Académique Documents
Professionnel Documents
Culture Documents
Area of Focus
Network Quality Management
and Reliability
Repair & Maintenance Focus
Process Performance
Responsibility
Field Engineers
Head of Division
Head of Division
Equipment Monitoring
Field Engineers/
Managers & Head
of Division
Field Engineers
Head of Division
Key result
Reduction in Breakdowns
Reduction in Breakdowns
Conformance to Safety &
Quality Requirements
Reduction in maintenance
cost
Good health of the
infrastructure & Safe
working conditions
Healthy infrastructure &
bare minimum breakdowns
QUALITY TAT
Example Cable laying TAT
Implementation of Quality & Safety Plan for 19 divisions & EHV
Monitoring of maintenance of Equipments
Identification of worn out equipment
Cable failures dynamics
Cables loaded nearer to rated capacities,
ageing
joint
Overloaded cables
Inputs for cable mtc
1. GIS may play important role in identifying such cables and planning their replacement
/improvement schemes.
2. SCADA provides input for loadings of HT cables. In LT system, overloaded cables are
identified based on
Analysis of repeated fuse blown or repeated cable fault cases,
Equipment health monitoring
Combining information from Single line diagram, consumer tagging and consumer
Consumptions
PARAMETER
DESCRIPTION
Handling of Cable
drums
Trenching
Bending Radius
of Cables
Clearances
Spacing
Cable Laying
REFERENCE/
VALUE
Responsibility
Of Execution
Yes /No
Execution Staff
Yes /No
Execution Staff
Yes /No
Execution Staff
RCP obtained
Yes /No
Execution Staff
As per annexure
Execution Staff
Nos
12XD
15xD
Execution Staff
Execution Staff
Execution Staff
Execution Staff
Execution Staff
Execution Staff
Execution Staff
Yes /No
Execution Staff
15xD
20xD
Timeline for
QA
Inspection
Execution Incharge
Immediate after
receiving cable
from store
When digging
starts
When laying
starts
At the time of
laying (Stage
Inspection)
Equal to
diameter of
higher sized
cable
200 MM
Execution Staff
300 MM
Execution Staff
300 MM
Execution Staff
Yes /No
Execution Staff
Responsibilit
y of QA
Inspection
Execution Incharge
Execution Incharge
Execution Incharge
QA Deptt
QA Deptt
QA Deptt
QA & safety
QA & safety
Execution Staff
QA & safety
QA & safety
QA & safety
QA & safety
From
To
Qty .
Execution Staff
Execution Staff
Execution Staff
QA & safety
QA & safety
QA & safety
From
To
Yes /No
Execution Staff
Execution Staff
Execution Staff
Yes /No
Execution Staff
QA & safety
Yes /No
Execution Staff
QA & safety
Yes /No
Execution Staff
QA & safety
Yes /No
Execution Staff
QA & safety
Yes /No
Execution Staff
QA & safety
At the time of
laying (Stage
Inspection)
QA & safety
QA & safety
QA & safety
PARAMETER
Back filling
Jointing
DESCRIPTION
REFERENCE/
VALUE
Responsibility
Of Execution
Yes /No
Execution Staff
Yes /No
Execution Staff
After Cable
laying
QA & safety
Yes /No
Execution Staff
After Cable
laying
QA & safety
Execution Staff
After Cable
laying
After Cable
laying
After Cable
laying
After Cable
laying
QA & safety
After Cable
laying
After Cable
laying
After Cable
laying
During Cable
laying
During Cable
laying
After Cable
laying
During Cable
laying
During Cable
laying
During Cable
laying
During Cable
laying
QA & safety
Nos
Locations of Joints
Earthing
Testing
Crossings
Execution Staff
Yes /No
Execution Staff
Ohm
Yes /No
Execution Staff
before jointing
Yes /No
Execution Staff
Yes /No
Nos of crossing
Nos
Locations of Crossing
Misc
Execution Staff
Execution Staff
Execution Staff
Yes /No
Execution Staff
Yes /No
Execution Staff
Yes /No
Execution Staff
Yes /No
Execution Staff
Yes /No
Execution Staff
Cable Energised
Yes /No
Execution Staff
Timeline for
QA
Inspection
Responsibilit
y of QA
Inspection
QA & safety
QA & safety
QA & safety
QA & safety
QA & safety
QA & safety
QA & safety
QA & safety
QA & safety
QA & safety
QA & safety
QA & safety
QA & safety
QA & safety
Cable Size
a)
1.1 KV LT Cables
Trench Size
Width (MM)
Depth (MM)
400
875
b)
11 KV Cables
1
2
c)
33 KV Cables
1
2
400
600
1055
1055
400
650
1235
1235
650
1235
650
1545
1200
1235
d)
66 KV Cables
1
2
650
1200
1445
1445