
24

CS
P91
P11

JOINT
16
3
19
0
0
0

P22

TOTAL

HP PIPING

76
0
0
0

P
R
E
S
S
U
R
E
PA
R
T

TOTAL

Pressure Part
Total
Previous
7,237
3,562
HP Piping to Hydrotest
Total
Previous
2669
1320

Area

Total

Previous

Today

Balance

Screen Middle

836

723

113

SuperHeater IV

760

525

235

SuperHeater 1A

1140

125

20

995

SuperHeater IB
SuperHeater II
SuperHeater III

380
760
1064

380
80
959

0
0
0

0
680
105

Superheater V

1064

770

294

Main inlet header to bottom

617

617

Furnace Floor

616

616

HP PIPING TO
HYDROTEST

TOTAL

7,237

MATERIAL

Total

Previous

CS
P91
P11

2308
131
152

1125
68
87

P22

78

40

2669

1320

total

20

3,562

Today

1177
63
65
38

Today

Balance
20

Today

2,422
Balance

Remarks

2,422
Balance

29 Februari 2016

1343

Remarks

1343

Circulation Pipe Riser


Area

Total

Previous

Today

Balance

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
SS

DIA INCH
171
72.75

CS
P91
P11

JOINT
28
14
42
0
0
0

P22

TOTAL

HP PIPING

PRESSURE PART

TOTAL

0
0
0

Area

Total

Previous

Today

Balance

Screen Middle

836

723

15

98

SuperHeater IV

760

525

30

205

SuperHeater 1A

1140

145

40

955

SuperHeater II
SuperHeater III
Superheater V

760
1064
1064

80
959
770

30
63
35

650
42
259

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

243.75

Pressure Part
Total
Previous
6,857
3,202
HP Piping to Hydrotest
Total
Previous
2669
1326

6,857

MATERIAL

Total

Previous

CS

2308

1131

P91
P11
P22

131
152
78

68
87
40

2669

1326

total
Circulation Pipe Riser

213

3,202

Today
19

Today

Balance
213

Today

2,209
Balance

19

Remarks

2,209
Balance
1158
63
65
38

19

01 Maret 2016

1324

Remarks

1324

Area

Total

Previous

Today

Balance

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
SS

DIA INCH
186
152

CS
P91
P11

JOINT
31
15
46
0
0
0

P22

TOTAL

HP PIPING

PRESSURE PART

TOTAL

0
0
0

Area

Total

Previous

Today

Balance

Screen Middle

836

738

91

SuperHeater IV

760

555

30

175

SuperHeater 1A

1140

185

50

905

SuperHeater II
SuperHeater III
Superheater V

760
1064
1064

110
1022
805

30
42
42

620
0
217

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

338

Pressure Part
Total
Previous
6,857
3,415
HP Piping to Hydrotest
Total
Previous
2669
1326

6,857

MATERIAL

Total

Previous

CS

2308

1131

P91
P11
P22

131
152
78

68
87
40

2669

1326

total
Circulation Pipe Riser

201

3,415

Today
27

Today

Balance
201

Today

2,008
Balance

27

Remarks

2,008
Balance
1150
63
65
38

27

02 Maret 2016

1316

Remarks

1316

Area

Total

Previous

Today

Balance

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
262
204

CS
P91
P11

JOINT
49
24
73
0
0
0

P22

TOTAL

HP PIPING

PRESSURE PART

TOTAL

0
0
0

Area

Total

Previous

Today

Balance

Screen Middle

836

745

14

77

SuperHeater IV

760

585

30

145

SuperHeater 1A

1140

235

94

811

SuperHeater II
Superheater V
Main inlet header to bottom

760
1064
617

140
847

0
42
0

620
175
617

Furnace Floor

616

17

599

TOTAL

HP PIPING TO
HYDROTEST

466

Pressure Part
Total
Previous
5,793
2,552
HP Piping to Hydrotest
Total
Previous
2669
1353

5,793

197

2,552

Today

Total

Previous

CS

2308

1158

P91

131

68

63

P11

152

87

65

P22

78
2669

40
1353

38
32

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
197

Today

1,828
Balance

32

Remarks

1,828

MATERIAL

32

03 Maret 2016

Balance

Remarks

1118

1284

Remarks

1284

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
159
70

CS
P91
P11

JOINT
35
9
44
0
0
0

P22

TOTAL

HP PIPING

PRESSURE PART

TOTAL

0
0
0

Area

Total

Previous

Today

Balance

Screen Middle

836

759

19

58

SuperHeater IV

760

615

30

115

SuperHeater 1A

1140

329

67

744

SuperHeater II
Superheater V
Main inlet header to bottom

760
1064
617

140
889

45
42
0

575
133
617

Furnace Floor

616

17

59

540

TOTAL

HP PIPING TO
HYDROTEST

229

Pressure Part
Total
Previous
5,793
2,732
HP Piping to Hydrotest
Total
Previous
2669
1385

5,793

262

2,732

Today

Total

Previous

CS

2308

1190

P91

131

68

63

P11

152

87

65

P22

78
2669

40
1385

38
28

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
262

Today

1,625
Balance

28

Remarks

1,625

MATERIAL

28

04 Maret 2016

Balance

Remarks

1090

1256

Remarks

1256

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
166
156

CS
P91
P11

JOINT
32
19
51
0
1
0

P22

22

TOTAL

HP PIPING

PRESSURE PART

TOTAL

0
22
0

Area

Total

Previous

Today

Balance

Screen Middle

836

778

11

47

SuperHeater IV

760

645

30

85

SuperHeater 1A

1140

396

58

686

SuperHeater II
Superheater V
Main inlet header to bottom

760
1064
617

185
931

60
42
0

515
91
617

Furnace Floor

616

76

39

501

TOTAL

HP PIPING TO
HYDROTEST

322

Pressure Part
Total
Previous
5,793
2,935
HP Piping to Hydrotest
Total
Previous
2669
1413

5,793

240

2,935

Today

Total

Previous

CS

2308

1218

P91

131

68

63

P11

152

87

65

P22

78
2669

40
1413

38
22

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
240

Today

1,424
Balance

22

Remarks

1,424

MATERIAL

22

04 Maret 2016

Balance

Remarks

1068

1234

Remarks

1234

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
166
156

CS
P91
P11

JOINT
32
19
51
0
0
0

P22

TOTAL

HP PIPING

PRESSURE PART

TOTAL

0
0
0

Area

Total

Previous

Today

Balance

Screen Middle

836

789

11

36

SuperHeater IV

760

675

30

55

SuperHeater 1A

1140

454

58

628

SuperHeater II
Superheater V
Main inlet header to bottom

760
1064
617

245
973

60
42
0

455
49
617

Furnace Floor

616

115

15

486

TOTAL

HP PIPING TO
HYDROTEST

322

Pressure Part
Total
Previous
5,793
3,136
HP Piping to Hydrotest
Total
Previous
2669
1435

5,793

216

3,136

Today

Total

Previous

CS

2308

1240

P91

131

68

63

P11

152

87

65

P22

78
2669

40
1435

38
24

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
216

Today

1,223
Balance

24

Remarks

1,223

MATERIAL

24

06 Maret 2016

Balance

Remarks

1044

1210

Remarks

1210

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
174
203

CS
P91
P11

JOINT
39
23
62
0
0
0

P22

TOTAL

HP PIPING

0
0
0

P
R
E
S
S
U
R
E
PA
R
T

TOTAL

377

Pressure Part
Total
Previous
5,793
3,337
HP Piping to Hydrotest
Total
Previous
2669
1459

Area

Total

Previous

Today

Balance

Screen Middle

836

800

11

25

SuperHeater IV

760

705

30

25

SuperHeater 1A

1140

512

75

553

SuperHeater II
Superheater V
Main inlet header to bottom

760
1064
617

305
1015

60
49
0

395
0
617

Furnace Floor

616

130

41

445

HP PIPING TO
HYDROTEST

TOTAL

5,793

266

3,337

Today

Total

Previous

CS

2308

1264

P91

131

68

63

P11

152

87

65

P22

78
2669

40
1459

38
30

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
266

Today

2,060
Balance

30

Remarks

2,060

MATERIAL

30

07 Maret 2016

Balance

Remarks

1014

1180

Remarks

1180

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
191
244

CS
P91
P11

JOINT
68
32
100
3
1
0

P22

28

TOTAL

HP PIPING

6
22
0

P
R
E
S
S
U
R
E
PA
R
T

TOTAL

435

Pressure Part
Total
Previous
4,729
2,498
HP Piping to Hydrotest
Total
Previous
2669
1489

Area

Total

Previous

Today

Balance

Screen Middle

836

811

25

SuperHeater IV

760

735

25

SuperHeater 1A

1140

587

106

447

Main inlet header to bottom


SuperHeater II
Furnace Floor

617
760
616

365
171

0
60
33

617
335
412

HP PIPING TO
HYDROTEST

TOTAL

4,729

224

2,498

Today

Total

Previous

CS
P91

2308
131

1294
68

P11

152

87

65

P22

78

40

38

2669

1489

30

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
224

Today

1,836
Balance

30

Remarks

1,836

MATERIAL

30

08 Maret 2016

Balance

Remarks

984
63

1150

Remarks

1150

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
0
0

CS
P91
P11

JOINT
0
0
0
0
0
0

P22

TOTAL

HP PIPING

PRESSURE PART

TOTAL

0
0
0

Area

Total

Previous

Today

Balance

Screen Middle

836

811

11

14

SuperHeater 1A

1140

693

75

372

SuperHeater II

760

425

60

275

Main inlet header to bottom

617

610

Furnace Floor

616

14

398

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
3,969
1,929
HP Piping to Hydrotest
Total
Previous
2669
1519

204
3,969

167

1,929

Today

Total

Previous

CS

2308

1324

P91
P11

131
152

68
87

63

P22

78

40

38

2669

1519

18

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
167

Today

1,669
Balance

18

Remarks

1,669

MATERIAL

18

09 Maret 2016

Balance

Remarks

966
65
1132

Remarks

1132

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
209.5
266

CS
P91
P11

JOINT
52
24
76
3
0
0

P22

TOTAL

HP PIPING

PRESSURE PART

TOTAL

6
0
0

Area

Total

Previous

Today

Balance

Screen Middle

836

822

14

SuperHeater 1A

1140

768

114

258

SuperHeater II

760

485

60

215

Main inlet header to bottom

617

610

Furnace Floor

616

218

44

354

TOTAL

HP PIPING TO
HYDROTEST

475.5

Pressure Part
Total
Previous
3,969
2,082
HP Piping to Hydrotest
Total
Previous
2669
1519

3,969

232

2,082

Today

Total

Previous

CS

2308

1324

P91
P11

131
152

68
87

63

P22

78

40

38

2669

1519

14

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
232

Today

1,437
Balance

14

Remarks

1,437

MATERIAL

14

10 Maret 2016

Balance

Remarks

970
65
1136

Remarks

1136

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
167
172

CS
P91
P11

JOINT
48
12
60
0
0
0

P22

TOTAL

HP PIPING

PRESSURE
PART

TOTAL

0
0
0

Area

Total

Previous

Today

Balance

SuperHeater 1A

1140

882

75

183

SuperHeater II

760

545

30

185

Main inlet header to bottom

617

20

590

Furnace Floor

616

262

10

344

TOTAL

HP PIPING TO
HYDROTEST

339

Pressure Part
Total
Previous
3,133
1,434
HP Piping to Hydrotest
Total
Previous
2669
1519

3,133

135

1,434

Today

Total

Previous

CS

2308

1324

P91

131

68

63

P11

152

87

65

P22

78

40

38

2669

1519

17

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
135

Today

1,302
Balance

17

Remarks

1,302

MATERIAL

17

11 Maret 2016

Balance

Remarks

967

1133

Remarks

1133

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
225.5
104

CS
P91
P11

JOINT
56
14
70
1
0
0

P22

TOTAL

HP PIPING

PRESSURE
PART

TOTAL

6
0
0

Area

Total

Previous

Today

Balance

SuperHeater 1A

1140

957

75

108

SuperHeater II

760

575

30

155

Main inlet header to bottom

617

27

15

575

Furnace Floor

616

272

34

310

TOTAL

HP PIPING TO
HYDROTEST

329.5

Pressure Part
Total
Previous
3,133
1,559
HP Piping to Hydrotest
Total
Previous
2669
1536

3,133

154

1,559

Today

Total

Previous

CS

2308

1341

P91

131

68

63

P11

152

87

65

P22

78

40

38

2669

1536

30

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
154

Today

1,148
Balance

30

Remarks

1,148

MATERIAL

30

12 Maret 2016

Balance

Remarks

937

1103

Remarks

1103

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
225.5
104

CS
P91
P11

JOINT
56
14
70
1
0
0

P22

TOTAL

HP PIPING

PRESSURE
PART

TOTAL

6
0
0

Area

Total

Previous

Today

Balance

SuperHeater 1A

1140

957

75

108

SuperHeater II

760

575

30

155

Main inlet header to bottom

617

27

15

575

Furnace Floor

616

272

34

310

TOTAL

HP PIPING TO
HYDROTEST

329.5

Pressure Part
Total
Previous
3,133
1,559
HP Piping to Hydrotest
Total
Previous
2669
1536

3,133

154

1,559

Today

Total

Previous

CS

2308

1341

P91

131

68

63

P11

152

87

65

P22

78

40

38

2669

1536

30

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
154

Today

1,148
Balance

30

Remarks

1,148

MATERIAL

30

12 Maret 2016

Balance

Remarks

937

1103

Remarks

1103

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
176
219

CS
P91
P11

JOINT
49
30
79
0
0
0

P22

TOTAL

HP PIPING

PRESSURE
PART

TOTAL

0
0
0

Area

Total

Previous

Today

Balance

SuperHeater 1A

1140

1032

58

50

SuperHeater II

760

605

60

95

Main inlet header to bottom

617

42

31

544

Furnace Floor

616

306

30

280

TOTAL

HP PIPING TO
HYDROTEST

395

Pressure Part
Total
Previous
3,133
1,679
HP Piping to Hydrotest
Total
Previous
2669
1536

3,133

179

1,679

Today

Total

Previous

CS

2308

1341

P91

131

68

63

P11

152

87

65

P22

78

40

38

2669

1536

36

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
179

Today

969
Balance

36

Remarks

969

MATERIAL

36

14 Maret 2016

Balance

Remarks

931

1097

Remarks

1097

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
176
219

CS
P91
P11

JOINT
42
32
74
4
0
0

P22

36

TOTAL

HP PIPING

PRESSURE
PART

TOTAL

36
0
0

Area

Total

Previous

Today

Balance

SuperHeater 1A

1140

1090

50

SuperHeater II

760

665

60

35

Main inlet header to bottom

617

73

26

518

Furnace Floor

616

336

24

256

TOTAL

HP PIPING TO
HYDROTEST

359.5

Pressure Part
Total
Previous
3,133
1,828
HP Piping to Hydrotest
Total
Previous
2669
1572

3,133

160

1,828

Today

Total

Previous

CS

2308

1377

P91

131

68

63

P11

152

87

65

P22

78

40

38

2669

1572

38

Previous

Today

Balance

total
Circulation Pipe Riser
Area

Total

Today

Balance
160

Today

809
Balance

38

Remarks

809

MATERIAL

38

15 Maret 2016

Balance

Remarks

893

1059

Remarks

1059

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
145
333

CS
P91
P11

JOINT
36
40
76
0
0
0

P22

TOTAL

HP PIPING

PRESSURE
PART

TOTAL

0
0
0

Area

Total

Previous

Today

Balance

SuperHeater II

760

725

35

Main inlet header to bottom

617

99

15

503

Furnace Floor

616

360

20

236

TOTAL

HP PIPING TO
HYDROTEST

478

Pressure Part
Total
Previous
1,993
824
HP Piping to Hydrotest
Total
Previous
2669
1610

1,993

70

824

Today

Total

Previous

CS

2308

1415

P91

131

68

63

P11

152

87

65

P22

78

40

38

2669

1610

23

Previous
127

Today
1

Balance
92

total
Circulation Pipe Riser
Area
Furnace Side wall riser

Total
220

Today

Balance
70

Today

739
Balance

23

Remarks

739

MATERIAL

23

16 Maret 2016

Balance

Remarks

870

1036

Remarks

1036

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
130.5
223.5

CS
P91
P11

JOINT
35
31
66
2
0
0

P22

16

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

354
16
0
0

Pressure Part
Total
Previous
1,233
114
HP Piping to Hydrotest
Total
Previous
2669
1633

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

114

23

480

Furnace Floor

616

380

227

HP PIPING TO
HYDROTEST

TOTAL

1,233

32

114

Today

Total

Previous

CS
P91

2308
131

1438
68

P11

152

87

65

P22

78

40

38

2669

1633

24

Previous
127

Today
1

Balance
92

total

Today
32
Today

Total
220

707
Balance

24

Remarks

Balance

Remarks

846
63

1012

Circulation Pipe Riser


Area
Furnace Side wall riser

Balance

707

MATERIAL

24

17 Maret 2016

Remarks

1012

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
122
153

CS
P91
P11

JOINT
28
17
45
4
0
0

P22

22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

275
22
0
0

Pressure Part
Total
Previous
1,233
137
HP Piping to Hydrotest
Total
Previous
2669
1657

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

137

43

437

Furnace Floor

616

389

227

HP PIPING TO
HYDROTEST

TOTAL

1,233

43

137

Today

Total

Previous

CS
P91

2308
131

1462
68

P11

152

87

65

P22

78

40

38

2669

1657

12

Previous
127

Today
1

Balance
92

total

Today
43
Today

Total
220

664
Balance

12

Remarks

Balance

Remarks

835
62

1000

Circulation Pipe Riser


Area
Furnace Side wall riser

Balance

664

MATERIAL

11
1

18 Maret 2016

Remarks

1000

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
34
88

CS
P91
P11

JOINT
8
8
16
0
0
0

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

122
0
0
0

Pressure Part
Total
Previous
1,233
180
HP Piping to Hydrotest
Total
Previous
2669
1657

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

180

55

382

Furnace Floor

616

389

10

217

HP PIPING TO
HYDROTEST

TOTAL

1,233

65

180

Today

Today
65
Today

Total

Previous

CS
P91

2308
131

1462
68

12
1

834
62

P11

152

87

62

P22

78

40

2669

1657

16

Previous
127

Today
1

Balance
92

Total
220

599
Balance

16

Remarks

Balance

Remarks

38
996

Circulation Pipe Riser


Area
Furnace Side wall riser

Balance

599

MATERIAL

total

19 Maret 2016

Remarks

996

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
62
136

CS
P91
P11

JOINT
14
10
24
0
0
0

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

198
0
0
0

Pressure Part
Total
Previous
1,233
235
HP Piping to Hydrotest
Total
Previous
2669
1673

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

235

53

329

Furnace Floor

616

399

34

183

HP PIPING TO
HYDROTEST

TOTAL

1,233

87

235

Today

Today
87
Today

Total

Previous

CS
P91

2308
131

1474
69

15

P11

152

90

58

P22

78

40

37

2669

1673

20

976

Previous
127

Today
1

Balance
92

Total
220

512
Balance

20

Remarks

Balance

Remarks

819
62

Circulation Pipe Riser


Area
Furnace Side wall riser

Balance

512

MATERIAL

total

20 Maret 2016

Remarks

976

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
115
201

CS
P91
P11

JOINT
23
29
52
0
0
0

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

316
0
0
0

Pressure Part
Total
Previous
1,233
288
HP Piping to Hydrotest
Total
Previous
2669
1693

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

288

50

279

Furnace Floor

616

433

55

128

HP PIPING TO
HYDROTEST

TOTAL

1,233

105

288

Today

Today
105
Today

Total

Previous

CS
P91

2308
131

1489
69

15
1

804

P11

152

94

57

P22

78

41

37

2669

1693

17

959

Previous
127

Today
1

Balance
92

Total
220

407
Balance

17

Remarks

Balance

Remarks

61

Circulation Pipe Riser


Area
Furnace Side wall riser

Balance

407

MATERIAL

total

21 Maret 2016

Remarks

959

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
123.5
219

CS
P91
P11

JOINT
27
26
53
0
0
0

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

342.5
0
0
0

Pressure Part
Total
Previous
1,233
338
HP Piping to Hydrotest
Total
Previous
2669
1710

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

338

73

206

Furnace Floor

616

488

10

118

HP PIPING TO
HYDROTEST

TOTAL

1,233

83

338

Today

Today
83
Today

Total

Previous

CS
P91

2308
131

1504
70

18
1

786

P11

152

95

54

P22

78

41

35

2669

1710

24

935

Previous
127

Today
1

Balance
92

Total
220

324
Balance

24

Remarks

Balance

Remarks

60

Circulation Pipe Riser


Area
Furnace Side wall riser

Balance

324

MATERIAL

total

22 Maret 2016

Remarks

935

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
112
298

CS
P91
P11

JOINT
21
32
53
0
0
0

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

410
0
0
0

Pressure Part
Total
Previous
1,233
411
HP Piping to Hydrotest
Total
Previous
2669
1734

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

411

17

189

Furnace Floor

616

498

34

84

HP PIPING TO
HYDROTEST

TOTAL

1,233

51

411

Today

Today
51
Today

Total

Previous

CS
P91

2308
131

1522
71

28
1

758

P11

152

98

48

P22

78

43

35

2669

1734

35

900

Previous
127

Today
1

Balance
92

Total
220

273
Balance

35

Remarks

Balance

Remarks

59

Circulation Pipe Riser


Area
Furnace Side wall riser

Balance

273

MATERIAL

total

23 Maret 2016

Remarks

900

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
174
319

CS
P91
P11

JOINT
22
40
62
0
0
0

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

493
0
0
0

Pressure Part
Total
Previous
1,233
428
HP Piping to Hydrotest
Total
Previous
2669
1769

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

428

16

173

Furnace Floor

616

532

14

70

HP PIPING TO
HYDROTEST

TOTAL

1,233

30

428

Today

Today
30
Today

Total

Previous

CS
P91

2308
131

1550
72

28
1

730

P11

152

104

42

P22

78

43

35

2669

1769

35

865

Previous
127

Today
1

Balance
92

Total
220

243
Balance

35

Remarks

Balance

Remarks

58

Circulation Pipe Riser


Area
Furnace Side wall riser

Balance

243

MATERIAL

total

24 Maret 2016

Remarks

865

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
94
219.5

CS
P91
P11

JOINT
33
31
64
0
0
0

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

313.5
0
0
0

Pressure Part
Total
Previous
1,233
444
HP Piping to Hydrotest
Total
Previous
2669
1804

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

444

31

142

Furnace Floor

616

546

10

60

HP PIPING TO
HYDROTEST

TOTAL

1,233

41

444

Today

Today
41
Today

Total

Previous

CS
P91

2308
131

1578
73

34
0

696

P11

152

110

40

P22

78

43

35

2669

1804

36

829

Previous
127

Today
1

Balance
92

Total
220

202
Balance

36

Remarks

Balance

Remarks

58

Circulation Pipe Riser


Area
Furnace Side wall riser

Balance

202

MATERIAL

total

25 Maret 2016

Remarks

829

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
94
219.5

CS
P91
P11

JOINT
33
31
64
0
0
0

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

313.5
0
0
0

Pressure Part
Total
Previous
1,233
475
HP Piping to Hydrotest
Total
Previous
2669
1840

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

475

42

100

Furnace Floor

616

556

16

44

HP PIPING TO
HYDROTEST

TOTAL

1,233

58

475

Today

Today
58
Today

Total

Previous

CS
P91

2308
131

1612
73

23
1

673

P11

152

112

35

P22

78

43

33

2669

1840

31

798

Previous
127

Today
1

Balance
92

Total
220

144
Balance

31

Remarks

Balance

Remarks

57

Circulation Pipe Riser


Area
Furnace Side wall riser

Balance

144

MATERIAL

total

26 Maret 2016

Remarks

798

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
SS

PIPING PROCESS

DIA INCH
140
77.25

CS
P91
P11

JOINT
16
27
43
0
0
0

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

217.25
0
0
0

Pressure Part
Total
Previous
1,233
517
HP Piping to Hydrotest
Total
Previous
2669
1871

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

517

14

86

Furnace Floor

616

572

44

HP PIPING TO
HYDROTEST

TOTAL

1,233

14

517

Today

Today
14
Today

Total

Previous

CS
P91

2308
131

1635
74

22
1

651

P11

152

117

31

P22

78

45

31

2669

1871

29

769

Previous
127

Today
1

Balance
92

Total
220

130
Balance

29

Remarks

Balance

Remarks

56

Circulation Pipe Riser


Area
Furnace Side wall riser

Balance

130

MATERIAL

total

27 Maret 2016

Remarks

769

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
DUPLEX
SS

PIPING PROCESS

JOINT
9
3
11
23

DIA INCH
73.5
24
164

CS
P91

0
0

0
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

2669

Total

Previous

Today

Balance

Main inlet header to bottom

617

531

27

59

Furnace Floor

616

572

44

1,233

27

531

Today

Total

Previous

CS

2308

1657

34

617

P91

131

75

55

P11

152

121

31

P22

78

47

30

2669

1900

36

733

Previous

Today

Balance

Circulation Pipe Riser


Area

Total

Balance
27

Today

103
Balance

36

Remarks

103

MATERIAL

total

Today

1900

Area

TOTAL

HP PIPING TO
HYDROTEST

261.5

Pressure Part
Total
Previous
1,233
531
HP Piping to Hydrotest
Total
Previous

28 Maret 2016

Balance

Remarks

Remarks

733

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
DUPLEX
SS

PIPING PROCESS

JOINT
19
0
19
38

DIA INCH
93
0
131

CS
P91

0
0

0
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

2669

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

558

22

37

Furnace Floor

616

572

44

TOTAL

HP PIPING TO
HYDROTEST

224

Pressure Part
Total
Previous
1,233
558
HP Piping to Hydrotest
Total
Previous

1,233

22

558

Today

Total

Previous

CS

2308

1691

37

580

P91

131

76

54

P11

152

121

30

P22

78

48

30

2669

1936

39

694

Previous

Today

Balance

Circulation Pipe Riser


Area

Total

Today

Balance
22

Today

1936

81
Balance

39

Remarks

81

MATERIAL

total

29 Maret 2016

Balance

Remarks

Remarks

694

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
DUPLEX
SS

PIPING PROCESS

JOINT
29
0
23
52

DIA INCH
96
0
269

CS
P91

0
0

0
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

2669

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

580

31

Furnace Floor

616

572

35

TOTAL

HP PIPING TO
HYDROTEST

365

Pressure Part
Total
Previous
1,233
580
HP Piping to Hydrotest
Total
Previous

1,233

41

580

Today

Total

Previous

CS

2308

1728

36

544

P91

131

77

53

P11

152

122

25

P22

78

48

30

2669

1975

42

652

Previous

Today

Balance

Circulation Pipe Riser


Area

Total

Today

Balance
41

Today

1975

40
Balance

42

Remarks

40

MATERIAL

total

30 Maret 2016

Balance

Remarks

Remarks

652

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
DUPLEX
SS

PIPING PROCESS

JOINT
56
0
46
102

DIA INCH
166
0
225

CS
P91

0
0

0
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

391

2669

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

586

31

Furnace Floor

616

607

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
586
HP Piping to Hydrotest
Total
Previous

1,233

586

Today

Total

Previous

CS

2308

1728

26

554

P91

131

77

54

P11

152

122

23

P22

78

48

28

2669

1975

35

659

Previous

Today

Balance

Circulation Pipe Riser


Area

Total

Today

Balance
9

Today

1975

31
Balance

35

Remarks

31

MATERIAL

total

31 Maret 2016

Balance

Remarks

Remarks

659

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
DUPLEX
SS

PIPING PROCESS

JOINT
59
0
42
101

DIA INCH
232.5
0
193.5

CS
P91

0
0

0
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

426

2669

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

586

25

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
586
HP Piping to Hydrotest
Total
Previous

1,233

586

Today

Total

Previous

CS

2308

1754

31

523

P91

131

77

54

P11

152

129

14

P22

78

50

26

2669

2010

42

617

Previous

Today

Balance

Circulation Pipe Riser


Area

Total

Today

Balance
6

Today

2010

25
Balance

42

Remarks

25

MATERIAL

total

01 April 2016

Balance

Remarks

Remarks

617

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
DUPLEX
SS

PIPING PROCESS

JOINT
25
0
46
71

DIA INCH
89
0
139

CS
P91

0
0

0
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

228

2699

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

592

20

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
592
HP Piping to Hydrotest
Total
Previous

1,233

592

Today

Total

Previous

CS

2308

1785

38

485

P91

131

77

52

P11

182

138

35

P22

78

52

25

2699

2052

50

597

Previous

Today

Balance

Circulation Pipe Riser


Area

Total

Today

Balance
5

Today

2052

20
Balance

50

Remarks

20

MATERIAL

total

02 April 2016

Balance

Remarks

Remarks

597

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
DUPLEX
SS

PIPING PROCESS

JOINT
3
0
10
13

DIA INCH
17
0
38

CS
P91

0
0

0
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

2699

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

597

10

10

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

55

Pressure Part
Total
Previous
1,233
597
HP Piping to Hydrotest
Total
Previous

1,233

10

597

Today

Total

Previous

CS

2308

1823

34

451

P91

131

79

50

P11

182

147

31

P22

78

53

24

2699

2102

41

556

Previous

Today

Balance

Circulation Pipe Riser


Area

Total

Today

Balance
10

Today

2102

10
Balance

41

Remarks

10

MATERIAL

total

03 April 2016

Balance

Remarks

Remarks

556

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS

MATERIAL
CS
DUPLEX
SS

PIPING PROCESS

JOINT
72
0
49
121

DIA INCH
125
0
118

CS
P91

0
0

0
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

243

2798

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

607

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
607
HP Piping to Hydrotest
Total
Previous

1,233

607

Today

Total

Previous

CS

2308

1857

45

406

P91

230

81

148

P11

182

151

25

P22

78

54

24

2798

2143

52

603

Previous

Today

Balance

Circulation Pipe Riser


Area

Total

Today

Balance
8

Today

2143

2
Balance

52

Remarks

MATERIAL

total

04 April 2016

Balance

Remarks

Remarks

603

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
72
0
49
121

DIA INCH
125
0
118

CS
P91

0
0

0
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

243

2700

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

607

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
607
HP Piping to Hydrotest
Total
Previous

1,233

607

Today

Total

Previous

CS

2135

1901

32

202

P91 (big bore)

57

14

42

P91 (Small Bore)

174

69

P11

255

146

11

98

P22

79

52

25

2700

2182

46

472

Circulation Pipe Riser

Today

Balance
8

Today

2
Balance

46

Remarks

MATERIAL

total

2182

05 April 2016

Balance

105

Remarks

472

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
26
0
27
53

DIA INCH
54
0
137

CS
P91

0
0

0
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

191

2700

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

615

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
615
HP Piping to Hydrotest
Total
Previous

1,233

615

Today

Total

Previous

CS

2135

1933

24

178

P91 (big bore)

57

15

41

P91 (Small Bore)

174

69

P11

255

157

92

P22

79

54

23

2700

2228

33

439

Circulation Pipe Riser

Today

Balance
2

Today

Balance

33

Remarks

MATERIAL

total

2228

06 April 2016

Balance

105

Remarks

439

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
47
0
23
70

DIA INCH
69.5
0
112

CS
P91

14
0

14
0

P11

P22

14

14

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

181.5

2700

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

617

Today

Total

Previous

CS

2135

1957

11

167

P91 (big bore)

57

16

38

P91 (Small Bore)

174

69

98

P11

255

163

86

P22

79

56

2700

2261

Circulation Pipe Riser

Balance

23
27

Today

Balance
-

Today

Balance

27

Remarks

MATERIAL

total

2261

07 April 2016

412

Remarks

412

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
40
0
29
69

DIA INCH
70.5
0
88

CS
P91

20
0

28
0

P11

P22

20

28

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

158.5

2700

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

617

Today

Total

Previous

CS

2135

1968

12

155

P91 (big bore)

57

19

36

P91 (Small Bore)

174

76

95

P11

255

169

83

P22

79

56

2700

2288

Circulation Pipe Riser

Balance

23
20

Today

Balance
-

Today

Balance

20

Remarks

MATERIAL

total

2288

08 April 2016

392

Remarks

392

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
27
0
24
51

DIA INCH
60

CS
P91

11
0

22
0

P11

P22

11

22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

88

148

2700

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2135

1980

19

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

21
79
172

1
6
8

35

P22

79

56

2700

2308

Circulation Pipe Riser

89
75
23

34

Today

Balance
-

Today

Balance

34

Remarks

136

total

2308

09 April 2016

358

Remarks

358

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
68
4
31
103

DIA INCH
95
29
35

CS
P91

2
0

6
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

159

2700

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2135

1999

31

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

22
85
180

1
5
3

34

P22

79

56

22

2700

2342

41

317

Circulation Pipe Riser

Today

Balance
-

Today

Balance

41

Remarks

105

total

2342

10 April 2016

84
72

Remarks

317

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
44
4
26
74

DIA INCH
44
26
116

CS
P91

13
0

39
0

P11

P22

13

39

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

186

2700

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2135

2030

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

23
90
183

2
0
12

32

P22

79

57

18

2700

2383

27

290

Circulation Pipe Riser

Today

Balance
-

Today

Balance

27

Remarks

96

total

2383

11 April 2016

84
60

Remarks

290

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
10
8
61
79

DIA INCH
46
62
124

CS
P91

18
0

36
0

P11

P22

18

36

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

232

2700

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2135

2039

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

25
90
195

3
0
8

29

P22

79

61

16

2700

2410

18

272

Circulation Pipe Riser

Today

Balance
-

Today

Balance

18

Remarks

91

total

2410

12 April 2016

84
52

Remarks

272

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
11
0
34
45

DIA INCH
46
0
110

CS
P91

12
0

32
0

P11

P22

12

32

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

156

2700

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2135

2044

11

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

28
90
191

2
0
8

27

P22

79

63

16

2700

2416

21

263

Circulation Pipe Riser

Today

Balance
-

Today

Balance

21

Remarks

80

total

2416

13 April 2016

84
56

Remarks

263

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
14
0
27
41

DIA INCH
28
0
127

CS
P91

12
0

24
0

P11

P22

12

24

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

155

2700

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2135

2055

17

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

30
90
199

3
6
3

24

P22

79

63

16

2700

2437

29

234

Circulation Pipe Riser

Today

Balance
-

Today

Balance

29

Remarks

63

total

2437

14 April 2016

78
53

Remarks

234

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
40
8
27
75

DIA INCH
40
57
176

CS
P91

22
0

56
0

P11

P22

22

56

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

273

2700

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2135

2072

16

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

33
96
202

1
8
0

23

P22

79

63

16

2700

2466

25

209

Circulation Pipe Riser

Today

Balance
-

Today

Balance

25

Remarks

47

total

2466

15 April 2016

70
53

Remarks

209

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
40
8
27
75

DIA INCH
40
57
176

CS
P91

9
0

12
0

P11

P22

12

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

273

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2332

29

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

34
104
202

5
0
15

18

P22

79

63

15

2973

2735

50

188

Circulation Pipe Riser

Today

Balance
-

Today

Balance

50

Remarks

47

total

2735

16 April 2016

70
38

Remarks

188

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
19
3
8
30

DIA INCH
34
19
40

CS
P91

9
0

12
0

P11

P22

12

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

93

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2361

12

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

39
104
217

1
0
0

17

P22

79

64

15

2973

2785

13

175

Circulation Pipe Riser

Today

Balance
-

Today

Balance

13

Remarks

35

total

2785

17 April 2016

70
38

Remarks

175

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
23
4
12
39

DIA INCH
46
16
45

CS
P91

40
2

56
6

P11

P22

42

62

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

107

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2373

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

40
104
217

2
12
4

15

P22

79

64

12

2973

2798

30

145

Circulation Pipe Riser

Today

Balance
-

Today

Balance

30

Remarks

26

total

2798

18 April 2016

58
34

Remarks

145

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
19
6
62
87

DIA INCH
75
25
113.5

CS
P91

53

147

P11

P22

56

147

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

213.5

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2382

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

42
116
221

2
10
7

13

P22

79

67

10

2973

2828

21

124

Circulation Pipe Riser

Today

Balance
-

Today

Balance

21

Remarks

26

total

2828

19 April 2016

48
27

Remarks

124

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
29
5
39
73

DIA INCH
45
35
80.5

CS
P91

30
0

60
0

P11

P22

30

60

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

160.5

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2382

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

44
126
228

3
11
12

10

P22

79

69

2973

2849

28

96

Circulation Pipe Riser

Today

Balance
-

Today

Balance

28

Remarks

26

total

2849

20 April 2016

37
15

Remarks

96

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
62
9
60
131

DIA INCH
77.5
18
69

CS
P91

30
0

60
0

P11

P22

30

60

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

164.5

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2382

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

47
137
240

2
15
5

8
22
10

P22

79

71

2973

2877

27

69

Circulation Pipe Riser

Today

Balance
-

Today

Balance

27

Remarks

26

total

2877

21 April 2016

Remarks

69

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
58
5
87
150

DIA INCH
98
24
73

CS
P91

10
0

20
0

P11

P22

10

20

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

195

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2382

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

49
152
245

0
9
4

8
13
6

P22

79

76

2973

2904

20

49

Circulation Pipe Riser

Today

Balance
-

Today

Balance

20

Remarks

22

total

2904

22 April 2016

Remarks

49

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
21
15
75
111

DIA INCH
31
70
94.5

CS
P91

11
0

22
0

P11

P22

11

22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

195.5

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2386

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

49
161
249

3
2
0

5
11
6

P22

79

79

2973

2924

44

Circulation Pipe Riser

Today

Balance
-

Today

Balance

Remarks

22

total

2924

23 April 2016

Remarks

44

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
43
9
71
123

DIA INCH
79.5
27
110

CS
P91

2
0

1.5
0

P11

P22

1.5

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

216.5

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2386

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

52
163
249

2
5
2

P22

79

79

2973

2929

35

Circulation Pipe Riser

Today

Balance
-

Today

Balance

Remarks

22

total

2929

24 April 2016

6
4

Remarks

35

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
18
14
69
101

DIA INCH
56
35
71

CS
P91

3
0

6
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

162

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2386

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

54
168
251

0
0
0

P22

79

79

2973

2938

28

Circulation Pipe Riser

Today

Balance
-

Today

Balance

Remarks

15

total

2938

25 April 2016

6
4

Remarks

28

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
26
12
31
69

DIA INCH
91
34
91

CS
P91

0
0

0
0

P11

P22

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

216

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2393

15

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

54
168
251

3
6
0

P22

79

79

2973

2945

24

Circulation Pipe Riser

Today

Balance
-

Today

Balance

24

Remarks

total

2945

26 April 2016

0
4

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
23
26
39
88

DIA INCH
35.5
60
101.5

CS
P91

12
0

24
0

P11

P22

12

24

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

197

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2408

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

57
174
251

0
0
4

P22

79

79

2973

2969

Circulation Pipe Riser

Today

Balance
-

Today

Balance

Remarks

total

2969

27 April 2016

0
0

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

DESCRIPTIONS
PIPING PROCESS

MATERIAL
CS
DUPLEX
SS

JOINT
23
26
39
88

DIA INCH
35.5
60
101.5

CS
P91

0
0

0
0

P11

20

P22

20

TOTAL

HP PIPING

PRESSU
RE PART

TOTAL

197

2973

Area

Total

Previous

Today

Balance

Main inlet header to bottom

617

617

Furnace Floor

616

616

TOTAL

HP PIPING TO
HYDROTEST

Pressure Part
Total
Previous
1,233
617
HP Piping to Hydrotest
Total
Previous

1,233

MATERIAL

Total

617
Previous

Today

Balance

CS

2408

2408

P91 (big bore)


P91 (Small Bore)
P11

57
174
255

57
174
255

0
0
0

P22

79

79

2973

2973

Circulation Pipe Riser

Today

Balance
-

Today

Balance

Remarks

total

2973

28 April 2016

0
0

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Previous
22
0
0

Today
1
0
0

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

0
0
0

0
0
0

Balance
23
12
36
82
38
25

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

18

Soot Blower Steam (BB CS)

619

619

Soot Blower Steam (SB CS)

152
1034

0
0

0
0

152

Total (DI)

Total (J)

total

20 Mei 2016
Remarks

1011

PROCESS PIPING
System test package
Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate

432

Prevous (DI)

Previous (J)

Today (DI)

Today (J)

Balance (DI)

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Previous
23
0
0

Today
0
0
0

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

0
0
0

0
0
6

Balance
23
12
36
82
38
19

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

18

Soot Blower Steam (BB CS)

619

619

Soot Blower Steam (SB CS)

0
23

0
6

152

total

152
1034

System

Total (DI)

Total (J)

Priority 1
Priority 2

40892.00
25208.98

10377
6331

Priority 3

27081.75

N/A
total

Prevous (DI)

21 Mei 2016
Remarks

1005

Previous (J)

Today (DI)

Today (J)

Balance (DI)

33768.00
17057.50

6901
3569

85.00
34.00

60
19

7039.00
8117.48

5317

19968.25

3217

116.50

30

6997.00

5987.00

2215

3974.00

1049

72.50

23

1940.50

99169.73

24240.00

74767.75

14736.00

308.00

132.00

24093.98

Total (DI)

Total (J)

Priority 1

PROCESS PIPING
System test package

Prevous (DI)

Previous (J)

Today (DI)

Today (J)

Balance (DI)

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Previous
23
0
0

Today
1
0
0

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

0
0
6

0
0
0

Balance
22
12
36
82
38
19

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

18

Soot Blower Steam (BB CS)

619

619

Soot Blower Steam (SB CS)

0
29

0
1

152

total

152
1034

System

Total (DI)

Total (J)

Priority 1
Priority 2

40892.00
25208.98

10377
6331

Priority 3

27081.75

N/A
total

Prevous (DI)

22 Mei 2016
Remarks

1004

Previous (J)

Today (DI)

Today (J)

Balance (DI)

33853.00
17091.50

6961
3588

53.50
32.00

48
5

6985.50
8085.48

5317

20084.75

3247

72.00

14

6925.00

5987.00

2215

4046.50

1072

13.50

10

1927.00

99169.73

24240.00

75075.75

14868.00

171.00

77.00

23922.98

Total (DI)

Total (J)

Priority 1

PROCESS PIPING
System test package

Prevous (DI)

Previous (J)

Today (DI)

Today (J)

Balance (DI)

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

23 Mei 2016

System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Previous
24
0
0

Today
0
0
0

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

0
0
6

0
0
2

Balance
22
12
36
82
38
17

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

18

Soot Blower Steam (BB CS)

619

616

Soot Blower Steam (SB CS)

0
30

4
9

148

total

152
1034

System

Total (DI)

Total (J)

Priority 1
Priority 2

40892.00
25208.98

10377
6331

33906.50
17123.50

7009
3593

209.50
27.00

97
15

6776.00
8058.48

Priority 3

27081.75

5317

20166.75

3261

14.00

6901.00

N/A

5987.00

2215

4060.00

1082

36.50

31

1890.50

total

99169.73

24240.00

75256.75

14945.00

287.00

150.00

23625.98

Total (DI)

Total (J)

Prevous (DI)

Remarks

995

Previous (J)

Today (DI)

Today (J)

Balance (DI)

Priority 1

PROCESS PIPING
System test package

Prevous (DI)

Previous (J)

Today (DI)

Today (J)

Balance (DI)

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Previous
24
0
0

Today
0
0
0

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

0
0
6

0
0
0

Balance
22
12
36
82
38
19

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

18

Soot Blower Steam (BB CS)

619

612

Soot Blower Steam (SB CS)

4
37

0
4

148

total

152
1034

System

Total (DI)

Total (J)

Priority 1
Priority 2

40892.00
25208.98

10377
6331

34116.00
17150.50

7106
3608

Priority 3

27081.75

5317

20180.75

N/A

5987.00

2215

total

99169.73

24240.00

Total (DI)

Total (J)

Prevous (DI)

23 Mei 2016
Remarks

993

Previous (J)

Today (DI)

Today (J)

Balance (DI)

213.00
22.50

144
7

6563.00
8035.98

3268

73.50

24

6827.50

4060.00

1082

36.50

31

1890.50

75507.25

15064.00

345.50

206.00

23316.98

Priority 1

PROCESS PIPING
System test package

Prevous (DI)

Previous (J)

Today (DI)

Today (J)

Balance (DI)

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Previous
24
0
0

Today
0
0
0

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

0
0
6

0
0
2

Balance
22
12
36
82
38
17

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

18

Soot Blower Steam (BB CS)

619

616

Soot Blower Steam (SB CS)

0
30

4
9

148

total

152
1034

System

Total (DI)

Total (J)

Priority 1
Priority 2

41358.00
25670.73

11272
6586

34362.00
17316.50

7244
3714

Priority 3

30238.25

5666

22399.25

3336

N/A

970.00

716

345.50

240

total

98236.98

24240.00

74423.25

14534.00

Total (DI)

Total (J)

Prevous (DI)

26 Mei 2016
Remarks

995

Previous (J)

Today (DI)

Today (J)

Balance (DI)

227.00
39.00

105
19

6769.00
8315.23

14.00

7825.00
624.50

280.00

132.00

23533.73

Priority 1

PROCESS PIPING
System test package

Prevous (DI)

Previous (J)

Today (DI)

Today (J)

Balance (DI)

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Previous
24
0
0

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

0
0
6

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

Soot Blower Steam (SB CS)

152
1034

4
37

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
0

Balance
22
12
36
82
38
19

18

612

0
4

148

Prevous (DI)
34589.00
17355.50
22413.25

Previous (J)
7349
3733
3347
240

74703.25

14669.00

Previous (J)
61
1,256
110
454
510
449
454
1,175
1,519
293
358

4778.00

710

34589.00

7349

Prevous (DI)

Remarks

993

345.50

Prevous (DI)
168.00
7324.00
936.00
1208.00
1092.00
2001.25
3037.00
6126.00
5827.75
956.00
1135.00

24 Mei 2016

Previous (J)

Today (DI)
220.00
24.50
79.50
324.00

Today (DI)
31.00
24.00
37.00
21.00
39.50
20.00
6.00
37.50
4.00

220.00

Today (DI)

Today (J)
140
8
25
173.00

Today (J)
9
4
37
18
28
11
6
24
3

140

Today (J)

Balance (DI)
6549.00
8290.73
7745.50

Balance (J)
3783
2845
2294

624.50

476

23209.73

9398

Balance (DI)
264.00
1261.25
47.50
488.75
366.50
409.50
515.00
770.50
1525.50
241.00
523.50

Balance (J)
186
588
10
421
266
394
234
240
952
197
266

136.00

29

6549.00

3783

Balance (DI)

Balance (J)

3517.00
1629.50
171.00
549.50

555
82
58
228

840

81.00
123.50
291.25
485.00
62.75
492.00
566.00
0.00
26.50
8.23
800.00
3.00
45.75
94.00
2024.00

24
13
159
213
87
258
309
0
50
19
434
18
47
63
710

1369.75
1291.50

620
565

2684.00
11.00

557
7

3660.25
2472.00

221

3187.75

441

17355.50

3733

24.50

8290.73

2845

Prevous (DI)
200.00
46.00
4361.50
3209.00
2674.75
443.00

Previous (J)
92
25
839
286
392
113

Today (DI)

276.00
412.00
2784.00
2855.00
538.00
881.00
1060.00
480.00

77
54
137
553
225
138
165
44

2193.00

207

22413.25

3347

2.00
10.50

1
6

12.00

Today (J)

20.00

41.50

21

18.00

79.50

25

Balance (DI)
72.00
127.50
986.50
1889.50
561.50
147.00
0.00
151.00
90.00
200.50
1506.50
431.00
707.25
99.00
36.00

Balance (J)
50
86
415
252
113
57
0
114
20
139
555
195
119
9
3

740.25

167

7745.50

2294

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

Previous
24
0
0
0
0
6

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

Soot Blower Steam (SB CS)

152
1034

4
41

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
2

Balance
21
12
36
82
38
17

18

612

2
5

146

Prevous (DI)
34893.00
17341.00
22492.75

Previous (J)
7489
3741
3372
240

75072.25

14842.00

Previous (J)
61
1,265
114
491
528
477
465
1,181
1,543
296
358

4778.00

710

34893.00

7489

Prevous (DI)

Remarks

988

345.50

Prevous (DI)
168.00
7355.00
960.00
1245.00
1113.00
2040.75
3093.00
6132.00
5913.25
960.00
1135.00

24 Mei 2016

Previous (J)

Today (DI)
160.50
27.00
34.50
222.00

Today (DI)
3.00
22.00
13.00
34.00
7.50
8.00
17.50
2.00
42.50
11.00

160.50

Today (DI)

Today (J)
121
24
26
171.00

Today (J)
1
4
5
37
7
13
16
1
33
4

121

Today (J)

Balance (DI)
6304.50
8302.73
7711.00

Balance (J)
3662
2821
2268

624.50

476

22942.73

9227

Balance (DI)
261.00
1239.25
34.50
454.75
359.00
401.50
461.50
768.50
1435.00
230.00
523.50

Balance (J)
185
584
5
384
259
381
218
239
919
193
266

136.00

29

6304.50

3662

Balance (DI)

Balance (J)

3517.00
1629.50
170.00
542.00

555
82
59
234

840

81.00
123.50
294.25
494.00
62.75
510.00
566.00
0.00
26.50
8.23
782.00
3.00
45.75
94.00
2024.00

24
13
159
207
87
258
309
0
50
19
416
18
47
63
710

1351.75
1291.50

620
565

2696.00
11.00

558
7

3660.25
2472.00

221

3187.75

441

17341.00

3741

27.00

8302.73

2821

Prevous (DI)
200.00
46.00
4361.50
3209.00
2694.75
443.00

Previous (J)
92
25
839
286
394
113

Today (DI)

276.00
412.00
2784.00
2896.50
538.00
899.00
1060.00
480.00

77
54
137
574
225
140
165
44

2193.00

207

22492.75

3372

9.00

18.00

18

24

Today (J)

4.00

30.50

24

34.50

26

Balance (DI)
72.00
127.50
986.50
1889.50
561.50
143.00
0.00
151.00
90.00
200.50
1476.00
431.00
707.25
99.00
36.00

Balance (J)
50
86
415
252
113
55
0
114
20
139
531
195
119
9
3

740.25

167

7711.00

2268

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

Previous
25
0
0
0
0
8

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

Soot Blower Steam (SB CS)

152
1034

6
46

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
3

Balance
21
12
36
82
38
14

18

612

0
4

146

Prevous (DI)
35053.50
17368.00
22527.25

Previous (J)
7610
3765
3398
240

75294.25

15013.00

Previous (J)
62
1269
119
528
535
490
481
1182
1576
300
358

4778.00

710

35053.50

7610

Prevous (DI)

Remarks

984

345.50

Prevous (DI)
171.00
7377.00
973.00
1279.00
1120.50
2048.75
3110.50
6134.00
5955.75
971.00
1135.00

26 Mei 2016

Previous (J)

Today (DI)
123.00
1.00
44.50
168.50

Today (DI)

21.00
13.00
20.00
19.50
8.00
41.50

123.00

Today (DI)

Today (J)
113
1
15
129.00

Today (J)

21
13
18
20
6
35

113

Today (J)

Balance (DI)
6181.50
8301.73
7666.50

Balance (J)
3549
2820
2253

624.50

476

22774.23

9098

Balance (DI)
261.00
1239.25
34.50
433.75
346.00
381.50
442.00
760.50
1393.50
230.00
523.50

Balance (J)
185
584
5
363
246
363
198
233
884
193
266

136.00

29

6181.50

3549

Balance (DI)

Balance (J)

3517.00
1629.50
170.00
551.00
0.00
1351.75
1291.50
0.00
0.00
0.00
2714.00
11.00
0.00
0.00
3660.25

555
82
59
240
0
620
565
0
0
0
576
7
0
0
840

2472.00

221

17368.00

3765

1.00

Prevous (DI)
200.00
46.00
4361.50
3209.00
2694.75
447.00
0.00
276.00
412.00
2784.00
2927.00
538.00
899.00
1060.00
480.00

Previous (J)
92
25
839
286
394
115
0
77
54
137
598
225
140
165
44

Today (DI)
9.00

2193.00

207

22527.25

3398

1.00

Today (J)
9

20.00

8.00

1.50
6.00

1
2

44.50

15

81.00
123.50
294.25
494.00
62.75
510.00
566.00
0.00
25.50
8.23
782.00
3.00
45.75
94.00
2024.00

24
13
159
207
87
258
309
0
49
19
416
18
47
63
710

3187.75

441

8301.73

2820

Balance (DI)
63.00
127.50
986.50
1889.50
541.50
143.00
0.00
151.00
82.00
200.50
1474.50
425.00
707.25
99.00
36.00

Balance (J)
41
86
415
252
111
55
0
114
19
139
530
193
119
9
3

740.25

167

7666.50

2253

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

Previous
25
0
0
0
0
11

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

Soot Blower Steam (SB CS)

152
1034

6
50

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
3

Balance
20
12
36
82
38
11

18

607

0
9

146

Prevous (DI)
35176.50
17369.00
22571.75

Previous (J)
7723
3766
3413
240

75462.75

15142.00

Previous (J)
62
1,269
119
549
548
508
501
1,188
1,611
300
358

4778.00

710

35176.50

7723

Prevous (DI)

Remarks

975

345.50

Prevous (DI)
171.00
7377.00
973.00
1300.00
1133.50
2068.75
3130.00
6142.00
5997.25
971.00
1135.00

27 Mei 2016

Previous (J)

Today (DI)
112.50
19.00
2.00
133.50

Today (DI)

Today (J)
53
4
2

476

59.00

22640.73

9039

Today (J)

Balance (DI)
261.00
1181.25
34.50
433.75
346.00
381.50
442.00
748.50
1355.50
230.00
519.00

19

12.00
38.00

3
22

4.50

Today (DI)

Balance (J)
3496
2816
2251

624.50

58.00

112.50

Balance (DI)
6069.00
8282.73
7664.50

53

Today (J)

Balance (J)
185
565
5
363
246
363
198
230
862
193
257

136.00

29

6069.00

3496

Balance (DI)

Balance (J)

3517.00
1629.50
170.00
551.00
0.00
1351.75
1291.50
0.00
1.00
0.00
2714.00
11.00
0.00
0.00
3660.25

555
82
59
240
0
620
565
0
1
0
576
7
0
0
840

2472.00

221

17369.00

3766

19.00

Prevous (DI)
209.00
46.00
4361.50
3209.00
2714.75
447.00
0.00
276.00
420.00
2784.00
2928.50
544.00
899.00
1060.00
480.00

Previous (J)
101
25
839
286
396
115
0
77
55
137
599
227
140
165
44

Today (DI)
2.00

2193.00

207

22571.75

3413

10.00

9.00

2.00

Today (J)
2

71.00
123.50
294.25
494.00
62.75
510.00
566.00
0.00
25.50
8.23
773.00
3.00
45.75
94.00
2024.00

23
13
159
207
87
258
309
0
49
19
413
18
47
63
710

3187.75

441

8282.73

2816

Balance (DI)
61.00
127.50
986.50
1889.50
541.50
143.00
0.00
151.00
82.00
200.50
1474.50
425.00
707.25
99.00
36.00

Balance (J)
39
86
415
252
111
55
0
114
19
139
530
193
119
9
3

740.25

167

7664.50

2251

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

Previous
26
0
0
0
0
14

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

12

Soot Blower Steam (SB CS)

152
1034

6
59

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
1
0
0
1

Balance
20
12
35
82
38
10

18

607

13
15

133

Prevous (DI)
35289.00
17388.00
22573.75

28 Mei 2016
Remarks

960

Previous (J)
7776
3770
3415

Today (DI)
154.00
18.00
72.00

Today (J)
75
3
15

Balance (DI)
5915.00
8264.73
7592.50

Balance (J)
3421
2813
2236

345.50

240

16.00

608.50

474

75596.25

15201.00

260.00

95.00

22380.73

8944

Today (DI)
5.00
75.00
0.00
0.00
0.00
18.00
6.00
18.00
26.00
6.00
0.00

Today (J)
5
19
0
0
0
18
2
3
26
2
0

Balance (DI)
256.00
1106.25
34.50
433.75
346.00
363.50
436.00
730.50
1329.50
224.00
519.00

Prevous (DI)
171.00
7435.00
973.00
1300.00
1133.50
2068.75
3130.00
6154.00
6035.25
971.00
1139.50

Previous (J)
62
1,288
119
549
548
508
501
1,191
1,633
300
367

Balance (J)
180
546
5
363
246
345
196
227
836
191
257

4778.00

710

0.00

136.00

29

35289.00

7776

154.00

75

5915.00

3421

Prevous (DI)

Previous (J)

Today (DI)

Today (J)

Balance (DI)

Balance (J)

3527.00
1629.50
170.00
551.00
0.00
1351.75
1291.50
0.00
1.00
0.00
2723.00
11.00
0.00
0.00
3660.25

556
82
59
240
0
620
565
0
1
0
579
7
0
0
840

0.00
18.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
3
0
0
0
0
0
0
0
0
0
0
0
0
0

71.00
105.50
294.25
494.00
62.75
510.00
566.00
0.00
25.50
8.23
773.00
3.00
45.75
94.00
2024.00

23
10
159
207
87
258
309
0
49
19
413
18
47
63
710

2472.00

221

0.00

3187.75

441

17388.00

3770

18.00

8264.73

2813

Prevous (DI)
211.00
46.00
4361.50
3209.00
2714.75
447.00
0.00
276.00
420.00
2784.00
2928.50
544.00
899.00
1060.00
480.00

Previous (J)
103
25
839
286
396
115
0
77
55
137
599
227
140
165
44

Today (DI)
0.00
0.00
3.00
15.00
46.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
0.00

Today (J)
0
0
3
3
5
0
0
0
0
0
4
0
0
0
0

Balance (DI)
61.00
127.50
983.50
1874.50
495.50
143.00
0.00
151.00
82.00
200.50
1466.50
425.00
707.25
99.00
36.00

Balance (J)
39
86
412
249
106
55
0
114
19
139
526
193
119
9
3

2193.00

207

0.00

740.25

167

22573.75

3415

72.00

15

7592.50

2236

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

Previous
26
0
1
0
0
15

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

12

Soot Blower Steam (SB CS)

152
1034

19

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

74

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
4

Balance
20
12
35
82
38
6

18

10

597

0
14

133

Prevous (DI)
35443.00
17406.00
22645.75

Previous (J)
7851
3773
3430
242.00

75856.25

15296.00

Previous (J)
67
1,307
119
549
548
526
503
1,194
1,659
302
367

4778.00

710

35443.00

7851

Prevous (DI)

Remarks

946

361.50

Prevous (DI)
176.00
7510.00
973.00
1300.00
1133.50
2086.75
3136.00
6172.00
6061.25
977.00
1139.50

29 Mei 2016

Previous (J)

Today (DI)
125.50
48.00
16.00

Today (J)
71
18
1

Balance (DI)
5789.50
8216.73
7576.50
608.50

474
8854

189.50

90.00

22191.23

Today (DI)
9.00
47.00

Today (J)
9
14

Balance (DI)
247.00
1059.25
34.50
418.25
346.00
357.50
436.00
719.50
1292.50
224.00
519.00

15.50

14

6.00

11.00
37.00

6
22

125.50

Today (DI)

71

Today (J)

Balance (J)
3350
2795
2235

Balance (J)
171
532
5
349
246
339
196
221
814
191
257

136.00

29

5789.50

3350

Balance (DI)

Balance (J)

3527.00
1647.50
170.00
551.00
0.00
1351.75
1291.50
0.00
1.00
0.00
2723.00
11.00
0.00
0.00
3660.25

556
85
59
240
0
620
565
0
1
0
579
7
0
0
840

2472.00

71.00
88.50
294.25
467.00
62.75
510.00
562.00
0.00
25.50
8.23
773.00
3.00
45.75
94.00
2024.00

23
4
159
199
87
258
305
0
49
19
413
18
47
63
710

17.00

27.00

4.00

221

0.00

3187.75

441

17406.00

3773

48.00

18

8216.73

2795

Prevous (DI)
211.00
46.00
4364.50
3224.00
2760.75
447.00
0.00
276.00
420.00
2784.00
2936.50
544.00
899.00
1060.00
480.00

Previous (J)
103
25
842
289
401
115
0
77
55
137
603
227
140
165
44

Today (DI)

2193.00

207

22645.75

3430

16.00

16.00

Today (J)

Balance (DI)
61.00
127.50
967.50
1874.50
495.50
143.00
0.00
151.00
82.00
200.50
1466.50
425.00
707.25
99.00
36.00

Balance (J)
39
86
411
249
106
55
0
114
19
139
526
193
119
9
3

740.25

167

7576.50

2235

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

Previous
26
0
1
0
0
19

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

22

Soot Blower Steam (SB CS)

152
1034

19

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

88

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
3

Balance
19
12
35
82
38
3

18

588

0
13

133

Prevous (DI)
35559.50
17454.00
22661.75

30 Mei 2016
Remarks

933

Previous (J)
7922
3791
3431

Today (DI)
125.50
17.00
103.00

Today (J)
72
13
24

Balance (DI)
5673.00
8199.73
7473.50

Balance (J)
3278
2782
2211

361.50

242.00

4.00

604.50

468

76036.75

15386.00

249.50

115.00

21950.73

8739

Prevous (DI)
176.00
7557.00
973.00
1315.50
1133.50
2092.75
3136.00
6183.00
6098.25
977.00
1139.50

Previous (J)
76
1,321
119
563
548
532
503
1,200
1,681
302
367

4778.00

710

35559.50

7922

Prevous (DI)

Previous (J)

Today (DI)
6.00
45.00

Today (J)
6
8

16.00

16

14.50

25

42.00

15

2.00

125.50

Today (DI)

72

Today (J)

Balance (DI)
250.00
1014.25
34.50
402.25
346.00
357.50
421.50
719.50
1250.50
224.00
517.00

Balance (J)
165
524
5
333
246
339
171
221
799
191
255

136.00

29

5673.00

3278

Balance (DI)

Balance (J)

3527.00
1664.50
170.00
578.00
0.00
1351.75
1295.50
0.00
1.00
0.00
2723.00
11.00
0.00
0.00
3660.25

556
91
59
248
0
620
569
0
1
0
579
7
0
0
840

2472.00

71.00
88.50
294.25
467.00
62.75
510.00
562.00
0.00
25.50
8.23
756.00
3.00
45.75
94.00
2024.00

23
4
159
199
87
258
305
0
49
19
400
18
47
63
710

17.00

13

221

0.00

3187.75

441

17454.00

3791

17.00

13

8199.73

2782

Prevous (DI)
211.00
46.00
4380.50
3224.00
2760.75
447.00
0.00
276.00
420.00
2784.00
2936.50
544.00
899.00
1060.00
480.00

Previous (J)
103
25
843
289
401
115
0
77
55
137
603
227
140
165
44

Today (DI)
5.00

Today (J)
5

50.00

10.00
34.00

5
6

Balance (DI)
56.00
127.50
967.50
1874.50
445.50
143.00
0.00
151.00
82.00
190.50
1432.50
425.00
707.25
99.00
36.00

Balance (J)
34
86
411
249
101
55
0
114
19
134
520
193
119
9
3

2193.00

207

4.00

736.25

164

22661.75

3431

103.00

24

7473.50

2211

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

Previous
27
0
1
0
0
22

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

31

Soot Blower Steam (SB CS)

152
1034

19
101

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
3

Balance
19
12
35
82
38
0

18

579

0
12

133

Prevous (DI)
35685.00
17471.00
22764.75

31 Mei 2016
Remarks

921

Previous (J)
7994
3804
3455

Today (DI)
204.00
40.00
7.50

Today (J)
151
18
7

Balance (DI)
5469.00
8159.73
7466.00

Balance (J)
3127
2764
2204

365.50

248.00

3.00

601.50

467

76286.25

15501.00

254.50

177.00

21696.23

8562

Prevous (DI)
182.00
7602.00
973.00
1331.50
1133.50
2092.75
3150.50
6183.00
6140.25
977.00
1141.50

Previous (J)
82
1,329
119
579
548
532
528
1,200
1,696
302
369

4778.00

710

35685.00

7994

Prevous (DI)

Previous (J)

Today (DI)
25.00
43.00

Today (J)
22
6

28.00

28

27.00
21.50
6.00
41.50

9
41
6
35

12.00

204.00

Today (DI)

151

Today (J)

Balance (DI)
225.00
971.25
34.50
374.25
346.00
330.50
400.00
713.50
1209.00
224.00
505.00

Balance (J)
143
518
5
305
246
330
130
215
764
191
251

136.00

29

5469.00

3127

Balance (DI)

Balance (J)

3527.00
1664.50
170.00
578.00
0.00
1351.75
1295.50
0.00
1.00
0.00
2740.00
11.00
0.00
0.00
3660.25

556
91
59
248
0
620
569
0
1
0
592
7
0
0
840

2472.00

71.00
88.50
294.25
467.00
62.75
510.00
562.00
0.00
25.50
8.23
716.00
3.00
45.75
94.00
2024.00

23
4
159
199
87
258
305
0
49
19
382
18
47
63
710

40.00

18

221

0.00

3187.75

441

17471.00

3804

40.00

18

8159.73

2764

Prevous (DI)
216.00
46.00
4380.50
3224.00
2810.75
447.00
0.00
276.00
420.00
2794.00
2970.50
544.00
899.00
1060.00
480.00

Previous (J)
108
25
843
289
406
115
0
77
55
142
609
227
140
165
44

Today (DI)

2197.00

210

22764.75

3455

7.50

7.50

Today (J)

Balance (DI)
56.00
127.50
967.50
1874.50
445.50
143.00
0.00
151.00
82.00
183.00
1432.50
425.00
707.25
99.00
36.00

Balance (J)
34
86
411
249
101
55
0
114
19
127
520
193
119
9
3

736.25

164

7466.00

2204

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

Previous
27
0
1
0
0
25

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

40

Soot Blower Steam (SB CS)

152
1034

19
113

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
0

Balance
18
12
35
82
38
0

18

16

563

0
17

133

Prevous (DI)
35858.00
17511.00
22772.25

01 Juni 2016
Remarks

904

Previous (J)
8145
3822
3462

Today (DI)
114.00
14.00
85.00

368.50

249.00

23.00

578.50

459

76509.75

15678.00

236.00

113.00

21491.23

8449

Prevous (DI)
176.00
7645.00
973.00
1359.50
1133.50
2119.75
3172.00
6189.00
6181.75
977.00
1153.50

Previous (J)
104
1,335
119
607
548
541
569
1,206
1,731
302
373

4778.00

710

35858.00

8145

Prevous (DI)

Previous (J)

Today (DI)
12.50
20.00

Today (J)
87
5
13

Today (J)
9
8

5.50
34.00

7
26

4.50
18.00
6.00
10.50
3.00

3
18
8
7
1

114.00

Today (DI)

87

Today (J)

Balance (DI)
5386.00
8145.73
7381.00

Balance (DI)
243.50
951.25
34.50
368.75
312.00
330.50
395.50
695.50
1203.00
213.50
502.00

Balance (J)
3040
2759
2191

Balance (J)
134
510
5
298
220
330
127
197
756
184
250

136.00

29

5386.00

3040

Balance (DI)

Balance (J)

3527.00
1664.50
170.00
578.00
0.00
1351.75
1295.50
0.00
1.00
0.00
2780.00
11.00
0.00
0.00
3660.25

556
91
59
248
0
620
569
0
1
0
610
7
0
0
840

12.00

2.00

2472.00

221

0.00

17511.00

3822

14.00

Prevous (DI)
216.00
46.00
4380.50
3224.00
2810.75
447.00
0.00
276.00
420.00
2801.50
2970.50
544.00
899.00
1060.00
480.00

Previous (J)
108
25
843
289
406
115
0
77
55
149
609
227
140
165
44

Today (DI)

2197.00

210

22772.25

3462

59.00
88.50
294.25
467.00
62.75
510.00
560.00
0.00
25.50
8.23
716.00
3.00
45.75
94.00
2024.00

20
4
159
199
87
258
303
0
49
19
382
18
47
63
710

3187.75

441

8145.73

2759

Today (J)

22.00

39.00
6.00
18.00

4
6
1

85.00

13

Balance (DI)
56.00
127.50
967.50
1852.50
445.50
143.00
0.00
151.00
82.00
183.00
1393.50
419.00
689.25
99.00
36.00

Balance (J)
34
86
411
247
101
55
0
114
19
127
516
187
118
9
3

736.25

164

7381.00

2191

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

Previous
28
0
1
0
0
25

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

56

Soot Blower Steam (SB CS)

152
1034

19
130

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
1
0
0
0

Balance
18
12
34
82
38
0

18

17

546

0
18

133

Prevous (DI)
35959.50
17525.00
22857.25

02 Juni 2016
Remarks

886

Previous (J)
8232
3827
3475

Today (DI)
154.75
16.00
136.00

391.50

257.00

30.00

15

548.50

444

76733.25

15791.00

336.75

130.00

21166.98

8319

Prevous (DI)
176.00
7665.00
973.00
1365.00
1167.50
2119.75
3176.50
6207.00
6187.75
987.50
1156.50

Previous (J)
113
1,343
119
614
574
541
572
1,224
1,739
309
374

4778.00

710

35959.50

8232

Prevous (DI)

Previous (J)

Today (DI)
28.00
22.50

Today (J)
98
4
13

Today (J)
36
4

44.00
18.00

11
8

15.00
25.75
1.50

14
24
1

154.75

Today (DI)

98

Today (J)

Balance (DI)
5243.75
8129.73
7245.00

Balance (DI)
228.00
928.75
34.50
324.75
294.00
330.50
395.50
680.50
1177.25
212.00
502.00

Balance (J)
2942
2755
2178

Balance (J)
98
506
5
287
212
330
127
183
732
183
250

136.00

29

5243.75

2942

Balance (DI)

Balance (J)

3539.00
1664.50
170.00
578.00
0.00
1351.75
1297.50
0.00
1.00
0.00
2780.00
11.00
0.00
0.00
3660.25

559
91
59
248
0
620
571
0
1
0
610
7
0
0
840

2472.00

59.00
88.50
294.25
467.00
62.75
510.00
544.00
0.00
25.50
8.23
716.00
3.00
45.75
94.00
2024.00

20
4
159
199
87
258
299
0
49
19
382
18
47
63
710

16.00

221

0.00

3187.75

441

17525.00

3827

16.00

8129.73

2755

Prevous (DI)
216.00
46.00
4380.50
3246.00
2810.75
447.00
0.00
276.00
420.00
2801.50
3009.50
550.00
917.00
1060.00
480.00

Previous (J)
108
25
843
291
406
115
0
77
55
149
613
233
141
165
44

Today (DI)

2197.00

210

22857.25

3475

Today (J)

48.00
26.00

3
5

20.00

36.00

6.00

136.00

13

Balance (DI)
56.00
127.50
967.50
1804.50
419.50
143.00
0.00
151.00
62.00
183.00
1393.50
419.00
653.25
99.00
30.00

Balance (J)
34
86
411
244
96
55
0
114
17
127
516
187
116
9
2

736.25

164

7245.00

2178

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
25

Previous
28
0
2
0
0
25

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

73

Soot Blower Steam (SB CS)

152
1034

19
148

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
1
0
0
0

Balance
18
12
33
82
38
0

18

21

525

0
22

133

Prevous (DI)
36114.25
17541.00
22993.25

03 Juni 2016
Remarks

864

Previous (J)
8330
3831
3488

Today (DI)
119.00
5.00
53.00

421.50

272.00

50.00

498.50

435

77070.00

15921.00

227.00

104.00

20939.98

8215

Prevous (DI)
204.00
7687.50
973.00
1409.00
1185.50
2119.75
3176.50
6222.00
6213.50
989.00
1156.50

Previous (J)
149
1,347
119
625
582
541
572
1,238
1,763
310
374

4778.00

710

36114.25

8330

Prevous (DI)

Previous (J)

Today (DI)
8.00
23.00

Today (J)
83
5
7

Today (J)
6
13

25.50
7.00
18.00

18
6
11

33.50
4.00

27
2

119.00

Today (DI)

83

Today (J)

Balance (DI)
5124.75
8124.73
7192.00

Balance (DI)
220.00
905.75
34.50
299.25
287.00
312.50
395.50
647.00
1173.25
212.00
502.00

Balance (J)
2859
2750
2171

Balance (J)
92
493
5
269
206
319
127
156
730
183
250

136.00

29

5124.75

2859

Balance (DI)

Balance (J)

3539.00
1664.50
170.00
578.00
0.00
1351.75
1313.50
0.00
1.00
0.00
2780.00
11.00
0.00
0.00
3660.25

559
91
59
248
0
620
575
0
1
0
610
7
0
0
840

2472.00

221

5.00

17541.00

3831

5.00

Prevous (DI)
216.00
46.00
4380.50
3294.00
2836.75
447.00
0.00
276.00
440.00
2801.50
3009.50
550.00
953.00
1060.00
486.00

Previous (J)
108
25
843
294
411
115
0
77
57
149
613
233
143
165
45

Today (DI)

2197.00

210

22993.25

3488

59.00
88.50
294.25
467.00
62.75
510.00
544.00
0.00
25.50
8.23
716.00
3.00
45.75
94.00
2024.00

20
4
159
199
87
258
299
0
49
19
382
18
47
63
710

3182.75

436

8124.73

2750

Today (J)

13.00

22.00

18.00

53.00

Balance (DI)
56.00
127.50
954.50
1804.50
397.50
143.00
0.00
151.00
62.00
183.00
1393.50
419.00
635.25
99.00
30.00

Balance (J)
34
86
409
244
92
55
0
114
17
127
516
187
115
9
2

736.25

164

7192.00

2171

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
28
0
3
0
0
25

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

94

Soot Blower Steam (SB CS)

152
1042

19
170

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
1

Balance
18
12
33
82
38
7

18

22

503

0
23

133

Prevous (DI)
36233.25
17546.00
23046.25

04 Juni 2016
Remarks

849

Previous (J)
8413
3836
3495

Today (DI)
103.50
4.00
76.00

Today (J)
79
4
16

Balance (DI)
5021.25
8120.73
7116.00

Balance (J)
2780
2746
2155

471.50

281.00

0.00

498.50

435

77297.00

16025.00

183.50

99.00

20756.48

8116

Today (DI)
16.00

Today (J)
14

Balance (DI)
204.00
905.75
34.50
287.25
276.50
305.50
381.50
639.00
1140.25
209.00
502.00

Prevous (DI)
212.00
7710.50
973.00
1434.50
1192.50
2137.75
3176.50
6255.50
6217.50
989.00
1156.50

Previous (J)
155
1,360
119
643
588
552
572
1,265
1,765
310
374

4778.00

710

36233.25

8413

Prevous (DI)

Previous (J)

12.00
10.50
7.00
14.00
8.00
33.00
3.00

103.50

Today (DI)

10
7
14
7
8
18
1

79

Today (J)

Balance (J)
78
493
5
259
199
305
120
148
712
182
250

136.00

29

5021.25

2780

Balance (DI)

Balance (J)

3539.00
1664.50
170.00
578.00
0.00
1351.75
1313.50
0.00
1.00
0.00
2780.00
11.00
0.00
0.00
3660.25

559
91
59
248
0
620
575
0
1
0
610
7
0
0
840

2477.00

226

4.00

17546.00

3836

4.00

Prevous (DI)
216.00
46.00
4393.50
3294.00
2858.75
447.00
0.00
276.00
440.00
2801.50
3009.50
550.00
971.00
1060.00
486.00

Previous (J)
108
25
845
294
415
115
0
77
57
149
613
233
144
165
45

Today (DI)

59.00
88.50
294.25
467.00
62.75
510.00
544.00
0.00
25.50
8.23
716.00
3.00
45.75
94.00
2024.00

20
4
159
199
87
258
299
0
49
19
382
18
47
63
710

3178.75

432

8120.73

2746

Today (J)

3.00

52.00
6.00

6
2

13.00

Balance (DI)
56.00
127.50
951.50
1804.50
345.50
137.00
0.00
151.00
62.00
183.00
1380.50
419.00
635.25
99.00
30.00

Balance (J)
34
86
408
244
86
53
0
114
17
127
513
187
115
9
2

2197.00

210

2.00

734.25

160

23046.25

3495

76.00

16

7116.00

2155

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
28
0
3
0
0
26

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

116

Soot Blower Steam (SB CS)

152
1042

19
193

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
4
0
0
0
0
1

Balance
14
12
33
82
38
6

18

10

493

0
15

133

Prevous (DI)
36336.75
17550.00
23122.25

05 Juni 2016
Remarks

834

Previous (J)
8492
3840
3511

Today (DI)
106.25
16.00
0.00

Today (J)
72
8
0

Balance (DI)
4915.00
8104.73
7116.00

Balance (J)
2708
2738
2155

471.50

281.00

2.00

496.50

433

77480.50

16124.00

124.25

82.00

20632.23

8034

Today (J)
1
3

Balance (DI)
203.00
899.75
34.50
271.25
266.00
289.00
367.50
632.00
1109.50
204.50
502.00

Prevous (DI)
228.00
7710.50
973.00
1446.50
1203.00
2144.75
3190.50
6263.50
6250.50
992.00
1156.50

Previous (J)
169
1,360
119
653
595
566
579
1,273
1,783
311
374

4778.00

710

36336.75

8492

Prevous (DI)

Previous (J)

Today (DI)
1.00
6.00
16.00
10.50
16.50
14.00
7.00
30.75
4.50

106.25

Today (DI)

14
6
11
7
2
25
3

72

Today (J)

Balance (J)
77
490
5
245
193
294
113
146
687
179
250

136.00

29

4915.00

2708

Balance (DI)

Balance (J)

3539.00
1664.50
170.00
578.00
0.00
1351.75
1313.50
0.00
1.00
0.00
2780.00
11.00
0.00
0.00
3660.25

559
91
59
248
0
620
575
0
1
0
610
7
0
0
840

2481.00

59.00
88.50
294.25
467.00
62.75
499.00
544.00
0.00
25.50
8.23
713.00
3.00
45.75
94.00
2024.00

20
4
159
199
87
255
299
0
49
19
379
18
47
63
710

11.00

3.00

230

2.00

3176.75

430

17550.00

3840

16.00

8104.73

2738

Prevous (DI)
216.00
46.00
4396.50
3294.00
2910.75
453.00
0.00
276.00
440.00
2801.50
3022.50
550.00
971.00
1060.00
486.00

Previous (J)
108
25
846
294
421
117
0
77
57
149
616
233
144
165
45

Today (DI)

2199.00

214

23122.25

3511

0.00

Today (J)

Balance (DI)
56.00
127.50
951.50
1804.50
345.50
137.00
0.00
151.00
62.00
183.00
1380.50
419.00
635.25
99.00
30.00

Balance (J)
34
86
408
244
86
53
0
114
17
127
513
187
115
9
2

734.25

160

7116.00

2155

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
32
0
3
0
0
27

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

126

Soot Blower Steam (SB CS)

152
1042

19
208

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
1

Balance
14
12
33
82
38
5

18

484

0
10

133

Prevous (DI)
36443.00
17566.00
23122.25

06 Juni 2016
Remarks

824

Previous (J)
8564
3848
3511

Today (DI)
106.00
9.00
42.00

473.50

283.00

40.00

456.50

431

77604.75

16206.00

197.00

107.00

20435.23

7927

Prevous (DI)
229.00
7716.50
973.00
1462.50
1213.50
2161.25
3204.50
6270.50
6281.25
996.50
1156.50

Previous (J)
170
1,363
119
667
601
577
586
1,275
1,808
314
374

4778.00

710

36443.00

8564

Prevous (DI)

Previous (J)

Today (DI)
16.00

Today (J)
94
3
8

Today (J)
16

28.00
23.00

24
22

18.00
21.00

18
14

106.00

Today (DI)

94

Today (J)

Balance (DI)
4809.00
8095.73
7074.00

Balance (DI)
187.00
899.75
34.50
271.25
238.00
266.00
367.50
614.00
1088.50
204.50
502.00

Balance (J)
2614
2735
2147

Balance (J)
61
490
5
245
169
272
113
128
673
179
250

136.00

29

4809.00

2614

Balance (DI)

Balance (J)

3539.00
1664.50
170.00
578.00
0.00
1362.75
1313.50
0.00
1.00
0.00
2783.00
11.00
0.00
0.00
3660.25

559
91
59
248
0
623
575
0
1
0
613
7
0
0
840

2483.00

232

17566.00

3848

9.00

Prevous (DI)
216.00
46.00
4396.50
3294.00
2910.75
453.00
0.00
276.00
440.00
2801.50
3022.50
550.00
971.00
1060.00
486.00

Previous (J)
108
25
846
294
421
117
0
77
57
149
616
233
144
165
45

Today (DI)

9.00

Today (J)

59.00
88.50
294.25
467.00
62.75
490.00
544.00
0.00
25.50
8.23
713.00
3.00
45.75
94.00
2024.00

20
4
159
199
87
252
299
0
49
19
379
18
47
63
710

3176.75

430

8095.73

2735

30.00

Balance (DI)
56.00
127.50
951.50
1804.50
345.50
137.00
0.00
151.00
62.00
183.00
1380.50
419.00
635.25
99.00
0.00

Balance (J)
34
86
408
244
86
53
0
114
17
127
513
187
115
9
0

2199.00

214

12.00

722.25

154

23122.25

3511

42.00

7074.00

2147

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
32
0
3
0
0
28

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

135

Soot Blower Steam (SB CS)

152
1042

19
218

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
1

Balance
14
12
33
82
38
4

18

484

0
1

133

Prevous (DI)
36549.00
17575.00
23164.25

Previous (J)
8658
3851
3519
285.00

77801.75

16313.00

Previous (J)
186
1,363
119
667
625
599
586
1,293
1,822
314
374

4778.00

710

36549.00

8658

Prevous (DI)

Remarks

823

513.50

Prevous (DI)
245.00
7716.50
973.00
1462.50
1241.50
2184.25
3204.50
6288.50
6302.25
996.50
1156.50

07 Juni 2016

Previous (J)

Today (DI)
108.50
17.00
20.00

Today (J)
80
15
1

Balance (DI)
4700.50
8078.73
7054.00
456.50

431
7831

145.50

96.00

20289.73

Today (DI)
19.50
42.00

Today (J)
11
16

Balance (DI)
167.50
857.75
34.50
271.25
238.00
262.50
366.50
598.00
1062.00
204.50
502.00

3.50
1.00
16.00
26.50

108.50

Today (DI)

7
1
24
21

80

Today (J)

Balance (J)
2534
2720
2146

Balance (J)
50
474
5
245
169
265
112
104
652
179
250

136.00

29

4700.50

2534

Balance (DI)

Balance (J)

3539.00
1664.50
170.00
578.00
0.00
1371.75
1313.50
0.00
1.00
0.00
2783.00
11.00
0.00
0.00
3660.25

559
91
59
248
0
626
575
0
1
0
613
7
0
0
840

2483.00

232

17575.00

3851

17.00

Prevous (DI)
216.00
46.00
4396.50
3294.00
2910.75
453.00
0.00
276.00
440.00
2801.50
3022.50
550.00
971.00
1060.00
516.00

Previous (J)
108
25
846
294
421
117
0
77
57
149
616
233
144
165
47

Today (DI)

4.00

13.00

13

15

Today (J)

59.00
88.50
294.25
467.00
62.75
490.00
540.00
0.00
25.50
8.23
700.00
3.00
45.75
94.00
2024.00

20
4
159
199
87
252
297
0
49
19
366
18
47
63
710

3176.75

430

8078.73

2720

Balance (DI)
56.00
127.50
951.50
1804.50
345.50
137.00
0.00
151.00
62.00
183.00
1380.50
419.00
635.25
99.00
0.00

Balance (J)
34
86
408
244
86
53
0
114
17
127
513
187
115
9
0

2211.00

220

20.00

702.25

153

23164.25

3519

20.00

7054.00

2146

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
32
0
3
0
0
29

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

135

Soot Blower Steam (SB CS)

152
1042

19
219

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
2
0
0
0
1

Balance
14
10
33
82
38
3

18

10

474

0
13

133

Prevous (DI)
36657.50
17592.00
23184.25

08 Juni 2016
Remarks

810

Previous (J)
8738
3866
3520

Today (DI)
72.25
0.00
25.00

513.50

285.00

24.00

432.50

430

77947.25

16409.00

121.25

92.00

20168.48

7739

Today (DI)
29.00
1.00

Today (J)
20
1

Balance (DI)
138.50
856.75
34.50
271.25
238.00
250.50
366.50
592.00
1037.75
204.50
502.00

Prevous (DI)
264.50
7758.50
973.00
1462.50
1241.50
2187.75
3205.50
6304.50
6328.75
996.50
1156.50

Previous (J)
197
1,379
119
667
625
606
587
1,317
1,843
314
374

12.00

21

6.00
24.25

6
29

4778.00

710

36657.50

8738

72.25

Previous (J)

Today (DI)

Prevous (DI)

Today (J)
77
0
14

77

Today (J)

Balance (DI)
4628.25
8078.73
7029.00

Balance (J)
2457
2720
2132

Balance (J)
30
473
5
245
169
244
112
98
623
179
250

136.00

29

4628.25

2457

Balance (DI)

Balance (J)

3539.00
1664.50
170.00
578.00
0.00
1371.75
1317.50
0.00
1.00
0.00
2796.00
11.00
0.00
0.00
3660.25

559
91
59
248
0
626
577
0
1
0
626
7
0
0
840

59.00
88.50
294.25
467.00
62.75
490.00
540.00
0.00
25.50
8.23
700.00
3.00
45.75
94.00
2024.00

20
4
159
199
87
252
297
0
49
19
366
18
47
63
710

2483.00

232

3176.75

430

17592.00

3866

0.00

8078.73

2720

Prevous (DI)
216.00
46.00
4396.50
3294.00
2910.75
453.00
0.00
276.00
440.00
2801.50
3022.50
550.00
971.00
1060.00
516.00

Previous (J)
108
25
846
294
421
117
0
77
57
149
616
233
144
165
47

Today (DI)
9.00

2231.00

221

23184.25

3520

16.00

25.00

Today (J)
9

14

Balance (DI)
47.00
127.50
951.50
1804.50
329.50
137.00
0.00
151.00
62.00
183.00
1380.50
419.00
635.25
99.00
0.00

Balance (J)
25
86
408
244
81
53
0
114
17
127
513
187
115
9
0

702.25

153

7029.00

2132

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
32
2
3
0
0
30

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

145

Soot Blower Steam (SB CS)

152
1042

19
232

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
1

Balance
14
10
33
82
38
2

18

465

0
10

133

Prevous (DI)
36729.75
17592.00
23209.25

09 Juni 2016
Remarks

800

Previous (J)
8815
3866
3534

Today (DI)
60.00
52.00
126.00

537.50

286.00

39.00

65

393.50

365

78068.50

16501.00

277.00

92.00

19891.48

7647

Today (DI)
32.00
4.00

Today (J)
4
1

Balance (DI)
106.50
852.75
34.50
255.25
238.00
250.50
366.50
584.00
1037.75
204.50
502.00

Prevous (DI)
293.50
7759.50
973.00
1462.50
1241.50
2199.75
3205.50
6310.50
6353.00
996.50
1156.50

Previous (J)
217
1,380
119
667
625
627
587
1,323
1,872
314
374

16.00

8.00

4778.00

710

36729.75

8815

60.00

Previous (J)

Today (DI)

Prevous (DI)

Today (J)
9
4
14

Today (J)

Balance (DI)
4568.25
8026.73
6903.00

Balance (J)
2448
2716
2118

Balance (J)
26
472
5
243
169
244
112
96
623
179
250

136.00

29

4568.25

2448

Balance (DI)

Balance (J)

3539.00
1664.50
170.00
578.00
0.00
1371.75
1317.50
0.00
1.00
0.00
2796.00
11.00
0.00
0.00
3660.25

559
91
59
248
0
626
577
0
1
0
626
7
0
0
840

2483.00

232

17592.00

3866

52.00

Prevous (DI)
225.00
46.00
4396.50
3294.00
2926.75
453.00
0.00
276.00
440.00
2801.50
3022.50
550.00
971.00
1060.00
516.00

Previous (J)
117
25
846
294
426
117
0
77
57
149
616
233
144
165
47

Today (DI)

52.00

Today (J)

70.00

8.00
16.00

1
2

59.00
88.50
294.25
467.00
62.75
490.00
540.00
0.00
25.50
8.23
648.00
3.00
45.75
94.00
2024.00

20
4
159
199
87
252
297
0
49
19
362
18
47
63
710

3176.75

430

8026.73

2716

Balance (DI)
47.00
127.50
881.50
1804.50
329.50
137.00
0.00
151.00
62.00
175.00
1364.50
419.00
635.25
99.00
0.00

Balance (J)
25
86
403
244
81
53
0
114
17
126
511
187
115
9
0

2231.00

221

32.00

670.25

147

23209.25

3534

126.00

14

6903.00

2118

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
32
2
3
0
0
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

154

Soot Blower Steam (SB CS)

152
1042

19
242

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
1
0
12
1

Balance
14
10
32
82
26
1

18

456

0
23

133

Prevous (DI)
36789.75
17644.00
23335.25

10 Juni 2016
Remarks

777

Previous (J)
8824
3870
3548

Today (DI)
249.00
20.00
81.00

576.50

351.00

23.00

370.50

361

78345.50

16593.00

373.00

140.00

19518.48

7507

Prevous (DI)
325.50
7763.50
973.00
1478.50
1241.50
2199.75
3205.50
6318.50
6353.00
996.50
1156.50

Previous (J)
221
1,381
119
669
625
627
587
1,325
1,872
314
374

4778.00

710

36789.75

8824

Prevous (DI)

Previous (J)

Today (DI)
106.50
15.00

Today (J)
109
5
22

Today (J)
26
15

6.00

55.00
31.50
25.00
10.00

20
14
16
12

249.00

Today (DI)

109

Today (J)

Balance (DI)
4319.25
8006.73
6822.00

Balance (DI)
0.00
837.75
34.50
249.25
238.00
195.50
335.00
559.00
1027.75
204.50
502.00

Balance (J)
2339
2711
2096

Balance (J)
0
457
5
237
169
224
98
80
611
179
250

136.00

29

4319.25

2339

Balance (DI)

Balance (J)

3539.00
1664.50
170.00
578.00
0.00
1371.75
1317.50
0.00
1.00
0.00
2848.00
11.00
0.00
0.00
3660.25

559
91
59
248
0
626
577
0
1
0
630
7
0
0
840

2483.00

232

17644.00

3870

20.00

Prevous (DI)
225.00
46.00
4466.50
3294.00
2926.75
453.00
0.00
276.00
440.00
2809.50
3038.50
550.00
971.00
1060.00
516.00

Previous (J)
117
25
851
294
426
117
0
77
57
150
618
233
144
165
47

Today (DI)

20.00

Today (J)

14.00

20.00

10.00

15.00

59.00
88.50
294.25
467.00
62.75
490.00
540.00
0.00
25.50
8.23
628.00
3.00
45.75
94.00
2024.00

20
4
159
199
87
252
297
0
49
19
357
18
47
63
710

3176.75

430

8006.73

2711

Balance (DI)
47.00
127.50
867.50
1804.50
309.50
137.00
0.00
151.00
52.00
175.00
1364.50
404.00
635.25
99.00
0.00

Balance (J)
25
86
402
244
79
53
0
114
16
126
511
180
115
9
0

2263.00

227

22.00

11

648.25

136

23335.25

3548

81.00

22

6822.00

2096

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
32
2
4
0
12
32

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

163

Soot Blower Steam (SB CS)

152
1042

19
265

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
1

Balance
14
10
32
82
26
0

18

449

0
8

133

Prevous (DI)
37038.75
17664.00
23416.25

Previous (J)
8933
3875
3570
355.00

78718.50

16733.00

Previous (J)
247
1,396
119
675
625
647
601
1,341
1,884
314
374

4778.00

710

37038.75

8933

Prevous (DI)

Remarks

769

599.50

Prevous (DI)
432.00
7778.50
973.00
1484.50
1241.50
2254.75
3237.00
6343.50
6363.00
996.50
1156.50

11 Juni 2016

Previous (J)

Today (DI)
228.00
0.00
102.00
330.00

Today (DI)

Today (J)
115
0
26
141.00

Today (J)

72.00

11

8.00

13.00
40.00
15.00
45.00

23
17
15
25

35.00

20

228.00

Today (DI)

115

Today (J)

Balance (DI)
4091.25
8006.73
6720.00

Balance (J)
2224
2711
2070

370.50

361

19188.48

7366

Balance (DI)
0.00
765.75
34.50
241.25
238.00
182.50
295.00
544.00
982.75
204.50
467.00

Balance (J)
0
446
5
233
169
201
81
65
586
179
230

136.00

29

4091.25

2224

Balance (DI)

Balance (J)

3539.00
1664.50
170.00
578.00
0.00
1371.75
1317.50
0.00
1.00
0.00
2868.00
11.00
0.00
0.00
3660.25

559
91
59
248
0
626
577
0
1
0
635
7
0
0
840

59.00
88.50
294.25
467.00
62.75
490.00
540.00
0.00
25.50
8.23
628.00
3.00
45.75
94.00
2024.00

20
4
159
199
87
252
297
0
49
19
357
18
47
63
710

2483.00

232

3176.75

430

17664.00

3875

0.00

8006.73

2711

Prevous (DI)
225.00
46.00
4480.50
3294.00
2946.75
453.00
0.00
276.00
450.00
2809.50
3038.50
565.00
971.00
1060.00
516.00

Previous (J)
117
25
852
294
428
117
0
77
58
150
618
240
144
165
47

Today (DI)

2285.00

238

23416.25

3570

Today (J)

24.00
8.00

1
4

6.00
30.00
24.00
10.00

5
2
10
4

102.00

26

Balance (DI)
47.00
127.50
867.50
1780.50
301.50
137.00
0.00
151.00
46.00
145.00
1340.50
394.00
635.25
99.00
0.00

Balance (J)
25
86
402
243
75
53
0
114
11
124
501
176
115
9
0

648.25

136

6720.00

2070

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
32
2
4
0
12
33

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

170

Soot Blower Steam (SB CS)

152
1042

19
273

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
2

Balance
13
10
32
82
26
-2

18

12

437

0
15

133

Prevous (DI)
37266.75
17664.00
23518.25

Previous (J)
9048
3875
3596
355.00

79048.50

16874.00

Previous (J)
247
1,407
119
679
625
670
618
1,356
1,909
314
394

4778.00

710

37266.75

9048

Prevous (DI)

Remarks

754

599.50

Prevous (DI)
432.00
7850.50
973.00
1492.50
1241.50
2267.75
3277.00
6358.50
6408.00
996.50
1191.50

12 Juni 2016

Previous (J)

Today (DI)
114.50
18.00
149.00
281.50

Today (DI)

Today (J)
59
4
25
88.00

Today (J)

20.00

3.00
7.00
16.00
13.00
30.00

2
14
8
4
14

25.50

16

114.50

Today (DI)

59

Today (J)

Balance (DI)
3976.75
7988.73
6571.00

Balance (J)
2165
2707
2045

370.50

361

18906.98

7278

Balance (DI)
0.00
745.75
34.50
241.25
235.00
175.50
279.00
531.00
952.75
204.50
441.50

Balance (J)
0
445
5
233
167
187
73
61
572
179
214

136.00

29

3976.75

2165

Balance (DI)

Balance (J)

3539.00
1664.50
170.00
578.00
0.00
1371.75
1317.50
0.00
1.00
0.00
2868.00
11.00
0.00
0.00
3660.25

559
91
59
248
0
626
577
0
1
0
635
7
0
0
840

2483.00

232

17664.00

3875

18.00

Prevous (DI)
225.00
46.00
4480.50
3318.00
2954.75
453.00
0.00
276.00
456.00
2839.50
3062.50
575.00
971.00
1060.00
516.00

Previous (J)
117
25
852
295
432
117
0
77
63
152
628
244
144
165
47

Today (DI)
1.00

18.00

Today (J)
1

24.00
6.00

1
3

22.00
20.00
24.00
12.00

3
1
8
6

59.00
70.50
294.25
467.00
62.75
490.00
540.00
0.00
25.50
8.23
628.00
3.00
45.75
94.00
2024.00

20
0
159
199
87
252
297
0
49
19
357
18
47
63
710

3176.75

430

7988.73

2707

Balance (DI)
46.00
127.50
867.50
1756.50
295.50
137.00
0.00
151.00
24.00
125.00
1316.50
382.00
635.25
99.00
0.00

Balance (J)
24
86
402
242
72
53
0
114
8
123
493
170
115
9
0

2285.00

238

40.00

608.25

134

23518.25

3596

149.00

25

6571.00

2045

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
33
2
4
0
12
35

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

182

Soot Blower Steam (SB CS)

152
1042

19
288

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today

0
0
0

Balance
13
10
32
82
26
-2

18

428

0
9

133

0
0

Prevous (DI)
37381.25
17682.00
23667.25

12 Juni 2016
Remarks

745

Previous (J)
9107
3879
3621

Today (DI)
153.00
35.00
105.00

599.50

355.00

18.00

30

352.50

331

79330.00

16962.00

311.00

152.00

18595.98

7126

Prevous (DI)
432.00
7870.50
973.00
1492.50
1244.50
2274.75
3293.00
6371.50
6438.00
996.50
1217.00

Previous (J)
247
1,408
119
679
627
684
626
1,360
1,923
314
410

4778.00

710

37381.25

9107

Prevous (DI)

Previous (J)

Today (DI)

Today (J)
83
14
25

Today (J)

27.00

10.00
28.00
10.00
49.00

15
17
2
32

29.00

13

153.00

Today (DI)

83

Today (J)

Balance (DI)
3823.75
7953.73
6466.00

Balance (DI)
0.00
718.75
34.50
241.25
235.00
165.50
251.00
521.00
903.75
204.50
412.50

Balance (J)
2082
2693
2020

Balance (J)
0
441
5
233
167
172
56
59
540
179
201

136.00

29

3823.75

2082

Balance (DI)

Balance (J)

3539.00
1682.50
170.00
578.00
0.00
1371.75
1317.50
0.00
1.00
0.00
2868.00
11.00
0.00
0.00
3660.25

559
95
59
248
0
626
577
0
1
0
635
7
0
0
840

2483.00

232

17682.00

3879

35.00

Prevous (DI)
226.00
46.00
4480.50
3342.00
2960.75
453.00
0.00
276.00
478.00
2859.50
3086.50
587.00
971.00
1060.00
516.00

Previous (J)
118
25
852
296
435
117
0
77
66
153
636
250
144
165
47

Today (DI)

2325.00

240

23667.25

3621

15.00
20.00

8
6

14

Today (J)

6.00
40.00

2
2

6.00

30.00
23.00

10
10

105.00

25

59.00
70.50
294.25
467.00
62.75
475.00
520.00
0.00
25.50
8.23
628.00
3.00
45.75
94.00
2024.00

20
0
159
199
87
244
291
0
49
19
357
18
47
63
710

3176.75

430

7953.73

2693

Balance (DI)
46.00
127.50
867.50
1750.50
255.50
137.00
0.00
151.00
18.00
125.00
1286.50
359.00
635.25
99.00
0.00

Balance (J)
24
86
402
240
70
53
0
114
7
123
483
160
115
9
0

608.25

134

6466.00

2020

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
33
2
4
0
12
35

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

191

Soot Blower Steam (SB CS)

152
1042

19
297

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
4
0
0
0

Balance
12
10
28
82
26
-2

18

28

400

0
33

133

Prevous (DI)
37534.25
17717.00
23772.25

14 Juni 2016
Remarks

712

Previous (J)
9190
3893
3646

Today (DI)
60.50
53.00
74.50

617.50

385.00

123.00

22

229.50

309

79641.00

17114.00

311.00

115.00

18284.98

7011

Prevous (DI)
432.00
7897.50
973.00
1492.50
1244.50
2284.75
3321.00
6381.50
6487.00
996.50
1246.00

Previous (J)
247
1,412
119
679
627
699
643
1,362
1,955
314
423

Today (DI)

5.00
2.25
18.25
29.00
6.00

4778.00

710

37534.25

9190

60.50

Previous (J)

Today (DI)

Prevous (DI)

Today (J)
43
16
34

Today (J)
0

9
3
12
15
4

43

Today (J)

Balance (DI)
3763.25
7900.73
6391.50

Balance (DI)
0.00
718.75
34.50
241.25
235.00
160.50
248.75
502.75
874.75
198.50
412.50

Balance (J)
2039
2677
1986

Balance (J)
0
441
5
233
167
163
53
47
525
175
201

136.00

29

3763.25

2039

Balance (DI)

Balance (J)

3539.00
1682.50
170.00
578.00
0.00
1386.75
1337.50
0.00
1.00
0.00
2868.00
11.00
0.00
0.00
3660.25

559
95
59
248
0
634
583
0
1
0
635
7
0
0
840

8.00
8.00

4
4

9.00

8.00

59.00
70.50
294.25
467.00
62.75
467.00
512.00
0.00
25.50
8.23
619.00
3.00
45.75
94.00
2016.00

2483.00

232

20.00

3156.75

429

17717.00

3893

53.00

16

7900.73

2677

Prevous (DI)
226.00
46.00
4480.50
3348.00
3000.75
453.00
0.00
276.00
484.00
2859.50
3116.50
610.00
971.00
1060.00
516.00

Previous (J)
118
25
852
298
437
117
0
77
67
153
646
260
144
165
47

Today (DI)

2325.00

240

23772.25

3646

Today (J)

3.00

14.00

24.00

27.50
6.00

14
3

74.50

34

Balance (DI)
46.00
124.50
867.50
1750.50
241.50
137.00
0.00
127.00
18.00
125.00
1259.00
353.00
635.25
99.00
0.00

20
0
159
199
87
240
287
0
49
19
354
18
47
63
706

Balance (J)
24
84
402
240
63
53
0
106
7
123
469
157
115
9
0

608.25

134

6391.50

1986

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
34
2
8
0
12
35

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

219

Soot Blower Steam (SB CS)

152
1042

19
330

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
6
0
0
0

Balance
11
10
22
82
26
-2

18

23

377

0
30

133

Prevous (DI)
37594.75
17770.00
23846.75

Remarks

682

Previous (J)
9233
3909
3680

740.50

407.00

79952.00

17229.00

Prevous (DI)
432.00
7897.50
973.00
1492.50
1244.50
2289.75
3323.25
6399.75
6516.00
1002.50
1246.00

Previous (J)
247
1,412
119
679
627
708
646
1,374
1,970
318
423

Today (DI)
59.50
0.00
99.50
159.00

Today (DI)
10.00

10.00
9.00
5.00
11.00
6.00
8.50

4778.00

710

37594.75

9233

59.50

Previous (J)

Today (DI)

Prevous (DI)

15 Juni 2016

Today (J)
48
0
42
90.00

Today (J)
0
1

15
7
5
10
4
6
48

Today (J)

Balance (DI)
3703.75
7900.73
6292.00

Balance (J)
1991
2677
1944

229.50

309

18125.98

6921

Balance (DI)
0.00
708.75
34.50
241.25
235.00
150.50
239.75
497.75
863.75
192.50
404.00

Balance (J)
0
440
5
233
167
148
46
42
515
171
195

136.00

29

3703.75

1991

Balance (DI)

Balance (J)

3539.00
1682.50
170.00
578.00
0.00
1394.75
1345.50
0.00
1.00
0.00
2877.00
11.00
0.00
0.00
3668.25

559
95
59
248
0
638
587
0
1
0
638
7
0
0
844

59.00
70.50
294.25
467.00
62.75
467.00
512.00
0.00
25.50
8.23
619.00
3.00
45.75
94.00
2016.00

20
0
159
199
87
240
287
0
49
19
354
18
47
63
706

2503.00

233

3156.75

429

17770.00

3909

0.00

7900.73

2677

Prevous (DI)
226.00
49.00
4480.50
3348.00
3014.75
453.00
0.00
300.00
484.00
2859.50
3144.00
616.00
971.00
1060.00
516.00

Previous (J)
118
27
852
298
444
117
0
85
67
153
660
263
144
165
47

Today (DI)

Today (J)

13.00

13

40.00

13.50
3.00

9
2

Balance (DI)
46.00
111.50
867.50
1750.50
201.50
137.00
0.00
127.00
18.00
125.00
1245.50
350.00
635.25
99.00
0.00

Balance (J)
24
71
402
240
61
53
0
106
7
123
460
155
115
9
0

2325.00

240

30.00

16

578.25

118

23846.75

3680

99.50

42

6292.00

1944

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
35
2
14
0
12
35

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

242

Soot Blower Steam (SB CS)

152
1042

19
360

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
0

Balance
10
10
22
82
26
-2

18

370

0
8

133

Prevous (DI)
37654.25
17770.00
23946.25

16 Juni 2016
Remarks

674

Previous (J)
9281
3909
3722

Today (DI)
191.00
18.00
77.25

740.50

407.00

18.50

36

211.00

273

80111.00

17319.00

304.75

168.00

17821.23

6753

Prevous (DI)
432.00
7907.50
973.00
1492.50
1244.50
2299.75
3332.25
6404.75
6527.00
1008.50
1254.50

Previous (J)
247
1,413
119
679
627
723
653
1,379
1,980
322
429

4778.00

710

37654.25

9281

Prevous (DI)

Previous (J)

Today (DI)
38.25

Today (J)
93
16
23

Today (J)
0
11

1.00
12.00
21.75
75.00

1
3
33
14

26.00

14

17.00

17

191.00

Today (DI)

93

Today (J)

Balance (DI)
3512.75
7882.73
6214.75

Balance (DI)
0.00
670.50
34.50
240.25
223.00
128.75
164.75
497.75
837.75
192.50
387.00

Balance (J)
1898
2661
1921

Balance (J)
0
429
5
232
164
115
32
42
501
171
178

136.00

29

3512.75

1898

Balance (DI)

Balance (J)

3539.00
1682.50
170.00
578.00
0.00
1394.75
1345.50
0.00
1.00
0.00
2877.00
11.00
0.00
0.00
3668.25

559
95
59
248
0
638
587
0
1
0
638
7
0
0
844

2503.00

233

17770.00

3909

18.00

Prevous (DI)
226.00
62.00
4480.50
3348.00
3054.75
453.00
0.00
300.00
484.00
2859.50
3157.50
619.00
971.00
1060.00
516.00

Previous (J)
118
40
852
298
446
117
0
85
67
153
669
265
144
165
47

Today (DI)

12.00

6.00

12

16

Today (J)

4.00

4.00

11.25

15

59.00
70.50
294.25
467.00
62.75
467.00
500.00
0.00
25.50
2.23
619.00
3.00
45.75
94.00
2016.00

20
0
159
199
87
240
283
0
49
7
354
18
47
63
706

3156.75

429

7882.73

2661

Balance (DI)
46.00
107.50
867.50
1746.50
201.50
137.00
0.00
127.00
18.00
125.00
1234.25
350.00
635.25
99.00
0.00

Balance (J)
24
67
402
239
61
53
0
106
7
123
445
155
115
9
0

2355.00

256

58.00

520.25

115

23946.25

3722

77.25

23

6214.75

1921

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
36
2
14
0
12
35

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

249

Soot Blower Steam (SB CS)

152
1042

19
368

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
0

Balance
9
10
22
82
26
-2

18

363

0
8

133

Prevous (DI)
37845.25
17788.00
24023.50

17 Juni 2016
Remarks

666

Previous (J)
9374
3925
3745

Today (DI)
191.50
77.50
133.00

Today (J)
99
47
33

Balance (DI)
3321.25
7805.23
6081.75

Balance (J)
1799
2614
1888

759.00

443.00

6.00

20

205.00

253

80415.75

17487.00

408.00

199.00

17413.23

6554

Prevous (DI)
432.00
7945.75
973.00
1493.50
1256.50
2321.50
3407.25
6404.75
6553.00
1008.50
1271.50

Previous (J)
247
1,424
119
680
630
756
667
1,379
1,994
322
446

4778.00

710

37845.25

9374

Prevous (DI)

Previous (J)

Today (DI)

Today (J)

20.50

12

4.00

29.75
55.00
50.00
26.25

40
15
3
17

6.00

191.50

Today (DI)

99

Today (J)

Balance (DI)
0.00
650.00
34.50
236.25
223.00
99.00
109.75
447.75
811.50
192.50
381.00

Balance (J)
0
417
5
224
164
75
17
39
484
171
174

136.00

29

3321.25

1799

Balance (DI)

Balance (J)

3539.00
1682.50
170.00
578.00
0.00
1394.75
1357.50
0.00
1.00
6.00
2877.00
11.00
0.00
0.00
3668.25

559
95
59
248
0
638
591
0
1
12
638
7
0
0
844

2503.00

233

17788.00

3925

77.50

Prevous (DI)
226.00
66.00
4480.50
3352.00
3054.75
453.00
0.00
300.00
484.00
2859.50
3168.75
619.00
971.00
1060.00
516.00

Previous (J)
118
44
852
299
446
117
0
85
67
153
684
265
144
165
47

Today (DI)
8.00
19.00
40.00

7.50

70.00

42

47

Today (J)
8
14
4

6.00

59.00
70.50
294.25
459.50
62.75
467.00
500.00
0.00
25.50
2.23
549.00
3.00
45.75
94.00
2016.00

20
0
159
194
87
240
283
0
49
7
312
18
47
63
706

3156.75

429

7805.23

2614

Balance (DI)
38.00
88.50
827.50
1746.50
201.50
137.00
0.00
127.00
18.00
125.00
1228.25
350.00
635.25
99.00
0.00

Balance (J)
16
53
398
239
61
53
0
106
7
123
441
155
115
9
0

2413.00

259

60.00

460.25

112

24023.50

3745

133.00

33

6081.75

1888

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
37
2
14
0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

256

Soot Blower Steam (SB CS)

152
1042

19
372

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
0

Balance
8
10
22
82
26
2

18

15

348

0
16

133

Prevous (DI)
38036.75
17865.50
24156.50

18 Juni 2016
Remarks

654

Previous (J)
9473
3972
3778

Today (DI)
144.50
104.00
66.00

Today (J)
79
18
30

Balance (DI)
3176.75
7701.23
6015.75

Balance (J)
1720
2596
1858

765.00

463.00

2.25

202.75

248

80823.75

17686.00

316.75

132.00

17096.48

6422

Prevous (DI)
432.00
7966.25
973.00
1497.50
1256.50
2351.25
3462.25
6454.75
6579.25
1008.50
1277.50

Previous (J)
247
1,436
119
688
630
796
682
1,382
2,011
322
450

4778.00

710

38036.75

9473

Prevous (DI)

Previous (J)

Today (DI)

Today (J)

12.00

11

18.50
55.00
32.00
9.00
9.00
9.00

24
9
14
12
3
6

144.50

Today (DI)

79

Today (J)

Balance (DI)
0.00
638.00
34.50
236.25
223.00
80.50
54.75
415.75
802.50
183.50
372.00

Balance (J)
0
406
5
224
164
51
8
25
472
168
168

136.00

29

3176.75

1720

Balance (DI)

Balance (J)

3539.00
1682.50
170.00
585.50
0.00
1394.75
1357.50
0.00
1.00
6.00
2947.00
11.00
0.00
0.00
3668.25

559
95
59
253
0
638
591
0
1
12
680
7
0
0
844

2503.00

233

17865.50

3972

104.00

Prevous (DI)
234.00
85.00
4520.50
3352.00
3054.75
453.00
0.00
300.00
484.00
2859.50
3174.75
619.00
971.00
1060.00
516.00

Previous (J)
126
58
856
299
446
117
0
85
67
153
688
265
144
165
47

Today (DI)
38.00

2473.00

262

24156.50

3778

3.00

71.00

12

30.00

5
18

Today (J)
16

20.00

13

8.00

66.00

30

59.00
70.50
294.25
459.50
62.75
464.00
500.00
0.00
25.50
2.23
478.00
3.00
45.75
94.00
1986.00

20
0
159
194
87
239
283
0
49
7
300
18
47
63
701

3156.75

429

7701.23

2596

Balance (DI)
0.00
88.50
807.50
1746.50
201.50
137.00
0.00
127.00
10.00
125.00
1228.25
350.00
635.25
99.00
0.00

Balance (J)
0
53
385
239
61
53
0
106
6
123
441
155
115
9
0

460.25

112

6015.75

1858

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)

Total
46
12
36

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
38
2
14
0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

271

Soot Blower Steam (SB CS)

152
1042

19
388

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

Total (DI)

Total (J)

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING
System test package

Feed Water Tank


Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
3
0
0
0

Balance
8
10
19
82
26
2

18

12

336

0
15

133

Prevous (DI)
38181.25
17969.50
24222.50

Previous (J)
9552
3990
3808
468.00

81140.50

17818.00

Previous (J)
247
1,447
119
688
630
820
691
1,396
2,023
325
456

4778.00

710

38181.25

9552

Prevous (DI)

Remarks

639

767.25

Prevous (DI)
432.00
7978.25
973.00
1497.50
1256.50
2369.75
3517.25
6486.75
6588.25
1017.50
1286.50

19 Juni 2016

Previous (J)

Today (DI)
146.50
17.23
30.75
194.48

Today (DI)

Today (J)
57
22
23
102.00

Today (J)

17.25

8.00
54.75
24.50
30.00

16
8
8
8

12.00

146.50

Today (DI)

57

Today (J)

Balance (DI)
3030.25
7684.00
5985.00

Balance (J)
1663
2574
1835

202.75

248

16902.00

6320

Balance (DI)
0.00
620.75
34.50
236.25
223.00
72.50
0.00
391.25
772.50
183.50
360.00

Balance (J)
0
397
5
224
164
35
0
17
464
168
160

136.00

29

3030.25

1663

Balance (DI)

Balance (J)

3539.00
1682.50
170.00
585.50
0.00
1397.75
1357.50
0.00
1.00
6.00
3018.00
11.00
0.00
0.00
3698.25

559
95
59
253
0
639
591
0
1
12
692
7
0
0
849

2503.00

233

17969.50

3990

17.23

Prevous (DI)
272.00
85.00
4540.50
3352.00
3054.75
453.00
0.00
300.00
492.00
2859.50
3174.75
619.00
971.00
1060.00
516.00

Previous (J)
142
58
869
299
446
117
0
85
68
153
688
265
144
165
47

Today (DI)

2473.00

262

24222.50

3808

2.23
15.00

7
15

22

Today (J)

15.00

15

8.00

4.00
3.75

2
5

30.75

23

59.00
70.50
294.25
459.50
62.75
464.00
500.00
0.00
25.50
0.00
463.00
3.00
45.75
94.00
1986.00

20
0
159
194
87
239
283
0
49
0
285
18
47
63
701

3156.75

429

7684.00

2574

Balance (DI)
0.00
73.50
807.50
1746.50
193.50
137.00
0.00
127.00
10.00
125.00
1224.25
346.25
635.25
99.00
0.00

Balance (J)
0
38
385
239
60
53
0
106
6
123
439
150
115
9
0

460.25

112

5985.00

1835

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

PERMATA

Elv.83

QTY Machine
1
1
1
1
1
1
1

Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

Remarks

1
1

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Previous
38
2
17
2

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

283

Soot Blower Steam (SB CS)

152
1241

19
405

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
5
1
8
0
0
0

Balance
7
10
14
43
145
82
26
2

18

17

319

0
32

133

Prevous (DI)
38327.75
17986.73
24253.25

Remarks

804

Previous (J)
9609
4012
3831

767.25

468.00

81334.98

17920.00

Prevous (DI)
432.00
7995.50
973.00
1497.50
1256.50
2377.75
3572.00
6511.25
6618.25
1017.50
1298.50

20 Juni 2016

Previous (J)
247
1,456
119
688
630
836
699
1,404
2,031
325
464

4778.00

710

38327.75

9609

Today (DI)
51.25
30.00
31.00
112.25

Today (DI)

Today (J)
62
21
18
101.00

Today (J)

30.25

35

8.00

16

1.00
10.00

1
8

2.00

51.25

62

Balance (DI)
2979.00
7654.00
5954.00

Balance (J)
1601
2553
1817

202.75

248

16789.75

6219

Balance (DI)
0.00
590.50
34.50
236.25
223.00
64.50
0.00
390.25
762.50
183.50
358.00

Balance (J)
0
362
5
224
164
19
0
16
456
168
158

136.00

29

2979.00

1601

Prevous (DI)
3539.00
1682.50
170.00
585.50
0.00
1397.75
1357.50
0.00
1.00
8.23
3033.00
11.00
0.00
0.00
3698.25

Previous (J)
559
95
59
253
0
639
591
0
1
19
707
7
0
0
849

Today (DI)

30.00

2503.00

233

17986.73

4012

30.00

Prevous (DI)
272.00
100.00
4540.50
3352.00
3062.75
453.00
0.00
300.00
492.00
2859.50
3178.75
622.75
971.00
1060.00
516.00

Previous (J)
142
73
869
299
447
117
0
85
68
153
690
270
144
165
47

Today (DI)

2473.00

262

24253.25

3831

Today (J)

21

21

Today (J)

25.00

17

6.00

31.00

18

Balance (DI)
59.00
70.50
294.25
459.50
62.75
464.00
500.00
0.00
25.50
0.00
433.00
3.00
45.75
94.00
1986.00

Balance (J)
20
0
159
194
87
239
283
0
49
0
264
18
47
63
701

3156.75

429

7654.00

2553

Balance (DI)
0.00
48.50
807.50
1740.50
193.50
137.00
0.00
127.00
10.00
125.00
1224.25
346.25
635.25
99.00
0.00

Balance (J)
0
21
385
238
60
53
0
106
6
123
439
150
115
9
0

460.25

112

5954.00

1817

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
39
2
22
3
8
0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

300

Soot Blower Steam (SB CS)

152
1241

19
437

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
6
0
6
0
0
0

Balance
7
10
8
43
139
82
26
2

18

42

277

0
54

133

Prevous (DI)
38379.00
18016.73
24284.25

21 Juni 2016
Remarks

750

Previous (J)
9671
4033
3849

Today (DI)
58.50
78.50
35.00

767.25

468.00

36.00

74

166.75

174

81447.23

18021.00

208.00

166.00

16581.75

6053

Prevous (DI)
432.00
8025.75
973.00
1497.50
1256.50
2385.75
3572.00
6512.25
6628.25
1017.50
1300.50

Previous (J)
247.00
1491.00
119.00
688.00
630.00
852.00
699.00
1405.00
2039.00
325.00
466.00

4778.00

710.00

38379.00

9671

Today (DI)

Today (J)
19
53
20

Today (J)

33.50

11.00

11

6.00
2.00
6.00

1
2
2

58.50

19

Balance (DI)
2920.50
7575.50
5919.00

Balance (DI)
0.00
557.00
34.50
236.25
223.00
53.50
0.00
390.25
756.50
181.50
352.00

Balance (J)
1582
2500
1797

Balance (J)
0
359
5
224
164
8
0
16
455
166
156

136.00

29

2920.50

1582

Prevous (DI)
3539.00
1682.50
170.00
585.50
0.00
1397.75
1357.50
0.00
1.00
8.23
3063.00
11.00
0.00
0.00
3698.25

Previous (J)
559.00
95.00
59.00
253.00
0.00
639.00
591.00
0.00
1.00
19.00
728.00
7.00
0.00
0.00
849.00

Today (DI)

2503.00
18016.73

Today (J)

Balance (DI)
59.00
70.50
294.25
444.50
62.75
434.00
500.00
0.00
25.50
0.00
420.50
3.00
45.75
94.00
1986.00

Balance (J)
20
0
159
189
87
222
283
0
49
0
255
18
47
63
701

15.00

30.00

17

12.50

233.00

21.00

22

3135.75

407

4033

78.50

53

7575.50

2500

Prevous (DI)
272.00
125.00
4540.50
3358.00
3062.75
453.00
0.00
300.00
492.00
2859.50
3178.75
622.75
971.00
1060.00
516.00

Previous (J)
142.00
90.00
869.00
300.00
447.00
117.00
0.00
85.00
68.00
153.00
690.00
270.00
144.00
165.00
47.00

2473.00

262.00

24284.25

3849

Today (DI)
20.00
7.00
8.00

35.00

Today (J)
12
7
1

20

Balance (DI)
0.00
28.50
800.50
1732.50
193.50
137.00
0.00
127.00
10.00
125.00
1224.25
346.25
635.25
99.00
0.00

Balance (J)
0
9
378
237
60
53
0
106
6
123
439
150
115
9
0

460.25

112

5919.00

1797

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
39
2
28
3
14
0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

342

Soot Blower Steam (SB CS)

152
1241

19
491

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
8
1
7
0
0
0

Balance
7
10
0
42
132
82
26
2

18

15

262

0
31

133

Prevous (DI)
38437.50
18095.23
24319.25

22 Juni 2016
Remarks

719

Previous (J)
9690
4086
3869

Today (DI)
168.00
32.50
36.50

Today (J)
106
23
11

Balance (DI)
2752.50
7543.00
5882.50

Balance (J)
1476
2477
1786

803.25

542.00

2.50

164.25

171

81655.23

18187.00

239.50

143.00

16342.25

5910

Prevous (DI)
432.00
8059.25
973.00
1497.50
1256.50
2396.75
3572.00
6512.25
6634.25
1019.50
1306.50

Previous (J)
247.00
1494.00
119.00
688.00
630.00
863.00
699.00
1405.00
2040.00
327.00
468.00

4778.00

710.00

38437.50

9690

Today (DI)

Today (J)

19.25

18

21.00

15

27.50

88.25

66

12.00

168.00

106

Balance (DI)
0.00
537.75
34.50
215.25
223.00
26.00
0.00
390.25
668.25
181.50
340.00

Balance (J)
0
341
5
209
164
4
0
16
389
166
153

136.00

29

2752.50

1476

Prevous (DI)
3539.00
1682.50
170.00
600.50
0.00
1427.75
1357.50
0.00
1.00
8.23
3075.50
11.00
0.00
0.00
3698.25

Previous (J)
559.00
95.00
59.00
258.00
0.00
656.00
591.00
0.00
1.00
19.00
737.00
7.00
0.00
0.00
849.00

2524.00

255.00

18095.23

4086

Prevous (DI)
272.00
145.00
4547.50
3366.00
3062.75
453.00
0.00
300.00
492.00
2859.50
3178.75
622.75
971.00
1060.00
516.00

Previous (J)
142.00
102.00
876.00
301.00
447.00
117.00
0.00
85.00
68.00
153.00
690.00
270.00
144.00
165.00
47.00

2473.00

262.00

24319.25

3869

Today (DI)

Today (J)

21.00
1.50

14
1

10.00

32.50

Today (DI)

23

Today (J)

28.50

8.00

36.50

11

Balance (DI)
59.00
70.50
273.25
443.00
62.75
424.00
500.00
0.00
25.50
0.00
420.50
3.00
45.75
94.00
1986.00

Balance (J)
20
0
145
188
87
214
283
0
49
0
255
18
47
63
701

3135.75

407

7543.00

2477

Balance (DI)
0.00
0.00
800.50
1732.50
193.50
137.00
0.00
119.00
10.00
125.00
1224.25
346.25
635.25
99.00
0.00

Balance (J)
0
0
378
237
60
53
0
104
6
123
439
150
115
9
0

460.25

112

5882.50

1786

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
39
2
36
4
21
0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

357

Soot Blower Steam (SB CS)

152
1241

19
522

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
0
0
0

Balance
7
10
0
42
132
82
26
2

18

253

0
9

133

Prevous (DI)
38605.50
18127.73
24355.75

23 Juni 2016
Remarks

710

Previous (J)
9796
4109
3880

Today (DI)
106.75
47.50
87.50

805.75

545.00

68.00

60

96.25

111

81894.73

18330.00

309.75

185.00

16032.50

5725

Prevous (DI)
432.00
8078.50
973.00
1518.50
1256.50
2424.25
3572.00
6512.25
6722.50
1019.50
1318.50

Previous (J)
247.00
1512.00
119.00
703.00
630.00
867.00
699.00
1405.00
2106.00
327.00
471.00

4778.00

710.00

38605.50

9796

Today (DI)

Today (J)
75
17
33

Today (J)

21.00

24

10.00
26.00

11
4

31.00
6.75
12.00

24
9
3

106.75

75

Balance (DI)
2645.75
7495.50
5795.00

Balance (DI)
0.00
516.75
34.50
215.25
213.00
0.00
0.00
390.25
637.25
174.75
328.00

Balance (J)
1401
2460
1753

Balance (J)
0
317
5
209
153
0
0
16
365
157
150

136.00

29

2645.75

1401

Prevous (DI)
3539.00
1682.50
191.00
602.00
0.00
1437.75
1357.50
0.00
1.00
8.23
3075.50
11.00
0.00
0.00
3698.25

Previous (J)
559.00
95.00
73.00
259.00
0.00
664.00
591.00
0.00
1.00
19.00
737.00
7.00
0.00
0.00
849.00

2524.00

255.00

18127.73

4109

Today (DI)

Today (J)

1.50
36.00

1
8

6.00

2.00

2.00

47.50

Prevous (DI)
272.00
173.50
4547.50
3366.00
3062.75
453.00
0.00
308.00
492.00
2859.50
3178.75
622.75
971.00
1060.00
516.00

Previous (J)
142.00
111.00
876.00
301.00
447.00
117.00
0.00
87.00
68.00
153.00
690.00
270.00
144.00
165.00
47.00

Today (DI)

2473.00
24355.75

17

Today (J)

Balance (DI)
59.00
70.50
271.75
407.00
62.75
418.00
500.00
0.00
25.50
0.00
418.50
3.00
45.75
94.00
1984.00

Balance (J)
20
0
144
180
87
212
283
0
49
0
253
18
47
63
697

3135.75

407

7495.50

2460

Balance (DI)
0.00
0.00
788.50
1720.50
193.50
137.00
0.00
119.00
6.00
125.00
1180.75
346.25
635.25
99.00
0.00

Balance (J)
0
0
369
231
60
53
0
104
4
123
431
150
115
9
0

12.00
12.00

9
6

4.00

43.50

262.00

16.00

444.25

104

3880

87.50

33

5795.00

1753

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
39
2
36
4
21
0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

366

Soot Blower Steam (SB CS)

152
1241

19
531

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
1
0
0
0
0

Balance
7
10
0
41
132
82
26
2

18

16

237

0
17

133

Prevous (DI)
38712.25
18175.23
24443.25

24 Juni 2016
Remarks

693

Previous (J)
9871
4126
3913

Today (DI)
125.00
126.50
32.50

873.75

605.00

30.50

28

65.75

83

82204.48

18515.00

314.50

221.00

15718.00

5504

Prevous (DI)
432.00
8099.50
973.00
1518.50
1266.50
2450.25
3572.00
6512.25
6753.50
1026.25
1330.50

Previous (J)
247.00
1536.00
119.00
703.00
641.00
871.00
699.00
1405.00
2130.00
336.00
474.00

4778.00

710.00

38712.25

9871

Today (DI)

Today (J)
95
77
21

Today (J)

76.00

34

16.00
33.00

10
51

125.00

95

Balance (DI)
2520.75
7369.00
5762.50

Balance (DI)
0.00
440.75
34.50
215.25
213.00
0.00
0.00
390.25
621.25
141.75
328.00

Balance (J)
1306
2383
1732

Balance (J)
0
283
5
209
153
0
0
16
355
106
150

136.00

29

2520.75

1306

Prevous (DI)
3539.00
1682.50
192.50
638.00
0.00
1443.75
1357.50
0.00
1.00
8.23
3077.50
11.00
0.00
0.00
3700.25

Previous (J)
559.00
95.00
74.00
267.00
0.00
666.00
591.00
0.00
1.00
19.00
739.00
7.00
0.00
0.00
853.00

Today (DI)

2524.00
18175.23

Today (J)

Balance (DI)
59.00
70.50
256.75
385.00
62.75
388.50
482.00
0.00
25.50
0.00
400.50
3.00
45.75
94.00
1984.00

Balance (J)
20
0
140
174
87
190
274
0
49
0
239
18
47
63
697

15.00
22.00

4
6

29.50
18.00

22
9

18.00

14

255.00

24.00

22

3111.75

385

4126

126.50

77

7369.00

2383

Prevous (DI)
272.00
173.50
4559.50
3378.00
3062.75
453.00
0.00
308.00
496.00
2859.50
3222.25
622.75
971.00
1060.00
516.00

Previous (J)
142.00
111.00
885.00
307.00
447.00
117.00
0.00
87.00
70.00
153.00
698.00
270.00
144.00
165.00
47.00

2489.00

270.00

24443.25

3913

Today (DI)

Today (J)

12.00
12.00
4.50

8
3
6

4.00

32.50

21

Balance (DI)
0.00
0.00
776.50
1708.50
189.00
137.00
0.00
119.00
6.00
125.00
1176.75
346.25
635.25
99.00
0.00

Balance (J)
0
0
361
228
54
53
0
104
4
123
427
150
115
9
0

444.25

104

5762.50

1732

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
39
2
36
5
21
0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

382

Soot Blower Steam (SB CS)

152
1241

19
548

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
0
0
0

Balance
6
10
0
41
132
82
26
2

18

11

226

0
12

133

Prevous (DI)
38837.25
18301.73
24475.75

25 Juni 2016
Remarks

681

Previous (J)
9966
4203
3934

Today (DI)
48.50
105.00
34.00

904.25

633.00

14.00

51.75

76

82518.98

18736.00

201.50

120.00

15516.50

5384

Prevous (DI)
432.00
8175.50
973.00
1518.50
1266.50
2450.25
3572.00
6512.25
6769.50
1059.25
1330.50

Previous (J)
247.00
1570.00
119.00
703.00
641.00
871.00
699.00
1405.00
2140.00
387.00
474.00

4778.00

710.00

38837.25

9966

Today (DI)

Today (J)
45
55
13

Today (J)

1.00

6.00

21.25
0.75
19.50

16
1
23

48.50

45

Balance (DI)
2472.25
7264.00
5728.50

Balance (DI)
0.00
439.75
34.50
215.25
207.00
0.00
0.00
390.25
600.00
141.00
308.50

Balance (J)
1261
2328
1719

Balance (J)
0
282
5
209
149
0
0
16
339
105
127

136.00

29

2472.25

1261

Prevous (DI)
3539.00
1682.50
207.50
660.00
0.00
1473.25
1375.50
0.00
1.00
8.23
3095.50
11.00
0.00
0.00
3700.25

Previous (J)
559.00
95.00
78.00
273.00
0.00
688.00
600.00
0.00
1.00
19.00
753.00
7.00
0.00
0.00
853.00

Today (DI)

2548.00
18301.73

12.00
45.00

2
16

18.00
21.00

9
21

1.00

4.00

Balance (DI)
59.00
70.50
244.75
340.00
62.75
370.50
461.00
0.00
25.50
0.00
399.50
3.00
45.75
94.00
1980.00

277.00

4.00

3107.75

384

4203

105.00

55

7264.00

2328

Prevous (DI)
272.00
173.50
4571.50
3390.00
3067.25
453.00
0.00
308.00
496.00
2859.50
3226.25
622.75
971.00
1060.00
516.00

Previous (J)
142.00
111.00
893.00
310.00
453.00
117.00
0.00
87.00
70.00
153.00
702.00
270.00
144.00
165.00
47.00

2489.00

270.00

24475.75

3934

Today (DI)

Today (J)

Today (J)

12.00

3.00

7.00
12.00

4
3

34.00

13

Balance (DI)
0.00
0.00
776.50
1696.50
189.00
134.00
0.00
119.00
6.00
118.00
1164.75
346.25
635.25
99.00
0.00

Balance (J)
20
0
138
158
87
181
253
0
49
0
238
18
47
63
692

Balance (J)
0
0
361
225
54
50
0
104
4
119
424
150
115
9
0

444.25

104

5728.50

1719

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
40
2
36
5
21
0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

393

Soot Blower Steam (SB CS)

152
1241

19
560

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
6
0
0
0

Balance
6
10
0
41
126
82
26
2

18

14

212

0
20

133

Prevous (DI)
38885.75
18406.73
24509.75

26 Juni 2016
Remarks

661

Previous (J)
10011
4258
3947

Today (DI)
12.00
96.00
30.00

918.25

640.00

14.00

20

37.75

56

82720.48

18856.00

152.00

99.00

15364.50

5285

Prevous (DI)
432.00
8176.50
973.00
1518.50
1272.50
2450.25
3572.00
6512.25
6790.75
1060.00
1350.00

Previous (J)
247.00
1571.00
119.00
703.00
645.00
871.00
699.00
1405.00
2156.00
388.00
497.00

4778.00

710.00

38885.75

10011

Today (DI)

Today (J)
16
51
12

Today (J)

2.00

9.00

12

1.00

12.00

16

Balance (DI)
2460.25
7168.00
5698.50

Balance (DI)
0.00
439.75
34.50
213.25
207.00
0.00
0.00
390.25
591.00
141.00
307.50

Balance (J)
1245
2277
1707

Balance (J)
0
282
5
207
149
0
0
16
327
105
125

136.00

29

2460.25

1245

Prevous (DI)
3539.00
1682.50
219.50
705.00
0.00
1491.25
1396.50
0.00
1.00
8.23
3096.50
11.00
0.00
0.00
3704.25

Previous (J)
559.00
95.00
80.00
289.00
0.00
697.00
621.00
0.00
1.00
19.00
754.00
7.00
0.00
0.00
858.00

2552.00

278.00

18406.73

4258

Today (DI)

Today (J)

29.00
28.00
3.00
22.00
4.00

11
7
4
11
8

10.00

10

96.00

Prevous (DI)
272.00
173.50
4571.50
3402.00
3067.25
456.00
0.00
308.00
496.00
2866.50
3238.25
622.75
971.00
1060.00
516.00

Previous (J)
142.00
111.00
893.00
313.00
453.00
120.00
0.00
87.00
70.00
157.00
705.00
270.00
144.00
165.00
47.00

Today (DI)

2489.00
24509.75

51

Today (J)

Balance (DI)
59.00
70.50
215.75
312.00
59.75
348.50
457.00
0.00
25.50
0.00
389.50
3.00
45.75
94.00
1980.00

Balance (J)
20
0
127
151
83
170
245
0
49
0
228
18
47
63
692

3107.75

384

7168.00

2277

Balance (DI)
0.00
0.00
776.50
1692.50
189.00
134.00
0.00
119.00
6.00
108.00
1152.75
346.25
635.25
99.00
0.00

Balance (J)
0
0
361
224
54
50
0
104
4
118
418
150
115
9
0

4.00

10.00
12.00

1
6

270.00

4.00

440.25

100

3947

30.00

12

5698.50

1707

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
40
2
36
5
27
0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

407

Soot Blower Steam (SB CS)

152
1241

19
580

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
2
0
0
0
0

Balance
5
10
0
39
126
82
26
2

18

10

202

0
13

133

Prevous (DI)
38897.75
18502.73
24539.75

27 Juni 2016
Remarks

648

Previous (J)
10027
4309
3959

Today (DI)
39.00
110.50
38.00

Today (J)
45
54
31

Balance (DI)
2421.25
7057.50
5660.50

Balance (J)
1200
2223
1676

932.25

660.00

3.00

34.75

53.00

82872.48

18955.00

190.50

133.00

15174.00

5152

Prevous (DI)
432.00
8176.50
973.00
1520.50
1272.50
2450.25
3572.00
6512.25
6799.75
1060.00
1351.00

Previous (J)
247.00
1571.00
119.00
705.00
645.00
871.00
699.00
1405.00
2168.00
388.00
499.00

4778.00

710.00

38897.75

10027

Today (DI)

12.00
9.00
18.00

39.00

Today (J)

3
12
30

45

Balance (DI)
0.00
439.75
34.50
213.25
207.00
0.00
0.00
378.25
582.00
123.00
307.50

Balance (J)
0
282
5
207
149
0
0
13
315
75
125

136.00

29

2421.25

1200

Prevous (DI)
3539.00
1682.50
248.50
733.00
3.00
1513.25
1400.50
0.00
1.00
8.23
3106.50
11.00
0.00
0.00
3704.25

Previous (J)
559.00
95.00
91.00
296.00
4.00
708.00
629.00
0.00
1.00
19.00
764.00
7.00
0.00
0.00
858.00

2552.00

278.00

18502.73

4309

Prevous (DI)
272.00
173.50
4571.50
3406.00
3067.25
456.00
0.00
308.00
496.00
2876.50
3250.25
622.75
971.00
1060.00
516.00

Previous (J)
142.00
111.00
893.00
314.00
453.00
120.00
0.00
87.00
70.00
158.00
711.00
270.00
144.00
165.00
47.00

2493.00

274.00

24539.75

3959

Today (DI)

12.00
25.00
1.50
34.00
38.00

110.50

Today (DI)

Today (J)

7
9
2
17
19

54

Today (J)

12.00

12

12.00
14.00

8
11

38.00

31

Balance (DI)
59.00
70.50
203.75
287.00
58.25
314.50
419.00
0.00
25.50
0.00
389.50
3.00
45.75
94.00
1980.00

Balance (J)
20
0
120
142
81
153
226
0
49
0
228
18
47
63
692

3107.75

384

7057.50

2223

Balance (DI)
0.00
0.00
764.50
1692.50
189.00
134.00
0.00
119.00
6.00
96.00
1138.75
346.25
635.25
99.00
0.00

Balance (J)
0
0
349
224
54
50
0
104
4
110
407
150
115
9
0

440.25

100

5660.50

1676

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
41
2
36
7
27
0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

417

Soot Blower Steam (SB CS)

152
1241

19
593

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
3
0
0
0

Balance
5
10
0
39
123
82
26
2

18

195

0
10

133

Prevous (DI)
38936.75
18613.23
24577.75

28 Juni 2016
Remarks

638

Previous (J)
10072
4363
3990

Today (DI)
33.50
80.00
115.00

935.25

663.00

14.00

20.75

44.00

83062.98

19088.00

242.50

122.00

14931.50

5030

Prevous (DI)
432.00
8176.50
973.00
1520.50
1272.50
2450.25
3572.00
6524.25
6808.75
1078.00
1351.00

Previous (J)
247.00
1571.00
119.00
705.00
645.00
871.00
699.00
1408.00
2180.00
418.00
499.00

4778.00

710.00

38936.75

10072

Today (DI)

Today (J)
28
43
42

Today (J)

2.25

18.75
12.50

13
12

33.50

28

Balance (DI)
2387.75
6977.50
5545.50

Balance (DI)
0.00
437.50
34.50
213.25
207.00
0.00
0.00
378.25
563.25
110.50
307.50

Balance (J)
1172
2180
1634

Balance (J)
0
279
5
207
149
0
0
13
302
63
125

136.00

29

2387.75

1172

Prevous (DI)
3539.00
1682.50
260.50
758.00
4.50
1547.25
1438.50
0.00
1.00
8.23
3106.50
11.00
0.00
0.00
3704.25

Previous (J)
559.00
95.00
98.00
305.00
6.00
725.00
648.00
0.00
1.00
19.00
764.00
7.00
0.00
0.00
858.00

2552.00

278.00

18613.23

4363

Prevous (DI)
272.00
173.50
4583.50
3406.00
3067.25
456.00
0.00
308.00
496.00
2888.50
3264.25
622.75
971.00
1060.00
516.00

Previous (J)
142.00
111.00
905.00
314.00
453.00
120.00
0.00
87.00
70.00
166.00
722.00
270.00
144.00
165.00
47.00

2493.00

274.00

24577.75

3990

Today (DI)

Today (J)

18.00
16.00
3.00

9
7
4

43.00

23

80.00

Today (DI)

43

Today (J)

10.00

10

11.00

11

38.00

17

56.00

115.00

42

Balance (DI)
59.00
70.50
185.75
271.00
55.25
314.50
376.00
0.00
25.50
0.00
389.50
3.00
45.75
94.00
1980.00

Balance (J)
20
0
111
135
77
153
203
0
49
0
228
18
47
63
692

3107.75

384

6977.50

2180

Balance (DI)
0.00
0.00
764.50
1682.50
189.00
134.00
0.00
108.00
6.00
96.00
1100.75
346.25
579.25
99.00
0.00

Balance (J)
0
0
349
214
54
50
0
93
4
110
390
150
111
9
0

440.25

100

5545.50

1634

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
41
2
36
7
30
0
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

424

Soot Blower Steam (SB CS)

152
1241

19
603

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
6
12
0
0

Balance
4
10
0
39
117
70
26
2

18

10

185

0
29

133

Prevous (DI)
38970.25
18693.23
24692.75

29 Juni 2016
Remarks

609

Previous (J)
10100
4406
4032

Today (DI)
50.50
75.00
86.00

949.25

672.00

4.50

16.25

40.00

83305.48

19210.00

216.00

121.00

14715.50

4909

Prevous (DI)
432.00
8178.75
973.00
1520.50
1272.50
2450.25
3572.00
6524.25
6827.50
1090.50
1351.00

Previous (J)
247.00
1574.00
119.00
705.00
645.00
871.00
699.00
1408.00
2193.00
430.00
499.00

4778.00

710.00

38970.25

10100

Today (DI)

Today (J)
44
33
40

Today (J)

2.00

3.00
31.50

2
32

14.00

50.50

44

Balance (DI)
2337.25
6902.50
5459.50

Balance (DI)
0.00
435.50
34.50
213.25
207.00
0.00
0.00
375.25
531.75
110.50
293.50

Balance (J)
1128
2147
1594

Balance (J)
0
278
5
207
149
0
0
11
270
63
116

136.00

29

2337.25

1128

Prevous (DI)
3539.00
1682.50
278.50
774.00
7.50
1547.25
1481.50
0.00
1.00
8.23
3106.50
11.00
0.00
0.00
3704.25

Previous (J)
559.00
95.00
107.00
312.00
10.00
725.00
671.00
0.00
1.00
19.00
764.00
7.00
0.00
0.00
858.00

2552.00

278.00

18693.23

4406

Prevous (DI)
272.00
173.50
4583.50
3416.00
3067.25
456.00
0.00
319.00
496.00
2888.50
3302.25
622.75
1027.00
1060.00
516.00

Previous (J)
142.00
111.00
905.00
324.00
453.00
120.00
0.00
98.00
70.00
166.00
739.00
270.00
148.00
165.00
47.00

2493.00

274.00

24692.75

4032

Today (DI)

Today (J)

12.00
11.00
15.00

5
9
2

25.00

11

12.00

75.00

Today (DI)

33

Today (J)

12.00
16.00

12
4

24.00

24.00
10.00

16
2

86.00

40

Balance (DI)
59.00
70.50
173.75
260.00
40.25
314.50
351.00
0.00
25.50
0.00
377.50
3.00
45.75
94.00
1980.00

Balance (J)
20
0
106
126
75
153
192
0
49
0
222
18
47
63
692

3107.75

384

6902.50

2147

Balance (DI)
0.00
0.00
752.50
1666.50
189.00
134.00
0.00
84.00
6.00
96.00
1076.75
336.25
579.25
99.00
0.00

Balance (J)
0
0
337
210
54
50
0
87
4
110
374
148
111
9
0

440.25

100

5459.50

1594

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION

Date:

System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Today
1
0
0
1
0

82
38
33

Previous
42
2
36
7
36
12
12
31

0
0
0

Balance
3
10
0
38
117
70
26
2

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)
Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

18

Soot Blower Steam (BB CS)

619

434

178

Soot Blower Steam (SB CS)

152
1241

19

133

632

0
9

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

total

System

Prevous (DI)
39020.75
18768.23
24778.75

30 Juni 2016
Remarks

600

Previous (J)
10144
4439
4072

Today (DI)
48.00
134.00
43.00

Today (J)
52
82
25

Balance (DI)
2289.25
6768.50
5416.50

Balance (J)
1076
2065
1569

953.75

676.00

16.25

40

0.00

0.00

83521.48

19331.00

241.25

199.00

14474.25

4710

nce (J)
076
065
569

00

710

Remarks

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
43
2
36
8
36
12
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

441

Soot Blower Steam (SB CS)

152
1241

19
641

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
0
0
0

Balance
2
10
0
38
117
70
26
2

18

15

163

0
16

133

Prevous (DI)
39068.75
18902.23
24821.75

01 Juli 2016
Remarks

584

Previous (J)
10196
4521
4097

Today (DI)
24.00
49.00
21.00

Today (J)
17
33
10

970.00

716.00

83762.73

19530.00

94.00

60.00

Prevous (DI)
432.00
8180.75
973.00
1520.50
1288.50
2450.25
3572.00
6533.25
6873.00
1102.50
1365.00

Previous (J)
247.00
1575.00
119.00
705.00
657.00
871.00
699.00
1416.00
2239.00
450.00
508.00

Today (DI)

Today (J)

4778.00

710.00

39068.75

10196

4.00

8.00
6.00

8
6

6.00

24.00

17

Balance (DI)
2265.25
6719.50
5395.50

Balance (J)
1059
2032
1559

0.00

0.00

14380.25

4650

Balance (DI)
0.00
431.50
34.50
205.25
185.00
0.00
0.00
369.25
511.75
98.50
293.50

Balance (J)
0
277
5
199
131
0
0
5
254
43
116

136.00

29

2265.25

1059

Prevous (DI)
3539.00
1682.50
310.50
813.00
42.50
1547.25
1556.50
0.00
1.00
8.23
3134.50
11.00
0.00
0.00
3704.25

Previous (J)
559.00
95.00
121.00
332.00
38.00
725.00
702.00
0.00
1.00
19.00
786.00
7.00
0.00
0.00
858.00

2552.00

278.00

18902.23

4521

Prevous (DI)
272.00
173.50
4595.50
3448.00
3067.25
456.00
0.00
350.00
496.00
2888.50
3346.25
632.75
1027.00
1060.00
516.00

Previous (J)
142.00
111.00
917.00
334.00
453.00
120.00
0.00
111.00
70.00
166.00
767.00
272.00
148.00
165.00
47.00

2493.00

274.00

24821.75

4097

Today (DI)

Today (J)

6.00
16.00
7.50

3
4
10

4.00

15.50

12

49.00

Today (DI)

33

Today (J)

14.00

7.00

21.00

10

Balance (DI)
59.00
70.50
147.75
216.00
12.75
314.50
301.00
0.00
25.50
0.00
357.50
3.00
45.75
94.00
1964.50

Balance (J)
20
0
94
111
39
153
172
0
49
0
202
18
47
63
680

3107.75

384

6719.50

2032

Balance (DI)
0.00
0.00
738.50
1650.50
189.00
134.00
0.00
77.00
6.00
96.00
1049.75
336.25
579.25
99.00
0.00

Balance (J)
0
0
331
204
54
50
0
80
4
110
358
148
111
9
0

440.25

100

5395.50

1559

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
44
2
36
8
36
12
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

456

Soot Blower Steam (SB CS)

152
1241

19
657

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
0
0
0

Balance
2
10
0
38
117
70
26
2

18

161

0
2

133

Prevous (DI)
39092.75
18951.23
24842.75

02 Juli 2016
Remarks

582

Previous (J)
10213
4554
4107

970.00

716.00

83856.73

19590.00

Prevous (DI)
432.00
8184.75
973.00
1528.50
1294.50
2450.25
3572.00
6533.25
6879.00
1102.50
1365.00

Previous (J)
247.00
1576.00
119.00
713.00
663.00
871.00
699.00
1416.00
2241.00
450.00
508.00

4778.00

710.00

39092.75

10213

Today (DI)
15.50
53.75
67.00
136.25

Today (DI)

Today (J)
11
53
24
88.00

Today (J)

4.00

1.50
10.00

1
8

15.50

11

Balance (DI)
2249.75
6665.75
5328.50

Balance (J)
1048
1979
1535

0.00

0.00

14244.00

4562

Balance (DI)
0.00
431.50
34.50
205.25
181.00
0.00
0.00
367.75
501.75
98.50
293.50

Balance (J)
0
277
5
199
129
0
0
4
246
43
116

136.00

29

2249.75

1048

Prevous (DI)
3539.00
1682.50
316.50
829.00
50.00
1547.25
1556.50
0.00
1.00
8.23
3138.50
11.00
0.00
0.00
3719.75

Previous (J)
559.00
95.00
124.00
336.00
48.00
725.00
702.00
0.00
1.00
19.00
790.00
7.00
0.00
0.00
870.00

Today (DI)

20.00
12.00
12.75
1.00

6
3
39
1

2552.00

278.00

8.00

3099.75

380

18951.23

4554

53.75

53

6665.75

1979

Prevous (DI)
272.00
173.50
4609.50
3448.00
3067.25
456.00
0.00
350.00
496.00
2888.50
3353.25
632.75
1027.00
1060.00
516.00

Previous (J)
142.00
111.00
923.00
334.00
453.00
120.00
0.00
111.00
70.00
166.00
771.00
272.00
148.00
165.00
47.00

2493.00

274.00

24842.75

4107

Today (DI)

Today (J)

Today (J)

22.00
8.00

8
3

18.00
10.00
9.00

8
2
3

67.00

24

Balance (DI)
59.00
70.50
127.75
204.00
0.00
313.50
301.00
0.00
25.50
0.00
357.50
3.00
45.75
94.00
1964.50

Balance (DI)
0.00
0.00
716.50
1642.50
189.00
134.00
0.00
77.00
6.00
96.00
1031.75
326.25
570.25
99.00
0.00

Balance (J)
20
0
88
108
0
152
172
0
49
0
202
18
47
63
680

Balance (J)
0
0
323
201
54
50
0
80
4
110
350
146
108
9
0

440.25

100

5328.50

1535

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
44
2
36
8
36
12
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

458

Soot Blower Steam (SB CS)

152
1241

19
659

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
0
0
0

Balance
1
10
0
38
117
70
26
2

18

161

0
1

133

Prevous (DI)
39108.25
19004.98
24909.75

03 Juli 2016
Remarks

581

Previous (J)
10224
4607
4131

Today (DI)
36.00
17.50
30.00

Today (J)
37
8
21

970.00

716.00

83992.98

19678.00

83.50

66.00

Prevous (DI)
432.00
8184.75
973.00
1528.50
1298.50
2450.25
3572.00
6534.75
6889.00
1102.50
1365.00

Previous (J)
247.00
1576.00
119.00
713.00
665.00
871.00
699.00
1417.00
2249.00
450.00
508.00

Today (DI)

Today (J)

4778.00

710.00

39108.25

10224

11.00
25.00

36.00

14
23

37

Balance (DI)
2213.75
6648.25
5298.50

Balance (J)
1011
1971
1514

0.00

0.00

14160.50

4496

Balance (DI)
0.00
431.50
34.50
205.25
181.00
0.00
0.00
356.75
476.75
98.50
293.50

Balance (J)
0
277
5
199
129
0
0
-10
223
43
116

136.00

29

2213.75

1011

Prevous (DI)
3539.00
1682.50
336.50
841.00
62.75
1548.25
1556.50
0.00
1.00
8.23
3138.50
11.00
0.00
0.00
3719.75

Previous (J)
559.00
95.00
130.00
339.00
87.00
726.00
702.00
0.00
1.00
19.00
790.00
7.00
0.00
0.00
870.00

2560.00

282.00

19004.98

4607

Prevous (DI)
272.00
173.50
4631.50
3456.00
3067.25
456.00
0.00
350.00
496.00
2888.50
3371.25
642.75
1036.00
1060.00
516.00

Previous (J)
142.00
111.00
931.00
337.00
453.00
120.00
0.00
111.00
70.00
166.00
779.00
274.00
151.00
165.00
47.00

2493.00

274.00

24909.75

4131

Today (DI)

8.00
9.50

17.50

Today (DI)

Today (J)

2
6

Today (J)

21.00
5.00

14
5

4.00

30.00

21

Balance (DI)
59.00
70.50
119.75
194.50
0.00
313.50
301.00
0.00
25.50
0.00
357.50
3.00
45.75
94.00
1964.50

Balance (J)
20
0
86
102
0
152
172
0
49
0
202
18
47
63
680

3099.75

380

6648.25

1971

Balance (DI)
0.00
0.00
695.50
1637.50
189.00
134.00
0.00
77.00
6.00
96.00
1031.75
326.25
566.25
99.00
0.00

Balance (J)
0
0
309
196
54
50
0
80
4
110
350
146
106
9
0

440.25

100

5298.50

1514

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
45
2
36
8
36
12
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

458

Soot Blower Steam (SB CS)

152
1241

19
660

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
0
0
0

Balance
0
10
0
38
117
70
26
2

18

161

0
1

133

Prevous (DI)
39144.25
19022.48
24939.75

04 Juli 2016
Remarks

580

Previous (J)
10261
4615
4152

Today (DI)
0.00
39.50
12.00

Today (J)
0
18
3

970.00

716.00

84076.48

19744.00

51.50

21.00

Prevous (DI)
432.00
8184.75
973.00
1528.50
1298.50
2450.25
3572.00
6545.75
6914.00
1102.50
1365.00

Previous (J)
247.00
1576.00
119.00
713.00
665.00
871.00
699.00
1431.00
2272.00
450.00
508.00

Today (DI)

Today (J)

4778.00

710.00

39144.25

10261

0.00

Balance (DI)
2213.75
6608.75
5286.50

Balance (J)
1011
1953
1511

0.00

0.00

14109.00

4475

Balance (DI)
0.00
431.50
34.50
205.25
181.00
0.00
0.00
356.75
476.75
98.50
293.50

Balance (J)
0
277
5
199
129
0
0
-10
223
43
116

136.00

29

2213.75

1011

Prevous (DI)
3539.00
1682.50
344.50
850.50
62.75
1548.25
1556.50
0.00
1.00
8.23
3138.50
11.00
0.00
0.00
3719.75

Previous (J)
559.00
95.00
132.00
345.00
87.00
726.00
702.00
0.00
1.00
19.00
790.00
7.00
0.00
0.00
870.00

Today (DI)

16.00
16.00

4
4

2560.00

282.00

7.50

10

3092.25

370

19022.48

4615

39.50

18

6608.75

1953

Prevous (DI)
272.00
173.50
4652.50
3461.00
3067.25
456.00
0.00
350.00
496.00
2888.50
3371.25
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
342.00
453.00
120.00
0.00
111.00
70.00
166.00
779.00
274.00
153.00
165.00
47.00

2493.00

274.00

24939.75

4152

Today (DI)

12.00

12.00

Today (J)

Today (J)

Balance (DI)
59.00
70.50
103.75
178.50
0.00
313.50
301.00
0.00
25.50
0.00
357.50
3.00
45.75
94.00
1964.50

Balance (DI)
0.00
0.00
695.50
1637.50
189.00
134.00
0.00
77.00
6.00
84.00
1031.75
326.25
566.25
99.00
0.00

Balance (J)
20
0
82
98
0
152
172
0
49
0
202
18
47
63
680

Balance (J)
0
0
309
196
54
50
0
80
4
107
350
146
106
9
0

440.25

100

5286.50

1511

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
45
2
36
8
36
12
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

458

Soot Blower Steam (SB CS)

152
1241

19
660

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
0
0
0
0
0

Balance
1
10
0
38
117
70
26
2

18

161

0
0

133

Prevous (DI)
39144.25
19022.48
24939.75

09 Juli 2016
Remarks

581

Previous (J)
10261
4615
4152

Today (DI)
78.00
0.00
0.00

Today (J)
22
0
0

970.00

716.00

84076.48

19744.00

78.00

22.00

Prevous (DI)
432.00
8184.75
973.00
1528.50
1298.50
2450.25
3572.00
6545.75
6914.00
1102.50
1365.00

Previous (J)
247.00
1576.00
119.00
713.00
665.00
871.00
699.00
1431.00
2272.00
450.00
508.00

Today (DI)

Today (J)

4778.00

710.00

39144.25

10261

78.00

78.00

22

22

Balance (DI)
2135.75
6648.25
5298.50

Balance (J)
989
1971
1514

0.00

0.00

14082.50

4474

Balance (DI)
0.00
431.50
34.50
127.25
181.00
0.00
0.00
356.75
476.75
98.50
293.50

Balance (J)
0
277
5
177
129
0
0
-10
223
43
116

136.00

29

2135.75

989

Prevous (DI)
3539.00
1682.50
344.50
850.50
62.75
1548.25
1556.50
0.00
1.00
8.23
3138.50
11.00
0.00
0.00
3719.75

Previous (J)
559.00
95.00
132.00
345.00
87.00
726.00
702.00
0.00
1.00
19.00
790.00
7.00
0.00
0.00
870.00

2560.00

282.00

19022.48

4615

Prevous (DI)
272.00
173.50
4652.50
3461.00
3067.25
456.00
0.00
350.00
496.00
2888.50
3371.25
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
342.00
453.00
120.00
0.00
111.00
70.00
166.00
779.00
274.00
153.00
165.00
47.00

2493.00

274.00

24939.75

4152

Today (DI)

0.00

Today (DI)

0.00

Today (J)

Today (J)

Balance (DI)
59.00
70.50
119.75
194.50
0.00
313.50
301.00
0.00
25.50
0.00
357.50
3.00
45.75
94.00
1964.50

Balance (J)
20
0
86
102
0
152
172
0
49
0
202
18
47
63
680

3099.75

380

6648.25

1971

Balance (DI)
0.00
0.00
695.50
1637.50
189.00
134.00
0.00
77.00
6.00
96.00
1031.75
326.25
566.25
99.00
0.00

Balance (J)
0
0
309
196
54
50
0
80
4
110
350
146
106
9
0

440.25

100

5298.50

1514

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
45
2
36
8
36
12
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

458

Soot Blower Steam (SB CS)

152
1241

19
660

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
1
0
0
0
0
12
0
0

Balance
0
10
0
38
117
58
26
2

18

158

0
16

133

Prevous (DI)
39144.25
19022.48
24939.75

10 Juli 2016
Remarks

565

Previous (J)
10261
4615
4152

Today (DI)
56.00
0.00
0.00

Today (J)
28
0
0

970.00

716.00

84076.48

19744.00

56.00

28.00

Prevous (DI)
432.00
8184.75
973.00
1528.50
1298.50
2450.25
3572.00
6545.75
6914.00
1102.50
1365.00

Previous (J)
247.00
1576.00
119.00
713.00
665.00
871.00
699.00
1431.00
2272.00
450.00
508.00

Today (DI)

Today (J)

4778.00

710.00

39144.25

10261

56.00

56.00

28

28

Balance (DI)
2157.75
6648.25
5298.50

Balance (J)
983
1971
1514

0.00

0.00

14104.50

4468

Balance (DI)
0.00
375.50
34.50
205.25
181.00
0.00
0.00
356.75
476.75
98.50
293.50

Balance (J)
0
249
5
199
129
0
0
-10
223
43
116

136.00

29

2157.75

983

Prevous (DI)
3539.00
1682.50
344.50
850.50
62.75
1548.25
1556.50
0.00
1.00
8.23
3138.50
11.00
0.00
0.00
3719.75

Previous (J)
559.00
95.00
132.00
345.00
87.00
726.00
702.00
0.00
1.00
19.00
790.00
7.00
0.00
0.00
870.00

2560.00

282.00

19022.48

4615

Prevous (DI)
272.00
173.50
4652.50
3461.00
3067.25
456.00
0.00
350.00
496.00
2888.50
3371.25
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
342.00
453.00
120.00
0.00
111.00
70.00
166.00
779.00
274.00
153.00
165.00
47.00

2493.00

274.00

24939.75

4152

Today (DI)

0.00

Today (DI)

0.00

Today (J)

Today (J)

Balance (DI)
59.00
70.50
119.75
194.50
0.00
313.50
301.00
0.00
25.50
0.00
357.50
3.00
45.75
94.00
1964.50

Balance (J)
20
0
86
102
0
152
172
0
49
0
202
18
47
63
680

3099.75

380

6648.25

1971

Balance (DI)
0.00
0.00
695.50
1637.50
189.00
134.00
0.00
77.00
6.00
96.00
1031.75
326.25
566.25
99.00
0.00

Balance (J)
0
0
309
196
54
50
0
80
4
110
350
146
106
9
0

440.25

100

5298.50

1514

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
2
36
8
36
24
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

461

Soot Blower Steam (SB CS)

152
1241

19
676

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
1
0
0
0
0

Balance
0
10
0
37
117
58
26
2

18

155

0
4

133

Prevous (DI)
39200.25
19022.48
24939.75

11 Juli 2016
Remarks

561

Previous (J)
10289
4615
4152

Today (DI)
90.00
0.00
0.00

Today (J)
45
0
0

970.00

716.00

84132.48

19772.00

90.00

45.00

Prevous (DI)
432.00
8240.75
973.00
1528.50
1298.50
2450.25
3572.00
6545.75
6914.00
1102.50
1365.00

Previous (J)
247.00
1604.00
119.00
713.00
665.00
871.00
699.00
1431.00
2272.00
450.00
508.00

Today (DI)

Today (J)

4778.00

710.00

39200.25

10289

90.00

90.00

45

45

Balance (DI)
2067.75
6648.25
5298.50

Balance (J)
938
1971
1514

0.00

0.00

14014.50

4423

Balance (DI)
0.00
285.50
34.50
205.25
181.00
0.00
0.00
356.75
476.75
98.50
293.50

Balance (J)
0
204
5
199
129
0
0
-10
223
43
116

136.00

29

2067.75

938

Prevous (DI)
3539.00
1682.50
344.50
850.50
62.75
1548.25
1556.50
0.00
1.00
8.23
3138.50
11.00
0.00
0.00
3719.75

Previous (J)
559.00
95.00
132.00
345.00
87.00
726.00
702.00
0.00
1.00
19.00
790.00
7.00
0.00
0.00
870.00

2560.00

282.00

19022.48

4615

Prevous (DI)
272.00
173.50
4652.50
3461.00
3067.25
456.00
0.00
350.00
496.00
2888.50
3371.25
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
342.00
453.00
120.00
0.00
111.00
70.00
166.00
779.00
274.00
153.00
165.00
47.00

2493.00

274.00

24939.75

4152

Today (DI)

0.00

Today (DI)

0.00

Today (J)

Today (J)

Balance (DI)
59.00
70.50
119.75
194.50
0.00
313.50
301.00
0.00
25.50
0.00
357.50
3.00
45.75
94.00
1964.50

Balance (J)
20
0
86
102
0
152
172
0
49
0
202
18
47
63
680

3099.75

380

6648.25

1971

Balance (DI)
0.00
0.00
695.50
1637.50
189.00
134.00
0.00
77.00
6.00
96.00
1031.75
326.25
566.25
99.00
0.00

Balance (J)
0
0
309
196
54
50
0
80
4
110
350
146
106
9
0

440.25

100

5298.50

1514

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
2
36
9
36
24
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

464

Soot Blower Steam (SB CS)

152
1241

19
680

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
2
0
9
0
0

Balance
0
10
0
35
117
49
26
2

18

16

139

0
27

133

Prevous (DI)
39290.25
19022.48
24939.75

12 Juli 2016
Remarks

534

Previous (J)
10334
4615
4152

970.00

716.00

84222.48

19817.00

Prevous (DI)
432.00
8330.75
973.00
1528.50
1298.50
2450.25
3572.00
6545.75
6914.00
1102.50
1365.00

Previous (J)
247.00
1649.00
119.00
713.00
665.00
871.00
699.00
1431.00
2272.00
450.00
508.00

4778.00

710.00

39290.25

10334

Today (DI)
23.50
70.00
31.75
125.25

Today (DI)

Today (J)
21
36
33
90.00

Today (J)

10.00

7.50

6.00

23.50

21

Balance (DI)
2044.25
6578.25
5266.75

Balance (J)
917
1935
1481

0.00

0.00

13889.25

4333

Balance (DI)
0.00
275.50
34.50
197.75
181.00
0.00
0.00
356.75
470.75
98.50
293.50

Balance (J)
0
197
5
190
129
0
0
-10
218
43
116

136.00

29

2044.25

917

Prevous (DI)
3539.00
1682.50
344.50
850.50
62.75
1548.25
1556.50
0.00
1.00
8.23
3138.50
11.00
0.00
0.00
3719.75

Previous (J)
559.00
95.00
132.00
345.00
87.00
726.00
702.00
0.00
1.00
19.00
790.00
7.00
0.00
0.00
870.00

2560.00

282.00

19022.48

4615

Today (DI)

48.00
22.00

70.00

Prevous (DI)
272.00
173.50
4652.50
3461.00
3067.25
456.00
0.00
350.00
496.00
2888.50
3371.25
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
342.00
453.00
120.00
0.00
111.00
70.00
166.00
779.00
274.00
153.00
165.00
47.00

Today (DI)

2493.00
24939.75

Today (J)

30
6

36

Today (J)

Balance (DI)
59.00
70.50
71.75
172.50
0.00
313.50
301.00
0.00
25.50
0.00
357.50
3.00
45.75
94.00
1964.50

Balance (J)
20
0
56
96
0
152
172
0
49
0
202
18
47
63
680

3099.75

380

6578.25

1935

Balance (DI)
0.00
0.00
695.50
1628.50
189.00
134.00
0.00
64.00
6.00
96.00
1031.75
326.25
566.25
99.00
0.00

Balance (J)
0
0
309
189
54
50
0
67
4
110
350
146
106
9
0

9.00

13.00

13

274.00

9.75

13

430.50

87

4152

31.75

33

5266.75

1481

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
2
36
11
36
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

480

Soot Blower Steam (SB CS)

152
1241

19
707

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
2
0
0
0
0

Balance
0
10
0
33
117
49
26
2

18

20

119

0
22

133

Prevous (DI)
39313.75
19092.48
24971.50

13 Juli 2016
Remarks

512

Previous (J)
10355
4651
4185

970.00

716.00

84347.73

19907.00

Prevous (DI)
432.00
8340.75
973.00
1536.00
1298.50
2450.25
3572.00
6545.75
6920.00
1102.50
1365.00

Previous (J)
247.00
1656.00
119.00
722.00
665.00
871.00
699.00
1431.00
2277.00
450.00
508.00

4778.00

710.00

39313.75

10355

Today (DI)
45.00
75.00
12.00
132.00

Today (DI)

Today (J)
22
48
8
78.00

Today (J)

25.00

20.00

15

45.00

22

Balance (DI)
1999.25
6503.25
5254.75

Balance (J)
895
1887
1473

0.00

0.00

13757.25

4255

Balance (DI)
0.00
250.50
34.50
197.75
181.00
0.00
0.00
356.75
450.75
98.50
293.50

Balance (J)
0
190
5
190
129
0
0
-10
203
43
116

136.00

29

1999.25

895

Prevous (DI)
3539.00
1682.50
392.50
872.50
62.75
1548.25
1556.50
0.00
1.00
8.23
3138.50
11.00
0.00
0.00
3719.75

Previous (J)
559.00
95.00
162.00
351.00
87.00
726.00
702.00
0.00
1.00
19.00
790.00
7.00
0.00
0.00
870.00

Today (DI)

35.00
25.00

20
8

2560.00

282.00

15.00

20

3084.75

360

19092.48

4651

75.00

48

6503.25

1887

Prevous (DI)
272.00
173.50
4652.50
3470.00
3067.25
456.00
0.00
363.00
496.00
2888.50
3371.25
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
349.00
453.00
120.00
0.00
124.00
70.00
166.00
779.00
274.00
153.00
165.00
47.00

2502.75

287.00

24971.50

4185

Today (DI)

Today (J)

Today (J)

10.00

2.00

12.00

Balance (DI)
59.00
70.50
36.75
147.50
0.00
313.50
301.00
0.00
25.50
0.00
357.50
3.00
45.75
94.00
1964.50

Balance (DI)
0.00
0.00
695.50
1618.50
189.00
134.00
0.00
62.00
6.00
96.00
1031.75
326.25
566.25
99.00
0.00

Balance (J)
20
0
36
88
0
152
172
0
49
0
202
18
47
63
680

Balance (J)
0
0
309
183
54
50
0
65
4
110
350
146
106
9
0

430.50

87

5254.75

1473

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
2
36
13
36
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

500

Soot Blower Steam (SB CS)

152
1241

19
729

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
1
10
0
0
0

Balance
0
10
0
32
107
49
26
2

18

13

106

0
24

133

Prevous (DI)
39358.75
19167.48
24983.50

14 Juli 2016
Remarks

488

Previous (J)
10377
4699
4193

970.00

716.00

84479.73

19985.00

Prevous (DI)
432.00
8365.75
973.00
1536.00
1298.50
2450.25
3572.00
6545.75
6940.00
1102.50
1365.00

Previous (J)
247.00
1663.00
119.00
722.00
665.00
871.00
699.00
1431.00
2292.00
450.00
508.00

4778.00

710.00

39358.75

10377

Today (DI)
41.00
65.00
82.00
188.00

Today (DI)

Today (J)
19
54
15
88.00

Today (J)

15.00

11

1.00
13.00

1
5

12.00

41.00

19

Balance (DI)
1958.25
6438.25
5172.75

Balance (J)
876
1833
1458

0.00

0.00

13569.25

4167

Balance (DI)
0.00
235.50
34.50
197.75
181.00
0.00
0.00
355.75
437.75
98.50
281.50

Balance (J)
0
179
5
190
129
0
0
-11
198
43
114

136.00

29

1958.25

876

Prevous (DI)
3539.00
1682.50
427.50
897.50
62.75
1548.25
1556.50
0.00
1.00
8.23
3138.50
11.00
0.00
0.00
3719.75

Previous (J)
559.00
95.00
182.00
359.00
87.00
726.00
702.00
0.00
1.00
19.00
790.00
7.00
0.00
0.00
870.00

Today (DI)

37.00
23.00

23
21

2575.00

302.00

5.00

10

3079.75

350

19167.48

4699

65.00

54

6438.25

1833

Prevous (DI)
272.00
173.50
4652.50
3480.00
3067.25
456.00
0.00
365.00
496.00
2888.50
3371.25
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
355.00
453.00
120.00
0.00
126.00
70.00
166.00
779.00
274.00
153.00
165.00
47.00

Today (DI)

2502.75
24983.50

Today (J)

Today (J)

Balance (DI)
59.00
70.50
-0.25
124.50
0.00
313.50
301.00
0.00
25.50
0.00
357.50
3.00
45.75
94.00
1964.50

Balance (DI)
0.00
0.00
695.50
1612.50
189.00
134.00
0.00
62.00
0.00
96.00
981.75
326.25
566.25
99.00
0.00

Balance (J)
20
0
13
67
0
152
172
0
49
0
202
18
47
63
680

Balance (J)
0
0
309
178
54
50
0
65
0
110
345
146
106
9
0

6.00

6.00

50.00

287.00

20.00

410.50

86

4193

82.00

15

5172.75

1458

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
2
36
14
46
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

513

Soot Blower Steam (SB CS)

152
1241

19
753

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
1
0
0
0
0

Balance
0
10
0
31
107
49
26
2

18

31

75

0
32

133

Prevous (DI)
39399.75
19232.48
25065.50

15 Juli 2016
Remarks

456

Previous (J)
10396
4753
4208

970.00

716.00

84667.73

20073.00

Prevous (DI)
432.00
8380.75
973.00
1536.00
1298.50
2450.25
3572.00
6546.75
6953.00
1102.50
1377.00

Previous (J)
247.00
1674.00
119.00
722.00
665.00
871.00
699.00
1432.00
2297.00
450.00
510.00

4778.00

710.00

39399.75

10396

Today (DI)
39.00
60.50
36.50
136.00

Today (DI)

Today (J)
15
27
18
60.00

Today (J)

11.00

4.00
24.00

11

39.00

15

Balance (DI)
1919.25
6377.75
5136.25

Balance (J)
861
1806
1440

0.00

0.00

13433.25

4107

Balance (DI)
0.00
224.50
34.50
197.75
181.00
0.00
0.00
351.75
413.75
98.50
281.50

Balance (J)
0
175
5
190
129
0
0
-11
187
43
114

136.00

29

1919.25

861

Prevous (DI)
3539.00
1682.50
464.50
920.50
62.75
1548.25
1556.50
0.00
1.00
8.23
3138.50
11.00
0.00
0.00
3719.75

Previous (J)
559.00
95.00
205.00
380.00
87.00
726.00
702.00
0.00
1.00
19.00
790.00
7.00
0.00
0.00
870.00

Today (DI)

2580.00
19232.48

4.00

12.00

10.50

12

Balance (DI)
59.00
70.50
-0.25
120.50
0.00
301.50
301.00
0.00
25.50
0.00
357.50
3.00
45.75
94.00
1954.00

312.00

34.00

3045.75

343

4753

60.50

27

6377.75

1806

Prevous (DI)
272.00
173.50
4652.50
3486.00
3067.25
456.00
0.00
365.00
502.00
2888.50
3421.25
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
360.00
453.00
120.00
0.00
126.00
74.00
166.00
784.00
274.00
153.00
165.00
47.00

Today (DI)

2522.75
25065.50

Today (J)

Today (J)

Balance (DI)
0.00
0.00
695.50
1606.50
189.00
134.00
0.00
62.00
0.00
96.00
971.25
326.25
566.25
99.00
0.00

Balance (J)
20
0
13
65
0
146
172
0
49
0
202
18
47
63
668

Balance (J)
0
0
309
173
54
50
0
65
0
110
333
146
106
9
0

6.00

10.50

12

288.00

20.00

390.50

85

4208

36.50

18

5136.25

1440

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
2
36
15
46
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

544

Soot Blower Steam (SB CS)

152
1241

19
785

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
2
4
0
0
0

Balance
0
10
0
29
103
49
26
2

18

47

28

0
53

133

Prevous (DI)
39438.75
19292.98
25102.00

16 Juli 2016
Remarks

403

Previous (J)
10411
4780
4226

970.00

716.00

84803.73

20133.00

Prevous (DI)
432.00
8391.75
973.00
1536.00
1298.50
2450.25
3572.00
6550.75
6977.00
1102.50
1377.00

Previous (J)
247.00
1678.00
119.00
722.00
665.00
871.00
699.00
1432.00
2308.00
450.00
510.00

4778.00

710.00

39438.75

10411

Today (DI)
15.00
114.00
59.00
188.00

Today (DI)

15.00

15.00

Today (J)
16
98
45
159.00

Today (J)

16

16

Balance (DI)
1904.25
6263.75
5077.25

Balance (J)
845
1708
1395

0.00

0.00

13245.25

3948

Balance (DI)
0.00
224.50
34.50
197.75
181.00
0.00
0.00
351.75
398.75
98.50
281.50

Balance (J)
0
175
5
190
129
0
0
-11
171
43
114

136.00

29

1904.25

845

Prevous (DI)
3539.00
1682.50
464.50
924.50
62.75
1560.25
1556.50
0.00
1.00
8.23
3138.50
11.00
0.00
0.00
3730.25

Previous (J)
559.00
95.00
205.00
382.00
87.00
732.00
702.00
0.00
1.00
19.00
790.00
7.00
0.00
0.00
882.00

Today (DI)

2614.00
19292.98

4.00

9.00
20.00

4
10

16.00

14

5.00

10.00

10

Balance (DI)
59.00
70.50
-0.25
116.50
0.00
292.50
281.00
0.00
25.50
0.00
341.50
3.00
40.75
94.00
1944.00

319.00

50.00

48

2995.75

295

4780

114.00

98

6263.75

1708

Prevous (DI)
272.00
173.50
4652.50
3492.00
3067.25
456.00
0.00
365.00
502.00
2888.50
3431.75
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
365.00
453.00
120.00
0.00
126.00
74.00
166.00
796.00
274.00
153.00
165.00
47.00

Today (DI)

2542.75
25102.00

Today (J)

Today (J)

Balance (DI)
0.00
0.00
695.50
1597.50
189.00
134.00
0.00
41.00
0.00
96.00
958.25
326.25
566.25
99.00
0.00

Balance (J)
20
0
13
61
0
142
162
0
49
0
188
18
39
63
658

Balance (J)
0
0
309
167
54
50
0
44
0
110
325
146
106
9
0

9.00

21.00

21

13.00

289.00

16.00

10

374.50

75

4226

59.00

45

5077.25

1395

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
2
36
17
50
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

591

Soot Blower Steam (SB CS)

152
1241

19
838

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
1
0
0
0
0

Balance
0
10
0
28
103
49
26
2

18

25

0
26

133

Prevous (DI)
39453.75
19406.98
25161.00

17 Juli 2016
Remarks

377

Previous (J)
10427
4878
4271

970.00

716.00

84991.73

20292.00

Prevous (DI)
432.00
8391.75
973.00
1536.00
1298.50
2450.25
3572.00
6550.75
6992.00
1102.50
1377.00

Previous (J)
247.00
1678.00
119.00
722.00
665.00
871.00
699.00
1432.00
2324.00
450.00
510.00

4778.00

710.00

39453.75

10427

Today (DI)
9.00
123.00
27.00
159.00

Today (DI)

1.00
8.00

9.00

Today (J)
7
77
24
108.00

Today (J)

Balance (DI)
1895.25
6140.75
5050.25

Balance (J)
838
1631
1371

0.00

0.00

13086.25

3840

Balance (DI)
0.00
224.50
34.50
197.75
181.00
0.00
0.00
350.75
390.75
98.50
281.50

Balance (J)
0
175
5
190
129
0
0
-11
164
43
114

136.00

29

1895.25

838

Prevous (DI)
3539.00
1682.50
464.50
928.50
62.75
1569.25
1576.50
0.00
1.00
8.23
3154.50
11.00
5.00
0.00
3740.25

Previous (J)
559.00
95.00
205.00
386.00
87.00
736.00
712.00
0.00
1.00
19.00
804.00
7.00
8.00
0.00
892.00

Today (DI)

2664.00
19406.98

Today (J)

Balance (DI)
59.00
70.50
-0.25
116.50
0.00
224.50
259.00
0.00
25.50
0.00
338.00
3.00
34.75
94.00
1944.00

Balance (J)
20
0
9
61
0
109
151
0
49
0
185
18
33
63
658

68.00
22.00

33
11

3.50

6.00

367.00

23.50

20

2972.25

275

4878

123.00

77

6140.75

1631

Prevous (DI)
272.00
173.50
4652.50
3501.00
3067.25
456.00
0.00
386.00
502.00
2888.50
3444.75
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
371.00
453.00
120.00
0.00
147.00
74.00
166.00
804.00
274.00
153.00
165.00
47.00

2558.75

299.00

25161.00

4271

Today (DI)

Today (J)

9.00

18.00

15

27.00

24

Balance (DI)
0.00
0.00
695.50
1597.50
189.00
134.00
0.00
32.00
0.00
96.00
940.25
326.25
566.25
99.00
0.00

Balance (J)
0
0
309
167
54
50
0
35
0
110
310
146
106
9
0

374.50

75

5050.25

1371

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
2
36
18
50
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

616

Soot Blower Steam (SB CS)

152
1241

19
864

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
1
0
0
0
0

Balance
0
10
0
27
103
49
26
2

18

0
4

133

Prevous (DI)
39462.75
19529.98
25188.00

18 Juli 2016
Remarks

373

Previous (J)
10434
4955
4295

970.00

716.00

85150.73

20400.00

Prevous (DI)
432.00
8391.75
973.00
1536.00
1298.50
2450.25
3572.00
6551.75
7000.00
1102.50
1377.00

Previous (J)
247.00
1678.00
119.00
722.00
665.00
871.00
699.00
1432.00
2331.00
450.00
510.00

4778.00

710.00

39462.75

10434

Today (DI)
50.75
74.25
37.00
162.00

Today (DI)

Today (J)
27
45
21
93.00

Today (J)

11.75

18

19.00

20.00

50.75

27

Balance (DI)
1844.50
6066.50
5013.25

Balance (J)
811
1586
1350

0.00

0.00

12924.25

3747

Balance (DI)
0.00
212.75
34.50
197.75
181.00
0.00
0.00
350.75
371.75
98.50
261.50

Balance (J)
0
157
5
190
129
0
0
-11
160
43
109

136.00

29

1844.50

811

Prevous (DI)
3539.00
1682.50
464.50
928.50
62.75
1637.25
1598.50
0.00
1.00
8.23
3158.00
11.00
11.00
0.00
3740.25

Previous (J)
559.00
95.00
209.00
386.00
87.00
769.00
723.00
0.00
1.00
19.00
807.00
7.00
14.00
0.00
892.00

Today (DI)
4.00

2687.50
19529.98

Today (J)
2

Balance (DI)
55.00
70.50
-0.25
113.50
0.00
182.50
239.50
0.00
25.50
0.00
336.00
3.00
34.75
94.00
1944.00

Balance (J)
18
0
9
59
0
88
138
0
49
0
183
18
33
63
658

3.00

42.00
19.50

21
13

2.00

387.00

3.75

2968.50

270

4955

74.25

45

6066.50

1586

Prevous (DI)
272.00
173.50
4652.50
3501.00
3067.25
456.00
0.00
395.00
502.00
2888.50
3462.75
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
371.00
453.00
120.00
0.00
156.00
74.00
166.00
819.00
274.00
153.00
165.00
47.00

2558.75

299.00

25188.00

4295

Today (DI)

Today (J)

5.00

16.00

16

16.00

37.00

21

Balance (DI)
0.00
0.00
695.50
1592.50
189.00
134.00
0.00
16.00
0.00
96.00
924.25
326.25
566.25
99.00
0.00

Balance (J)
0
0
309
163
54
50
0
19
0
110
309
146
106
9
0

374.50

75

5013.25

1350

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
2
36
19
50
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

619

Soot Blower Steam (SB CS)

152
1241

19
868

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
1
0
0
0
0

Balance
0
10
0
26
103
49
26
2

18

32
33

101

Prevous (DI)
39513.50
19604.23
25225.00

19 Juli 2016
Remarks

340

Previous (J)
10461
5000
4316

Today (DI)
31.00
103.25
47.00

970.00

716.00

85312.73

20493.00

Prevous (DI)
432.00
8403.50
973.00
1536.00
1298.50
2450.25
3572.00
6551.75
7019.00
1102.50
1397.00

Previous (J)
247.00
1696.00
119.00
722.00
665.00
871.00
699.00
1432.00
2335.00
450.00
515.00

Today (DI)

4778.00
39513.50

181.25

Today (J)
11
61
15
87.00

Today (J)

Balance (DI)
1813.50
5963.25
4966.25

Balance (J)
800
1525
1335

0.00

0.00

12743.00

3660

Balance (DI)
0.00
197.75
34.50
197.75
181.00
0.00
0.00
350.75
371.75
86.50
261.50

Balance (J)
0
152
5
190
129
0
0
-11
160
41
109

15.00

12.00

710.00

4.00

132.00

25

10461

31.00

11

1813.50

800

Prevous (DI)
3543.00
1682.50
464.50
931.50
62.75
1679.25
1618.00
0.00
1.00
8.23
3160.00
11.00
11.00
0.00
3740.25

Previous (J)
561.00
95.00
209.00
388.00
87.00
790.00
736.00
0.00
1.00
19.00
809.00
7.00
14.00
0.00
892.00

Today (DI)

2691.25
19604.23

Today (J)

Balance (DI)
55.00
70.50
-0.25
113.50
0.00
182.50
167.50
0.00
25.50
0.00
313.00
3.00
32.75
94.00
1944.00

Balance (J)
18
0
9
59
0
88
102
0
49
0
169
18
31
63
658

72.00

36

23.00

14

2.00

392.00

6.25

2962.25

261

5000

103.25

61

5963.25

1525

Prevous (DI)
272.00
173.50
4652.50
3506.00
3067.25
456.00
0.00
411.00
502.00
2888.50
3478.75
642.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
375.00
453.00
120.00
0.00
172.00
74.00
166.00
820.00
274.00
153.00
165.00
47.00

2558.75

299.00

25225.00

4316

Today (DI)

Today (J)

11.00

11

32.00
4.00

2
2

47.00

15

Balance (DI)
0.00
0.00
695.50
1592.50
189.00
134.00
0.00
5.00
0.00
96.00
892.25
322.25
566.25
99.00
0.00

Balance (J)
0
0
309
163
54
50
0
8
0
110
307
144
106
9
0

374.50

75

4966.25

1335

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
2
36
20
50
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

619

Soot Blower Steam (SB CS)

152
1241

51
901

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
6
0
1
6
0
0
0

Balance
0
4
0
25
97
49
26
2

18

30
43

71

Prevous (DI)
39544.50
19707.48
25272.00

20 Juli 2016
Remarks

297

Previous (J)
10472
5061
4331

970.00

716.00

85493.98

20580.00

Prevous (DI)
432.00
8418.50
973.00
1536.00
1298.50
2450.25
3572.00
6551.75
7019.00
1114.50
1397.00

Previous (J)
247.00
1701.00
119.00
722.00
665.00
871.00
699.00
1432.00
2335.00
452.00
515.00

4782.00

714.00

39544.50

10472

Today (DI)
21.00
86.50
31.00
138.50

Today (DI)

21.00

21.00

Today (J)
21
52
30
103.00

Today (J)

21

21

Balance (DI)
1792.50
5876.75
4935.25

Balance (J)
779
1473
1305

0.00

0.00

12604.50

3557

Balance (DI)
0.00
197.75
34.50
197.75
181.00
0.00
0.00
350.75
350.75
86.50
261.50

Balance (J)
0
152
5
190
129
0
0
-11
139
41
109

132.00

25

1792.50

779

Prevous (DI)
3543.00
1682.50
464.50
931.50
62.75
1679.25
1690.00
0.00
1.00
8.23
3183.00
11.00
13.00
0.00
3740.25

Previous (J)
561.00
95.00
209.00
388.00
87.00
790.00
772.00
0.00
1.00
19.00
823.00
7.00
16.00
0.00
892.00

2697.50

401.00

19707.48

5061

Prevous (DI)
272.00
173.50
4652.50
3506.00
3067.25
456.00
0.00
422.00
502.00
2888.50
3510.75
646.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
375.00
453.00
120.00
0.00
183.00
74.00
166.00
822.00
276.00
153.00
165.00
47.00

2558.75

299.00

25272.00

4331

Today (DI)

86.50
86.50

Today (DI)

31.00

31.00

Today (J)

52
52

Today (J)

30

30

Balance (DI)
55.00
70.50
-0.25
113.50
0.00
182.50
167.50
0.00
25.50
0.00
313.00
3.00
32.75
94.00
1857.50

Balance (J)
18
0
9
59
0
88
102
0
49
0
169
18
31
63
606

2962.25

261

5876.75

1473

Balance (DI)
0.00
0.00
695.50
1592.50
189.00
134.00
0.00
5.00
0.00
96.00
861.25
322.25
566.25
99.00
0.00

Balance (J)
0
0
309
163
54
50
0
8
0
110
277
144
106
9
0

374.50

75

4935.25

1305

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
8
36
21
56
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

619

Soot Blower Steam (SB CS)

152
1241

81
944

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
2
0
0
0
0

Balance
0
4
0
23
97
49
26
2

18

34
36

37

Prevous (DI)
39565.50
19793.98
25303.00

21 Juli 2016
Remarks

261

Previous (J)
10493
5113
4361

970.00

716.00

85632.48

20683.00

Prevous (DI)
432.00
8418.50
973.00
1536.00
1298.50
2450.25
3572.00
6551.75
7040.00
1114.50
1397.00

Previous (J)
247.00
1701.00
119.00
722.00
665.00
871.00
699.00
1432.00
2356.00
452.00
515.00

4782.00

714.00

39565.50

10493

Today (DI)
41.50
126.00
16.00
183.50

Today (DI)

Today (J)
32
73
17
122.00

Today (J)

16.00

25.50

27

41.50

32

Balance (DI)
1751.00
5750.75
4919.25

Balance (J)
747
1400
1288

0.00

0.00

12421.00

3435

Balance (DI)
0.00
181.75
34.50
197.75
181.00
0.00
0.00
350.75
325.25
86.50
261.50

Balance (J)
0
147
5
190
129
0
0
-11
112
41
109

132.00

25

1751.00

747

Prevous (DI)
3543.00
1682.50
464.50
931.50
62.75
1679.25
1690.00
0.00
1.00
8.23
3183.00
11.00
13.00
0.00
3826.75

Previous (J)
561.00
95.00
209.00
388.00
87.00
790.00
772.00
0.00
1.00
19.00
823.00
7.00
16.00
0.00
944.00

Today (DI)

2697.50
19793.98

Today (J)

Balance (DI)
55.00
70.50
-0.25
103.00
0.00
124.50
125.50
0.00
25.50
0.00
309.00
3.00
32.75
94.00
1857.50

Balance (J)
18
0
9
52
0
59
81
0
49
0
165
18
31
63
606

10.50

58.00
42.00

29
21

4.00

401.00

11.50

12

2950.75

249

5113

126.00

73

5750.75

1400

Prevous (DI)
272.00
173.50
4652.50
3506.00
3067.25
456.00
0.00
422.00
502.00
2888.50
3541.75
646.75
1040.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
375.00
453.00
120.00
0.00
183.00
74.00
166.00
852.00
276.00
153.00
165.00
47.00

2558.75

299.00

25303.00

4361

Today (DI)

Today (J)

1.00

9.00

10

6.00

16.00

17

Balance (DI)
0.00
0.00
695.50
1592.50
189.00
134.00
0.00
4.00
0.00
96.00
852.25
322.25
560.25
99.00
0.00

Balance (J)
0
0
309
163
54
50
0
7
0
110
267
144
100
9
0

374.50

75

4919.25

1288

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
8
36
23
56
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

619

Soot Blower Steam (SB CS)

152
1241

115
980

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
1
0
0
0
0

Balance
0
4
0
22
97
49
26
2

18

13
14

24

Prevous (DI)
39607.00
19919.98
25319.00

22 Juli 2016
Remarks

247

Previous (J)
10525
5186
4378

970.00

716.00

85815.98

20805.00

Prevous (DI)
432.00
8434.50
973.00
1536.00
1298.50
2450.25
3572.00
6551.75
7065.50
1114.50
1397.00

Previous (J)
247.00
1706.00
119.00
722.00
665.00
871.00
699.00
1432.00
2383.00
452.00
515.00

4782.00

714.00

39607.00

10525

Today (DI)
68.00
86.00
85.00
239.00

Today (DI)

Today (J)
9
45
44
98.00

Today (J)

23.00

30.00
14.00

3
1

1.00

68.00

Balance (DI)
1683.00
5664.75
4834.25

Balance (J)
738
1355
1244

0.00

0.00

12182.00

3337

Balance (DI)
0.00
158.75
34.50
167.75
167.00
0.00
0.00
350.75
324.25
86.50
261.50

Balance (J)
0
143
5
187
128
0
0
-11
111
41
109

132.00

25

1683.00

738

Prevous (DI)
3543.00
1682.50
464.50
942.00
62.75
1737.25
1732.00
0.00
1.00
8.23
3187.00
11.00
13.00
0.00
3826.75

Previous (J)
561.00
95.00
209.00
395.00
87.00
819.00
793.00
0.00
1.00
19.00
827.00
7.00
16.00
0.00
944.00

Today (DI)

2709.00
19919.98

Today (J)

Balance (DI)
55.00
70.50
-0.25
94.00
0.00
104.50
117.50
0.00
25.50
0.00
304.00
3.00
32.75
94.00
1857.50

Balance (J)
18
0
9
49
0
50
77
0
49
0
160
18
31
63
606

9.00

20.00
8.00

9
4

5.00

413.00

44.00

24

2906.75

225

5186

86.00

45

5664.75

1355

Prevous (DI)
272.00
173.50
4652.50
3506.00
3067.25
456.00
0.00
423.00
502.00
2888.50
3550.75
646.75
1046.00
1060.00
516.00

Previous (J)
142.00
111.00
945.00
375.00
453.00
120.00
0.00
184.00
74.00
166.00
862.00
276.00
159.00
165.00
47.00

2558.75

299.00

25319.00

4378

Today (DI)

Today (J)

24.00
26.00

4
26

11.00
16.00
8.00

11
1
2

85.00

44

Balance (DI)
0.00
0.00
671.50
1566.50
189.00
134.00
0.00
4.00
0.00
85.00
836.25
314.25
560.25
99.00
0.00

Balance (J)
0
0
305
137
54
50
0
7
0
99
266
142
100
9
0

374.50

75

4834.25

1244

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
8
36
24
56
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

619

Soot Blower Steam (SB CS)

152
1241

128

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

994

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
1
0
0
0
0

Balance
0
4
0
21
97
49
26
2

18

3
4

21

Prevous (DI)
39675.00
20005.98
25404.00

23 Juli 2016
Remarks

243

Previous (J)
10534
5231
4422

970.00

716.00

86054.98

20903.00

Prevous (DI)
432.00
8457.50
973.00
1566.00
1312.50
2450.25
3572.00
6551.75
7066.50
1114.50
1397.00

Previous (J)
247.00
1710.00
119.00
725.00
666.00
871.00
699.00
1432.00
2384.00
452.00
515.00

4782.00

714.00

39675.00

10534

Today (DI)
29.00
126.00
134.00
289.00

Today (DI)

Today (J)
7
58
60
125.00

Today (J)

4.00

25.00

29.00

Balance (DI)
1654.00
5538.75
4700.25

Balance (J)
731
1297
1184

0.00

0.00

11893.00

3212

Balance (DI)
0.00
154.75
34.50
167.75
167.00
0.00
0.00
350.75
299.25
86.50
261.50

Balance (J)
0
141
5
187
128
0
0
-11
106
41
109

132.00

25

1654.00

731

Prevous (DI)
3543.00
1682.50
464.50
951.00
62.75
1757.25
1740.00
0.00
1.00
8.23
3192.00
11.00
13.00
0.00
3826.75

Previous (J)
561.00
95.00
209.00
398.00
87.00
828.00
797.00
0.00
1.00
19.00
832.00
7.00
16.00
0.00
944.00

Today (DI)

2753.00
20005.98

5.00

18.00
72.00

9
36

3.00

Balance (DI)
55.00
70.50
-0.25
89.00
0.00
86.50
45.50
0.00
25.50
0.00
304.00
3.00
32.75
94.00
1854.50

437.00

28.00

2878.75

219

5231

126.00

58

5538.75

1297

Prevous (DI)
272.00
173.50
4676.50
3532.00
3067.25
456.00
0.00
423.00
502.00
2899.50
3566.75
654.75
1046.00
1060.00
516.00

Previous (J)
142.00
111.00
949.00
401.00
453.00
120.00
0.00
184.00
74.00
177.00
863.00
278.00
159.00
165.00
47.00

Today (DI)

2558.75
25404.00

Today (J)

Today (J)

Balance (DI)
0.00
0.00
635.50
1536.50
189.00
134.00
0.00
0.00
0.00
85.00
821.25
306.25
530.25
99.00
0.00

Balance (J)
18
0
9
44
0
41
41
0
49
0
160
18
31
63
604

Balance (J)
0
0
299
134
54
50
0
0
0
99
258
138
80
9
0

36.00
30.00

6
3

4.00

15.00
8.00
30.00

8
4
20

299.00

11.00

12

363.50

63

4422

134.00

60

4700.25

1184

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
8
36
25
56
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

619

Soot Blower Steam (SB CS)

152
1241

131

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

998

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
0
0
1
0
0
0
0

Balance
0
4
0
20
97
49
26
2

18

8
9

13

Prevous (DI)
39704.00
20131.98
25538.00

24 Juli 2016
Remarks

234

Previous (J)
10541
5289
4482

970.00

716.00

86343.98

21028.00

Prevous (DI)
432.00
8461.50
973.00
1566.00
1312.50
2450.25
3572.00
6551.75
7091.50
1114.50
1397.00

Previous (J)
247.00
1712.00
119.00
725.00
666.00
871.00
699.00
1432.00
2389.00
452.00
515.00

4782.00

714.00

39704.00

10541

Today (DI)
17.00
35.00
179.25
231.25

Today (DI)

Today (J)
5
19
95
119.00

Today (J)

12.00

5.00

17.00

Balance (DI)
1637.00
5503.75
4521.00

Balance (J)
726
1278
1089

0.00

0.00

11661.75

3093

Balance (DI)
0.00
142.75
34.50
167.75
167.00
0.00
0.00
350.75
294.25
86.50
261.50

Balance (J)
0
138
5
187
128
0
0
-11
104
41
109

132.00

25

1637.00

726

Prevous (DI)
3543.00
1682.50
464.50
956.00
62.75
1775.25
1812.00
0.00
1.00
8.23
3192.00
11.00
13.00
0.00
3829.75

Previous (J)
561.00
95.00
209.00
403.00
87.00
837.00
833.00
0.00
1.00
19.00
832.00
7.00
16.00
0.00
946.00

2781.00

443.00

20131.98

5289

Today (DI)

Today (J)

28.00
3.00

14
1

4.00

35.00

Prevous (DI)
272.00
173.50
4712.50
3562.00
3067.25
456.00
0.00
427.00
502.00
2899.50
3581.75
662.75
1076.00
1060.00
516.00

Previous (J)
142.00
111.00
955.00
404.00
453.00
120.00
0.00
191.00
74.00
177.00
871.00
282.00
179.00
165.00
47.00

Today (DI)

2569.75
25538.00

19

Today (J)

Balance (DI)
55.00
70.50
-0.25
89.00
0.00
58.50
42.50
0.00
25.50
0.00
304.00
3.00
28.75
94.00
1854.50

Balance (J)
18
0
9
44
0
27
40
0
49
0
160
18
27
63
604

2878.75

219

5503.75

1278

Balance (DI)
0.00
0.00
611.50
1479.25
189.00
134.00
0.00
0.00
0.00
82.00
800.25
270.25
506.25
99.00
0.00

Balance (J)
0
0
295
99
54
50
0
0
0
98
238
129
68
9
0

24.00
57.25

4
35

3.00
21.00
36.00
24.00

1
20
9
12

311.00

14.00

14

349.50

49

4482

179.25

95

4521.00

1089

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC

RECOVERY BOILER DAILY PROGRESS


WELDING SECTION
System
Main steam up to TIE IN (BB P91)
Main steam up to TIE IN (SB P91)
Drain piping Main Steam(SB P91)
Main steam up to TURBINE (BB P91)
Main steam up to TURBINE (SB P91)

Total
46
12
36
46
153

Sample cooler Piping (SB SS)


Chemical Feed Piping (SB SS)
Silincer Safety Valve (BB P11)

82
38
33

Previous
46
8
36
26
56
33
12
31

Silencer Soot Blower Steam (BB CS)

Drain Pipings (SB CS)

18

Soot Blower Steam (BB CS)

619

619

Soot Blower Steam (SB CS)

152
1241

139
1007

Priority 1
Priority 2
Priority 3

Total (DI)
41358.00
25670.73
30238.25

Total (J)
11272
6586
5666

N/A

970.00

716

total

98236.98

24240.00

System test package


Sealing Water
LP Steam and Condensate
LP Condensate after Pump
Instrument Air
Mill Air
Reserve Water Tank
Cooling Water
MP Steam-1 and Condensate
MP Steam-2 and Condensate
Secondary Condensate
Water Sump

Total (DI)
432.00
8616.25
1007.50
1733.75
1479.50
2450.25
3572.00
6902.50
7390.75
1201.00
1658.50

Total (J)
247
1,853
124
912
794
871
699
1,421
2,495
493
624

Roof and Floor Drain

4914.00

739

total

41358.00

11272

total

System

Priority 1

PROCESS PIPING

Priority 2

PROCESS PIPING

System test package


Feed Water Tank
Make Up Water
Light Fuel Oil to Start Up and CNCG Burner
Medium Fuel Oil
Ignition Gas
Smelt Spout Cooling Water A
Smelt Spout Cooling Water B
Phosphate
Oxygen Scavanger
Ammonia
HP Drains to BDT
Sample Lines
Light Fuel Oil to Stand By CNCG Burner
NaOH
Sealing Air

Total (DI)
3598.00
1753.00
464.25
1045.00
62.75
1861.75
1857.50

Total (J)
579
95
218
447
87
878
874

26.50
8.23
3496.00
14.00
45.75
94.00
5684.25

50
19
992
25
47
63
1,550

FG Coolers

5659.75

662

total

25670.73

6586

System test package


Demin Water
Safety Showers
Firing Liquor
Green Liquor
Heavy BL and Dump Tank
BL Sump Pump
RecBo Sootblower
Weak White Liquor to mini hoods
Vent Gas Condenser
Hot Water
DNCG Foul Condensate A
DNCG Foul Condensate B
CNCG Strip and Foul Condensate
Boiler Wash Water
Dissolving Tank Floor Drain

Total (DI)
272.00
173.50
5348.00
5098.50
3256.25
590.00

Total (J)
142
111
1,254
538
507
170

427.00
502.00
2984.50
4403.00
969.00
1606.25
1159.00
516.00

191
74
276
1,129
420
259
174
47

DNCG to Boiler

2933.25

374

total

30238.25

5666

Priority 3

PROCESS PIPING

Date:
Today
0
4
0
0
0
0
0
0

Balance
0
0
0
20
97
49
26
2

18

8
12

Prevous (DI)
39721.00
20166.98
25717.25

25 Juli 2016
Remarks

222

Previous (J)
10546
5308
4577

970.00

716.00

86575.23

21147.00

Prevous (DI)
432.00
8473.50
973.00
1566.00
1312.50
2450.25
3572.00
6551.75
7096.50
1114.50
1397.00

Previous (J)
247.00
1715.00
119.00
725.00
666.00
871.00
699.00
1432.00
2391.00
452.00
515.00

4782.00

714.00

39721.00

10546

Today (DI)
44.00
56.00
94.00
194.00

Today (DI)

12.00
32.00

44.00

Today (J)
10
27
41
78.00

Today (J)

10

10

Balance (DI)
1593.00
5447.75
4427.00

Balance (J)
716
1251
1048

0.00

0.00

11467.75

3015

Balance (DI)
0.00
142.75
34.50
167.75
167.00
0.00
0.00
338.75
262.25
86.50
261.50

Balance (J)
0
138
5
187
128
0
0
-11
94
41
109

132.00

25

1593.00

716

Prevous (DI)
3543.00
1682.50
464.50
956.00
62.75
1803.25
1815.00
0.00
1.00
8.23
3192.00
11.00
17.00
0.00
3829.75

Previous (J)
561.00
95.00
209.00
403.00
87.00
851.00
834.00
0.00
1.00
19.00
832.00
7.00
20.00
0.00
946.00

Today (DI)

34.00
6.00

17
6

2781.00

443.00

16.00

2862.75

215

20166.98

5308

56.00

27

5447.75

1251

Prevous (DI)
272.00
173.50
4736.50
3619.25
3067.25
456.00
0.00
427.00
502.00
2902.50
3602.75
698.75
1100.00
1060.00
516.00

Previous (J)
142.00
111.00
959.00
439.00
453.00
120.00
0.00
191.00
74.00
178.00
891.00
291.00
191.00
165.00
47.00

Today (DI)

2583.75
25717.25

Today (J)

Today (J)

Balance (DI)
55.00
70.50
-0.25
89.00
0.00
24.50
36.50
0.00
25.50
0.00
304.00
3.00
28.75
94.00
1854.50

Balance (DI)
0.00
0.00
602.50
1479.25
189.00
134.00
0.00
0.00
0.00
78.00
780.25
254.25
506.25
99.00
0.00

Balance (J)
18
0
9
44
0
10
34
0
49
0
160
18
27
63
604

Balance (J)
0
0
288
99
54
50
0
0
0
94
219
123
68
9
0

9.00

4.00
20.00
16.00

4
19
6

325.00

45.00

304.50

44

4577

94.00

41

4427.00

1048

ARRANGEMENT PRE-HEAT MACHINE


SUBCONT

LOCATION

QTY Machine
1
1
1

Elv.83

PERMATA

1
1
1
1
Elv.78

1
1
1
1
1

RUN

Remarks

Elv. 33

Elv.83

1
1
1
1

Elv. 55
Ground floor

Remarks
30

1
1

Remarks

Remarks

TODAY ACTIVITIES
Mat'l

NPS

Qty

P-No. 15E
P-No. 15E

22
22

1
1

P-No. 15E

22

TODAY ACTIVITIES

PLA
REMARKS
PWHT BY QC
PWHT BY QC
PWHT BY QC

PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT INTERCONNECTING
PWHT BY QC
PWHT BY QC
PWHT BY QC

Mat'l

NPS

Date :

April 27, 2016


PLANING TOMORROW

Qty

REMARKS
PWHT BY QC
PWHT BY QC
STANDBY REPAIR

STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
PWHT BY QC
STANDBY REPAIR
STANDBY REPAIR
STANDBY REPAIR
PWHT BY QC
PWHT BY QC
PWHT BY QC